STATEMENT OF WORK (SOW) On-Call Certified Welding Inspections and Nondestructive Testing

Size: px
Start display at page:

Download "STATEMENT OF WORK (SOW) On-Call Certified Welding Inspections and Nondestructive Testing"

Transcription

1 1.0 INTRODUCTION Colorado Springs Utilities (UTILITIES) is seeking qualified firms to provide verification welding inspection services, nondestructive testing services, and technical reporting to Colorado Springs Utilities (UTILITIES) on an as needed basis for work to be identified on an on-call basis. The range and extent of services will vary depending on the project and UTILITIES needs. No specific amount of work is guaranteed. UTILITIES reserves the right to utilize its own staff or other contracts to provide the services. The successful Respondent(s) will form a pool of pre-qualified firms to perform on a Task Order basis the required services, and on a rotation basis may be asked to respond to Request-For- Proposals and/or address project requirements in an expedited fashion to meet individual projects schedule during this period. Respondent s will be required to provide services on-call, and will have the ability to respond to short notice requests. The services required will cover any facility or construction project occurring on Colorado Springs Utilities infrastructure. This includes the areas surrounding El Paso County, Buena Vista, CO to the west and Pueblo, CO to the south. In addition, Respondents will travel to manufacturer s facilities to perform inspections for UTILITIES. Respondents must be able to perform all scope items in this Statement of Work. Subcontracting of scope items that are not a primary function of the Respondent is acceptable. Respondent will perform 3rd party services to Utilities, so no conflict of interest shall exist between the Respondents, and other members of the Project Team. 2.0 SCOPE & BACKGROUND 2.1 Scope CONTRACTOR shall furnish Certified Welding Inspector (CWI) personnel certified in accordance with the American Welding Society (AWS) QC 1 and in accordance with project construction documents on an as needed basis. CWI shall have a minimum of 5 years of professional experience related to welding inspection similar to the work. CONTRACTOR shall furnish Nondestructive Testing (NDT) Quality Control personnel certified in accordance with the American Society of Nondestructive Testing (ASNT), requirements of Recommended Practice No. SNT-TC-1A. After receiving the NDT qualification, NDT Quality Control personnel shall have a minimum of at least 5 years of professional experience related to NDT inspection. 2.2 Background UTILITIES has identified a need for on-call welding services and nondestructive testing, due in part to the large amount of large diameter pipe to be installed over the next several years. However, this scope includes services for structural steel as well. For each project the CONTRACTOR shall be provided the schedule, drawings, plans and project specifications to be used as a basis for a quote. Work shall be completed in accordance with project plans and specifications. The services under this contract shall include, but is not limited to, the tasks as outlined below: Inspection of Shop Welds for Steel Pipe and Fittings Inspection and Testing of Steel Pipe Field Welded Joints Inspection of structural steel welds, including floor and roof deck welds Page 1 of 6

2 Inspection of stainless steel welds Nondestructive Testing, i.e. Ultrasonic, Magnetic Particle Testing and Radiographic Review of manufacturer s welding procedure specifications (WPS) Review of manufacturer s QA/QC plan Review of manufacturer s welder certificates of compliance Review of manufacturer s and field contractor s welder qualifications Review of compliance with construction documents 3.0 TASKS, SCHEDULE & DELIVERABLES 3.1 Tasks CONTRACTOR shall provide a certified welding inspector (CWI) and nondestructive testing (NDT) personnel to complete the following Services, including, but not limited to: Perform nondestructive joint weld testing and CWI examinations as required. Welding inspections shall be performed in accordance with the latest construction documents and revisions as provided for each project. Scope of projects may include field welding inspection and nondestructive testing work Field Inspection and Testing of Steel Pipe Fabricated Specials and Fittings Inspection and testing of field welded butt joints: Work may include, but not be limited to, inspection of the weld by visual observation and radiographic or ultrasonic testing methods in accordance with the requirements of the project construction documents. Defective welds will be re-inspected after repair by repeating the original test procedures. Equipment required for testing shall be provided by the CONTRACTOR Inspection and testing of interior and exterior field fillet-welded lap joints: Work may include, but not be limited to, inspection of the weld by visual observation and magnetic particle inspection or liquid dye penetrate testing methods in accordance with the requirements of the project construction documents. Defective welds will be re-inspected after repair by repeating the original test procedures. Testing may also include air-soap leakage testing. Equipment required for testing shall be provided by the CONTRACTOR Complete field reports shall be provided that include dates of inspection, descriptions and results of all welds inspected and reinspected until passing results are achieved Shop Inspection of Steel Pipe Fabricated Specials and Fittings Visually examine and confirm shop fabrication, shop welding, and shop nondestructive testing of cylinders, specials, and fittings to confirm compliance with pipe manufacturer s welding procedure specification (WPS) and contract documents. Test shop welds by magnetic particle, liquid penetrant, ultrasonic, or radiographic methods as appropriate and as required. Page 2 of 6

3 Review of pipe manufacturer s source quality control reports This description of Work, while not intended to cover all details, outlines the major items and Work to be accomplished. The CONTRACTOR shall bring nonconforming items to the immediate attention of the UTILITIES Representative, and note all such items in the daily report. If any item is not resolved in a timely manner or is about to be incorporated into the work, The CONTRACTOR shall immediately notify the UTILITIES Representative by telephone or in person, and post as a discrepancy in the inspection report Testing and Inspection of Structural Steel, Joists, Decking, Metal Wall Panel Structural Steel Framing a. Attend pre-installation conference for steel erection. b. Respondent is responsible for the testing and inspections of Structural Steel Framing as specified in the specifications. The Respondent will not be responsible for enforcing requirements relating to aesthetic field. c. Implement Shop and Field testing program for UTILITIES as required by the specifications. d. Material & Welder Qualification i. Review each contractor s mill reports covering chemical and physical properties of steel conformance with the applicable ASTM specification ii. Review each contractor s field welder qualifications for conformance with AWS qualification requirement; per AWS D1.1. e. Bolted Connections: Bolted connections must be inspected according to RCSC s specification for structural joints using ASTM A325 or A490 bolts. i. Visually inspect bolted connections ii. iii. Perform calibrated wrench tests on all bolted slip critical connections. For connections not designated as slip critical inspect connections to insure that the plies of the connected elements have been brought into snug contact. f. Welded Connections: Welded Connections must be tested and inspected according to AWS D1.1. i. Perform inspection VT of all welded connections ii. iii. Perform testing UT of all complete penetration welds. Complete penetration CJP welds of HSS members must meet AWS class R acceptance Criteria g. Shear Connectors: connectors welded studs shall be tested and inspected according to AWS D1.1.., Clause 7 Stud Welding i. Perform visual inspections of all welded shear connectors. Page 3 of 6

