XB YETS-2014-2015 PS-TT2. Indico 355427 EDMS 1448498

Similar documents
Reliability and Availability Aspects of. the IPHI Project

FCC JGU WBS_v0034.xlsm

LIU-PSB Configuration Management EDMS Documentation, Layout and ECRs. Thomas Birtwistle EN-MEF-DC

Status of Radiation Safety System at

Buildings Construction Procurement Strategy

Linac RF Commissioning with the SNS HPRF Systems

K O M A C. Beam Commissioning of 100-MeV KOMAC Linac. Korea Multi-purpose Accelerator Complex 양 성 자 가 속 기 연 구 센 터

DOCUMENTS AND PARAMETERS PROCESS AND CONTROL

THE ALIGNMENT STRATEGY FOR THE SPIRAL2 SUPERCONDUCTING LINAC CRYOMODULES

Fire Protection Program Of Chashma Nuclear Power Generating Station Pakistan Atomic Energy Commission 5/28/2015 1

The commissioning of the LHC: first the technical systems, then the commissioning with beam

Large Systems Commissioning

Machine Interlocks Systems

February 19, Senior Fellow, Nuclear Energy Systems & Services Division Power Systems Company

Mechanical Operation and Maintenance Vacuum Group

Standby Services or Reliance on Experts for Accelerator control?

Definition of safety functions Application to degraded operating modes and minimum operating requirements

10 Project Costs and Schedule

HIGH CURRENT OPERATION OF THE ACSI TR30 CYCLOTRON

ON-VEHICLE INSPECTION

& Tunnel Cross Section

Tom Wilson Product Marketing Manager Delivery Systems Varian Medical Systems International AG. CERN Accelerator School, May 2015

Catherine LeCocq, Robert Ruland. February, 2008

Industrial Involvement in the Construction of Synchrotron Light Sources

Air Pollution Control Division. Technical Services Program

MIDLAND COLLEGE SYLLABUS DEMR 1323 AUTOMOTIVE HEATING AND AIR CONDITIONING 2-4

Status Overview The Australian Synchrotron. Steven Banks Control Systems Group

Special interventions Status of production and QC

Heavy Duty Equipment Mechanic (Class Code 3743) Task List. Inspection and Diagnosis

Turbocharger system components, servicing

AIR CONDITIONING SYSTEM 1. FFH SPECIFICATION AIR CONDITIONING SYSTEM RODIUS

Saint Paul Public Schools Secondary Course Syllabus. Course Title: Automotive Technology 3 Course Length: Quarter/Semester/Trimester

Maintenance & reliability management. H. Rozelot - Workshop Maintenance & Reliability SOLEIL- November 9 & 10

FOXAIR 60/50 ALL MODELS

R&D Support Services. Ad Astra Rocket Company

DC LOAD TESTING Gian Trento June 18 th, 2004

Results: Low current ( ) Worst case: 800 MHz, GeV, 4 turns Energy oscillation amplitude 154 MeV, where

SHORT STRAIGHT SECTION TYPES IN THE MATCHING SECTIONS

6.7L Diesel Fuel System Contamination Diagnosis and Service Procedure Job Aid (Revised March, 2012)

Principles of Ion Implant

VZ/VZM SERIES Heavy Duty Shredders 600-2,100 kg/h

Wireless Optical Mouse

National Competency Based Skill Training Refrigeration and Air-conditioning Mechanic Logbook

EFFECT. DATE: 01/13/1991 SERIES PURPOSE: The purpose of the automotive mechanic occupation is to repair & maintain cars, trucks & equipment.

CDS TROUBLESHOOTING SECTION I. VACUUM Weak vacuum at wand. Gauge reads normal (10hg to 14hg)

Vehicle Maintenance Policies and Procedures

Manitoba Curriculum Framework of Outcomes Refrigeration & Air Conditioning Overview 2013 Draft

MYRRHA Injector Design

Zero Degree Extraction using an Electrostatic Separator

A/C refrigerant system, overview

Consortiwm Awdurdodau Lleol Cymru Consortium Local Authorities Wales

LHCC TOTEM STATUS REPORT

Software Engineering. Computer Science Tripos 1B Michaelmas Richard Clayton

Root & Contributing Causes. Site Answers & Comments: Preventative / Recommended / Accepted Steps of Risk Mitigation, Points of Interest:

Wind Turbine Maintenance Technician

Introduction; Kit Contents: Page 1

Automated Container Handling in Port Terminals

AIR CONDITIONING SYSTEM

MINNESOTA WEST COMMUNITY & TECHNICAL COLLEGE COURSE OUTLINE

Status of the HOM Damped Cavity for the Willy Wien Ring

BIOPOWER 5 CEX. 1 Wärtsilä 10 January 2012 Presentation name / Author

Assembly overview - fuel tank

RF SYSTEM FOR VEPP-5 DAMPING RING

Injector Max Machine

Competency Framework for Marine Engineer Class 6. Competency Framework for Marine Engineer Class 6

ROBOTIC PRINTED CIRCUIT BOARD ASSEMBLY LINE

21.1 Functions, Basic Configuration, and Interfaces

NAPCS Product List for NAICS 54134: Drafting Services

FACILITIES / SYSTEMS REQUIRING ASSESSMENT

Cryogenic Current Comparator Status at GSI/FAIR -

Acumen Enterprises, Inc.

While at work your safety also depends upon your colleagues. If you observe an unsafe situation, point it out to your colleague.

UNITED STATES NUCLEAR REGULATORY COMMISSION OFFICE OF NUCLEAR REACTOR REGULATION WASHINGTON, DC June 16, 2011

BEPC UPGRADES AND TAU-CHARM FACTORY DESIGN

Current state of plant Functioning as a peak and emergency centre. Statistics Accumulated operating hours:

Chris Clement 701 Bayou Lane Thibodaux, LA

Fully automatic air conditioning service! Bosch ACS 600, 601 and 650 for the workshop

Haliade 150-6MW Experiencia funcional con la nueva generación offshore

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)

The STAR Project: Southern european Thomson source for Applied Research

ABS/VDC WHEEL SPEED SENSOR DIAGNOSIS

UNDERGRADUATE DEGREE PROGRAMME IN ELECTRICAL ENGINEERING. School of Industrial Engineering, Albacete

Maintenance and Light Repair IV (MLR IV)

Edge 28B. Simple. Clean. PARTS LIST KENT model: (1)

REMOVAL AND INSTALLATION

Status of the Diamond Storage Ring RF Systems. Morten Jensen on behalf of Diamond Storage Ring RF Group

Descriptive Technical Documentation. DTD no

Septic Tank Use & Maintenance Tips

Preliminary program (September 2012)

2 STEPS TO CONDUCTING YOUR HVAC ASSESSMENT

Transcription:

XB YETS-2014-2015 PS-TT2 Indico 355427 EDMS 1448498

PS & TT2 Conditions During YETS Beam stop 15/12 @ 06:00 Switch off all equipment in a controlled manner All equipment switched off, but not consigné PS & TT2 remain in restricted access Christmas break: Access point in «Closed» mode 19/12/2014 19:00 to 05/01/2015 8:00 32nd meeting of the Facilities Operations Meeting - YETS organisation (R. Steerenberg) 2

CCC staffing during YETS 32nd meeting of the Facilities Operations Meeting - YETS organisation (R. Steerenberg) 3

CV activities for XMAS Circuits Stop Restart PS PS Central building Anneau 17/12/2014 06/01/2015 PS Main magnet 17/12/2014 13/01/2015 POPS 17/12/2014 13/01/2015 PS Chilled water Running (for the linac 2) Emptying the primary circuits and cleaning of the cooling towers Repairs / Bugs fixing Necessary maintenance (filters, belt, greasing, ) Works will be performed during the closure but not in the machines (no access needed) 35 th meeting of the Facilities Operations Meeting - CV activities for XMAS (S. Deleval) 4

