SAMPLE TEST QUESTIONS STEAMFITTER/PIPEFITTER - ITA WEBSITE
|
|
|
- Juliet Butler
- 10 years ago
- Views:
Transcription
1 1 Which tool is used to correct internal hi-low when preparing a 4-in. steel pipe for welding? A. 4-in. grinder with cutting disc. B. Mini-grinder with flapper disc. C. Pencil grinder with cone stone. D. 4-in. grinder with 1/4-in. grinding disc. 2 Which code governs the installation of pressure piping systems? A. ASW B. ASTM C. CWB 471 D. ASME B Which type of hanger is used when thermal horizontal movement is a factor? A. Roller. B. Clevis. C. Trapeze. D. Constant support spring. 4 Which document is used for shop assembly? A. Flow sheet. B. Spool sheet. C. Detail drawing. D. Schematic drawing.
2 5 A template is to be divided into 12 equal spaces. What is the angle between the ordinate lines? A. 15 B. 30 C. 45 D A template is to be located on a pipe, but a centre finder is not available. What else can be used to accurately mark the centerline? A. Wrap-around. B. Tape measure. C. 2-ft. level and plumb bob. D. Framing square and level. 7 A 150-mm (6-in.) extra heavy weld neck flange is to be transitioned to Schedule 40 pipe. What is done to prepare the flange? A. Grind the outside of the flange to match the outside diameter of the pipe. B. Grind the outside of the flange to match the inside diameter of the pipe. C. Grind the inside of the flange to match the outside diameter of the pipe. D. Grind the inside of the flange to match the inside diameter of the pipe. 8 A pipe is being suspended from a concrete structure using 1/2-in. wedge type female inserts (expansion shield) for supports. What is the procedure for installing the inserts after drilling the correct size hole? A. Place the insert and set the wedge. B. Apply epoxy and install the anchor. C. Place the insert and tighten the locking nut. D. Insert the anchor and remove the locking nut.
3 9 A press-fit joint is being assembled. What must be done at this joint location? A. Wash the joint inside and out with muriatic acid. B. Grind the edge to a 35 bevel and insert into joint. C. Clean the joint with sand cloth and apply acid flux. D. Mark the circumference with a felt pen following pipe insertion. 10 During fit-up, the spool piece is found to be 3 mm (1/8 in.) too long. Based on the following information, what should be done? Piping system is 250-mm (10-in.) schedule 40. Final piece is a 6-m (20-ft.) pipe spool flanged at both ends located between two risers. Specifications require the use of 3-mm (1/8-in.) spiral wound gaskets. A. Apply liquid Teflon to supplement the spiral wound gaskets. B. Use flange spreaders until the final gasket can be installed, then complete bolt-up. C. Use ready-rod in holes at 90 intervals to push the joint apart until gaskets can be inserted. D. Disconnect the previous flange, install 1.5-mm (1/16-in.) asbestos flat-ring gaskets and apply copper coat. 11 A sleeve is needed for a 300-mm (12-in.) pipe with a minimum of 38-mm (1 1/2- in.) clearance for insulation. Which size pipe is used for this sleeve? METRIC IMPERIAL A. 300 mm A. 12 in. B. 350 mm B. 14 in. C. 400 mm C. 16 in. D. 450 mm D. 18 in.
4 12 A fabricated piece of 10-in. pipe, 45 ft. long weighs 40 lb. per lineal foot. What is the total weight of the load? A. 400 lb. B. 450 lb. C lb. D lb. 13 A 12-m (40-ft.), 350-mm (14-in.) Schedule 80 pipe has to be moved 18 m (60 ft.) horizontally in a pipe rack. Which piece of rigging equipment is best suited for this task? A. Tirfor. B. Chain fall. C. Pinch bars. D. Block and tackle. 14 How and shackles and pins stored when a job is complete? A. Place pins in shackles and store in a clean dry environment. B. Remove pins from shackles and keep in an accessible rigging box. C. Replace worn pins with bolts and keep in an accessible rigging box. D. Replace worn pins with bolts and store together in a clean dry environment. 15 A low-pressure steam boiler has a set operating pressure 5 psig below the maximum allowed by the ASME code. The differential of the pressuretrol is 4 psig. What is the cut-in pressure? A. 3 psig B. 6 psig C. 16 psig D. 21 psig
5 16 What is the procedure for installing a water column on a high-pressure steam boiler? A. Tie in to water space and steam space with 25-mm (1-in.) pipe, and install test cocks and inspection crosses top and bottom. B. Install both ends of water column below low water cut-off and tie in with 19- mm (3/4-in.) pipe. C. Install both ends of water column in steam space with 25-mm (1-in.) pipe, and install test cocks and inspection crosses top and bottom. D. Tie 50-mm (2-in.) pipe between the mud drum and the steam drum, and install a relief valve and a drain valve. 17 A reduction in pipe size is required in low pressure process steam line. How is the piping arranged to prevent water hammer? A. Eccentric reducer flat on top. B. Concentric reducer flat on top. C. Eccentric reducer flat on bottom. D. Concentric reducer flat on bottom. 18 The condensate side of a steam trap is piped into an overhead condensate main. Which type of check valve is installed and what is the best location? A. Lift check valve installed at mid-point. B. Stop check valve installed at mid-point. C. Swing check valve installed close to the trap location. D. Non-slam check valve installed closed to the main connection.