4 4.0 SCHEDULE ii. Perform bend tests if visual inspection reveals a less than continuous 360 degree weld and at intervals required in the contract documents Steel Floor and Roof Deck Perform inspections and tests as follows: a. The Respondent will inspect deck, deck fastening and side lap fastening and welding as per requirements set forth in the specifications. b. Welders Certification Qualification: Verify that qualification of welders is not more than one year prior to time welding work is to be performed. c. Shop and Field Welds: Visually inspect all shop and field welds. Conform to America Welding Society, Structural Welding Code -Steel, AWS D1.1 & Structural Welding Code-Sheet Steel, AWS D1.3, current edition Cold Formed Metal Framing The Respondent will be responsible for performing field test, inspection and prepare test reports to make sure that the work meets the requirements set forth in the specifications. Schedules shall be unique for each project. 5.0 DELIVERABLES CONTRACTOR shall provide the qualified CWI necessary for a reliable, high quality project as defined in the project construction documents. 5.1 Furnish Final Report. The CONTRACTOR shall submit written field reports periodically to Utilities. The CONTRACTOR shall submit a final signed report to UTILITIES stating that all items requiring special inspection and testing were fulfilled and reported and, to the best of his/her knowledge, in conformance with the approved design drawings and specifications. Items not in conformance, unresolved items or any discrepancies in inspection coverage (i.e. missed inspections, periodic inspections when continuous was required, etc.) shall be specifically itemized in this report. Provide project photographs as necessary to document the findings. A CD containing the final report and all periodic inspection reports will be provided within one week after the conclusion of a project Prior to the beginning of any work, contractor shall provide current certifications of all welding inspection personnel. No welding tester is to perform any Work without the UTILITIES Representative having the welding inspector s current certification(s). The welding personnel shall have all certifications complete prior to arriving on the job site. 5.2 Acceptance Page 4 of 6

5 5.2.1 Respondents shall demonstrate compliance with all standards, certifications, and training as required for the services under this contract The code of acceptance for the personnel qualifications shall be the "American Society of Non-Destructive Testing or American Welding Society, current revision or as incorporated by reference Respondents shall provide the firms written safety plan addressing jobsite safety, worker protection, and training. 6.0 CONTRACTOR S PERSONNEL 6.1 Key Personnel CONTRACTOR shall provide a list of Key Personnel and subcontractors as required by UTILITIES. UTILITIES reserves the right to view and approve/disapprove any Key Personnel and subcontractors prior to start of project. Contractor shall demonstrate that they can support a sustained operation while providing ASNT Level II or higher personnel. Contractor shall have a Level III technician on staff to supervise and consult with Level II personnel. CWI s shall be current on visual (eye) testing as required by the code being inspected to The CONTRACTOR shall provide qualified personnel, within a 24 hour notification, at the project site and/or the off-site fabrication yards, necessary to undertake the specified services. The number of such staff shall be sufficient to perform such service in accordance with the construction schedule and sequences of construction utilized by the general Contractor and its subcontractors CONTRACTOR S personnel shall have current confined space training. The pipeline installing contractor will provide ventilation and lighting. The CONTRACTOR is responsible for providing all other protective equipment for CONTRACTOR S personnel Certain CONTRACTOR personnel are considered essential to the work being performed and as such shall be referred to as Key Personnel hereunder, and to such Key Personnel the following provisions will apply: CONTRACTOR shall, at all times, provide Key Personnel of the appropriate experience, qualifications, and knowledge to perform the Work as specified in this Statement of Work Prior to diverting any of the specified Key Personnel to other programs or positions, or substituting any key personnel, CONTRACTOR shall notify the identified UTILITIES in writing in a timely manner with proposed substitutions including their experience, background, and certifications as related to this type of work. Replacements or substitutions of key personnel shall not be permitted until written approval of the replacement or substitution has been received from UTILITIES. Page 5 of 6

6 6.2 CONTRACTOR Personnel If CONTRACTOR s personnel lack the appropriate qualifications for this Work, CONTRACTOR shall immediately replace the non-qualified employee with another employee with qualifications appropriate to the Work being performed. UTILITIES may also require that CONTRACTOR s remove from the job, at no additional cost to UTILITIES, employees who endanger persons or property, are disruptive to the workforce, or whose continued employment under this contract is inconsistent with the requirements of the contract and/or interests of safety or security at the project site. Replacement of personnel shall be at CONTRACTOR S expense. Page 6 of 6

9. QUALITY CONTROL/QUALITY ASSURANCE

9. QUALITY CONTROL/QUALITY ASSURANCE Interim Guidelines: Chapter 9 - Quality Control/Quality Assurance 9. QUALITY CONTROL/QUALITY ASSURANCE Quality control is principally the responsibility of the contractor, while Quality Assurance is performed

More information

Contractor s Statement of Responsibility for Seismic-Force-Resisting Systems This form is to be filled out by the contractor.

