1 LOAD TEST PROCEDURE Bridge, Gantry and Jib Cranes & Monorail Systems B001-R05/07 Introduction: Load testing and inspection of overhead cranes is required by many safety regulations, national consensus standards and manufacturers. It is the purpose of the annual condition inspection to ensure that the overall structural, mechanical and electric components of the equipment have been maintained in a safe and serviceable condition and are functioning properly according to the original equipment manufacturer s specifications. It is the purpose of the load test to ensure by actual overloading that the equipment is capable of safely lifting and moving the rated load through all designed motions. The inspection and load test do not take into account the duty factor of the equipment. The frequency of performing a load test can vary depending on regulatory jurisdiction. The CCAA recommends that load testing be performed at least once every four (4) years. Please keep in mind that the original equipment manufacturer may have more stringent requirements and these requirements must take precedence. A certification issued is not a license to use a crane beyond the original designed duty factor. Owners and operators should always be aware of the equipment s duty factor. The following equipment requires proof testing: 1. All bridge cranes, gantry cranes, monorail systems and jib cranes of all capacities upon original installation and before equipment is put into service. 2. All bridge cranes, gantry cranes, monorail systems and jib cranes of all capacities to be proof tested once every four (4) years after original proof test. 3. All bridge cranes, gantry cranes, monorail systems and jib cranes of all capacities to be proof tested and operationally tested after significant modifications or major repairs are performed. The certifying agency shall make a determination on whether the Modification s or repairs are sufficient to require a proof test. The following procedure is established to provide a method which will meet the most stringent requirements that apply to this type of crane. The methods herein recommended are intended to provide a safe and effective means by which load tests can be conducted. 1
2 1. Pre-test Procedures 1-1. Check that an operator s manual is available for the crane and review same for operationa1 limitations Determine that lifting gear to be used with the crane in normal duties or for the purpose of testing the crane has already been tested independently. Check that all lifting attachments are clearly marked with their safe working load Review previous test and inspection certificates, wire rope inspections, and deficiency reports and determine that any necessary corrections have been made Review periodic inspection reports, maintenance records and documentation of repairs to determine that all work was in order Determine that the safe working load for the crane is known and clearly marked on the crane or on charts affixed to it. If the craneway supports more than one crane, verify that the craneway and its supporting structure were designed to support the cranes and loads in all authorized operational configurations Choose appropriate loads for the test based on the manufacturer s load ratings for the condition of use. A 25% minimum partial load, the rated load, and a proof load as close as possible but not exceeding 125% of rated load shall be used. Check manufacturer s limitations and or specific instructions on testing. Reeving configuration must be recorded Rigging should be arranged for the test loads which conforms to good rigging practice for a safe lift Barriers should be set up around the operating perimeter if there is any possibility that personnel or vehicles will intrude into the operating region A pre test conference should be arranged with the operator, the riggers, and the signalman to establish how the test will be conducted and to review the signals to be used Inspect the crane in its entirety according to the checklist normally used for that type of crane. Particular attention should be given to the structural elements of the crane which will be subjected to stress during the load testing procedure. Any evidence of degradation among the structural elements should be evaluated and a determination made as to the suitability of the crane s condition for load testing and the need for nondestructive testing or dismantling for detailed examination. 2