6 19 What is installed on a pipe for an expansion joint on a 6-in. steam main in a precast concrete tunnel? A. Anchors welded on the grating. B. Guides attached to the concrete structure. C. Bypass installed around the expansion joint. D. Anchors and guides attached to the concrete structure. 20 What is installed with a chemical pot feeder that is serving a closed hydronic heating system? A. Injectors. B. Isolating valves. C. Circulating pump. D. Pressure relief valve. 21 Where should a cooling tower be installed? A. Outside, in a ventilated area. B. Outside, in an airtight structure. C. As close as possible to the ventilator. D. In the mechanical room, with adequate drainage. 22 Process steam is supplied to a brewery. Why is a economizer installed? A. To increase the temperature of the steam. B. To separate the condensate from the steam. C. To use the flue gas to preheat the feed water. D. To remove dissolved gases from the feed water.
7 23 Which type of gasket is most often used in a high-pressure hydraulic system assembled with socket weld flanges? A. O-ring. B. Crush ring. C. Spiral wound. D. Asbestos fibre. 24 What is installed on a fuel oil system to remove suspended particles and prevent clogging of the nozzles? A. Trap. B. Filter. C. Screen. D. Strainer. 25 How is a compressed air line installed to allow drainage of condensation from the piping system? A. By installing the piping level and providing a drip leg. B. By grading up in the direction of flow with an air vent at the high point. C. By installing the piping level and connecting branches to the bottom. D. By grading down in the direction of flow towards the condensation collection point. 26 What should be verified before hooking up a pump for a hydrostatic test? A. That pump is installed after header. B. That pump is installed without isolation valves. C. That an orifice is installed between the pump and the test header. D. That an isolation valve is installed between the pump and the test header.
8 27 A system is rated for kpa (1 500 psi). What is the minimum rating required when making up a test header? METRIC IMPERIAL A kpa A psi B kpa B psi C kpa C psi D kpa D psi 28 What could cause fluctuations on the test gauge reading during a 24-hour air test? A. Change in elevation. B. Change in volume of system. C. Change in ambient air temperature. D. Test air absorbed by moisture in the system. 29 What is the procedure to repair a broken fitting on a hydronic heating system using CPVC pipe? A. Isolate, drain, remove joint, solvent weld to new spool and fitting, and install. B. Isolate, drain, remove joint, apply primer, solvent weld to new spool and fitting, and install. C. Isolate, drain, remove joint, apply primer to new spool and fitting, and install. D. Drain, isolate, remove joint, apply primer, solvent weld to new spool and fitting, and install.
9 30 Water hammering is occurring due to priming of a steam boiler. What is the main cause of the problem? A. Condensate is returning to the boiler under pressure. B. Boiler water is traveling into the system with the steam. C. Steam is returning to the boiler through the return main. D. Both the continuous and intermittent blow-downs are open.
DARTMOUTH COLLEGE DESIGN January 3, 2012 & CONSTRUCTION GUIDELINES
SECTION 15062 STEAM AND CONDENSATE PIPING PART 1 DESIGN DIRECTIVES 1.1 QUALITY ASSURANCE A. Comply with the provisions of the following: 1.2 DESIGN CRITERIA 1. ASME B 31.9 Building Services Piping : for
Constantemp Double Wall Low pressure steam-water Heater F-340LDW,F-640LDW, F-940LDW and F-1240LDW
Installation, Operating and Maintenance Instructions 90/4.5.5 Rev. 0 Constantemp Double Wall Low pressure steam-water Heater F-340LDW,F-640LDW, F-940LDW and F-1240LDW Table of Contents SECTION I... 2 INSTALLATION...
PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT
PIPES AND TUBES FOR HVAC PIPING AND EQUIPMENT GENERAL INFORMATION 1.1 This section applies to piping systems for chilled water, hot water, condenser water, steam, condensate return, fuel oil, refrigerant
PBX Series Quick Fit Connector Bimetallic Steam Traps
6262100/6 IM-P626-01 ST Issue 6 PBX Series Quick Fit Connector Bimetallic Steam Traps Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation 4. Commissioning
SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)
APPLICATIONS Process Industry Weak Acids Alkalies Compressed Air Pulp & Paper MODELS ASM - Flanged Connection OPTIONS Control Rods Oil & Gas Water & Waste Pump suction & discharge Sea water Chemical lines
James M. Pleasants Company
James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:
Float and Thermostatic Traps Series H, C and X
Hoffman Specialty Installation & Maintenance Instructions HS-(E) and Thermostatic Traps Series H, C and X Series C & NPT Series C NPT Series X NPT Series C NPT Series H Ratings Maximum Max. Operating NPT
Course available 24/7 for up to six months from the date of purchase or until completion
SPED ONLINE COURSE TRAINING Piper BootCamp and Process Plant Layout BOTH Piper BootCamp and Process Plant Layout online courses contain: Approximately 25 hours of online videos Printable notes Links to
TYPE E Main Valve Sizes 3 /8 through 12
SD 3001F PRINTED IN U.S.A. SD 3001F/0707 A B TYPE E MAIN VALVE C D E TYPE E Main Valve Sizes 3 /8 through 12 The Spence Type E Main Valve is of normally closed, single seat design featuring packless construction,
5.23.22 STEAM AND CONDENSATE PIPING AND PUMPS DESIGN AND CONSTRUCTION STANDARD PART 1: GENERAL. 1.01 Purpose:
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
WD600 STEAM TRAPS. Thermodynamic Steam Trap
WD600 Watson McDaniel reserves the right to change the designs and/or materials of its products without notice. 2010 Watson McDaniel Company WD600, WD600L Sizes 3/8, 1/2, 3/4, 1 NPT Material Stainless
building engineering services association specification for: Domestic Heating www.thebesa.com
building engineering services association specification for: Domestic central Heating installation www.thebesa.com building engineering services association acknowledgments Guide to good practice: Domestic
OPERATION AND MAINTENANCE MANUAL 5-1/4 B-84-B-5 FIRE HYDRANT
OPERATION AND MAINTENANCE MANUAL 5-1/4 B-84-B-5 FIRE HYDRANT INDEX AMERICAN - DARLING 5-1/4 IN. B-84-B-5 FIRE HYDRANT OPERATION AND MAINTENANCE MANUAL OPERATION AND MAINTENANCE REPAIRS Operation and Maintenance...
SECTION 02630 STORM DRAINAGE SYSTEM
SECTION 02630 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for storm drainage systems including modifications and connections to existing storm drainage systems. 1.02 REFERENCE
ASME/ANSI B16.1-1998 - Cast Iron Pipe Flanges and Flanged Fittings ASME/ANSI B16.3-1998 - Malleable Iron Threaded Fittings ASME/ANSI B16.
ASME/ANSI B16.1-1998 - Cast Iron Pipe Flanges and Flanged Fittings ASME/ANSI B16.3-1998 - Malleable Iron Threaded Fittings ASME/ANSI B16.4-1998 - Cast Iron Threaded Fittings ASME/ANSI B16.5-1996 - Pipe
Power Cube Open Source Ecology Page 1. Power Cube. Version 4
Power Cube Open Source Ecology Page 1 Power Cube Version 4 Power Cube Open Source Ecology Page 2 Contents Table of Contents Power Cube... 1 Contents...2 Introduction... 3 Bill Of Materials...4 Discrete
3", 4", 6" & 8" Model H Series Alarm Check Valve Installation and Maintenance Guide
", ", " & " Model H Series Alarm Check Valve Installation and Maintenance Guide 077 AIRPARK DRIVE STANDISH, MICHIGAN PHONE 99-- 00-2-0 FAX 99--92 www.globesprinkler.com OCTOBER 2 C- BULLETIN A.C.V.I.M.,
CHAPTER 10 BOILERS, WATER HEATERS AND PRESSURE VESSELS
CHAPTER 10 BOILERS, WATER HEATERS AND PRESSURE VESSELS SECTION 1001 GENERAL 1001.1 Scope. This chapter shall govern the installation, alteration and repair of boilers, water heaters and pressure vessels.
