. Water Resources in Korea.. IWRM Application Cases.. Future Works
|
|
|
- Philip Shepherd
- 10 years ago
- Views:
Transcription
1
2 . Water Resources in Korea. IWRM Application Cases. Future Works
3 K-water Overview
4 with a history of 47 years 1. K-water Overview
5 Water Resources in Korea
6 Monthly Precipitation & Geographical Characteristics JAN. FEB. MAR. APR. MAY JUN. JUL. AUG. SEP. OCT. NOV. DEC. Steep slopes : Upper Basin Mild slopes : Lower Basin 2/3 of annual precipitation : June ~ September 2. Water Resources in Korea
7 Climate Change Annual Precipitation : 16.4% 1225mm Trend 1465mm Typhoon trend yr 6yr 6yr 7yr 7yr Yearly mean NO. of Typhoon occurrences : 25.4 times Steadily decreasing trend Yearly mean NO. of affecting Korea : 3.5times %: 3.09times Affecting Korea/Typhoon occurrence(%) 15.2%: 3.87times Gradually increasing trend 2. Water Resources in Korea
8 Structural Measures Sub-Spillway Construction Parapet Wall Construction Spillway Structural Change Imha Dam Milyang Dam Gwangdong Dam Soyanggang, Daechung, Andong, Imha, Juam, etc Boryeong, Milyang, Buan, etc Gwangdong, Dalbang, Yeoncho, Guchun, etc 24 out of 33 Dams require flood control capability improvements to mitigate extreme flooding events caused by climate change 2. Water Resources in Korea
9 Non-structural Measures Adoption of IWRM Change Laws & Framework Improve River Environment & Water Quality Control Soil Eco System Water Quality Water Quantity River Basic water law amendments Water management framework changes Burden of expenses for water management framework changes Organize Water entitlements Changes in water management policies for each river basin Give more weight to Nonpoint pollution source management Provide policies and measures for the water quality of muddy water Integrate managing water facilities to reduce pollution Secure Preserve Manage Sustainable Water 2. Water Resources in Korea
10 IWRM in Korea
11 Acquisition of Preliminary Data Rain Gauging Stations Water Level Gauging Stations Discharge Gauging Stations TOTAL K-water MOLIT ETC IWRM in Korea
12 Water Management Center HUB of Water Management in Korea 24 hours 365 days, Constant Duty Imjin river Geum river Han river Nakdong river Facilities 33 dams 16 weirs 25 hydropower plants 78 generators(1,333mw) 350 gauging stations 184 warning stations Youngsan river Sumjin river 3. IWRM in Korea
13 K-HIT RHDAPS (IHDMS, WDMS) Hydrological Data Acquisition and Processing GIOS Generation Integrated Operation System PFS Precipitation Forecasting System RWSS Reservoir Water Supply System FAS Flood Analysis 3. IWRM in Korea
14 K-HIT : RHDAPS Real-time Hydrological Data Acquisition and Processing System Gathering and Processing of Real-time Hydrological Data Rainfall, water level, inflow, outflow, etc. 1 minute real-time base (1, 10, 30, 60 min. data management) Satellite + CDMA (dual communication network) Acquisition Transmission 3. IWRM in Korea
15 K-HIT : PFS(Precipitation Forecasting System) Providing Weather Information & Precipitation Forecast for Dams/Weirs Weather Data Collection Korea Meteorological Administration (KMA) K-PPM run on HPC (4times/1day, 5days forecast) High Performance Computing (HPC) Precipitation Forecast Calculate Precipitation 3km 3km National Oceanic and Atmospheric Administration (NOAA) Weather Chart Flood Analysis System 3. IWRM in Korea
16 K-HIT : FAS (Flood Analysis System) Precipitation Forecasting Precipitation Forecast Observed Hydrological Data PFS Flood Analysis Reservoir Simulation (Combined) Channel Routing FAS Flood Analysis Optimal Release Gate Open/Warning Flood Warning Flood Control Effect Analysis 3. IWRM in Korea
17 K-HIT : RWSS(Reservoir Water Supply System) Long Term Runoff Long Term Runoff Water Demand Water Demand Reservoir Operation Plan Water Balance Water Quality Water Balance Reservoir Simulation Water Quality Optimized Reservoir Water Supply Plan Optimized Reservoir Water Supply Plan 3. IWRM in Korea
18 K-HIT : GIOS (Generation Integrated Operation System) Remote Control & Monitoring H 1,333 MW Hydropower Plants WMC 9 Multipurpose Dams (37 Generators, 1,010 MW) 16 Weirs (41 Generators, 51 MW) New Renewable Energy (Tide, Wind etc. 272 MW) Remote Control 3. IWRM in Korea
19 Governance Dam-Weir Co-management Council Water Quality Management Council River System Management Council Dam Construction Pre-review Council 3. IWRM in Korea
20 IWRM Application Cases
21 Sihwa tidal power plant Improve water quality & recover ecosystem Water Quality Expected to be improved up to open seawater quality Water quality of Sihwa lake(cod) Eco system Recover ecosystem by systematic management Marine Benthos Individual Species Operate tidal power plant (2월) '97 '98 '00 '05 '09 '11 '12 '13 * 2012 open sea average COD : 1.3mg/L '00 '05 '10 '12 * Migratory bird number(individual) : 6,544( 97) 96,415( 11) 4. IWRM application cases