3 1-11. Conduct a visual examination of the crane runway, track, power conductors, collectors and switch gear prior to commencing the test The crane should be operated without a load through its full range of operation and all safety devices and limit switches should be checked. The 25% partial load should then be applied and required adjustments made for appropriate function. (i.e., limit switches, variable frequency drives, soft starts, etc.) Note: Many of the new cranes today incorporate bridge and trolley travel limits including anti-collision devices, which can be adjusted to maintain a predetermined distance and eliminate the possibility of two (2) cranes or monorail hoists between runway support centers. Inspector must always beware of this fact before load testing. 2. Load Test 2-1. At the start of the rated load test the crane should be positioned over a supporting stanchion or column of the runway with the trolley positioned adjacent to the end truck. With the crane in this position, measure the deflection of the crane main girders and the runway girders at center span Lift the rated load a sufficient height to ensure that each tooth of the lifting gear train is subjected to the rated load. Lower the load to a height of 4-8 inches above the ground Traverse the bridge to mid span of each runway girder and measure the deflection. Traverse the trolley with rated load to mid span of the bridge and measure the deflection. Compare these values with appropriate specifications for the crane. Published Deflection Specifications: CMAA #70 Top Riding Double Girder Cranes and Gantry cranes. CMAA #74 Top Riding and Under Running Single Girder Cranes. ANSI MH27-1 For Patented Track Underhung Cranes and Monorail Systems. ANSI MH27.2 For Enclosed Track Underhung Cranes and Monorail Systems Raise the rated load approximately five (5) feet above the ground. With the hoist controller in the neutral position, release (by hand) the holding brake. The load controlling device should control the load. 3
4 Note: many load brakes are designed to hold the load, always check with the manufacturer With the holding brake in the released position, start the load down slowly and then return the controller to the off position as the test load is lowering. The load controlling device should prevent the load from accelerating. Note: It is not mandatory for the load controlling device to halt the downward motion of the load however, one needs to refer to the manufacturer testing procedures, as many load brakes are designed to stop and hold the load For cranes with primary and secondary holding brakes and/or eddy current or hoist dynamic load brakes visually observe that correct operation ensures control of the rated load For cranes equipped with a hoist dynamic brake, eddy current brake, or regenerative brake, check lowering speeds against manufacturer s specifications to ensure correct brake operation. Note: A load test should not be attempted until a full understanding of the brake function is achieved. Note: Do not release the holding brake when testing equipment with these brake systems. Could cause load to free fall. The speed test should be done with power on, so the holding brake will be in the released position In order to test the reaction of the hoist unit in the event of power failure during a lift, hoist the rated load to a convenient distance above the surface. Lower the load at high speed and, with the controller in the lowering position, disconnect the main power source. The test load should stop lowering when the power is disconnected Increase the test load to 125% of rated load to achieve the proof load. Repeat items 2-1 through 2-7 and determine that during these operations all crane functions operate effectively. Note: Hoist may be equipped with an adjustable or nonadjustable overload devise. This devise may require adjustment or modification in order to raise proof load. Always consult manufacturer for instructions While handling the proof load, operate the crane at speeds appropriate to the safe operation and control of the load For cranes with two or more hoists, separate tests must be carried out for each hoist Operate the trolley with the proof load suspended from the hook through the maximum operational range on the bridge. Use extreme caution and observe that the trolley brakes are operating properly if appropriate and allow for load swing and coasting. 4
5 2-13. Operate the bridge with the proof load suspended from the hook as near as possible to the runway rail on each side through the maximum operational range on the runway system. Use extreme caution and observe for any binding of bridge trucks and proper brake operation etc Test bridge and trolley brakes to determine that they stop their respective functions in a distance equal to 10% of full load speed in feet per minute when traveling at full speed with full rated load. NOTE: Some jurisdictions require that the bridge brakes must be capable of retarding the motion of the bridge at the rate of 1 foot per second per second while the full rated load is being carried. The stopping distance in feet to meet this requirement can be calculated from the formula, S = 0.5(v2/a), where v is the observed speed in ft./sec. and a is the deceleration in ft./sec./sec., in this case 1.0 ft./sec./sec When the regulatory authority specifies the rate of deceleration required to meet the energy absorbing requirement for runway and trolley bumpers, the formula in the above note can be used to determine the required stopping distance for the bridge and trolley. To use the formula substitute the appropriate deceleration value for a and the observed value of v for the particular function. Some jurisdictions specify v at a certain per cent of full speed, in which case the reduced value would be substituted in the formula. 