SECTION 15140 - PIPE HANGERS AND SUPPORTS
Part I - GENERAL 1.01 SECTION INCLUDES A. The work covered under this section consists of the furnishing of all necessary labor, supervision, materials, equipment, and services to completely execute the
Installation, Maintenance, & Repair Series 4000B/LF4000B
Installation, Maintenance, & Repair Series 4000B/LF4000B Reduced Pressure Zone Assemblies Sizes: 1 2" 2" (15 50mm) RP/IS-A-4000B 4000B/LF4000B Size: 3 /4"! WARNING Testing Read this Manual BEFORE using
HS-901(A) BASIC STEAM HEATING SYSTEMS
HS-901(A) BASIC HEATING SYSTEMS One-Pipe Two-Pipe Basic Steam Heating Systems One-pipe steam heating system EQUALIZER SAFETY FACTOR STATIC HEAD PRESSURE DROP 2" HEATING UNIT 15" DRIP CONNECTION In a one-pipe,
PRESSURE REDUCING CONTROL VALVE
Schematics Throttles to reduce high upstream pressure to constant lower downstream pressure Low Flow By-Pass controls at low flows 4 PRESSURE REDUCING CONTROL VALVE with LOW FLOW BY-PASS FEATURE Main Line
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
HYDRAULIC TABLE CART 500-LB.
HYDRAULIC TABLE CART 500-LB. OWNER S MANUAL WARNING: Read carefully and understand all MACHINE ADJUSTMENT AND OPERATION INSTRUCTIONS before operating. Failure to follow the safety rules and other basic
M A N U A L 13-10-05
Documentation The following information sheets illustrate the description below: 12-WW01-4G-E Sectional view of the lance with main dimensions 12-W101-6G-E Sectional view of the head of the lance with
Element D Services Plumbing
PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses domestic cold, hot and hot water return distribution systems within and to five feet beyond building perimeter. PART 2 - DESIGN CRITERIA 2.01 GENERAL
Element D Services Plumbing
Medical Vacuum and Gas PART 1 - GENERAL 1.01 OVERVIEW A. This section addresses medical vacuum, waste anesthetic gas disposal, compressed air, oxygen, nitrous oxide, nitrogen and carbon dioxide systems.
In-Track Repair of Concrete Ties. Deland Humpherys, Director Track Mtce
In-Track Repair of Concrete Ties Deland Humpherys, Director Track Mtce Concrete tie repairs: Shoulder repair process Normally the result of a derailment Lag removal and replacement process Broken lags
Select Radiators Installation Guide
Select Radiators Installation Guide Table of Contents Informational Symbols...3 Before You Begin...4 Select Rough-In... 5 Connection Installation...6 Optional Piping Arrangements...7 Conventional Wall
BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap
1263050/6 IM-P126-07 ST Issue 6 BPW32 DN15, DN20 and DN25 Balanced Pressure Wafer Steam Trap Installation and Maintenance Instructions 1. Safety information 2. General product information 3. Installation
Mustang Series PRESSURE REDUCING CONTROL VALVE WITH PRESSURE SUSTAINING FEATURE. M115-2 (Globe) M1115-2 (Angle) Schematic. Standard Components
Schematic Throttles to reduce high upstream pressure to constant lower downstream pressure Throttles to maintain minimum upstream pressure PRESSURE REDUCING CONTROL VALVE WITH PRESSURE SUSTAINING FEATURE
INSTALLATION INSTRUCTIONS. 6108 Air Spring Kit 2011+ Ford F250 Single Wheel 4WD 2011+ Ford F350 Dually 4WD (2011 F350 Single Wheel 4WD use p/n 6113)
INSTALLATION INSTRUCTIONS 6108 Air Spring Kit 2011+ Ford F250 Single Wheel 4WD 2011+ Ford F350 Dually 4WD (2011 F350 Single Wheel 4WD use p/n 6113) Thank you for purchasing a quality Hellwig Product. PLEASE
WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU!
