CHAPTER 13 LOAD HOOKS



Similar documents
WARNING! Failure to follow these inspection procedures can cause personal injury and property damage.

CHAPTER 14 BELOW-THE-HOOK LIFTING DEVICES

SAFE HANDLING OF PRECAST CONCRETE PRODUCTS

LiftAlloy Chain Slings

Safety Manual For Overhead Crane Operators

02805 Printed in China

POTENTIAL HEALTH & SAFETY HAZARDS

Slings, Rigging and Lifting Equipment

Owner s Manual Gantry Cranes

Cable Hoist. Operating, Maintenance & Parts Manual. Follow all instructions and warnings for LMCA680. Americrane & Hoist Corp.

11. NONDESTRUCTIVE TESTING

Field Welding Inspection Guide

How To Ensure Safety Of Lifting Equipment

TECHNICAL SPECIFICATION FOR HIGH TENSION LINE HARDWARE AND ACCESSORIES FOR ACSR PANTHER & WOLF CONDUCTOR

ENGLISH FORK GUIDE 2013

Owner s Manual & Safety Instructions

Hand chain 6,0m 1000kg

CHAPTER 7 OVERHEAD AND GANTRY CRANES

RIGGING HARDWARE ASME B Addresses detachable lifting hardware for lifting purposes

LOAD TEST PROCEDURE. Bridge, Gantry and Jib Cranes & Monorail Systems B001-R05/07

External Visual Inspection Form

NDT Procedure for Liquid Penetrant Inspection TRINITY NDT. An ISO 9001:2008 Certified Company

ROV shackles. your reliable partner

Non-destructive Testing

FALL PROTECTION- Part 2 SELF INSPECTION CHECKLIST

STANDARD PRACTICE INSTRUCTION

ENGINEERING SPECIFICATION FIBERGRATE MOLDED GRATING. January 24,

Fire Sprinkler System Maintenance and Testing Page 1 MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS

The Campbell operation facilities in York, PA, and Cortland, NY, conform to Quality Standard ISO 9001.

ASTM A860/A860M-09 Standard Specification for Wrought High Strength. Ferritic Steel Butt Welding Fittings. 1. Scope :- 2. Reference Documents :-

NDT Procedure for Liquid Penetrant Inspection

Working at Heights and Fall Protection

INSTRUCTION MANUAL IM042. Slide Rail Systems - Series A10 INSTALLATION, OPERATION AND MAINTENANCE INSTRUCTIONS

Ensco NDT Inspection Handling Tools And Wall Thickness Survey. Date: November, 2011 Doc. No: NDT-IRM 3019 Version: Original P.

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

Safe Operating Procedure

American Petroleum Institute Purchasing Guidelines Purchase API Spec 7K online at

D-Ring. Fixed Arm. 1.2 LIMITATIONS: The following application limitations must be recognized and considered before using this product:

PIPING SYSTEM - ABRASIVE SLURRIES Engineering Standard Specification. 96 B. Riutta

Wire Rope Extender Lanyard

TARIFF CODE and updates standard

FIELD ACCEPTANCE OF FIELD WELDING GUIDE

Reproduced with the permission of the American Welding Society (AWS), Miami, Florida - 09/15/ Stud Welding

Specification for Rotary Drill Stem Elements

SB96-11B FAA APPROVED Supersedes SB96-11A, SB96-11, M84-16

Industrial Guideline nr. 2

Product Name: Beamer 2000

Working Copy WP 05-WH1401. Revision 4. 6-Ton Electric Forklifts 74-H-010B. Technical Procedure EFFECTIVE DATE: 01/04/06. John Guy APPROVED FOR USE

Explosion proof enclosures

ENGINEERING SPECIFICATION PULTRUDED DYNAFORM FIBERGLASS STRUCTURAL SHAPES. July 1, 2008 Revision 2

fall arrest. Contact your distributor or Guardian about policies regarding replacement of Guardian components involved in a fall.

10 TON HYDRAULIC PRESS

Series 510 Submersible Level Transmitters

The Campbell operation facilities in York, PA, and Cortland, NY, conform to Quality Standard ISO 9001.