IMPACT Activity Activity Title System Responsible 1 58191 Longitudinal Damper Cavity A - Acceleration MATTHIAS HAASE 2 58041 Inspection ligne de transfere L2 => Booster A - Acceleration CHRISTIAN MASTROSTEFANO 3 57824 YETS PS 10MHz cavity A - Acceleration VALENTIN DANIEL DESQUIENS 4 58873 Cavity 89 : reparation tuner & Cavity A - Acceleration VALENTIN DANIEL DESQUIENS 5 58975 Camera replacement PE.BTV16 B - Beam Instrumentation STEPHANE BURGER 6 58980 Replacement of the camera of F61.BTV01 B - Beam Instrumentation STEPHANE BURGER Replacement of the camera of FT16BTV.388 and 7 58976 FTA.BTV9003 B - Beam Instrumentation STEPHANE BURGER 8 58644 TT2 BPM maintenance B - Beam Instrumentation JEROEN BELLEMAN 9 58263 PS BPM maintenance B - Beam Instrumentation JEROEN BELLEMAN 10 58244 Maintenance DCCT (PS-TR34) B - Beam Instrumentation PATRICK ODIER 11 58234 Mesures transformateurs PS B - Beam Instrumentation FRANCO LENARDON 12 58107 Inspection of SEMgrids TT2 B - Beam Instrumentation MICHEL DURAFFOURG 13 58106 Inspection of SEMgrids ITH Line B - Beam Instrumentation MICHEL DURAFFOURG 14 57301 PS FWS FWS54, FWS65 exchange B - Beam Instrumentation WILLIAM ANDREAZZA 15 XXXXX Drain blockage between East and PS ring??? C - Civil Engineering RICHARD MORTON 16 58632 Câblage BPM ligne BTP YETS-PS-2014-2015 E - Electricity GEORGI MINCHEV GEORGIEV 17 58196 Test PR.DHZOC18 power circuit E - Electricity SIMON MATAGUEZ 18 57856 Cablage RF 25KV (entre Bat 355 et Bat 151) E - Electricity PATRICK LELONG 19 57842 Cablage FGC-ETHER (Bat 355 R-005/R-021) E - Electricity PATRICK LELONG 20 57416 Cablage RF entre Bat 353 et Bat 151 E - Electricity PATRICK LELONG 21 57359 Câblage PS-ECLOUD (SD98) E - Electricity PATRICK LELONG 22 56028 Test cable abimé sur porte YEPZ01.SWY=151 E - Electricity PATRICK LELONG 23 58190 demontage vanne TA reseau EG sur station 4 F - Fluids HASSANE SABRI 24 59046 PSR - Mesures Piliers vers MU's G - Survey and Geodesy TOBIAS DOBERS 25 58618 Scan machine PS (suite et fin!) G - Survey and Geodesy TOBIAS DOBERS 26 57762 Inspection LBS.BVT10 Handling Operations RICHARD SCRIVENS DOMINIQUE BODART / SYLVAIN 27 59037 Blindage chicane bat.151/350 ECR??? Handling Operations FUMEY 28 57965 Inspection de sécurité levage Hoisting Equipment LAURENT COLLY 29 57942 Inspection and maintenance crane PS Hoisting Equipment GILLES ROCHE Condition: Vacuum interventions during XB for FWS54, FWS65, and C80-89 in SS89. In order to ensure a good vacuum for the ion run, interventions are requested to take place in week 51 preferably as early as possible Activity Title System Responsible 29 589723 Visite pour mise a jour layout L - Layouts and assemblies JEAN-MICHEL LACROIX 30 58972 Visite pour mise a jour layout L - Layouts and assemblies JEAN-MICHEL LACROIX 31 58139 Verification septa SEH23/31 M - Magnetic Elements ANTOINE PROST 32 58137 Inspection visuelle Septa M - Magnetic Elements THIERRY MASSON 33 57419 Inspection of the magnets in LTB, LBE, LBS, BI and BTP M - Magnetic Elements ANTONY NEWBOROUGH 34 58726 PS&TT2 Evacuation plan to check P - Personnel safety SIMON MATAGUEZ 35 XXXXX 3 days of testing with the POPS R - Power converter FULVIO BOATINI 36 58733 Inspection de sécurité générale S - General Safety THIBAUT GILLES 37 57990 Inspection de sécurité générale S - General Safety THIBAUT GILLES 38 57584 Inspection and maintenance SFDIN-00265 détection incendie TT2 S - General Safety DENIS RAFFOURT 39 57583 Inspection and maintenance SESEV-00230 Evacuation TT2 S - General Safety DENIS RAFFOURT 40 57482 Inspection and maintenance SESEV-00229 Evacuation PS Ring S - General Safety DENIS RAFFOURT 41 57479 Inspection and maintenance SFDIN-00266 détection incendie PS S - General Safety DENIS RAFFOURT 42 57239 RP Survey & RP follow-up YETS-14-15 S - General Safety GERALD DUMONT 43 58256 Inspection and maintenance PS Beam Stopper + SLITS T - Targets and Dumps JEROME LENDARO 44 58254 Inspection and maintenance - PS Internal Dump T - Targets and Dumps JEROME LENDARO 45 58252 Inspection and maintenance - PS Beam Stopper T - Targets and Dumps JEROME LENDARO 46 58250 Inspection and maintenance PS RADMONs + Radfets + Batmons T - Targets and Dumps JEROME LENDARO 47 58099 Inspection and maintenance ventilation extraction POPS U - Ventilation HASSANE SABRI 48 58073 Inspection and maintenance ventilation +reseau EG+EC U - Ventilation HASSANE SABRI 49 58057 Inspection and maintenance ventilation LOCAL RF ET VIDE U - Ventilation HASSANE SABRI 50 58125 Inspection Visuelle VRJA + jauge penning V - Vacuum FRANCOIS PAUL BELLORINI 51 57343 Intervention BE-OP (CPS) Y - Access system FABRICE CHAPUIS 52 58812 Inspection and maintenance Access & Safety System Y - Access system DIDIER CHAPUIS 53 XXXXX Maintenance Lift AS-35 TT2 B.269 13H-15H 18/12/14 Y - Access system NICOLAS PEREZ 54 XXXXX Maintenance Lift AS-104 B.855 13H-15H 13/01/15 Y - Access system NICOLAS PEREZ 55 xxxx Maintenance Green Spaces Service Mathieu Emmanuel Fontaine 5