Contractor s Statement of Responsibility for Seismic-Force-Resisting Systems This form is to be filled out by the contractor. SPECIAL INSPECTION PROCEDURE IBC CHAPTER 17 2012 EDITION When Required All projects that require a SC licensed Architect or Engineer per SC Architectural and Engineering registration law. Overview The

More information

11. NONDESTRUCTIVE TESTING

11. NONDESTRUCTIVE TESTING 11. NONDESTRUCTIVE TESTING Nondestructive testing includes magnetic particle testing (MT), Liquid Dye Penetrant testing (PT), Radiographic Testing (RT) and Ultrasonic Testing (UT). The purpose of nondestructive

More information

Guide to understanding Welding Procedure Specification (WPS), Procedure Qualification Record (PQR), and Welder Performance Qualification Record (WPQR)

Guide to understanding Welding Procedure Specification (WPS), Procedure Qualification Record (PQR), and Welder Performance Qualification Record (WPQR) An AEIS White Paper 265 Birdsall Dr. Yorktown Heights, NY 10598 914 214 8460 www.aeis.us Guide to understanding Welding Procedure Specification (WPS), Procedure Qualification Record (PQR), and Welder Performance

More information

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE Community Development Permit Services SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE PROJECT NAME PROJECT ADDRESS PERMIT NUMBER CITY RECEIVED STAMP AND INITIALS Instructions: BEFORE

More information

Pressure Control Supplier Quality Requirements Nondestructive Testing Services SQ-10 Rev: 1.1

Pressure Control Supplier Quality Requirements Nondestructive Testing Services SQ-10 Rev: 1.1 Approved By: Jerry Longmire Vice President - Quality Jim Harris Quality Leader - NAM Document Revision Chart The following chart lists the revisions made to this document tracked by version. Use this to

More information

3 Year On-Call Steel Fabrication Inspection Services. Request for Proposal. Iowa Department of Transportation

3 Year On-Call Steel Fabrication Inspection Services. Request for Proposal. Iowa Department of Transportation 3 Year On-Call Steel Fabrication Inspection Services Request for Proposal Iowa Department of Transportation Introduction The Iowa Department of Transportation s Office of Materials is interested in Certified

More information

Section 10.9 STRUCTURAL STEEL AND MISCELLANEOUS METAL COMPONENTS

Section 10.9 STRUCTURAL STEEL AND MISCELLANEOUS METAL COMPONENTS Section 10.9 STRUCTURAL STEEL AND MISCELLANEOUS METAL COMPONENTS 10.9.1 Purpose The purpose of this procedure is to provide a process for the evaluation and acceptance of fabricated structural steel and

More information

STEEL fabrication quality SySTEmS guideline

STEEL fabrication quality SySTEmS guideline STEEL fabrication quality systems guideline Copyright 2002 by Canadian Institute of Steel Construction All rights reserved. This book or any part therof must not be reproduced in any form without written

More information

NON DESTRUCTIVE TESTING & ASNT WELD INSPECTION & AWS

NON DESTRUCTIVE TESTING & ASNT WELD INSPECTION & AWS NON DESTRUCTIVE TESTING & ASNT WELD INSPECTION & AWS What is ASNT? What is ASNT? The American Society for Nondestructive Testing, Inc. What is ASNT? ASNT is the world's largest technical society for nondestructive

More information

CLARK COUNTY DEPARTMENT OF BUILDING & FIRE PREVENTION 4701 W. Russell Road Las Vegas, NV 89118 (702) 455-3000 Fax (702) 221-0630

CLARK COUNTY DEPARTMENT OF BUILDING & FIRE PREVENTION 4701 W. Russell Road Las Vegas, NV 89118 (702) 455-3000 Fax (702) 221-0630 CLARK COUNTY DEPARTMENT OF BUILDING & FIRE PREVENTION 4701 W. Russell Road Las Vegas, NV 89118 (702) 455-3000 Fax (702) 221-0630 Ronald L. Lynn, Director/Building & Fire Official Samuel D. Palmer, P.E.,

More information

ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR STRUCTURAL STEEL. AC172 February 2015 (Effective April 1, 2015)

ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR STRUCTURAL STEEL. AC172 February 2015 (Effective April 1, 2015) ACCREDITATION CRITERIA FOR FABRICATOR INSPECTION PROGRAMS FOR STRUCTURAL STEEL AC172 February 2015 (Effective April 1, 2015) Requirements related to the Designated Accreditation Representative (DAR) and

More information

ABOUT CWB CERTIFICATION/ QUALIFICATION The work CWB does on behalf of our clients can be divided into five main categories:

ABOUT CWB CERTIFICATION/ QUALIFICATION The work CWB does on behalf of our clients can be divided into five main categories: CWB CERTIFICATION/ CWB CERTIFICATION/ QUALIFICATION QUALIFICATION SERVICES SERVICES CANADIAN WELDING CERTIFICATION AN OVERVIEW Canada, like many countries around the world, has specific rules and regulations

More information

Reliable Flaw Detection. Fast Inspection Times. High quality non-destructive testing services tailored for all your needs. www.tuv.

Reliable Flaw Detection. Fast Inspection Times. High quality non-destructive testing services tailored for all your needs. www.tuv. INDUSTRIAL SERVICES - NON-DESTRUCTIVE TESTING Reliable Flaw Detection. Fast Inspection Times. High quality non-destructive testing services tailored for all your needs. www.tuv.com/ndt The reliability

More information

GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059

GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059 QUALITY MANUAL GENERAL WELDING & FABRICATING, INC. 991 Maple Road Elma, New York 14059 Distribution: Position Location Copy # President / CEO Office 1 Operations Manager Office 2 Quality Assurance Office

More information

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES 1.0 SCOPE CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES This document establishes the minimum quality program requirements for a contractor providing equipment, material, and construction

More information

Australian/New Zealand Standard

Australian/New Zealand Standard AS/NZS ISO 3834.5:2008 ISO 3834-5:2005 AS/NZS ISO 3834.5:2008 Australian/New Zealand Standard Quality requirements for fusion welding of metallic materials Part 5: Documents with which it is necessary