User Instruction Manual Vertical Lifelines and Vertical Lifeline Subsystems

NON DESTRUCTIVE TESTING & ASNT WELD INSPECTION & AWS

Guidelines for the Survey of Offshore Mooring Chain Cable in Use

DiscPlus DX195 and DX225 Air Disc Brakes

Conceptual Design of Buildings (Course unit code 1C2)

Wire rope slings, the hazards surrounding

MAINTENANCE AND SERVICE OF AUTOMATIC FIRE EXTINGUISHING SYSTEMS

APPENDIX 2-3 PCAPP EDS INSPECTION LOG SHEETS

Savard Labor & Marine Staffing, Inc. Rigging Safety Rev3/14 Rigging Safety

Operating instructions. 3-in. x 6-ft. Anchor Strap for Skyline Horizontal Lifeline

Non-destructive testing of steel forgings - Part 2: Penetrant testing (BS EN :1998)

Owner s Manual. MODEL TCR 10 Ton and 25 Ton Capacity. Code, Lot and Serial Number WARNING

Experimental Study on Non Destructive Testing Techniques (NDTT)

\ srl High Technology Gear Reducers and Cardan Shafts CERTIFIED QUALITY SYSTEM: UNI ISO EN 9001:2008 ICIM 2779/2; IQNET N. IT UNIVERSAL SHAFT

Rules for Testing and Certification of Materials

Manufacturing, Supply & Quality Plan for Tower Bolts. SL Tower Bolt Market Penetration

STORAGE, INSTALLATION AND MAINTENANCE PROCEDURES

SECTION HIGH DENSITY POLYETHYLENE (HDPE) PIPE AND FITTINGS FOR WATER DISTRIBUTION AND TRANSMISSION

Oil and Gas Pipeline Design, Maintenance and Repair

STATEMENT OF WORK (SOW) On-Call Certified Welding Inspections and Nondestructive Testing

A World Class Manufacturer of Induction Bends

White Paper FIRE DOOR INSPECTIONS, REPAIRS AND LABELING

Technical Notes NDT 001 Specific Requirements for Non- Destructive Testing Laboratories

BODY OF KNOWLEDGE API-570 AUTHORIZED PIPING INSPECTOR CERTIFICATION EXAMINATION

OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

NEW TECHNIQUE FOR RESIDUAL STRESS MEASUREMENT NDT

A GUIDE TO LIFTING BEAMS AND SPREADERS

Guidelines for Securing by Welding of Chain Cable Studs in Service Guidance for Anchoring Equipment in Service

Crane Best Practices in Tree Removal Hoisting a Qualified Arborist. By Mark Adams

SERIES NG 1800 STRUCTURAL STEELWORK

Operations and Instruction Manual Might Swivel - Part # Concrete and Steel Anchorage Connector ANSI Z ,000 lbs / 44kn

SAMPLE TEST QUESTIONS STEAMFITTER/PIPEFITTER - ITA WEBSITE

ENGINEERING SPECIFICATION PULTRUDED DYNARAIL FIBERGLASS LADDER & LADDER CAGES

MATERIAL HANDLING PROGRAM (Section 10)

Repair of a Hull 15 m below the Waterline

M_004 Basic Rigging Safety Lecture

Load Testing and Lift Engineering

49 CFR 192 Transportation of Natural and Other Gas By Pipeline: Minimum Federal Safety Standards

Member of Van Beest International

CONTRACT SPECIFICATIONS - SEISMIC ISOLATION BEARINGS

SFI SPECIFICATION 28.1 EFFECTIVE: SEPTEMBER 23, 2011 *

9. QUALITY CONTROL/QUALITY ASSURANCE

CR-SERIES CARPET POLES INSTRUCTION MANUAL

GLOBAL INSPECTION AND CERTIFICATION

DUFFERIN-PEEL CATHOLIC DISTRICT SCHOOL BOARD

Transcription:

CHAPTER 13 LOAD HOOKS This chapter provides safety standards for the inspection, testing, and maintenance of load hooks installed on cranes or hoists and implements the requirements of ASME B30.10, Chapter 10-1, Hooks. See Chapter 12, Rigging Accessories, for rigging hook requirements (for latest ASME standards, see http://catalog.asme.org/home.cfm?category=cs). 13.1 GENERAL...13-1 13.1.1 Marking...13-1 13.1.2 Attachments...13-1 13.1.3 Load Limits...13-1 13.1.4 Hook Standards...13-1 13.2 INSPECTIONS...13-2 13.2.1 Hook Service...13-2 13.2.2 Initial Inspection...13-2 13.2.3 Daily Inspection...13-2 13.2.4 Frequent Inspection...13-2 13.2.5 Periodic inspection...13-2 13.3 TESTING...13-4 13.4 NONDESTRUCTIVE TESTING (NDT)...13-6 13.4.1 NDT Requirements...13-6 13.4.2 NDT Records...13-6 13.4.3 NDT Methods...13-6 13.4.4 Acceptance Criteria...13-6 13.4.5 Discontinuity Removal...13-6 13.5 MAINTENANCE...13-8 13.6 OPERATION...13-9 Exhibit I Hook Periodic Inspection Report...13-13 13-i