22 4 major rivers restoration Damyang Barrage Expansion Dam Weir Flood Retention Res. Geum Riv. Gongjoo Sejong Ipo Baekje Seomjin Riv. Seungchon Juksan Yeoju Youngsan Riv. Gangcheon Hwasun Han Riv. Sangju Gumi Chilgok Gangjeong Nakdan Weir Youngju dam Andong-Imha connection Nakdong Riv. Dalseong Hapcheon Haman Barrage Expansion Bohyeon dam Project Dredging : 450 million m3 Multi-purpose Weir : 16 Bank Reinforcement : 620 km Dam : 3 Flood Control Reservoir : 2 Embanking Agri. Res. : 93 Small Hydro-power Plant: 16 Eco-stream : 929 km Bike path : 1,592km Project period: 2009~2012, Budget: 20 billion US$ 4. IWRM application cases
23 Case in Indonesia Jakarta Juanda Dam Cirata Dam Saguling Dan Bandung 4. IWRM application cases
24 Case in Laos 4. IWRM application cases
25 Future Works
26 Establish Post Smart IWRMs Clear use amongst programs and optimize by functions considering spatial characteristics and use Develop a Post Smart Integrated Water Resources Management Technology Package for common use Improve functions such as connectivity and expansion amongst programs Reduce time for simulations and provide a technical foundation for IWRM Upgrade Analysis confidence by comparing, connecting and improving functions 5. Future Works
27
28 Appendices
29 providing water for a variety of activities in Korea Total 4,200 employees(900 M.S. & Ph.D, 3,000 Engineers) 1. K-water Overview
30 67 ~ ~ ~ 13 Industrial Foundation Development Water Resources Securement, Industrial Complex Development Balance of Water Supply and Demand Expansion for Water Supply Infrastructure Climate Change, Economic Revival Green New Deal Multipurpose Dam Industrial Complex Multi-regional Water Supply Gyeong-in Ara Waterway Four-river Restoration Project 1. K-water Overview
31 operating Soyang R. Dam Chungju Dam Multipurpose (18) Providing water (21) 60% 1. K-water Overview
32 technologies Regional and Industrial Water Supply Network (in operation) Local Water Supply and Sewerage Network Regional and Industrial Water Supply Network (under construction) 1. K-water Overview
33 Leading the future of marine energy by developing and operating the world s largest tidal plant ㆍDeveloping and operating tidal and photovoltaic plants as clean alternatives to reduce Korea s Sihwa Lake Tidal Plant Total Capacity : 254MW(servicing 130,000 households/year) Replacing 920,000 barrels of crude oil each year. Reducing carbon emissions by 360,000 tons each year. The world s first offshore photovoltaic power plant 11 photovoltaic power plants generating 823kW 2 wind plants generating 6,000kW 1. K-water Overview
34 Preventing floods, reducing logistics costs, and promoting tourism by developing the Gyeongin Ara Waterway 1. K-water Overview
35 K-water Institute R & D Planning &Management Department Water Policy & Economic Research Center Water Resources Research Center Infrastructure Research Center Water Supply Research Center Green Technology Research Center Water Analysis Research Center
36 Annual Precipitation in Korea 1, U S A 11,519 25, ,069 1,718 5,107 1,220 1, ,591 4,969 4,693 High population density 11, , Water Resources in Korea
37 Coefficient of river regime Mississippi Nile Rhein Seine Thames Yeongsan Seomjin Kuem Nakdong Han Coefficient of river regime = Qmax /Qmin 2. Water Resources in Korea
38 Total Water Resources Total Water Resources 130(100%) River Discharge Loss 75(58%) 54(42%) Discharge During Floods Normal Discharge 56(43%) 19(15%) Discharge into Ocean Utilization of River Utilization of Dam Utilization of Groundwater 42(32%) 10(8%) 19(15%) 4(3%) Total Use 33(26%) 2. Water Resources in Korea
39 Water Use By the purpose of supply By the type of resources By the purpose of dams 23% 48% 23% 6% 32% 11% 57% 15% 7% 5% 16% 58% Domestic Industrial Agricultural River Maintenance Dam River Groundwater Multipurpose Watersupply Hydropower Agricultural ETC 2. Water Resources in Korea
40 Annual Precipitation Trend Annual Precipitation over a 38 year period (1973~2010) : 1,337mm 70 yrs : 1,230mm Recently : 1,432mm, 16.4% 1225mm Trend 5yr 6yr 6yr 7yr 7yr 1465mm 1,383 1,791 1,908 1,736 1,611 1,409 1,007 1, ,061 1, ,669 Monsoon : 327.0mm(24.3%) Typhoon : 201.4mm(14.9%) Trough : 817.5mm(60.7%) Since the 1970 s, droughts occur every 5-7 years 2. Water Resources in Korea
41 Typhoon Trend Typhoon occurrences have decreased slightly Ratio of affecting Korea and the intensity have increased Yearly mean NO. of Typhoon occurrences : 25.4 times Yearly mean NO. of affecting Korea : 3.5times Steadily decreasing trend 12.1%: 3.09times Affecting Korea/Typhoon occurrence(%) 15.2%: 3.87times Gradually increasing trend 2. Water Resources in Korea
42 Climate Change 2 times more than the Global Warming average [Change of Global Mean Temp.] [Change of Mean Temp. of Korea] In 100 years : Temp. 5, precipitation 17% (Source : KMA, Institute) 2. Water Resources in Korea