More information

Non-Destructive Test (NDT) and Non-Destructive Evaluation (NDE) Requirements

Non-Destructive Test (NDT) and Non-Destructive Evaluation (NDE) Requirements Table of Contents 1.0 Purpose/Scope/Timing... 2 1.1 Scope... 2 1.2 Communication... 2 1.3 Compliance Date... 2 2.0 Procedure / Quality Recd Requirements... 2 2.1 General Requirements... 2 2.2 Requirements

More information

Essentials Welding QA/QC Plan Sample

Essentials Welding QA/QC Plan Sample Essentials Welding QA/QC Plan Sample Good for smaller projects and bid qualifications Has All the Essential Elements of a well-founded Quality Control Plan Contact: Ed Caldeira 410-451-8006 Pat [Pick the

More information

NDT Procedure for Liquid Penetrant Inspection TRINITY NDT. An ISO 9001:2008 Certified Company

NDT Procedure for Liquid Penetrant Inspection TRINITY NDT. An ISO 9001:2008 Certified Company NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified

More information

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE

SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel

More information

ACCREDITATION CRITERIA FOR INSPECTION PROGRAMS FOR MANUFACTURERS OF METAL BUILDING SYSTEMS AC472

ACCREDITATION CRITERIA FOR INSPECTION PROGRAMS FOR MANUFACTURERS OF METAL BUILDING SYSTEMS AC472 ACCREDITATION CRITERIA FOR INSPECTION PROGRAMS FOR MANUFACTURERS OF METAL BUILDING SYSTEMS AC472 August 2012 (Effective September 1, 2012) (Editorially revised September 4, 2013) (Editorially revised February

More information

Testing & Consulting Engineering. NDT Industrial Environmental D.O.T, Construction & Mechanical. www.unifiedtesting.com

Testing & Consulting Engineering. NDT Industrial Environmental D.O.T, Construction & Mechanical. www.unifiedtesting.com Testing & Consulting Engineering NDT Industrial Environmental D.O.T, Construction & Mechanical www.unifiedtesting.com NONDESTRUCTIVE TESTING (NDT) SERVICES UTS Nondestructive Testing (NDT) Services provides

More information

1 RCNY 101-07 CHAPTER 100

1 RCNY 101-07 CHAPTER 100 1 RCNY 101-07 CHAPTER 100 Subchapter A Administration 101-07 Approved Agencies. (a) Definitions. For the purposes of this section, all terms used herein shall have the same meanings as set forth in the

More information

WELDING TECHNOLOGY DEGREES AND CERTIFICATES. Welding Technology Degree. Shielded Metal Arc Plate and Pipe (270 hours) Certificate

WELDING TECHNOLOGY DEGREES AND CERTIFICATES. Welding Technology Degree. Shielded Metal Arc Plate and Pipe (270 hours) Certificate Area: Technical Education Dean: Dr. Trish Caldwell Phone: (916) 484-8354 Counseling: (916) 484-8572 www.arc.losrios.edu/~welding/ The American Welding Society (AWS) nationally accredits American River

More information

STRUCTURAL TESTS AND SPECIAL INSPECTIONS

STRUCTURAL TESTS AND SPECIAL INSPECTIONS CHAPTER 17 STRUCTURAL TESTS AND SPECIAL INSPECTIONS SECTION 1701 GENERAL 1701.1 Scope. The provisions of this chapter shall apply to Class I buildings and shall govern the quality, workmanship and requirements

More information

Reach Higher with Inspection Academy GE s Inspection Technologies Global Knowledge Center. www.geinspectionacademy.com

Reach Higher with Inspection Academy GE s Inspection Technologies Global Knowledge Center. www.geinspectionacademy.com Reach Higher with Inspection Academy GE s Inspection Technologies Global Knowledge Center www.geinspectionacademy.com Sharing knowledge. Shaping technology. At GE, we know the value of investing in your

More information

Change Notice Revision 2 adds a definition of NANDTB, and acceptance of the National Aerospace NDT Board of Australia.

Change Notice Revision 2 adds a definition of NANDTB, and acceptance of the National Aerospace NDT Board of Australia. Advisory Circular AC43-8 Revision 2 Non-destructive Testing 27 February 2015 General Civil Aviation Authority advisory circulars contain information about standards, practices, and procedures that the

More information

Section 1. The title of Section 101-07 of Subchapter A of Chapter 100 of Title 1 of the Rules of the City of New York is amended to read as follows:

Section 1. The title of Section 101-07 of Subchapter A of Chapter 100 of Title 1 of the Rules of the City of New York is amended to read as follows: Section 1. The title of Section 101-07 of Subchapter A of Chapter 100 of Title 1 of the Rules of the City of New York is amended to read as follows: 101-07 [Inspections and] [a] Approved [a] Agencies.

More information

Supplier Quality Assurance Requirements Manual

Supplier Quality Assurance Requirements Manual 12716 EAST PINE STREET TULSA, OK 74116 Supplier Quality Assurance Requirements Manual Approved: Mike Collins Quality Assurance Manager Precise Machining & Manufacturing 1 Record of Revisions Revision D

More information

Preformed Metal Roofing and Siding

Preformed Metal Roofing and Siding Page -1-1. GENERAL 1.1. Description This specification along with the drawings covers the furnishing of all material, products, equipment, accessories, tools, services, transportation, labor and supervision

More information

MEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

MEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE MEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE This specification is intended to describe the general requirements applicable to a proper structural mezzanine design. In addition, it is to serve as

More information

RG 7 Accreditation for Inspection Bodies Performing Non-Destructive Testing

RG 7 Accreditation for Inspection Bodies Performing Non-Destructive Testing This publication contains policy, recommendations and guidance applicable to UKAS accredited inspection bodies RG 7 Accreditation for Inspection Bodies Performing Non-Destructive Testing Contents Section

More information

Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS

Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS Section 8.1 Volume I QUALITY ASSURANCE PROGRAM OF PRECAST PRESTRESSED CONCRETE PRODUCTS 8.1.1 PURPOSE This procedure provides guidelines related to the implementation of quality control and quality assurance