INTENTIONALLY BLANK Chapter 13 13-ii

13.1 GENERAL 13.1.1 MARKING a. The manufacturer s identification shall be forged, cast, or die-stamped on a low-stress and nonwearing area of the hook. b. Hoisting hooks furnished by the original hoisting equipment manufacturer as an integral part the hoist assembly or by the original hoist manufacturer as replacement hooks are not required to have manufacturer markings. 13.1.2 ATTACHMENTS a. Hoisting hooks shall be fitted with a latch to bridge the throat opening to prevent the accidental release of slings or attachments. Hooks without latches may be used in special applications where the latch would interfere with the proper use of the hook, providing that (1) the use of the hook is restricted to the application for which it is approved, and (2) in questionable cases, concurrence is obtained from the appropriate safety organization. b. If a handle or latch support is required to be welded to the hook, welding shall be done prior to final heat-treating. 13.1.3 LOAD LIMITS Hooks shall not be loaded beyond rated capacity except during load tests of the equipment of which they are a part. 13.1.4 HOOK STANDARDS a. Hook design shall meet generally accepted hook design standards and be compatible with the requirements of ASME B30.10. b. Hook material shall have sufficient ductility to permanently deform before failure at the ambient temperatures at which the hook will be used. c. When a latch is provided, it shall be designed to retain such items as slings under slack conditions. The latch is not intended to support the load. d. The bearing surfaces of new hooks shall be the arc of a circle. Gauge points, or hook gauges, for measuring spread after load testing should be provided. e. Field-fabricated hooks shall meet the requirements of this section and shall be approved by a qualified engineer. 13-1 Chapter 13

13.2 INSPECTIONS 13.2.1 HOOK SERVICE Hook service is defined as follows: a. Normal service operation at less than 85 percent of rated capacity except for isolated instances. b. Heavy service operation at 85 to 100 percent of rated capacity as a regular specified procedure. c. Severe service operation at heavy service coupled with abnormal operating conditions, (i.e., extreme temperatures, corrosive atmospheres, etc.). 13.2.2 INITIAL INSPECTION a. Prior to initial use, all new and repaired hooks shall be inspected by a qualified inspector to ensure their compliance with the applicable provisions of ASME B30.10, Section 10-1.2. Dated and signed inspection records shall be kept on file and shall be readily available. b. Inspection procedure and record keeping requirements for hooks in regular service shall be governed by requirements for the kind of equipment in which they are used. When such requirements are stated in standards for the specific equipment, they shall take precedence over the requirements of this section. 13.2.3 DAILY INSPECTION a. Operators or other designated personnel shall visually inspect hooks for deficiencies such as the following each day or prior to use if the hook has not been in regular service (records are not required): 1. Cracks, nicks, and gouges. 2. Deformation. 3. Damage from chemicals. 5. Evidence of heat damage. b. A designated person shall examine deficiencies and determine whether they constitute a safety hazard and whether a more detailed inspection is required. 13.2.4 FREQUENT INSPECTION a. Operators or other designated personnel shall visually inspect the hook at the following intervals (records are not required): 1. Normal service monthly.. 2. Heavy service weekly to monthly. 3. Severe service b. These inspections shall, in addition to the requirements of Section 13.2.3, Daily Inspection, include the following: 1. Wear. 2. Hook attachment and securing means. c. A designated person shall examine deficiencies and determine whether they constitute a safety hazard and whether a more detailed inspection is required. 13.2.5 PERIODIC INSPECTION a. A qualified inspector shall perform a complete inspection at the following intervals: 1. Normal service yearly. 2. Heavy service semiannually. 3. Severe service quarterly. b. A qualified person shall examine deficiencies and determine whether they constitute a safety hazard. 4. Latch engagement, damage to or malfunction of latch (if provided). Chapter 13 13-2