43 K-HIT : FAS (Flood Analysis System) Flow Chart of FAS Analysis Rainfall-runoff Model Optimization Simulation Hydraulic Channel Routing Joint Operation Model for Reservoir System Joint Operation Model for Reservoir System Storage function model Muskingum Muskingum-Cunge Quasi-optimization technique Optimization technique Reservoir operation rule (ROM) (rule-based simulation) Hydrological channel routing Flood damage expectation Modification from optimization results Hydraulic Channel Routing Downstream boundary condition (considering tidal water level)
44 K-HIT : RWSS (Reservoir Water Supply System) Maximize water use efficiency RWSS(Reservoir Water Supply System) Rainfall-runoff (RRFS) Water Quality model (Qual2E, W2, etc.) Reservoir Simulation (K-Modsim)
45 Governance Dam-Weir Co-management Council K-water, MOLIT, MOTIE, MOE, MAFRA, FCO, KHNP, EKR, Nongovernment experts Central Council Congress : February Council by River System Congress : December Common issues of each river system Establish, change, and evaluate operation plans Orchestrate opinion River System Management Council K-water, MOLIT, MOE, Local government, KFS, KHNP, EKR Council congress : June Deliberation and Decision on pollutant reduction plan, riverside management general plan Deliberation and Decision on Fund management Support Public Water Quality Patrol Water Quality Management Council K-water, MOLIT, MOE, NIER, KHNP, EKR, KECO, Local government, Water quality experts, Water Quantity experts Council Congress : December Change discuss contingency plan by water quality management phase Water quality management by river system Dam Construction Pre-review Council K-water, MOLIT, MOSPA, NEMA, KFS, CHA Council Congress : monthly Prevent conflicts caused by dam construction Review dam necessity, alternatives, public acceptance Provide proposal of recommendation about dam construction 3. IWRM in Korea
46 . Sihwa tidal power plant Develop Sihwa Area Tide Embankment Tidal Power Plant To secure industrial & residential spaces in metropolitan Construction of Sihwa Artificial lake was completed Severe Water Pollution Improve the water quality of Sihwa lake by seawater circulation Generate green energy 4. IWRM application cases
47 Case in Indonesia Synchronize Data Synchronize Data Use RRFS Use RRFS Capacity Building Water Related Staff Capacity Building Institutional Strengthening Training water related staffs of each organizations for optimized data sharing Hydrological & GIS Database Hydrological Data : Rainfall, Water Level, Water Quality GIS Data : Basin, River Network, Gauge Stations, Landuse, DEM Rainfall Runoff Forecasting System Long-term hydrologic model for continuous runoff simulation Ensemble Stream Flow Prediction (ESP) Data Collection & Monitoring Network All data have been collected, compiled, & analyzed in the basin Optimized Monitoring Networks 4. IWRM application cases
THE FOUR RIVERS RESTORATION PROJECT AND ITS IMPLICATIONS TO THE CHAO PHRAYA RIVER
KOREA S EXEMPLARY CASE OF FLOOD PREVENTION THE FOUR RIVERS RESTORATION PROJECT AND ITS IMPLICATIONS TO THE CHAO PHRAYA RIVER Office of National River Restoration, Korea MLTM Republic of Korea CONTENTS
THE FOUR RIVERS RESTORATION PROJECT
JSCE-2014 International Forum Human-Friendly River Restoration and Management in Korea THE FOUR RIVERS RESTORATION PROJECT November 20, 2014 Myung Pil SHIM, Ph.D Professor of Inha University President,
FOUR RIVERS RESTORATION PROJECT
MLTM Republic of Korea Making Every Drop Count International Workshop on Integrated Urban Water Management WATER & GREEN GROWTH FOUR RIVERS RESTORATION PROJECT Office of National River Restoration, Korea
THE 4 MAJOR RIVERS RESTORATION PROJECT
MLTM Republic of Korea WATER IN THE GREEN ECONOMY IN PRACTICE: TOWARDS RIO+20 WATER & GREEN GROWTH THE 4 MAJOR RIVERS RESTORATION PROJECT Office of National River Restoration, Korea 3 to 5 October 2011
Sihwa Tidal Power Plant: a success of environment and energy policy in Korea
Sihwa Tidal Power Plant: a success of environment and energy policy in Korea May 2007 Prof. Nohyoung Park Korea University Energy Situations in Korea Korea started its industrial development in the 1970s,
AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA
AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA GÁBOR KEVE 1, GÉZA HAJNAL 2, KATALIN BENE 3, PÉTER TORMA 4 EXTRAPOLATING
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) CHARTERED BANK ADMINISTERED INTEREST RATES - PRIME BUSINESS*
COMPARISON OF FIXED & VARIABLE RATES (25 YEARS) 2 Fixed Rates Variable Rates FIXED RATES OF THE PAST 25 YEARS AVERAGE RESIDENTIAL MORTGAGE LENDING RATE - 5 YEAR* (Per cent) Year Jan Feb Mar Apr May Jun
Assessment of Impact of Hydropower Dams Reservoir Outflow on the Downstream River Flood Regime Nigeria s Experience