2-l6. For craneways with two or more cranes, the l00%* rated load test should be conducted simultaneously for all the cranes that can fit on a single runway span with their buffers in contact. The runway deflection should be measured with the loads suspended as close as possible to the runway with the cranes moving across the span between runway supports and the values compared to appropriate specifications. Reference: AISE Tech. Report #13 Guide for Design of Mill Buildings and specifically Light and Heavy Industrial Buildings, Part II, With Cranes, Fisher & Buettner, AISE September, Post-test Inspection 3-1. After the tests are completed, conduct a thorough examination to ensure that the crane has satisfactorily withstood the tests. Park the crane at the proper location for service access and relax all rigging and reeving to allow for inspection of the wire rope and reeving components. Open the main disconnect and install a safety lock out device before mounting the crane. 5
6 3-2. Check all components of the crane for structural damage including cracks, weld separation, permanent deformation, paint flaking and loose fasteners Check the runway for structural damage or distortion, loose or damaged fasteners, track alignment and secure attachment to the structural support Check the crane and runway electrical components for deterioration and proper condition. Verify the integrity of wiring, connections and enclosures, checking for neatness, security and conformance to appropriate electrical codes Check all sheaves, drums and wire rope for evidence damage or excessive wear. Open the wire rope and inspect the core at several points to determine any deterioration. Give particular attention to potential damage at end fittings and anchor points Check that all required guards are securely attached. Verify that all shafts, couplings and open gears that can be contacted by personnel are properly guarded Make note of any damage, deficiencies, or corrections that may be required Hoist the load blocks clear of personnel or obstructions and verify that the wire rope has wound properly on the hoist drums. Open the main disconnect and leave the pendant, if any, in the designated location Complete the report and conduct an exit briefing, if appropriate. 6
Safety Manual For Overhead Crane Operators
Safety Manual For Overhead Crane Operators Contents Forward ---------------------------------------------------------------1 Qualifications---------------------------------------------------------1 Certification
Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder)
ASME NOG-1 2015 (Revision of ASME NOG-1 2010) Rules for Construction of Overhead and Gantry Cranes (Top Running Bridge, Multiple Girder) AN AMERICAN NATIONAL STANDARD ASME NOG-1 2015 (Revision of ASME
STANDARD PRACTICE INSTRUCTION
STANDARD PRACTICE INSTRUCTION DATE: SUBJECT: Crane Safety Program REGULATORY STANDARD: OSHA 29 CFR 1910.179 Overhead and Gantry Cranes OSHA 29 CFR 1926.550 Cranes and Derricks OSHA 29 CFR 1903.1 (The General
Operator Training Questionnaire
Participants Name: Company Name: Score: Test Date: Location: Crane Operator's Permit Issued on Date: Instructor: 1. A Top Running Overhead Crane is any crane that runs on two parallel runway beams over
CRANE & HOIST PROGRAM
Department of Environmental Safety DIVISION OF ADMINISTRATIVE AFFAIRS CRANE & HOIST PROGRAM Approved as UM Policy December 2012 UNIVERSITY OF MARYLAND, COLLEGE PARK, MD 20742-3133 (301) 405-3960 FAX (301)
Owner s Manual Gantry Cranes
Owner s Manual Gantry Cranes Fixed Height Gantry Crane MODEL NUMBER: SERIAL NUMBER: CAPACITY IN TONS: Telescoping Gantry Crane Bushman AvonTec 262-790-4200, 800338-7810, Fax 262-790-4200 www.bushmanavontec.com
Glossary of Common Crane Ter ms:
Glossary of Common Crane Ter ms: 26 Adjustable brakes: Electro-mechanical device to control crane deceleration. Bridge beam: Traveling beam connected to end trucks - supports trolley hoist and load. Bumpers:
Memberships. W.F. Welding & Overhead Cranes Ltd. Since 1986. W.F. Welding & Overhead Cranes. 1-200 Ton Overhead Cranes. Jib Cranes.
Memberships Canadian Standards Association (CSA) W.F. is approved by the Canadian Welding Bureau and certified to CSA standard W47.1-03-Division 1. Other memberships include: W.F. Welding & Overhead Cranes
ERIKKILA INDUSTRIAL CRANES
ERIKKILA INDUSTRIAL CRANES Capacity up to 20 000 kg BRIDGE CRANES - Overhead - Under running GANTRY CRANES I-GIRDER JIB CRANES LIFTING BEAMS SERVICE ERIKKILA Reliable lifting for almost 100 years ERIKKILA
Properly Install, Inspect, and Load Test Overhead Patient/Resident Track Lifts
Properly Install, Inspect, and Load Test Overhead Patient/Resident Track Lifts This bulletin briefly describes the causes of an accident involving an overhead patient/resident track lift system 1 and actions
SAFE HANDLING OF PRECAST CONCRETE PRODUCTS
SAFE HANDLING OF PRECAST CONCRETE PRODUCTS Safety Handling of Precast Concrete Products The lifting of any precast product requires the use of special equipment and substantial planning and knowledge.
