THE FOUR RIVERS RESTORATION PROJECT AND ITS IMPLICATIONS TO THE CHAO PHRAYA RIVER



Similar documents
FOUR RIVERS RESTORATION PROJECT

THE 4 MAJOR RIVERS RESTORATION PROJECT

THE FOUR RIVERS RESTORATION PROJECT

The Four Major Rivers Restoration Project

How To Build A River Restoration Project In North Korea

. Water Resources in Korea.. IWRM Application Cases.. Future Works

How To Manage Water Quality In Korea

Clean Water Services. Ecosystems Services Case Study: Tualatin River, Washington

BANGKOK FLOOD PROTECTION SYSTEM Bangkok Metropolitan Administration (BMA)

Environmental Engineering, University of Seoul, Jennong-dong, Dongdaemun-gu, Seoul, Korea.

Flood Mitigation and Management in Bangkok Metropolitan Area

Dr. Lidija Globevnik Luka Snoj, Neven Verdnik, Peter Muck. Meta Povž

COMMUNITY CERTIFICATIONS

Restoration Planning and Development of a Restoration Bank

Master Plan on Water Resource Management


Optimizing Water Resources Allocation System and Improving Water Resources Supply Capacity

Flood Risk Management

Flood Risk Management

Flooding Fast Facts. flooding), seismic events (tsunami) or large landslides (sometime also called tsunami).

Rhode Island NRCS received approximately $2.4 million in ARRA funds to implement four floodplain easement projects.

CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE

National Disaster Management Institute

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration

Henry Van Offelen Natural Resource Scientist MN Center for Environmental Advocacy

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

National Policy on Water Resources Restoration in Thailand

Chehalis River Basin Flood Damage Reduction Capital Budget Approved by Legislature in June 2013

SUSTAINABLE URBAN DRAINAGE SYSTEMS

COMPREHENSIVE DEVELOPMENT OF THE BRANTAS RIVER BASIN THE REPUBLIC OF INDONESIA

Ecosystem Services in the Greater Houston Region. A case study analysis and recommendations for policy initiatives

Preliminary advances in Climate Risk Management in China Meteorological Administration

Chapter 9. Selected Watershed Initiatives in the Great Basin Region

Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs

Gold Ray Dam Interagency Technical Team Meeting

Urban Waters and River Restoration. Pinja Kasvio, Finnish Environment Institute, SYKE RESTORE North Region Closing Seminar 14.8.

Post-Flood Assessment

River Restoration and Flood Control. Objectives. Pierre Y. Julien

How To Understand The Impacts Of Climate Change On Transboundary River Basins In West Africa

FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May Prepared by. for the by Earth Economics

Hydrologic Engineering Techniques for Regional Water Resources Planning

Lower Raritan Watershed Management Area Stormwater & Flooding Subcommittee Strategy Worksheet LRSW-S3C1

Hydrological and Material Cycle Simulation in Lake Biwa Basin Coupling Models about Land, Lake Flow, and Lake Ecosystem

Pervious Pavers. By: Rich Lahren. Hebron Brick & Block Supply

Integrated Restoration Prioritization

Michigan Wetlands. Department of Environmental Quality

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN

Oregon. Climate Change Adaptation Framework

Water planning in the transition towards a green economy

How To Manage Water Resources In The Yakima Basin

Addendum D. Nomination of Moody Wash ACEC

HCP Team Meeting. November 18, icfi.com

A Developer s Guide: Watershed-Wise Development

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

United States Army Corps of Engineers, Civil Works

Best Practice of Flood Hazard Map in Japan

How To Understand And Understand The Flood Risk Of Hoang Long River In Phuon Vietnam

Appendix J Online Questionnaire

Oklahoma Governor s Water Conference

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

EU China River Basin Management Programme

North American Weather & Climate Extremes: Progress in Monitoring and Research

The Everglades & Northern Estuaries; St. Lucie River Estuary, Indian River Lagoon & Caloosahatchee Estuary. Water Flows & Current Issues

XAYABURI HYDRO POWER PLANT, LAO PDR

STORMWATER POLLUTION PREVENTION PLAN TEMPLATE. 1.0 SITE DESCRIPTION 1.1 Project Name and Location Date

Action Plans of Water Management and Infrastructure Development

4.2 Buena Vista Creek Watershed

Healthy Forests Resilient Water Supply Vibrant Economy. Ecological Restoration Institute

How To Study The Climatic Impact Assessment Of Teesta Barrage Irrigation Project In Bhamphit

Proposed Terms of Reference for EIA studies

Overview and highlights

Responding to the Challenges of Water Security: the VIII Phase of the International Hydrological Programme

Management of Water and Fisheries Resources to Improve Community Livelihoods in Battambang

Lower Crooked Creek Watershed Conservation Plan EXECUTIVE SUMMARY

Wetlands and Climate Change: Considerations for Wetland Program Managers

Project Theory-Climate Change and Traditional Ecological Knowledge Adaption in the Klamath Basin

Swamp Area Passive Treatment System Kettle Creek Watershed, Clinton County, PA

The Muddy River: A Century of Change

Presentation from the 2013 World Water Week in Stockholm

Protecting Floodplain. While Reducing Flood Losses

Experience in Wetlands restoration and conservation concerning natural water retention measures. Ministry of Environment and Water, Bulgaria

How To Plan A Buffer Zone

INDONESIA - LAW ON WATER RESOURCES,

Climate Change Long Term Trends and their Implications for Emergency Management August 2011

River Management 2013 Colorado Flood

The River Ribble is one of the longest rivers in the North West of England

THE GREAT RUAHA RIVER PROFILE

Phosphorus. Phosphorus Lake Whatcom Cooperative Management.