c. The inspection shall include the requirements of Section 13.2.4, Frequent Inspection. d. Hooks having any of the following conditions shall be removed from service until repaired or replaced: 1. Deformation Any visibly apparent bend or twist from the plane of the unbent hook. 2. Throat opening Any distortion causing an increase in throat opening exceeding 5 percent, not to exceed ¼ inch (or as recommended by the manufacturer). 3. Wear Any wear exceeding 10 percent (or as recommended by the manufacturer) of the original section dimension of the hook or its load pin. 4. Cracks. 5. If a latch is provided and it becomes inoperative because of wear or deformation or fails to fully bridge the throat opening, the hook shall be removed from service until the device has been repaired or replaced and the throat opening has been assessed as described above. 6. Any self-locking hook that does not lock. e. If hooks are painted, a visual inspection should take the coating into consideration. Surface variations can disclose evidence of heavy or severe service. The surface condition may call for stripping the paint in such instances. f. Hooks in severe service as defined in 13.2.1.c. may show the need for a nondestructive testing. f. Dated and signed inspection records shall be kept on file and shall be readily available. 13-3 Chapter 13

13.3 TESTING a. Each new or replacement hook of 150-ton capacity or greater and a prototype of each hook design of less than 150-ton capacity shall be proof-tested by the manufacturer in accordance with Table 13-1. b. When proof tests are used, the hooks shall withstand the proof load application without permanent deformation when the load is applied for a minimum of 15 seconds. This condition is considered satisfied if the permanent increase in the throat opening does not exceed 0.5 percent or 0.01 in. (0.25 mm), whichever is greater. c. For a duplex (sister) hook having a pin eye, the proof load for the eye shall be in accordance with Table 13-1. The proof load shall be shared equally between the two prongs of a sister hook, unless the hook is designed for unbalanced loading. d. Hooks that have been proof-tested may be subsequently inspected by the magneticparticle method in accordance with ASTM E-709 ( Standard Practice for Magnetic Particle Examination ) and shall show no cracks, inclusions, or other relevant discrepancies; casting shall be evaluated in accordance with ASTM E-165 ( Standard Practice for Liquid Penetrant Inspection Method ). e. Performance testing of hooks shall not be required except where necessary to conform to the requirements for the equipment of which they are part. When testing is specified, documentation shall be uniquely identified to the hook by serial number or other identifier. Chapter 13 13-4

Table 13-1. Proof test load. Rated load, tons (2,000 lb) 0.50 1 5 10 15 20 25 30 35 40 45 50 60 75 100 125 150 175 250 300 350 400 450 500 kg 453.6 907.2 4,536 9,072 13,608 18,144 22,680 27,216 31,752 36,288 40,824 45,360 54,432 68,040 90,720 113,400 136,080 158,760 181,440 226,800 272,160 317,520 362,880 408,240 453,600 % rated load 193 183 166 150 Above 500 453,600 Proof load (minimum), tons (2,000 lb) kg 1 2 10 20 30 40 50 60 70 80 90 100 116 137 166 188 233 266 333 399 465 532 598 665 907.2 1,814.4 9,072 18,144 27,216 36,288 45,360 54,432 63,504 72,576 81,648 90,720 105,235 124,286 150,595 170,554 181,440 211,378 241,315 302,098 361,973 421,848 482,630 542,506 603,288 Note: 1 ton (short, 2,000 lb) = 907.2 kg For hooks with load ratings not shown above, use the next lower load rating for determining the percent f rated load to be applied. Reprinted from ASME B30.10-5 by permission of The American Society of Mechanical Engineers. All rights reserved. 13-5 Chapter 13