Engineered Material Handling. Overhead Bridge Cranes and Gantry Cranes
TM Engineered Material Handling Overhead Bridge Overhead and Gantry Bridge Cranes and Gantry Cranes Custom Engineered Crane Systems Gantry Cranes EMH builds a complete range of gantry cranes including
APPENDIX A UNIVERSITY OF MICHIGAN TRAINING PACKAGE FOR OVERHEAD OR GANTRY CRANES
APPENDIX A UNIVERSITY OF MICHIGAN TRAINING PACKAGE FOR OVERHEAD OR GANTRY CRANES CRANE AND HOIST TRAINING INSTRUCTIONS Training Procedures Each department using cranes or hoists will appoint at least one
TÜV Middle East W.L.L. Welcome
TÜV Middle East W.L.L. Welcome TÜV NORD Group Key Data Foundation of TÜV Nord e.v.: 1869 Foundation of TÜV NORD Group: 2004 Number of employees: 8,000 + A Competent and International Service Partner Competence
EMH, Inc. Specifications for
EMH, Inc. Specifications for Top Running Cranes Under Running Cranes Wire Rope Hoists DISCLAIMER These SPECIFICATIONS ARE INTENDED AS GENERAL GUIDELINES ONLY for technical procedure. Questions concerning
TOP RUNNING SINGLE GIRDER BRIDGE CRANE
SECTION 14630 TOP RUNNING SINGLE GIRDER BRIDGE CRANE 1.01 SUMMARY PART 1- GENERAL A. The work required under this section shall include the designing, manufacturing, shipping, installing and field testing
Owner s Manual & Safety Instructions
Owner s Manual & Safety Instructions Save This Manual Keep this manual for the safety warnings and precautions, assembly, operating, inspection, maintenance and cleaning procedures. Write the product s
CHAPTER 7 OVERHEAD AND GANTRY CRANES
CHAPTER 7 OVERHEAD AND GANTRY CRANES This chapter specifies operation, inspection, maintenance, and testing requirements for the use of overhead and gantry cranes and implements the requirements of ASME
TABLE OF CONTENTS. COLUMBUS McKINNON CORPORATION is a leading worldwide designer and manufacturer of material handling products,
TRAINING CLASSES TABLE OF CONTENTS COLUMBUS McKINNON CORPORATION is a leading worldwide designer and manufacturer of material handling products, systems and services with over 253 combined years experience
TLILIC3003A Licence to operate a bridge and gantry crane
TLILIC3003A Licence to operate a bridge and gantry crane Release: 1 TLILIC3003A Licence to operate a bridge and gantry crane Modification History Not Applicable Unit Descriptor Unit Descriptor This unit
EMPLOYEE FALL PROTECTION
EMPLOYEE FALL PROTECTION You can fall from any height and be seriously injured or killed. In the construction industry, as well as any other industry, when falls from heights happen, they are usually very
POTENTIAL HEALTH & SAFETY HAZARDS
Number: OH&S 18.27.1 Revision Date: 2014.01.28 Crane Safety Procedures 1. PURPOSE 1.1. These procedures provide the University requirements for the operation and management of overhead travelling cranes
Fall Protection Guidelines
OCT 2015 1 of 6 Fall Protection Guidelines 1.0 PURPOSE To establish the requirements and procedures to protect employees and other persons conducting work from hazards associated with falling from one
The mechanics finish work on time today...
The mechanics finish work on time today......and the next crane mounting too. Crane component kits by SWF Krantechnik Your mechanics are satisfied. Your customer is satisfied. You are satisfied. And that
WARNING! Failure to follow these inspection procedures can cause personal injury and property damage.
GARDNER-DENVER TECHNICAL MANUAL CPTEN-136 07/03 Hoist Inspection and Maintenance Guide Inspection Record For: Hoist Model.: Hoist Serial.: WARNING! Failure to follow these inspection procedures can cause
SELECTING THE RIGHT OVERHEAD CRANE
INTRODUCING CMAA The Crane Manufacturers Association of America, Inc. (CMAA), is an independent trade association affiliated with the United States Division of Material Handling Industry. The voluntary
INTER PLANT STANDARD STEEL INDUSTRY
INTER PLANT STANDARD STEEL INDUSTRY CODE OF PRACTICE FOR REVAMPING OF EOT CRANES IPSS:3-02-014-03 IPSS Corresponding IS does not exist 0. FOREWORD 0.1 This Inter Plant Standard has been prepared by the
CONSTRUCTION SAFETY. NOTE: Barriers, guards, and warning signs are required to ensure safety against existing hazards.