Assessment of Impact of Hydropower Dams Reservoir Outflow on the Downstream River Flood Regime Nigeria s Experience David O. Olukanni 1 and Adebayo W. Salami 2 1 Department of Civil Engineering, Covenant
How To Build A River Restoration Project In North Korea
Changnyeong Haman Weir Project for Nakdong-River Restoration 1. PROJECT A. Description Changnyeong Haman Weir Project for Nakdong-River Restoration stretched from Oisanri, Bukmyeon of Changwon City to
A Study on Power Generation Analysis of Floating PV System Considering Environmental Impact
, pp.75-84 http://dx.doi.org/10.14257/ijseia.2014.8.1.07 A Study on Power Generation Analysis of Floating PV System Considering Environmental Impact Young-Kwan Choi * K-water(Korea Water Resources Corporation),
The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin
The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin Dr.Phattaporn Mekpruksawong 1, Thana Suwattana 2 and Narong Meepayoong 3 1 Senior Civil Engineer, Office of Project Management,
Climate Change. Lauma M. Jurkevics - DWR, Southern Region Senior Environmental Scientist
Climate Change A n o t h e r F a c t o r i n M a n a g i n g S o u t h e r n C a l i f o r n i a s W a t e r R e s o u r c e s Lauma M. Jurkevics - DWR, Southern Region Senior Environmental Scientist USEPA-Region
Environmental Engineering, University of Seoul, Jennong-dong, Dongdaemun-gu, Seoul, Korea.
WATER QUALITY MANAGEMENT FOR ECOLOGICAL RESTORATION IN ANYANG STREAM Yu, M.J., Cho, Y.M. 2, Lee, S.K. 3 Environmental Engineering, University of Seoul, Jennong-dong, Dongdaemun-gu, Seoul, Korea. 2 Department
Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs
US Army Corps of Engineers Hydrologic Engineering Center Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs October 1966 Approved for Public Release. Distribution Unlimited.
Hydrologic Engineering Techniques for Regional Water Resources Planning
US Army Corps of Engineers Hydrologic Engineering Center Hydrologic Engineering Techniques for Regional Water Resources Planning October 1969 Approved for Public Release. Distribution Unlimited. TP-17
< SUBSURFACE DAMS TO AUGMENT GROUNDWATER STORAGE IN BASEMENT TERRAIN FOR HUMAN SUBSISTENCE BRAZILIAN EXPERIENCE >
CASE PROFILE COLLECTION No 5 < SUBSURFACE DAMS TO AUGMENT GROUNDWATER STORAGE IN BASEMENT TERRAIN FOR HUMAN SUBSISTENCE BRAZILIAN EXPERIENCE > Stephen Foster September 2002 TASK MANAGERS: Gabriel Azevedo
Sea Water Heat Pump Project
Sea Water Heat Pump Project Alaska SeaLife Center, Seward, AK Presenter: Andy Baker, PE, YourCleanEnergy LLC Also Present is ASLC Operations Manager: Darryl Schaefermeyer ACEP Rural Energy Conference Forum
How To Understand And Understand The Flood Risk Of Hoang Long River In Phuon Vietnam
FLOOD HAZARD AND RISK ASSESSMENT OF HOANG LONG RIVER BASIN, VIETNAM VU Thanh Tu 1, Tawatchai TINGSANCHALI 2 1 Water Resources University, Assistant Professor, 175 Tay Son Street, Dong Da District, Hanoi,
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015
AT&T Global Network Client for Windows Product Support Matrix January 29, 2015 Product Support Matrix Following is the Product Support Matrix for the AT&T Global Network Client. See the AT&T Global Network
National Disaster Management Institute
National Disaster Management Institute CONTENTS one Cause of Urban Flood Disaster two Urban Flood Damage Case three Disaster Prevention Measures for Future Urban Flood four NDMI s Measures & Strategy for
Addressing Declining Elevations in Lake Mead
Integrated Resource Planning Advisory Committee July 23, 2014 Addressing Declining Elevations in Lake Mead 1 Meeting Topics Drought update Attribute finalization Interbasin Cooperation Intake Pumping Station
The Four Major Rivers Restoration Project
The Four Major Rivers Restoration Project Yoon Jung Cha, Myung-Pil Shim, and Seung Kyum Kim, Office of National River Restoration Type of tool: water planning Issue: watersheds Location: South Korea, Asia
Nechako Fisheries Compensation Program. Annual Report. Executive Summary of Activities in 2014-2015 and Proposed Work Program for 2015-2016
Nechako Fisheries Compensation Program Annual Report Executive Summary of Activities in 2014-2015 and Proposed Work Program for 2015-2016 March, 2015 Contents Page Administration... 1 Technical Committee
MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed
MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT Significant water resources are found in many developing countries. In areas where adequate water resources are present, harnessing the power of falling
How To Forecast Solar Power
Forecasting Solar Power with Adaptive Models A Pilot Study Dr. James W. Hall 1. Introduction Expanding the use of renewable energy sources, primarily wind and solar, has become a US national priority.