WHAT YOU DON T KNOW ABOUT ACCUMULATORS CAN KILL YOU! Atlanta (Monroe) GA 770-267-3787 [email protected] www.gpmhydraulic.com What You Don t Know About Hydraulic Accumulators Can Kill You TABLE OF CONTENTS
Factory owners must ensure the boiler is:
Factory owners must ensure the boiler is: * Registered with the Boilers and Pressure Vessels Division, Labour Department * Examined by an appointed examiner and has a valid certificate of fitness * Supervised
Trash Pumps Models: 56200, 562000, 56201, 562001, 56300, 563000, 56301, 563001
Trash Pumps Models: 56200, 562000, 56201, 562001, 56300, 563000, 56301, 563001 Specifically designed pumps for heavy duty applications Handles solids with eas and simple to open and clean Standard roll
Fire Hydrant Troubleshooting
Fire Hydrant Troubleshooting Pulsation or chatter during opening and flow of water from hydrant. Loose condition in stem at lower valve plate nut. Tighten lower valve plate nut and secure with SS lock
Steam System Best Practices Condensate System Piping
Steam System Best Practices Condensate System Piping Summary The best method for improving steam system energy efficiency, reducing chemical costs, and reducing make-up water costs is to return the maximum
www.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 19 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT SCOPE 2 REFERENCES
BLADDER SURGE CONTROL SYSTEM
PART I GENERAL 1.01 Description BLADDER SURGE CONTROL SYSTEM This specification describes the requirements for a Bladder Surge Control System. The purpose of the system is to minimize transient pressures
B. ASTM C 533 Calcium Silicate Block and Pipe Thermal Insulation. C. ASTM C 547 Mineral Fiber Preformed Insulation
PART 1: GENERAL 1.01 Purpose: A. This standard is intended to provide useful information to the Professional Service Provider (PSP) to establish a basis of design. The responsibility of the engineer is
GAS DISTRIBUTION PRODUCTS STEEL SERVICE TEES
GAS DISTRIBUTION PRODUCTS STEEL SERVICE TEES CONTINENTAL INDUSTRIES ABOUT US THE ULTIMATE CONNECTION Our Company Continental Industries, headquartered in Tulsa, Oklahoma, was formed in 1958 and is today
Cooling system components, removing and installing
Engine BHW Cooling system components, removing and installing Page 1 / 24 19-1 Cooling system components, removing and installing Warning! When doing any repair work, especially in the engine compartment,
Fire Pump Plan Review March 2010
Fire Pump Plan Review March 2010 Date of Review: / / Permit Number: Business/Building Name: Address of Project: Designer Name: Designer s Phone: Contractor: Contractor s Phone: Occupancy Classification:
HOW TO SELECT A LOW VOLUME (L.V ) BOILER
HOW TO SELECT A LOW VOLUME (L.V ) BOILER FREQUENTLY ASKED QUESTIONS OR COMMENTS ON BOILERS Dear Potential Customer: Low Volume Operator Exempt boilers have been marketed in Ontario to eliminate the requirement
Boiler Plan II Table of Contents
Cover Page Table Of Contents Introduction Parts List Additional Materials Assembly instructions Drawings 1-15 Boiler Plan II Table of Contents Introduction This will be a very rewarding project, if you
Owner s Manual Gantry Cranes
Owner s Manual Gantry Cranes Fixed Height Gantry Crane MODEL NUMBER: SERIAL NUMBER: CAPACITY IN TONS: Telescoping Gantry Crane Bushman AvonTec 262-790-4200, 800338-7810, Fax 262-790-4200 www.bushmanavontec.com
! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P)
Series 150S and 157S (Snap Switch, All Models except 157S-RB-P) Low Water Cut-Off/Pump Controllers For Steam Boilers and Other Level Control Applications McDonnell & Miller Installation & Maintenance Instructions
2010 Residential Water Heater Replacement Check List