CONSTRUCTION SAFETY Introduction The following sections provide general guidelines and procedures for construction safety. This chapter covers the following topics: TOPIC PAGE General Construction Guidelines
FALL PROTECTION WORK PLAN
FALL PROTECTION WORK PLAN INSTRUCTIONS A written fall protection work plan must be implemented by each employer on a job site where a fall hazard of 10 feet or greater exists, in accordance with OSHA Standards.
SAFETY STANDARD FOR LIFTING DEVICES AND EQUIPMENT
This document was Superseded by NASA-STD-8719.9 NSS/GO-1740.9B Please update your links accordingly. NOVEMBER 1991 National Aeronautics and Space Administration SAFETY STANDARD FOR LIFTING DEVICES AND
FALL PROTECTION PROGRAM
FALL PROTECTION PROGRAM Page 2 of 15 Table of Contents Applicability... 3 Overview... 3 Definitions... 3 Responsibilities... 5 Risk Assessment... 6 Risk Management... 7 Roof Access Procedure 10 Rescue
How To Ensure Safety Of Lifting Equipment
1 of 12 2 of 12 CONTENTS 1.0 OBJECTIVES... 3 2.0 SCOPE... 3 3.0 DEFINITION OF TERMS... 3 3.2.1 Loose Lifting Tackle... 3 3.2.2 Examination... 4 3.2.3 Inspection... 4 4.0 RESPONSIBILITIES & AUTHORITIES...
ELEVATED WORK POLICY
ELEVATED WORK POLICY 1.0 BACKGROUND The purpose of this program is to prevent accidents and injuries to workers from falls and to provide employees with the information for the safe use of fall protection
Specification. Safelift Overhead Travelling Cranes
Specification Safelift Overhead Travelling Cranes Safelift overhead travelling cranes are Safelift products, produced by the Rossendale Group, backed by the Safelift Guarantee. GENERAL PRODUCT DESCRIPTION
OSHA STANDARD ON TESTING
426 Ogden Ave Superior, WI 54880 800-274-6676 715-392-2294 (phone) 715-392-9630 (fax) This information is taken from the OSHA web site. This is not an attempt by Total Tool to interpret the standard; it
INSTRUCTIONS AND PARTS LIST SINGLE GIRDER UNDERHUNG CRANE BRIDGE KITS 1/2 THRU 10 TON HAND GEARED AND MOTOR DRIVEN
INSTRUCTIONS AND PARTS LIST SINGLE GIRDER UNDERHUNG CRANE BRIDGE KITS 1/2 THRU 10 TON HAND GEARED AND MOTOR DRIVEN JUNE, 1999 COPYRIGHT 1999, Columbus Mckinnon Corporation PART NO. 113533-71 Page 1 COLUMBUS
Fall Protection Program
Fall Protection Program Policy: It is the policy of our company to provide fall protection for employees exposed to fall hazards greater than 7 ½ feet. Fall hazards include but, are not limited to; work
Boom and fly capacities for this machine are listed by the following sections:
Lifting Capacities Telescopic Hydraulic Truck Crane HTC 8650 50 ton (45.36 metric ton) and fly capacities for this machine are listed by the following sections: Fully Extended Outriggers Working Range
Slings, Rigging and Lifting Equipment
A printed or saved copy is an UNCONTROLLED copy. Check that it is the latest available version before use. Title: Number: SLINGS, RIGGING AND LIFTING EQUIPMENT GM-11-038-02 Version Number: 13.0 Date Revised:
Ladder Program and Training Materials
Prepared by Built Insurance Brokerage LLC Ladder Program and Training Materials Table of Contents Ladder Program... 1 Appendix A... 5 Appendix B... 7 Employee Handout... 9 Presentation Instructor Notes...
INSPECTION, THOROUGH EXAMINATION and TESTING
INSPECTION, THOROUGH EXAMINATION and TESTING Guidance Notes on INSPECTION, THOROUGH EXAMINATION and TESTING of Lifting Appliances and Lifting Gear Occupational Safety and Health Branch Labour Department
What should you check for when inspecting a crane before maintenance?