Water Management in Cuba: Problems, Perspectives, Challenges and the Role of the Cuban Academy of Sciences
Water Management in Cuba: Problems, Perspectives, Challenges and the Role of the Cuban Academy of Sciences Daniela M. Arellano Acosta Environment Agency/ Water Commission, Academy of Science, CUBA Water
Scheduling Best Practices
The eighth article in the Scheduling Best Practices series is How to Handle the Weather. Our colleague Beth Blair, a managing consultant in Warner s Disputes Resolution Group, has over 20 years of experience
HAZARD RISK ASSESSMENT, MONITORING, MAINTENANCE AND MANAGEMENT SYSTEM (HAMMS) FOR LANDSLIDE AND FLOOD. Mohd. Nor Desa, Rohayu and Lariyah, UNITEN
HAZARD RISK ASSESSMENT, MONITORING, MAINTENANCE AND MANAGEMENT SYSTEM (HAMMS) FOR LANDSLIDE AND FLOOD Mohd. Nor Desa, Rohayu and Lariyah, UNITEN WHAT WE HAVE IN MIND AND FROM OUR PREVIOUS PROJECT CONTRIBUTION
Integrated Water and Sediment Management of Yellow River
Keeping Health Life of Yellow River: Integrated Water and Sediment Management of Yellow River Shang Hongqi Yellow River Conservancy Commission 18 March 2009 Istanbul, Turkey Outline: I. Yellow River Characteristic
Concept Note for an IWRM Masters Degree Program. Armenia, Azerbaijan and Georgia 2012
Concept Note for an IWRM Masters Degree Program 1. Summary of Action Armenia, Azerbaijan and Georgia 2012 The UNDP-GEF Kura Project has undertaken several stakeholder involvement and capacity building
Concept Note for an IWRM Masters Degree Program. Armenia, Azerbaijan and Georgia 2012
Concept Note for an IWRM Masters Degree Program 1. Summary of Action Armenia, Azerbaijan and Georgia 2012 The UNDP-GEF Kura Project has undertaken several stakeholder involvement and capacity building
Disaster Prevention Measures in Global-Local Context 4 th World Water Forum Dr. Yoshihiko Yamashita CTI Engineering Co., Ltd Association of Japanese Consulting Engineers Outline of Presentation Up-to to-date
FLOOD FORECASTING PRACTICE IN NORTHERN CALIFORNIA
FLOOD FORECASTING PRACTICE IN NORTHERN CALIFORNIA California Department of Water Resources Post Office Box 219000, Sacramento, California 95821 9000 USA By Maurice Roos, Chief Hydrologist ABSTRACT Although
How To Manage Water Quality In Korea
RR 2004 3rd European Conference on River Restoration RIVER RESTORATION 2004 Zagreb, Croatia, 17-21 May 2004 Integrated watershed management system in Korea Ji-Yong Choi ABSTRACT: A watershed management
How To Recover From A Flood In Bundaberg
BUNDABERG FLOODS NOW THE MUD HAS DRIED FLOOD RECOVERY AT MILLBANK Paper Presented by: Kym Kneebone Author: Kym Kneebone, Assistant Coastal Treatment Co-ordinator, Bundaberg Regional Council 37th Annual
Master Plan on Water Resource Management
Master Plan on Water Resource Management Strategic Committee for Water Resource Management Office of the Strategic Committee for Water Resource Management Office of the National Economic and Social Development
River Management 2013 Colorado Flood
River Management 2013 Colorado Flood Damages, Countermeasures, Socio-Economic Impacts Miles Blair, Allen Chestnut, Hwayoung Kim, & Caroline Ubing CIVE 717 Spring 2014 Flood Statistics Sept 9 th 16 th,
WATER RESOURCES MANAGEMENT IN TURKEY
WATER RESOURCES MANAGEMENT IN TURKEY Prof. Dr. Veysel EROĞLU Director General General Directorate of State Hydraulic Works ABSTRACT There are several public institutions and organizations in Turkey working
Town of Warwick, Village of Florida, Village of Greenwood Lake and Village of Warwick MULTI JURISIDICTIONAL, MULTI HAZARD MITIGATION PLAN DRAFT
Town of Warwick, Village of Florida, Village of Greenwood Lake and Village of Warwick MULTI JURISIDICTIONAL, MULTI HAZARD MITIGATION PLAN DRAFT Appendix B Historical Hazard Documentation Rev #0 May 2013
Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún
Flood mitigation program for Gatun lake Programa de mitigación de inundaciones del lago Gatún Moffatt & Nichol Engineers 10 de febrero de 2005 Contrato No. 126161 Introducción y Recomendaciones 1 INTRODUCTION
Risk and vulnerability assessment of the build environment in a dynamic changing society
Risk and vulnerability assessment of the build environment in a dynamic changing society Limnei Nie SINTEF Building and infrastructure, P.O.Box 124 Blindern, NO-0314 Oslo, Norway. [email protected]
New challenges of water resources management: Title the future role of CHy