Cheong Gye Cheon Restoration Project

Muddy River Restoration Project Project Description

Adopted 9/23/98 CHATTAHOOCHEE CORRIDOR PLAN. The goals of the Chattahoochee Corridor Plan (hereinafter also referred to as the Plan ) are:

Policy & Management Applications of Blue Carbon. fact SHEET

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

River restoration and Natural Water Retention Measures. but questions and obstacles remain regarding their implementation

The Planning Process. 1 O WOW 1.0 Plan Moving Towards Sustainability

Aquatic Ecosystems Restoration

Estimating Potential Reduction Flood Benefits of Restored Wetlands

Transcription:

KOREA S EXEMPLARY CASE OF FLOOD PREVENTION THE FOUR RIVERS RESTORATION PROJECT AND ITS IMPLICATIONS TO THE CHAO PHRAYA RIVER Office of National River Restoration, Korea MLTM Republic of Korea

CONTENTS 1 BACKGROUND 2 THE FOUR RIVERS RESTORATION PROJECT 3 IMPLICATIONS TO THE CHAO PHRAYA RIVER 2

1. BACKGROUND 3

Major Rivers in South Korea Han River Geum River Nakdong River Yeongsan River

HYDROLOGICAL CHARACTERISTICS IN KOREA 1 Annual averaged precipitation of Korea :1,245mm Similar to the Chao Phraya River (1,179mm) 2 2/3 of Annual rainfall during Flood Season (JUN - SEP) Climate : Korea (Temperate Monsoon) vs. Chao Phraya (Tropical Monsoon) Repeated floods and droughts like Thailand 3 Water Shortage - Not much of Available Water Just 27%(33.7 million m3) is available Total amount of water available per capita in a year is approximately 1/8 less than the world average

CLIMAGE CHANGE, HEAVY STORMS FLOOD DAMAGE Annual flood damage: US$ 2.2 billion Restoration expenditure: US$ 3.5 billion Vicinity of the Nakdong River 6

DROUGHT DAMAGES IN KOREA - The photo & film competition of the natural disaster prevention 7

PROSPECT OF CLIMATE CHANGE IN KOREA Temperature & Precipitation Annual temp. 3.6 & annual average precipitation 14% Annual Average 1971~2000 2061~2090 Increase Temperature 12.5 16.1 3.6 Precipitation 1,230mm 1,398mm 14% Change of the pattern of precipitation 8

FLOOD & DROUGHT DAMAGES (2000-2010) Flood Damages (Typhoon : 2002 Rusa, 2003 Maemi, 2006 Ewinia) Nation(Total) Han Nakdong Geum Yeongsan Others Death 689 167 126 38 26 332 Damage Amount (Billion Baht) 415.4 80.7 108.4 24.7 19.7 181.9 * Total flood damage: 415.4 billion Baht(2000-2010) Drought Damages Year Damages 1994~1995 86 Cities & Counties (173,269 ha) 2001~2002 86 Cities & Counties (304,815 people experienced water supply restriction) 2008~2009 77 Cities & Counties (1,227 Villages experienced water supply restriction) * Severe drought cycle after 1990 : 7 year ( 94 01 08) 9

2. FOUR RIVERS RESTORATION PROJECT 10

REVIVAL OF RIVERS: A NEW KOREA Securing Water Improving water quality Protecting against Floods Promoting Local Economy Restoring the River Ecosystem 11

PROJECT SCOPES & EFFECTS Flood Control Dredging: 0.46 billion ton, Flood Control Retention: 6 Reinforcing old Levees: 620 km lowering Flood Water Level (0.4-4m) Water Security 16 Weirs and two Dams 96 Improving Reservoirs Secure 1.3 billion tons of water Water Quality Improvement Sewage Facilities: 1,281 TP Treatment Facilities : 273 Swimmable water 76% 86% Ecological Restoration Ecological Wetlands: 39 Preserving natural wildlife habitat Fish-way Restoration: 14 sites Improve Natural Ecology & Promote Eco-tourism Waterfront Development Constructing bicycle roads: 1,657km Tourist Attraction Sites : 36 Escalate people s quality of life 12

PROJECT BUDGET & SCHEDULE Composition of Budget Improving Water Quality 3.4 4.4 (unit : billion USD) Dredging Ecological Stream Restoration 2.7 6.1 19.3 1.3 Building weir 5.5 Reinforcing levees & Construction of Dams 2.0 Embanking Agricultural reservoir Project Schedule Primary Projects Completed by 2011 Remaining Projects Will be Completed by 2012 13