Crane Maintenance What should you check for when inspecting a crane before maintenance? Lower hoist to unload rope sheaves. Unwind all wire rope from the hoist drum to expose all parts of a rope, making
SECTION 5.0 LADDER SAFETY
SECTION 5.0 LADDER SAFETY The following material is being provided for informational purposes and in order to promote safety awareness. It does not constitute nor should it serve as a substitute for legal
I BEAM TRACK INSTALLATION
PDQ 0/700 FESTOON SYSTEM INSTALLATION AND MAINTENANCE INSTRUCTIONS INTRODUCTION The PDQ Festoon System was designed to run on one of three sizes of I-beams: S x., S8 x 8. and S x.. System trolleys must
CHAPTER 14 BELOW-THE-HOOK LIFTING DEVICES
CHAPTER 14 BELOW-THE-HOOK LIFTING DEVICES This chapter provides the requirements for below-the-hook lifting devices used in hoisting and rigging, such as spreader bars, lifting yokes, and lift fixtures.
ADD CURRENT FEATURES AND TECHNOLOGIES TO YOUR CRANE
INDUSTRIAL CRANES NUCLEAR CRANES PORT CRANES HEAVY-DUTY LIFT TRUCKS SERVICE MACHINE TOOL SERVICE RETROFITS ADD CURRENT FEATURES AND TECHNOLOGIES TO YOUR CRANE 2 Konecranes Retrofits RETROFITS MADE EASY
Guidance on Load Testing Suspended Access Equipment
Guidance on Load Testing Suspended Access Equipment SPECIALIST ACCESS ENGINEERING AND MAINTENANCE ASSOCIATION (This document must be read in conjunction with the SAEMA document: Guidance on Using Suspended
How To Make A Fall Arrest Anchor System
FALL ARREST TETHER TRACK RIGID RAIL ANCHOR SYSTEMS DESIGN: MOUNTING STYLE: LENGTHS: Built to withstand 900 pound maximum arresting force Ceiling mounted or free standing monorail & bridge anchor systems
CHAPTER 13 LOAD HOOKS
CHAPTER 13 LOAD HOOKS This chapter provides safety standards for the inspection, testing, and maintenance of load hooks installed on cranes or hoists and implements the requirements of ASME B30.10, Chapter
RISK RATING SAFE WORK METHOD STATEMENT 1 HIGH 2 MEDIUM 3LOW. I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager
RISK RATING 1 HIGH 2 MEDIUM 3LOW SAFE WORK METHOD STATEMENT Title: : Gantry Crane Operation Ref No: 1 I approve the use of this Safe Work Method Statement: NAME: POSITION: Department Manager SIGNATURE:
Fall Protection System: A system put in place to protect workers from falling. (i.e. installation of guardrails, fall arrest, fall restraint, etc.
SWP (6) FALL PROTECTION PROGRAM The following information on Fall Protection has been based around the BC OHS Regulations, standards, policies and guidelines. Prior to starting work outside of BC, the
Horizontal Cable Systems
Safety From The Top Down Suspended Access Systems and Fall Protection Overview Horizontal cable systems are generally installed as a permanent fall protection system, typically consisting of two terminating
SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS
SECTION 08360 SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS Display hidden notes to specifier by using Tools / Options / View / Hidden Text. On newer versions of Microsoft Word
Fall Protection Basics for Construction Activities
Fall Protection Basics for Construction Activities Washington State has revised fall protection rules, effective April 1, 2013. This booklet provides an overview of the requirements. www.lni.wa.gov/safety
SECTION 14 6300 BRIDGE CRANES
PART 1 GENERAL 1.01 SECTION INCLUDES SECTION 14 6300 A. CMAA Class C bridge crane complete system including runway beams, ASCE rails, bridge beam, end trucks, hoist, trolley, runway support columns and
FALL PROTECTION- Part 2 SELF INSPECTION CHECKLIST
OPTIONAL INFORMATION Name of School: Date of Inspection: Vocational Program/Course/Room: Signature of Inspector: FALL PROTECTION- Part 2 Instructions: This checklist covers fall protection systems criteria
INTERNATIONAL LABOUR ORGANISATION. REGISTER OF LIFTING APPLIANCES and ITEMS OF LOOSE GEAR
INTERNATIONAL LABOUR ORGANISATION REGISTER OF LIFTING APPLIANCES and ITEMS OF LOOSE GEAR Model Form and Certificates as required by Article 25(2) of the ILO Convention concerning Occupational Safety and
Chicago Crane Operators Examination Study Guide
Chicago Crane Operators Examination Study Guide Cranes and hoisting equipment with a rated capacity of 2,000 pounds or more require a licensed operator for use in the City of Chicago. This study guide
LOADING DOCK EQUIPMENT. A. Section 03100 - Concrete Forms and Accessories: Placement of anchors into concrete.