2010 Residential Water Heater Replacement Check List The intent of this check list is to provide installers a general reference for the enforcement of code requirements in the Greater San Diego Area. This
Mueller B-101 and A-3 Drilling and Tapping Machines
TM TM Mueller and Drilling and Tapping Machines A guide to selecting Mueller Equipment Mueller TM TM and Drilling and Tapping Machines When it comes to line stopping and drilling and tapping technology
Boiler & Pressure Vessel Inspection discrepancies and failures
Boiler & Pressure Vessel Inspection discrepancies and failures Water Heaters / Pressure Vessels Pressure Vessels are inspected once every three years. This requires a test of A: safety relief devices B:
Volkswagen New Beetle 2.0 Liter 4-cyl General, Engine (Engine Code AEG) 17 Engine-Lubrication system (Page GR-17)
17 Engine-Lubrication system (Page GR-17) Lubrication system components, removing and installing Oil pan, removing and installing Oil pressure and oil pressure switch, checking Dynamic oil pressure warning
STORAGE, INSTALLATION AND MAINTENANCE PROCEDURES
GATE VALVE O.S. & Y 1.0 Periodic Inspections 1.1 The valve stem packing should be inspected at least monthly. If the stem packing shows signs of leakage, simply tighten the adjusting nuts to compress the
Refrigeration Installation 101
Refrigeration Installation 101 Hundreds of Installations Refrigerated Cases 2 Compressor Racks 3 Condensing Units 4 Walk-in Boxes 5 Some were done very well 6 Some had some issues... 7 8 Some seemingly
The cylinder head bolts tightening stages have been updated as listed in Table 1.
NUMBER: 07 EPA04 MBE 4000-6 S.M. REF.: 1.2.2 ENGINE: MBE 4000 DATE: November 2007 SUBJECT: CYLINDER HEAD BOLTS TIGHTENING STAGES PUBLICATION: 6SE412 The cylinder head bolts tightening stages have been
SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT
SECTION 230529 - PART 1 - GENERAL 1.1 SUMMARY A. This Section includes the following: 1. Steel pipe hangers and supports. 2. Metal framing systems. 3. Thermal-hanger shield inserts. 4. Fastener systems.
3620 W 11th Streetб Houston, TX 77008 Telephone: 713-635-6291 Email: [email protected] Website: www.kellogg-american.com
Unpackaging & Handling Be sure to carefully inspect the unit before accepting the shipment. If any damage has occurred document it with the trucking company immediately. Contact your Kellogg Distributor
Awning Instructions. Standard Manual 1.5m to 4.5m
Awning Instructions Standard Manual 1.5m to 4.5m English Standard Manual Instructions Contents Warning 1.5m 3.0m Awnings 4 x Expansion bolts (2 per bracket)** 2 x brackets 1 x Awning 1 x Winder handle
SECTION 221413 FACILITY STORM DRAINAGE PIPING
SECTION 221413 FACILITY STORM DRAINAGE PIPING PART 1 - GENERAL 1.01 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01
Wastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
CCU Engineering Specifications. Section 003300 PRECAST CONCRETE PRODUCTS
CCU Engineering Specifications Section 003300 Effective Date: Nov. 1st, 2011 Page 1 of 5 PRECAST CONCRETE PRODUCTS PART 1 - GENERAL The following specification is intended for use for the design, selection
Steam Jet Vacuum Pumps
By: S.G. Ketterer and C.G. Blatchley The use of steam jet ejectors for entraining air or gases at subatmospheric pressures is increasing rapidly, particularly in the range of pressures below mm absolute.
SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
SunMaxx Solar Filling Station Operating Instructions
SunMaxx Solar Filling Operating Instructions Content 1. Declaration of conformity... 2 2. Introduction... 2 3. Transportation and unpacking... 4 4. Mounting and commissioning... 5 5. End of operation...