13.4 NONDESTRUCTIVE TESTING (NDT) 13.4.1 NDT REQUIREMENTS If detailed inspections are performed (refer to sections 13.2.3.b., 13.2.4.c, and 13.2.5.b.), the results shall be evaluated by a qualified person to determine the need for subsequent NDT. If NDT is deemed necessary, it shall be performed in accordance with Section 13.4.3. 13.4.2 NDT RECORDS Dated and signed NDT records, traceable to the hook by a serial number or other identifier, shall be kept on file as long as the hook remains in service and shall be readily available to appointed personnel. 13.4.3 NDT METHODS a. Use magnetic-particle testing or liquidpenetrant testing methods to inspect for surface intersecting discontinuities. b. A qualified inspector or designated person shall perform NDTs in accordance with the following ASTM standards: 1. ASTM E-709. 2. ASTM E-165. c. For magnetic-particle testing, a coil, yoke, or wet technique should be used to eliminate the possibility of prod burns or arc strikes. d. Perform an NDT with the hook in place unless conditions indicate that disassembly for thread or shank inspection is necessary. 13.4.4 ACCEPTANCE CRITERIA A designated person shall document and resolve the following relevant indications: a. Arc strikes (welding or electrical). b. Surface intersecting discontinuities 0.25 in. long or longer. 13.4.5 DISCONTINUITY REMOVAL a. Two directions of discontinuity, P and T, are shown on Figures 13-1 and 13-2. Discontinuity P parallels the contour of the hook, is considered nonserious, and does not require removal. Discontinuity T, on the other hand, is transverse to the contour of the hook and is more serious; when occurring in zones B, C, or D, discontinuity T may reduce the longevity of the hook. b. Discontinuities may be removed by grinding longitudinally following the contour of the hook to produce a smooth, gently undulating surface. In zones B and D, such grinding shall not reduce the original hook dimension by more than 10 percent. Such a reduction will not affect the working load limit rating or the ultimate load rating of the hook. In zone C, grinding shall not reduce the original dimension by more than 5 percent. c. Under normal and proper application, zone A is an unstressed zone. Therefore, it is not required that discontinuities in that zone be ground out. d. The hook shall be reexamined by performing an NDT after grinding to verify removal of relevant discontinuities. Chapter 13 13-6

Figure 13-1. Shank hook. Figure 13-1. Shank hook. Figure 13-2. Eye hook. 13-7 Chapter 13

13.5 MAINTENANCE a. A hook latch that is inoperative or missing shall be repaired or replaced. b. A hook with a latch that does not bridge the throat opening shall be removed from service until the latch is replaced or repaired and the hook is examined for deformation with special attention to the throat opening. c. A designated person shall repair cracks, nicks, and gouges by grinding longitudinally, following the contour of the hook, provided no dimension is reduced more than 10 percent (or as recommended by the manufacturer) of its original value. d. All other repairs shall be performed by the manufacturer or a qualified person. e. Replacement parts, such as load pins for clevis hooks, shall be at least equal to the original manufacturer s specifications. Chapter 13 13-8

13.6 OPERATION Hook users shall do the following: a. Determine that the weight of the load to be lifted does not exceed the load rating f the hook. b. Avoid shock loading. c. Center the load in the base (bowl or saddle) of the hook to prevent point loading of the hook. d. Do not use hooks in such a manner as to place a side- or backload on the hook. e. When using a device to bridge the throat opening of the hook, ensure that no portion of the load is carried by the bridging device. f. Keep hands and fingers from between the hook and the load. g. Load duplex (sister) hooks equally on both sides, unless the hook is specifically designed for single loading. h. Do not load the pinhole in duplex (sister) hooks beyond the rated load of the hook. 13-9 Chapter 13

INTENTIONALLY BLANK Chapter 13 13-10

Exhibit I is intended to be a sample form only. The equipment manufacturer s inspection/testing criteria supercede any other criteria. In cases where the equipment manufacturer does not include inspection/testing criteria, other forms developed to facilitate required inspection/testing are acceptable. 13-11 Chapter 13

INTENTIONALLY BLANK Chapter 13 13-12

EXHIBIT I (SAMPLE FORM) Page 1 of 1 DEVICE: DEVICE NO.: SERVICE CLASSIFICATION: LOCATION: Two directions of discontinuities are labeled on the drawing above as P and T. discontinuity P parallels the contour of the hook and is considered non-serious in nature and does not require removal from service. Discontinuity T is transverse to contour of the hook and is more serious in nature. Discontinuity T, when occurring in Zones B, C, or D, may reduce longevity of the hook. If the inspection identifies discontinuities, NDT should be considered. Date Throat Opening Tram AA Tram BB Twist Angle Crack Wear Hook Latch NDT Performed Pass/Fail Inspector Original Measurements COMMENTS: NOTES ON RESULTS: 13-13 Chapter 13

INTENTIONALLY BLANK Chapter 13 13-14