From 15/12 6.00 to 17/12 08.00 2 days of testing with the POPS But with 2 breaks: o EN/EL Test safety system(diesels). General power cut. 16/12/2014 Approx time 6.00 à 6.10 (10 mn) o RP Survey 16/12/2014 from 14.00 to 17.00 (3 hours) 32 hours after Beam Stop Restricted access to PS & TT2 allowed from 17/12 08.00 to 16/01 17.00 Test safety system (Diesels). BE/CO Controls Maintenance 05/01-07/01 Close PS & TT2 Ions to PS 6

Draft planning for discussion Beam off 06h00 POPS tests DECEMBER JANUARY Week 51 Week 2 Week 3 Week 4 15 16 17 18 19 5 6 7 8 9 12 13 14 15 16 19 20 21 22 23 * ** * PS Central building ring Cooling stations maintenance POPS Main magnet PS RP patrol (32h after beam stop) from 14.00 to 17.00 (3 hours) Test safety system (Diesels). (10 ' cut) PS FWS FWS54, FWS65 exchange Cavity 89 : reparation tuner & Cavity PS & TT2 Access closed Inspection and maintenance crane PS (payload needed) Cabling campaign Access maintenance and inspections (Access points not available) Ventilation maintenance and inspections detection incendie et evacuation Blindage chicane bat.151/350 ECR??? Maintenance Lift AS-35 TT2 B.269 13H-15H 18/12/14 Drain blockage between East and PS ring??? Bldg. 352 * Blind access needed ** Sector closed 7

Cabling campaign 16 58632 Câblage BPM ligne BTP YETS-PS-2014-2015 E - Electricity GEORGI MINCHEV GEORGIEV 17 58196 Test PR.DHZOC18 power circuit E - Electricity SIMON MATAGUEZ 18 57856 Cablage RF 25KV (entre Bat 355 et Bat 151) E - Electricity PATRICK LELONG 19 57842 Cablage FGC-ETHER (Bat 355 R-005/R-021) E - Electricity PATRICK LELONG 20 57416 Cablage RF entre Bat 353 et Bat 151 E - Electricity PATRICK LELONG 21 57359 Câblage PS-ECLOUD (SD98) E - Electricity PATRICK LELONG 22 56028 Test cable abimé sur porte YEPZ01.SWY=151 E - Electricity PATRICK LELONG HT test septa SEH23/31-15/12&16/12 RF Cavities test - 05/01-16/01 8

Shielding block CHICANE Bldg.151 project If ok shielding blocks will be removed week 2 (sector closed) Courtesy Dominique Bodart, Frederic Delsaux 9