INSTALLATION INSTRUCTIONS. 6111 Air Spring Kit 2011+ Ford F250/F-350 Single Wheel 2WD 2011+ Ford F350 Dually 2WD IMPORTANT NOTES
INSTALLATION INSTRUCTIONS 6111 Air Spring Kit 2011+ Ford F250/F-350 Single Wheel 2WD 2011+ Ford F350 Dually 2WD Thank you for purchasing a quality Hellwig Product. PLEASE READ THIS INSTRUCTION SHEET COMPLETELY
Toroidal Conductivity Sensor
Instruction Sheet PN 51A-/rev.C June 2012 Toroidal Conductivity Sensor For additional information, please visit our website at www.emersonprocess.com/rosemountanalytical.com SPECIFICATIONS Wetted Materials:
SECTION 08332 COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)
SECTION 08332 COILING COUNTER DOORS Display hidden notes to specifier. (Don't know how? Click Here) PART 1 GENERAL 1.1 SECTION INCLUDES A. Coiling Metal Counter Doors. B. Coiling Counter Fire Doors. 1.2
BOWIE PUMPS OPERATION - MAINTENANCE
BOWIE PUMPS OPERATION - MAINTENANCE PUMPING PRINCIPLE: The meshing owieeof the gears cause a slight depression, with the resulting enmeshing of the gears causing a vacuum drawing the fluid being pumped
Plumbing. Helpful Hints Residential Construction. Lincoln County. Bert Polk Plumbing Inspector
Plumbing Helpful Hints Residential Construction Bert Polk Plumbing Inspector Lincoln County 2015 Waste and vent fittings Vent 90 medium 90 long 90 1/16 bend,1/8 bend,1/6 bend, medium 90 san tee combination
Les Produits MURPHCO Ltée
DESCRIPTION The Murphco support clamp is an assembly made entirely of stainless steel and conceived for all sleeved roof drains. The Murphco Support Clamp is compatible with all types of Murphco* copper
Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,
4658.4500 PLUMBING SYSTEMS; NEW CONSTRUCTION. Subpart 1. Installation. All plumbing systems must be installed and tested according to this chapter and chapter 4715, the Minnesota Plumbing Code. Subp. 2.
with MERCURY FREE 1 HP Relays ! WARNING Before using this product read and understand instructions.
B Installation & Maintenance Instructions MM-414 Series 150E and 157E Low Water Cut-Off/Pump Controllers For Steam Boilers and Other Level Control Applications A Typical Applications: Primary or secondary
Guidelines for Earthquake Bracing of Residential Water Heaters
Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)
DeZURIK 3-20" BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT
3-20" BAW AWWA BUTTERFLY VALVES WITH TRANSFER MOLDED SEAT Instruction D10386 August 2013 Instructions These instructions provide installation, operation and maintenance information for BAW Butterfly Valves.
Cylinder head gasket, replacement
"VCC065612 EN 20110604" 1(7) Cylinder head gasket, replacement Special tools: 999 5098 Disconnect battery earth lead Drain coolant Remove heat shield over exhaust manifold. (Only the two bottom bolts on
Chicago Stationary Engineer Licensure Examination Information
Chicago Stationary Engineer Licensure Examination Information This candidate guide should help you prepare for the Chicago Stationary Engineer licensure examination. Part I contains general information
Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard
Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard Introduction SRU s (Sulfur Recovery Units) are critical pieces of equipment in refineries and gas plants. SRUs remove sulfur compounds from certain
FLASH TANK ECONOMIZER PRODUCT GUIDE
FLASH TANK ECONOMIZER PRODUCT GUIDE Overview A flash tank is used to recover blowdown energy in the form of flash steam and blowdown. This can only be used with a deaerator or some other pressurized device.
INSTRUCTIONS: LocknCharge Laptop Carts
INSTRUCTIONS: LocknCharge Laptop Carts www.lockncharge.com Extra Tools required: Hammer, Philips head screwdriver, medium adjustable spanner. (Allen key supplied) (Panel colours for illustration purposes
This instruction is valid for all ACD pump models shown on page 2
Screw pumps ACD Maintenance and Service Instruction This instruction is valid for all ACD pump models shown on page 2 Contents Page List of components 2 Exploded view/ordering code 3 Service intervals
Oregon Fuel Injection
Corporate Office: P.O. Box 21121, VE Pump Removal and Installation Cummins Lock Timed Applications Removal Clean the exterior of the injection pump and mounting surfaces. 1. Disconnect the fuel return
MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION
MOBILE FIRE - RESCUE DEPARTMENT FIRE CODE ADMINISTRATION Fire Pump Plan Review 2009 International Fire Code and NFPA 20 Date of Review / / BLD201 - Project Address: Project Name: Contractor s Business
Some Criteria for Choosing a Steam Boiler for a Microbrewery
Some Criteria for Choosing a Steam Boiler for a Microbrewery Jack Coe Rite Engineering and Manufacturing Corporation Breweries rely on steam heating for a number of functions, primarily to heat the brew
Turbocharger system components, servicing
21-1 Turbocharger system components, servicing Engine codes: AAZ, 1Z, AHU Observe rules of cleanliness Page 21-10 Turbocharger hoses and lines, connecting Page 21-11 WARNING! Do not re-use any fasteners
Guidelines for Securing by Welding of Chain Cable Studs in Service Guidance for Anchoring Equipment in Service
(July 2003) (Rev.1 July 2014) Guidelines for Securing by Welding of Chain Cable Studs in Service Guidance for Anchoring Equipment in Service 1. General 1.1 This document gives the guidelines for maximum
A.Y. McDonald Mfg. Co. Troubleshooting Submersible and Jet Pumps
A.Y. McDonald Mfg. Co. Troubleshooting Submersible and Jet Pumps Troubleshooting Submersible Pumps Fuse overload or circuit breaker trips when motor is started 1. Incorrect line voltage. Check the line
INSPECTION, MAINTENANCE AND RECHARGE SERVICE MANUAL P/N 16303
WATER MIST HAND PORTABLE FIRE EXTINGUISHERS Model B270 ¾ Gallon Model B272 2 ½ Gallon INSPECTION, MAINTENANCE AND RECHARGE SERVICE MANUAL P/N 6303 All fire extinguishers should be installed, inspected
Round Housing with Side Ports
Power Steering Steering Control Unit (SCU) Parts and Repair Information 5 Series Steering Control Units 001 Square Housing with Side Ports Round Housing with Side Ports T E L RP Round Housing with End
OTF Oil Fired Pool Heater
OTF Oil Fired Pool Heater Installation Operation Maintenance Manual Service Policy 722010 Congratulations on the purchase of your new pool heater. In order to maintain peak performance of your pool heater
INSTALLATION, OPERATION & MAINTENANCE MANUAL
INSTALLATION, OPERATION & MAINTENANCE MANUAL Flanged Disk Check Valve with Strainer Ref. GENEBRE: 2450 2451 2452 1 INSTRUCTIONS FOR INSTALLATION, OPERATION & MAINTENANCE MANUAL 1. Spare parts... 3 1.1
Repair of Hyd-ro-ac Actuators
Repair of Hyd-ro-ac Actuators OVERHAUL INSTRUCTIONS SS-.2A-1V SS-.5A-1V SS-.5A-2V Read the entire contents of these instructions before installing the actuator and before making any connections to the
DOUBLE CONTAINMENT DESIGN & INSTALLATION GUIDE
DC-3-0708 Spears Double Systems are engineered for ease of installation and lower associated installation costs. Complete systems include all necessary components - carrier pipe, containment pipe, centralizer
www.servicechamp.com
1-800-221-0216 Fax: 1-800-472-2281 www.servicechamp.com Service Champ Part 52081 Service Interval every 30,000 miles / Chevrolet 1992-2002 6.5 liter Description and Operation The fuel filter element separates
TECHNICAL DATA. Dry 122a. November 12, 2013
Dry 122a 1. PRODUCT DESCRIPTION The Viking is a quick-opening device. When installed with the required external Anti-flood Device, the assembly is designed to increase the operating speed of Viking Model
High efficiency, cast-iron gas boiler
SENTRY High efficiency, cast-iron gas boiler LOWER PROFILE MAKES PROBLEM INSTALLATIONS EASY SENTRY High efficiency, cast-iron gas boiler A smarter choice for informed The boiler you choose for your home
Table V. Troubleshooting Checklist for Refrigeration Systems. Air or non-condensable gas in system. Inlet water warm.
Table V Troubleshooting Checklist for Refrigeration Systems TROUBLE POSSIBLE CAUSE CORRECTIVE MEASURE High condensing pressure. Low condensing pressure. Air or non-condensable gas in system. Inlet water
Packaged Terminal Air Conditioner Wall Sleeve Installation
Installation & Maintenance Data IM 1196 Group: PTAC Part Number: 910141799 Date: October 2013 Packaged Terminal Air Conditioner Installation x 42" PGAN with Top-Mounted Hydronic Heat Note: Installation
RMF Engineering 23 05 23
PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 01 Specification Sections, apply to this Section.
Installation and Commissioning Manual Solar Stations FlowCon Max Evolution II
Installation and Commissioning Manual Solar Stations FlowCon Max Evolution II 1 For your safety Table of Contents 1 For your safety... 3 1.1 About this manual... 3 1.2 Designated use... 3 1.3 Qualification