More information

NON-DESTRUCTIVE TESTING FULL SCOPE OF INTEGRATED NDT SERVICES

NON-DESTRUCTIVE TESTING FULL SCOPE OF INTEGRATED NDT SERVICES NON-DESTRUCTIVE TESTING FULL SCOPE OF INTEGRATED NDT SERVICES RIGHT SERVICE MAXIMUM RETURN Whether it is in fabrication, pipe manufacturing, pipeline, plant construction, chemical, petrochemical plants,

More information

TWI INDIA CSWIP COURSE AND EXAMINATION FEES 2016 Course / Examination description. CSWIP 3.2 Senior Welding Inspector

TWI INDIA CSWIP COURSE AND EXAMINATION FEES 2016 Course / Examination description. CSWIP 3.2 Senior Welding Inspector TWI INDIA CSWIP COURSE AND EXAMINATION FEES 2016 Course / Examination description FEE CSWIP 3.0 Visual Welding Inspector Course and Examination Package 61,200 Exam only 26,500 Course Only 44,800 3.0 Retest

More information

Technical Notes NDT 001 Specific Requirements for Non- Destructive Testing Laboratories

Technical Notes NDT 001 Specific Requirements for Non- Destructive Testing Laboratories ACCREDITATION SCHEME FOR LABORATORIES Technical Notes NDT 001 Specific Requirements for Non- Destructive Testing Laboratories Technical Notes NDT 001, Apr 14 The SAC Accreditation Programme is managed

More information

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1078

STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1078 STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENT 1078 QUALIFICATION AND EVALUATION OF STRUCTURAL STEEL FABRICATORS December 31, 2012 1078.01 General 1078.02 Levels of Fabricator Qualification 1078.03

More information

CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY Special Inspector Qualification Michael Roach, P.E., Building Official

CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY Special Inspector Qualification Michael Roach, P.E., Building Official Reference: IBC Chapter 17, Section 1704 General: Special inspections required by IBC Chapter 17 shall be conducted by qualified persons working for an approved agency. The Building Official shall maintain

More information

Non-Destructive Testing Services, Inc. www.nondestructivetesting.com

Non-Destructive Testing Services, Inc. www.nondestructivetesting.com Non-Destructive Testing Services, Inc. www.nondestructivetesting.com NON-DESTRUCTIVE TESTING SERVICES (NDTS) Non-Destructive Testing Services, Inc. (NDTS) is a full-service inspection company providing

More information

Quality Assurance Manual. QAM-2013-Rev2

Quality Assurance Manual. QAM-2013-Rev2 QAM-2013-Rev2 President s Policy and Authorization of Quality Control The management system for the Steel Structural Fabrication of Pinnacle Industrial Services entrusted through furnishing high quality

More information

Indiana Boiler and Pressure Vessel Safety Section Frequently Asked Questions

Indiana Boiler and Pressure Vessel Safety Section Frequently Asked Questions Indiana Boiler and Pressure Vessel Safety Section Frequently Asked Questions What are the licensing requirements for boiler operators? Answer: Indiana statute (IC 22-15-6) and administrative rules (680

More information

NDT Procedure for Liquid Penetrant Inspection

NDT Procedure for Liquid Penetrant Inspection NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified

More information

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections Materials Standard shapes W sections, C channels, Structural T, Angles, Pipes, Tubes, Rods and Plates Fabricated members, Built-up sections Adding plates to beam flanges, Stiffeners to beam webs Built

More information

SECTION 11014 WINDOW WASHING SYSTEMS

SECTION 11014 WINDOW WASHING SYSTEMS SECTION 11014 WINDOW WASHING SYSTEMS PART 1 - GENERAL 1.1 SUMMARY A. Section includes, but is not limited to, design and furnishing portable davits, davit sleeves, dvit bases, four (4) removable outriggers,

More information

Annex of the Certificate (Page 1/4) Scope of Accreditation

Annex of the Certificate (Page 1/4) Scope of Accreditation Annex of the Certificate (Page 1/4) As a "Type A" Inspection Body Accreditation Nr: Address :Centrum İş Merkezi Aydınevler Sanayi Cad. No:3 Küçükyalı - Maltepe 34854 ISTANBUL / TURKEY Phone : +90 216 518

More information

EN 4179/NAS 410 Interpretation

EN 4179/NAS 410 Interpretation EN 4179/NAS 410 Interpretation The NANDTB has adopted NAS 410 / EN 4179 in lieu of AS 3669 as the standard for the qualification and approval of NDT technicians. Employers applying these standards sometimes

More information

1.2 For piping systems that operate at hoop stress of 20% or more of the Specified Minimum Yield Strength the following shall apply.

1.2 For piping systems that operate at hoop stress of 20% or more of the Specified Minimum Yield Strength the following shall apply. 1.0 JOINT FIT-UP AND ALIGNMENT 1.1 For piping systems that operate at hoop stress of less than 20% and the internal adjoining ends do not vary more than 1 / 8 in. and adequate penetration and fusion can

More information

SECTION 03400 PRECAST CONCRETE STRUCTURES

SECTION 03400 PRECAST CONCRETE STRUCTURES SECTION 03400 PART 1 - GENERAL 1.01 DESCRIPTION A. Section includes specifications for precast concrete structures, including fabrication and erection. 1.02 REFERENCE STANDARDS A. American Society for

More information

Application of Welding Standards in Hong Kong. S. K. Babu Laboratory Manager - Foundation Techniques Ltd

Application of Welding Standards in Hong Kong. S. K. Babu Laboratory Manager - Foundation Techniques Ltd Application of Welding Standards in Hong Kong S. K. Babu Laboratory Manager - Foundation Techniques Ltd Introduction: This paper summarizes the current welding standards practiced in Hong Kong & also outlines

More information

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

Final inspections are completed by site visit only. Access to fenced yards shall be planned. ROOFING RESIDENTIAL BUILDING INSPECTIONS DEPARTMENT www.ci.blaine.mn.us This handout is intended only as a guide and is based in part on the 2015 Minnesota State Building Code, Blaine City ordinances,

More information

Ensco 5002. NDT Inspection Handling Tools And Wall Thickness Survey. Date: November, 2011 Doc. No: NDT-IRM 3019 Version: Original P.