New challenges of water resources management: Title the future role of CHy by Bruce Stewart* Karl Hofius in his article in this issue of the Bulletin entitled Evolving role of WMO in hydrology and water
Measuring what we manage the importance of hydrological data to water resources management
doi:10.5194/piahs-366-80-2015 80 Hydrological Sciences and Water Security: Past, Present and Future (Proceedings of the 11th Kovacs Colloquium, Paris, France, June 2014). IAHS Publ. 366, 2015 Measuring
NAPA COUNTY WATERSHED SYMPOSIUM
Planning, Building, and Environmental Services NAPA VALLEY GROWTH NAPA COUNTY WATERSHED SYMPOSIUM Plunging Forward May 15, 2015 1 YOU CAN T CROSS THE SEA MERELY BY STANDING AND STARING AT THE WATER. Rabindranath
12.5: Generating Current Electricity pg. 518
12.5: Generating Current Electricity pg. 518 Key Concepts: 1. Electrical energy is produced by energy transformations. 2. Electrical energy is produced from renewable and non-renewable resources. 4. Electrical
XAYABURI HYDRO POWER PLANT, LAO PDR
XAYABURI HYDRO POWER PLANT, LAO PDR BACKGROUND MATERIAL ON PÖYRY S ASSIGNMENT CONTENT About Pöyry Pöyry s hydropower competences, p. 4-6 Xayaburi hydropower plant project, p. 7-14 Pöyry s role in the project,
Hydrological and Material Cycle Simulation in Lake Biwa Basin Coupling Models about Land, Lake Flow, and Lake Ecosystem
Sengupta, M. and Dalwani, R. (Editors). 2008. Proceedings of Taal2007: The 12 th World Lake Conference: 819-823 Hydrological and Material Cycle Simulation in Lake Biwa Basin Coupling Models about Land,
Climate, Drought, and Change Michael Anderson State Climatologist. Managing Drought Public Policy Institute of California January 12, 2015
Climate, Drought, and Change Michael Anderson State Climatologist Managing Drought Public Policy Institute of California January 12, 2015 Oroville Reservoir January 2009 Presentation Overview The Rules
Kali Tuntang. Map of River. Table of Basic Data. Indonesia 9. Serial No. : Indonesia-9
Kali Tuntang Map of River Table of Basic Data Name(s): Tuntang River Location: Java Island, Indonesia Area: 798 km 2 Origin: Mt. Merbabu (3,142 m) Outlet: Java sea Main tributaries: Senjoyo River (120
CLACKAMAS COUNTY ZONING AND DEVELOPMENT ORDINANCE
1008 STORM DRAINAGE (3/24/05) 1008.01 PURPOSE To minimize the amount of stormwater runoff resulting from development utilizing nonstructural controls where possible, maintain and improve water quality,
Analysis One Code Desc. Transaction Amount. Fiscal Period
Analysis One Code Desc Transaction Amount Fiscal Period 57.63 Oct-12 12.13 Oct-12-38.90 Oct-12-773.00 Oct-12-800.00 Oct-12-187.00 Oct-12-82.00 Oct-12-82.00 Oct-12-110.00 Oct-12-1115.25 Oct-12-71.00 Oct-12-41.00
Image source: www.rivers.gov. Visual Data Analytics, LLC
AWRA Spring Specialty AWRA Conference Spring Specialty on GIS Conference and Water on Resources GIS and Water VIII Resources May 13, 2014 Using a Temporal Information System for Visualization and Analysis
For the purposes of this article the Shannon can conveniently be divided into five sections:
Volume 29 Number 3 Autumn Inland Waterways News Table of Contents Shannon Water Level Management Robert Cullen The water levels along the Shannon River and its lakes are the subject of much discussion,
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138. Exhibit 8
Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 1 of 138 Exhibit 8 Case 2:08-cv-02463-ABC-E Document 1-4 Filed 04/15/2008 Page 2 of 138 Domain Name: CELLULARVERISON.COM Updated Date: 12-dec-2007
Distribution Restriction Statement Approved for public release; distribution is unlimited.
CEMP-CP Regulation No. 415-1-15 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Construction CONSTRUCTION TIME EXTENSIONS FOR WEATHER ER 415-1-15 Distribution Restriction
Application of Space Technology for Disaster monitoring and assessment current state in Vietnam
Application of Space Technology for Disaster monitoring and assessment current state in Vietnam Lai Anh Khoi SPACE TECHNOLOGY INSTITUTE 8th GEOSS Asian Pacific Symposium Beijing, Sep. 09-11, 2015 Types
Toronto s Wet Weather Flow Master Plan
Toronto s Wet Weather Flow Master Plan 1. The Master Plan 2. The Don And Waterfront Study 3. What the Individual Can Do Wet Weather Flow Management Master Plan 2000 Storm Presentation to Don Mouth Naturalization...