1 FLOOD CONTROL DREDGING OF SEDIMENTED RIVERBED & AGRICULTURAL LAND REMODELING Increasing Drainage capacity of the rivers Lowering Flood Level by Dredging (0.46 billion m3) Water Level Decline by Dredging Dredging 14

AGRICULTURAL LAND REMODELING Dredged soils are used for aggregate and improving agricultural lands Dredged accumulations are treated by the soil pollution standard BEFORE AFTER Sections for the agricultural land remodeling 15

FLOOD CONTROL EFFECT IN 2011 Record-breaking rainfall during rainy season (June 20~July 17, 2011) - Rainfall over 640mm for 20days (2.6 times more than the average) * The annual mean precipitation : 1,245mm No damaged areas due to the low flood water level (2~4m ) by dredging Rivers 1.Han 2.Nakdong 3.Geum 4.Yeongsan Mainstream Yeoju Sangju Yungi Naju 2.54m 3.78m 3.36m 2.13m Tributary Seom Hyung Miho Hyungrong 0.5m 1.3m 0.5m 0.6m 16

2 WATER SECURITY 16 WEIRS: STORING 800 MILLION TON 17

MOVABLE WEIRS Discharging Sedimentations periodically Controlling water level by flood forecast Lift Type Rotary Type (Rising Sector) Turning Type Sedimentation Discharge Water Level Control 18

3 WATER QUALITY & ECOLOGY IMPROVEMENT CLEAN WATER (SWIMMABLE WATER) 76% (2006) 86% (2012) * Estimated by National Institute of Environmental Research * Swimmable Water: Water Quality Grade II, BOD 3mg/L) Non-point Pollution Source Reduction Water Quality Improvement Facilities: 1,281 (3.9 trillion won) Sewage Facilities: 1,044 Total Phosphorus Treatment Plant: 273 19

4 ECOLOGICAL RESTORATION Ecological Stream: 929 km Ecological Wetland: 39 sites Total 3.87 million m2 of the wetlands will be expanded (115.89 119.76 million m2) Preserving Endangered Species Propagation of Endangered Fishes Restoration of fish migration and natural wildlife habitat 20

5 WATERFRONT DEVELOPMENT MULTI-PURPOSE USING OF WATERFRONT Coexistence of the People and Natures Making easy accessible waterfront sites ESTABLISHING LEISURE PLACE Constructing bicycle roads (1,657km) Promenades, Water Leisure sports area 21

SITE PHOTOS Geum River (2010. 3) Geum River (2011. 5) Marathon racing (2011. 5) Maegdo District (2011. 5) 22

SITE PHOTOS (weirs) 23

3. IMPLICATION TO THE CHAO PHRAYA RIVER 24

WHAT WE DID FOR IMPLEMENTAION ORGANIZATION LEGAL COMPLIANCE PUBLIC PARTICIPITAION 25

PROJECT ORGANIZATION STRUCTURE 26

EXECUTION OF MAJOR LEGAL PROCEDURES Environmental Assessment June 2009: Preliminary Environmental Review were completed June 2010: Environmental Impact Assessment were completed A post-construction environmental impact survey is now underway It is being carried out for the three years from commencement to completion of construction. Cultural Property Survey 220 personnel from 23 organizations that the Cultural Heritage Administration publicly announced as excavation-specializing organizations participated in an earth-surface survey. It was meticulously conducted over three months (February 10 April 30, 2009) 27

PUBLIC PARTICIPATION Public Meeting - 126 Times with 37,000(2009) - 70 Times with 23,000 (2010) Feedback Process with Local Government - Local Governments submitted 836 Recommendations, (worth 98.3 trillion KRW) - River-related 213 cases were reflected in the Plan 28

INTEGRATED WATER MANAGEMENT OPERATION, MAINTENANCE, MANAGEMENT Integrated River Management System Multi-purpose Weir (Small Scale Dam) Multi-purpose Dam & Flood Control Retention A comprehensive management through integrated approaches with weir, dam, flood control retention, etc. Agricultural Reservoir

Applicable Ideas for Flood Management Upstream Joint Operation (Flood Control) Build Storage - Dam - Reservoirs Middle Zone Retarding & Retention - Detention basin - Retention areas - Storage ponds Downstream Quick Drainage - Diversion canal - Dredging - Barrage Safe water block - Distribution plan - Zoning & Pumping - Embankment 30

3. Ideas 짜오프라야강 for Implementation 홍수관리 대책 제안 Establish a project plan based on the priority and implementation of short term plans as early as possible Short term plans Long term plans 1) Dredging in bottlenecked region and Remodeling of farmland 2) Develop an IWRM system and Joint operation 3) Movable Weirs 4) Construction of multi-purpose dams, 5) Diversion canals and Detention ponds, 6) Barrages (river mouth and key control points) 7) Division of drainage zones 31