Ensco 5002. NDT Inspection Handling Tools And Wall Thickness Survey. Date: November, 2011 Doc. No: NDT-IRM 3019 Version: Original P. Ensco 5002 NDT Inspection Handling Tools And Wall Thickness Survey Date: November, 2011 Doc. No: NDT-IRM 3019 Version: Original P.O nº 7302288 Client : Location : Ensco 5002 Project No.: NDT- IRM3019 Contents:

More information

City facilities that are currently part of the System are listed below. Other City facilities may be added in the future.

City facilities that are currently part of the System are listed below. Other City facilities may be added in the future. Equipment and Building Services Department, Security Division Introduction The City of Dallas (City) Equipment and Building Service (EBS) Security Division is requesting Bids to provide Security System

More information

2. Division 05 Structural Steel Framing for steel framework requirements

2. Division 05 Structural Steel Framing for steel framework requirements SECTION 131200 - CLIMBING WALLS PART 1 GENERAL 1.1 SUMMARY A. This section includes the following: 1. GFRC Rock Realistic Climbing Wall System B. Related Sections 1. Division 04 Unit Masonry 2. Division

More information

Acceptance Codes APPENDIX - A. Acceptance Criteria

Acceptance Codes APPENDIX - A. Acceptance Criteria 1111 Receipt of a satisfactory Test Report from WSDOT Materials Laboratory is required indicating the lot (or lots) or batch of material meets the requirement of the specifications under which it is listed.

More information

Doc Edition Section Question Answer Q1 9th 3.1.6 / 5.6.1.1

Doc Edition Section Question Answer Q1 9th 3.1.6 / 5.6.1.1 Doc Edition Section Question Answer Q1 9th 3.1.6 / 5.6.1.1 In a recent API Q1 audit, my auditor interpreted API Spec Q1, Section 3.1.6 to mean that the distributor supplying plastic shrink wrap material

More information

Pee Dee Empty Oil Storage Tank at

Pee Dee Empty Oil Storage Tank at Mechanical Integrity Report for the Pee Dee Empty Oil Storage Tank at 208 North Palmetto Boulevard Clemson, South Carolina 29631 Inspection: 10 October 2012 Prepared by: George E. Matthews, E.I.T. Senior

More information

VENDOR QUALIFICATION APPROVAL FORM

VENDOR QUALIFICATION APPROVAL FORM COMPANY INFORMATION: Company Name: Jet Aviation St. Louis, Inc. Address (Street, City, State) Other Property Locations: Website: Repair Station Certificate No. With Class Rating: Date of Last FAA Audit:

More information

Owner-User Pressure Equipment Integrity Management Requirements

Owner-User Pressure Equipment Integrity Management Requirements the pressure equipment safety authority Owner-User Pressure Equipment Integrity Management Requirements AB-512 Edition 2, Revision 0 Issued 2015-06-25 Owner-user Pressure Equipment Integrity Management

More information

How To Ensure Quality Assurance

How To Ensure Quality Assurance 1001 Robb Hill Road Oakdale, PA 15071-3200 412/923-2670 PROCUREMENT SPECIFICATION: SUPPLIER QUALITY MANAGEMENT SYSTEM REQUIREMENTS Specification Number: ATI-QA-703, Rev 4 Date: 11/12/13 Page: 1 of 7 Written

More information

proper way. Therefore operator training and certification is key in every inspection program to ensure compliance and improve quality and integrity.

proper way. Therefore operator training and certification is key in every inspection program to ensure compliance and improve quality and integrity. SGS NDT Training & Examination Centre Professional Services for Your Safety and Reputation ABOUT NON DESTRUCTIVE TESTING (NDT) About NDT NDT plays a key role in assessing conformity and reliability of

More information

ACCREDITATION CRITERIA FOR INSPECTION PRACTICES OF METAL BUILDING ASSEMBLERS AC478

ACCREDITATION CRITERIA FOR INSPECTION PRACTICES OF METAL BUILDING ASSEMBLERS AC478 ACCREDITATION CRITERIA FOR INSPECTION PRACTICES OF METAL BUILDING ASSEMBLERS AC478 February 2015 (Effective July 1, 2015) () PREFACE The attached accreditation criteria has been issued to provide all interested

More information

Surgi Manufacturing Quality Manual

Surgi Manufacturing Quality Manual Surgi Manufacturing Page 1 of 18 Approvals: QA: Eng. Mgt. : A Date: 18Aug98 1. Introduction... 4 1.1 Scope... 4 1.2 Purpose... 4 1.3 Authority... 4 1.4 Issue of the Manual... 4 1.5 Amendments... 4 1.6

More information

Layton Construction Co., Inc. Quality Management Manual

Layton Construction Co., Inc. Quality Management Manual Layton Construction Co., Inc QUALITY MANAGEMENT PLAN 1 Layton Construction Co., Inc. Quality Management Manual [ 2015 ] PHOENIX PHOENIX BOISE BOISE IRVINE IRVINE SALT LAKE CITY SALT ORLANDO LAKE CITY HAWAII

More information

SECTION 15410 GROUND WATER STORAGE TANKS

SECTION 15410 GROUND WATER STORAGE TANKS SECTION 15410 GROUND WATER STORAGE TANKS PART 1 GENERAL.01 SCOPE A. Section Includes Requirements for designing, fabricating, and erecting a welded steel ground storage tank..02 SYSTEM DESCRIPTION A. Design

More information

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet.