Appendix J Online Questionnaire
Appendix J Online Questionnaire In accordance with the Paperwork Reduction Act, this questionnaire was approved by the Office of Management and Budget (OMB). The OMB control number and expiration date
CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS
CHAPTER 372-68 WAC WATER POLLUTION CONTROL AND ABATEMENT PLANS FOR SEWAGE DRAINAGE BASINS Last Update: 6/8/88 WAC 372-68-010 Authority. 372-68-020 Purpose. 372-68-030 Definitions. 372-68-040 Planning guide.
Preliminary advances in Climate Risk Management in China Meteorological Administration
Preliminary advances in Climate Risk Management in China Meteorological Administration Gao Ge Guayaquil,Ecuador, Oct.2011 Contents China Framework of Climate Service Experience in Climate/disaster risk
City of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events
City of London Climate Change Adaptation Strategy Dealing with Extreme Rainfall Events May 29, 2014 Presented by: Berta Krichker M.Eng., FEC, P.Eng. Manager of Stormwater Unit Environmental and Engineering
DEVELOPING FLOOD VULNERABILITY MAP FOR NORTH KOREA INTROUDUCTION
DEVELOPING FLOOD VULNERABILITY MAP FOR NORTH KOREA Soojeong Myeong, Research Fellow Hyun Jung Hong, Researcher Korea Environment Institute Seoul, South Korea 122-706 [email protected] [email protected]
The Water, Energy, Food Nexus: Lebanese Policy and Institutional Analysis
The Water, Energy, Food Nexus: Lebanese Policy and Institutional Analysis Nadim Farajalla, Patricia Haydamous, Charbel Rizk, Silva Kerkezian and Rana El Hajj-Mitri Climate Change and the Environment in
Development of an Integrated Data Product for Hawaii Climate
Development of an Integrated Data Product for Hawaii Climate Jan Hafner, Shang-Ping Xie (PI)(IPRC/SOEST U. of Hawaii) Yi-Leng Chen (Co-I) (Meteorology Dept. Univ. of Hawaii) contribution Georgette Holmes
Ecosystem Services in the Greater Houston Region. A case study analysis and recommendations for policy initiatives
Ecosystem Services in the Greater Houston Region A case study analysis and recommendations for policy initiatives Ecosystem Services Ecosystems provide services through their natural processes that we
U.S. Army Corps of Engineers Tulsa District
U.S. Army Corps of Engineers Tulsa District Mike Abate, PMP. Chief, Civil Works Branch, PPMD April 17, 2015 US Army Corps of Engineers Civil Works Mission Water Supply 50% of Corps water supply contracts
Precipitation Monitoring Network:
The Caribbean Drought and Precipitation Monitoring Network: Adrian R. Trotman Caribbean Institute for Meteorology and Hydrology CARIWIN Regional Seminar 14-15 January, 2010 Georgetown, Guyana Why Plan
Chattichai WAISURASINGHA 1*, Prinya CHINDAPRASIRT 1, Winai SRI-AMPORN 1 and Sinee CHUANGCHAM 2
The Utilization of Geographic Information Systems and Multi-Criteria Decision Making with Local Community Participation for Selection of Site for Micro Hydropower Project: A Case Study of Chi River Basin,
MANITOBA FLOOD PROTECTION PROJECTS Project Justification and Benefits. Science Imagination Collaboration
MANITOBA FLOOD PROTECTION PROJECTS Project Justification and Benefits Science Imagination Collaboration Presentation Outline Extreme events on Red and Assiniboine Manitoba Flood Protection Works KGS Group
EPA Trends for wastewater Treatment in California - 2011
EPA S TECHNOLOGY NEEDS FOR THE WATER AND WASTEWATER INDUSTRY Nancy Stoner Acting Assistant Administrator U.S. EPA Office of Water International Emerging Technology Symposium Arlington, VA April 23rd, 2014
End to End Multi Hazard Early Warning Systems By Curt Barrett Hydrometeorological Consultant
End to End Multi Hazard Early Warning Systems By Curt Barrett Hydrometeorological Consultant Disaster Risk Management- East Asia and Pacific Experts Roundtable on Urban Flood Risk Management March 17,
US Army Corps of Engineers BUILDING STRONG
Fort Worth District Public Meeting 20 August 2013 US Army Corps of Engineers Lewisville Dam - Authorization Authorized by the River and Harbor Act, approved 2 March 1945 (Public Law 14, 79th Congress,
Impact of water harvesting dam on the Wadi s morphology using digital elevation model Study case: Wadi Al-kanger, Sudan
Impact of water harvesting dam on the Wadi s morphology using digital elevation model Study case: Wadi Al-kanger, Sudan H. S. M. Hilmi 1, M.Y. Mohamed 2, E. S. Ganawa 3 1 Faculty of agriculture, Alzaiem
Hydrologic Aspects of Flood Warning Preparedness Programs
US Army Corps of Engineers Hydrologic Engineering Center Hydrologic Aspects of Flood Warning Preparedness Programs August 1990 Approved for Public Release. Distribution Unlimited. TP-131 REPORT DOCUMENTATION
Basic Climatological Station Metadata Current status. Metadata compiled: 30 JAN 2008. Synoptic Network, Reference Climate Stations
Station: CAPE OTWAY LIGHTHOUSE Bureau of Meteorology station number: Bureau of Meteorology district name: West Coast State: VIC World Meteorological Organization number: Identification: YCTY Basic Climatological
DESWAT project (Destructive Water Abatement and Control of Water Disasters)
A new national hydrological forecast and warning system is now in advanced implementation phase, within the Romanian Waters National Administration, in the framework of DESWAT project. The main objectives
Overview on SEA output
1 st SEA workshop of the revised PDP VII Overview on SEA output of Project N a t i o n a l P o w e r D e v e l o p m e n t P l a n p e r i o d 2 0 11-2 0 2 0, v i s i o n 2 0 3 0 ( P D P V I I ) P r e
Standardized Runoff Index (SRI)
Standardized Runoff Index (SRI) Adolfo Mérida Abril Javier Gras Treviño Contents 1. About the SRI SRI in the world Methodology 2. Comments made in Athens on SRI factsheet 3. Last modifications of the factsheet
TEACHING SUSTAINABLE ENERGY SYSTEMS A CASE STUDY
M. Brito 1,3, K. Lobato 2,3, P. Nunes 2,3, F. Serra 2,3 1 Instituto Dom Luiz, University of Lisbon (PORTUGAL) 2 SESUL Sustainable Energy Systems at University of Lisbon (PORTUGAL) 3 FCUL, University of
Real-time Global Flood Monitoring and Forecasting using an Enhanced Land Surface Model with Satellite and NWP model based Precipitation
Real-time Global Flood Monitoring and Forecasting using an Enhanced Land Surface Model with Satellite and NWP model based Precipitation Huan Wu,2, Robert F. Adler, 2, Yudong Tian, 2, George J. Huffman
Frequently Asked Questions (FAQs) on Hydropower
Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life
Burnt River Black River and Gull River Flood Contingency Plan
Burnt River Black River and Gull River Flood Contingency Plan Objective: The objective of this plan is to preplan and prepare for flooding events in the Burnt River, Black River and Gull River area of
dynamic vegetation model to a semi-arid
Application of a conceptual distributed dynamic vegetation model to a semi-arid basin, SE of Spain By: M. Pasquato, C. Medici and F. Francés Universidad Politécnica de Valencia - Spain Research Institute
Enhanced Vessel Traffic Management System Booking Slots Available and Vessels Booked per Day From 12-JAN-2016 To 30-JUN-2017
From -JAN- To -JUN- -JAN- VIRP Page Period Period Period -JAN- 8 -JAN- 8 9 -JAN- 8 8 -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- -JAN- 8-JAN- 9-JAN- -JAN- -JAN- -FEB- : days
Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is
Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is playing a great role in economic development since the last
How To Assess The Vulnerability Of The Neman River To Climate Change
Management of the Neman River basin with account of adaptation to climate change Progress of the pilot project since February, 2011 Vladimir Korneev, Central Research Institute for Complex Use of Water
CE394K GIS IN WATER RESOURCES TERM PROJECT REPORT
CE394K GIS IN WATER RESOURCES TERM PROJECT REPORT Soil Water Balance in Southern California Cheng-Wei Yu Environmental and Water Resources Engineering Program Introduction Historical Drought Condition
WELCOMES ALL THE ATTENDEES WATER UTILISATION, MEASUREMENT AND METHODOLOGIES
SUTRON india WELCOMES ALL THE ATTENDEES WATER UTILISATION, MEASUREMENT AND ABOUT SUTRON USA Strong Corporation was founded in 1975 Sutron Operates in : Hydrological Meteorological Oceanic Aviation Real-Time
STORMWATER MANAGEMENT CHECKLIST
STORMWATER MANAGEMENT CHECKLIST *This checklist must be completed and part of the Land Disturbing Permit submittal for review if the acreage disturbed is one (1) acre or more: I. SUPPORTING DATA Narrative
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting
Graduate School of Disaster Prevention Kangwon National University. http://college.kangwon.ac.kr/prevention/main.jsp
Graduate School of Disaster Prevention Kangwon National University 1joongang-Ro Samcheok-city, Gangwon-Do, Republic of Korea http://college.kangwon.ac.kr/prevention/main.jsp Outline Natural disasters such
A Developer s Guide: Watershed-Wise Development
A Developer s Guide: Watershed-Wise Development Environmental Protection What is a watershed? It does not matter how far away you build from a creek, lake, or the ocean, you are in a watershed. Another
FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May 2010. Prepared by. for the. 2010 by Earth Economics
FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN May 2010 Prepared by for the Execubve Summary The Chehalis Basin experienced catastrophic flooding in 2007 and 2009. In response, the
HYDROLOGICAL CYCLE Vol. I - Anthropogenic Effects on the Hydrological Cycle - I.A. Shiklomanov ANTHROPOGENIC EFFECTS ON THE HYDROLOGICAL CYCLE
ANTHROPOGENIC EFFECTS ON THE HYDROLOGICAL CYCLE I.A. Shiklomanov Director, State Hydrological Institute, St. Petersburg, Russia Keywords: hydrological cycle, anthropogenic factors, afforestation, land
Adjusted Estimates of Texas Natural Gas Production
Adjusted Estimates of Texas Natural Gas Production Background The Energy Information Administration (EIA) is adjusting its estimates of natural gas production in Texas for 2004 and 2005 to correctly account