Copies of this document shall be classified either as Controlled or Uncontrolled, and shall be identified as such on the cover sheet. INTRODUCTION This document describes an inspection system broken down into four separate levels. When Inspection Level IV is invoked, this system meets the requirements of former MIL-I-45208A. The primary

More information

Chapter 4: Contractor Quality Control

Chapter 4: Contractor Quality Control Chapter 4: Contractor Quality Control Seattle District, NWS Last updated: 05FEB14 Chapter 4 Contractor Quality Control 1. GENERAL. Contractor is responsible for quality control and shall establish and

More information

a. Are the foundry s employees trained and familiar with portions of the system applicable to their position?

a. Are the foundry s employees trained and familiar with portions of the system applicable to their position? 1. Does the foundry have a documented quality system? a. Are the foundry s employees trained and familiar with portions of the system applicable to their position? b. What recognized quality management

More information

Mechanical Installation

Mechanical Installation Page -1-1. INTRODUCTION AND PURPOSE 1.1. This specification covers the installation, testing and precommissioning of mechanical equipment. Work is to be performed in conjunction with the manufacturer s

More information

CITY COLLEGE OF SAN FRANCISCO May 2008 PROJECT INSPECTION SERVICES

CITY COLLEGE OF SAN FRANCISCO May 2008 PROJECT INSPECTION SERVICES REQUEST FOR QUALIFICATIONS Project Number 105A, 106A City College of San Francisco DSA - Inspector of Record Services for: Balboa Reservoir Development Site Work Academic Joint Use Facility (Revised 5/12/08)

More information

Pressure Vessel acc. to PED for Chemical Industry fabricated in China

Pressure Vessel acc. to PED for Chemical Industry fabricated in China Pressure Vessel acc. to PED for Chemical Industry fabricated in China Kurt Schumacher ACHEMASIA 2013 Beijing May 14, 2013 Folie 1 Introduction Investment projects in the chemical/petrochemical industry

More information

Surveillance Report. Bascule span to the Railway bridge Jernbanebroen over Limfjorden

Surveillance Report. Bascule span to the Railway bridge Jernbanebroen over Limfjorden Transportudvalget 2013-14 TRU Alm.del endeligt svar på spørgsmål 192 Offentligt Surveillance Report Package / Item: Bascule span to the Railway bridge Jernbanebroen over Limfjorden Supplier: Purpose of

More information

www.klmtechgroup.com TABLE OF CONTENT

www.klmtechgroup.com TABLE OF CONTENT Page : 1 of 45 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT 1.0 SCOPE 2 2.0 CONFLICTS

More information

Supplier Quality Requirements and Clauses

Supplier Quality Requirements and Clauses Supplier Quality Requirements and Clauses Supplier Quality Requirements General The following Quality Notes (QN01 through QN19) apply to and form a part of all Purchase Orders issued by Advanced Conversion

More information

Spill Prevention, Control and Countermeasure Plan (SPCC) Program

Spill Prevention, Control and Countermeasure Plan (SPCC) Program United States Environmental Protection Agency Office of Emergency Management August 2013 www.epa.gov/emergencies Spill Prevention, Control and Countermeasure Plan (SPCC) Program Bulk Storage Container

More information

INSPECTION AND CONSTRUCTION MANAGEMENT CAPABILITIES

INSPECTION AND CONSTRUCTION MANAGEMENT CAPABILITIES INSPECTION AND CONSTRUCTION MANAGEMENT CAPABILITIES 9601 JONES ROAD, SUITE 242 HOUSTON, TEXAS 77065 (832) 678-2210 FAX (832) 678-2310 Table of Contents SECTION 1 - CORPORATE OVERVIEW... 3 SECTION 2 - RESPONSIBILITIES

More information

QUALITY MANAGEMENT SYSTEM REQUIREMENTS

QUALITY MANAGEMENT SYSTEM REQUIREMENTS QUALITY MANAGEMENT SYSTEM REQUIREMENTS FOR TRADE CONTRACTORS 2014 400 Prince George s Blvd. Upper Marlboro, MD 20774 800.638.8556 HomeInnovation.com TABLE OF CONTENTS Introduction... iii Notes... iii

More information

External Quality, Environment, Health & Safety Management Manual with Integrated Welding Engineering Manual

External Quality, Environment, Health & Safety Management Manual with Integrated Welding Engineering Manual conferdo GmbH & Co. KG External Quality, Environment, Health & Safety Management Manual with Integrated Welding Engineering Manual of the company conferdo GmbH & Co. KG STAHLBAU OHNE GRENZEN STEELWORK

More information

ETCAL Level 3 NVQ Diploma in Engineering Technical Support (QCF) Qualification No 600/2285/1 Credit Value 80 GLH 311. Qualification Structure

ETCAL Level 3 NVQ Diploma in Engineering Technical Support (QCF) Qualification No 600/2285/1 Credit Value 80 GLH 311. Qualification Structure ETCAL Level 3 NVQ Diploma in Engineering Technical Support (QCF) Qualification No 600/2285/1 Credit Value 80 GLH 311 Qualification Structure Unit Number Unit Title Unit Credit Value/GLH QCF Unit Number

More information

Helical Products Co., Inc.

Helical Products Co., Inc. Q01 GENERAL REQUIREMENTS 1. Supplier Responsibilities 1.1. Delivery Certification By delivering products or services on the Contract, the Supplier certifies that such products or services are in compliance

More information

Guidance from the Group of Notified Bodies for the Construction Products Directive 89/106/EEC. GNB-CPD position paper from SG17 - EN 1090-1:2009

Guidance from the Group of Notified Bodies for the Construction Products Directive 89/106/EEC. GNB-CPD position paper from SG17 - EN 1090-1:2009 GNB-CPD SG17 Guidance from the Group of Notified Bodies for the Construction Products Directive 89/106/EEC NB-CPD/SG17/09/069 Issued: 7 September 2009 APPROVED GUIDANCE GNB-CPD position paper from SG17

More information

ELIGIBILITY CHECKLIST:

ELIGIBILITY CHECKLIST: As stated in 38-75-485 of the Omnibus Coastal Property Insurance Reform Act of 2007, the South Carolina Hurricane Damage Mitigation ( SC Safe Home ) program is established within the South Carolina Department

More information

Non Destructive Testing Consultancy Welding Materials Testing Training

Non Destructive Testing Consultancy Welding Materials Testing Training Non Destructive Testing Consultancy Welding Materials Testing Training Introduction Applied Inspection is an ISO 9001:2008 and Link-Up accredited company providing non-destructive testing and training,

More information

BASE CONSTRUCTION INC

BASE CONSTRUCTION INC BASE CONSTRUCTION INC 14252 CULVER DRIVE A-630 IRVINE,CA 92604-0326 OFFICE:949 387-3471 Shop 714 994 9563 CELL:949 735-5292 FAX:949 786-8753 QUALITY ASSURANCE and QUALITY CONTROL MANUAL 1 TABLE OF CONTENTS

More information

GLOBAL INSPECTION AND CERTIFICATION

GLOBAL INSPECTION AND CERTIFICATION GLOBAL INSPECTION AND CERTIFICATION CONTENTS About us 3 Services 3 Lifting Equipment Inspection & Certification 3 Conventional & Advanced Non Destructive Testing (NDT) 4 Rig Inspection & Commissioning

More information

2. Performance Test Schedule and Certificates. 2.1 Definitions

2. Performance Test Schedule and Certificates. 2.1 Definitions 2. Performance Test Schedule and Certificates 2.1 Definitions 2.1.1 Unit shall mean the complete Power Station Assembly/Unit as defined in the Agreement (which consists of equipment provided by Contractor

More information

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan)

ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan) ISO 9001: 2008 Construction Quality Management System Sample - Selected pages (not a complete plan) Part 1: Project-Specific Quality Plan Part 2: Company Quality Manual Part 3: Submittal Forms Part 4:

More information

1 OF 7. there will be few "surprises" as the work progresses.

1 OF 7. there will be few surprises as the work progresses. 1 OF 7 FP-G1.94 GUIDELINES FOR SUCCESSFUL SUPERVISION OF SCHOOL DISTRICT CAPITAL CONSTRUCTION PROJECTS There is no doubt that the successful completion of any capital construction project is the result

More information

NON-DESTRUCTIVE TESTING OF PIPELINES. L. Annila. Abstract

NON-DESTRUCTIVE TESTING OF PIPELINES. L. Annila. Abstract NON-DESTRUCTIVE TESTING OF PIPELINES L. Annila Abstract This paper shall present different, contemporarily available non-destructive testing (NDT) methods of pipelines and compare them to each other from

More information

The 2009 RCSC MARKETING PUBLICATIONS REDESIGN TITLE CHANGE. Specification for Structural Joints Using High-Strength Bolts. Why use RCSC Specification?

The 2009 RCSC MARKETING PUBLICATIONS REDESIGN TITLE CHANGE. Specification for Structural Joints Using High-Strength Bolts. Why use RCSC Specification? 14 th Edition Steel Construction Manual Introduction to the new AISC Publications Specification for Structural Joints using High-Strength Bolts (AISC 348-09) Code of Standard Practice (AISC 303-10) Specification

More information

L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance

L-3 Communications Corporation AMI Purchase Order Supplement No. 3 Quality Assurance Q10 QUALITY SYSTEM REQUIREMENTS Q10A Q10B ISO 9001:2008 Seller s quality system shall be in compliance with the requirements of ISO 9001, Model for in Design, Development, Production, Installation and

More information

FPO. Meeting and Exceeding API Standards: How Much Testing Do Pumps Really Need? White Paper

FPO. Meeting and Exceeding API Standards: How Much Testing Do Pumps Really Need? White Paper White Paper Meeting and Exceeding API Standards: How Much Testing Do Pumps Really Need? John Bailey, API Global Product Manager Marc DeSilva, Global Product Director, Oil & Gas Plant Performance Services

More information

1.02 SYSTEM DESCRIPTION

1.02 SYSTEM DESCRIPTION 1 OF 7 MODULAR MEZZANINES GUIDE SPECIFICATIONS FOR PART 1 - GENERAL 1.01 RELATED WORK A. SECTION 03 30 00: Cast in Place Concrete (and Concrete Finishing) 1. The area where mezzanine is installed shall

More information

STANDARD PDCA P2-04 THIRD PARTY INSPECTIONS: QUALIFICATIONS, RESPONSIBILITIES, AND PROCEDURES

STANDARD PDCA P2-04 THIRD PARTY INSPECTIONS: QUALIFICATIONS, RESPONSIBILITIES, AND PROCEDURES 1. Scope STANDARD PDCA P2-04 THIRD PARTY INSPECTIONS: QUALIFICATIONS, RESPONSIBILITIES, AND PROCEDURES 1.1. The purpose of this standard is to establish third party inspection qualifications, responsibilities

More information

WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT. A & K Termite. 3381 Stevens Creek Blvd. San Jose CA 95117. Tel 408-244-4811 Fax 408-241-0113

WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT. A & K Termite. 3381 Stevens Creek Blvd. San Jose CA 95117. Tel 408-244-4811 Fax 408-241-0113 4523 WOOD DESTROYING PESTS AND ORGANISMS INSPECTION REPORT Building No. Street City Zip Mansion St. San Jose 95122 1/2/03 3 Date of Inspection Report # : 10000 Number of Pages Registration # : PR 123 Escrow

More information

725-R-599 PIPE LINING. (Revised 05-01-12) SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING PIPE

725-R-599 PIPE LINING. (Revised 05-01-12) SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING PIPE PIPE LINING (Revised 05-01-12) The Standard Specifications are revised as follows: SECTION 725, DELETE LINES 1 THRU 317. SECTION 725, BEGIN LINE 1, INSERT AS FOLLOWS: SECTION 725 SLIP LINING OF EXISTING

More information

Water Damage During Construction

Water Damage During Construction Allianz Global Corporate & Specialty Americas Water Damage During Construction May 2012 A Contractor s Loss Prevention Guide Water damage losses are a major cause of loss during construction and represent

More information

Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023

Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023 Specifications Preformed Metal Wall and Roof Panels Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023 Section 07410 Preformed Metal Wall and Roof Panels Structural

More information