LOADING DOCK EQUIPMENT PART 1 GENERAL 1.1 SECTION INCLUDES A. Loading dock equipment of the following types: 1. Dock lifts. 2. Control stations. 1.2 RELATED SECTIONS A. Section 03100 - Concrete Forms and
Guide to Fall Protection Regulations
Guide to Fall Protection Regulations Produced by: Workers Compensation Board of PEI PO Box 757 Charlottetown PE C1A 7L7 902-368-5697 or 1-800-237-5049 website: www.wcb.pe.ca Revised June 2013 Guide to
GUIDE TO TOWER CRANES 1
1 This Guide provides information on siting, erecting and using tower cranes and selferecting tower cranes in the workplace and supports the General guide for cranes. This Guide forms part of a series
Application for Approved (Overseas/Local) Third Party Inspection Agency for Lifting Equipment
Occupational Safety and Health Division 18 Havelock Road #03-02 Singapore 059764 Tel: 64385122 www.mom.gov.sg [email protected] Application for Approved (Overseas/Local) Third Party Inspection Agency
Overhead Cranes NORTH AMERICAN INDUSTRIES, INC.
Overhead Cranes Bridge Cranes, Gantry Cranes Monorails & Custom Engineered Systems NORTH AMERICAN INDUSTRIES, INC. North American Industries is a proud member of: Material Handling Industry of America
Appendix 6145-T1 Forklift Use Practices
Appendix 6145-T1 Operators must perform a preoperational inspection of the forklifts and attachments in accordance with the equipment operating manual. They will immediately report any equipment deficiencies
OVERHEAD CRANE OPERATOR SAFETY TRAINING
OVERHEAD CRANE OPERATOR SAFETY TRAINING 1 TYPES OF OVERHEAD CRANES Floor Mounted Jib Bridge Crane Monorail Crane Wall Mounted Jib Here is an assortment of overhead cranes. Take pictures of the different
AHS-Series Steel Adjustable-Height Gantry Cranes Instruction Manual
AHS manual 1011 rev. 1/9/014 Vestil Manufacturing Corp. 999 North Wayne Street, P.O. Box 507, Angola, IN 4670 Telephone: (60) 665-7586 -or- Toll Free (800) 48-0868 Fax: (60) 665-19 Url: www.vestilmfg.com
HPC500 Series Top Running and Underhung End Trucks
EFFECTIVE: May 2, 2012 HPC500 Series Top Running and Underhung End Trucks ½ Ton, 1 Ton, and 2 Ton Capacity Code and Serial No. This equipment should not be installed, operated or maintained by any person
Technical Advisory for Safe Operation of Lifting Equipment. Programme-Based Engagement
Technical Advisory for Safe Operation of Lifting Equipment Programme-Based Engagement Contents 1. Introduction and Background 03 2. Case Studies of Accidents Involving Lifting Equipment 05 3. Common Systemic
Wire Rope Extender Lanyard
Reliance Industries, LLC User Instructions for Wire Rope Extender Lanyard Model # 714004 Reliance Industries, LLC PO Box 140008 Denver, CO 80214 Ph. (800) 488-5751 Ph. (303) 424-8650 Fax (303) 424-8670
CONTRACTOR CRANE AWARENESS WEB BASED TRAINING STUDENT GUIDE NCC-CCA-01
CONTRACTOR CRANE AWARENESS WEB BASED TRAINING STUDENT GUIDE NCC-CCA-01 Naval Facilities Engineering Command Navy Crane Center Norfolk Naval Shipyard, Bldg. 491 Portsmouth, VA 23709-5000 Comm. Phone: 757.967.3803,
Fall Protection, Title 29 Code of Federal Regulations (CFR) Part 45, Subpart M, Fall Protection, 1926.500, 1926.501, 1926.502, and1926.
STANDARDS Fall Protection, Title 29 Code of Federal Regulations (CFR) Part 45, Subpart M, Fall Protection, 1926.500, 1926.501, 1926.502, and1926.503 1.0 Purpose This document meets the requirements outlined
Wallace Tri-Adjustable Gantries Round Tube Assembly Instructions
Wallace Tri-Adjustable Gantries Round Tube Assembly Instructions For any additional information, Please call -800-55-LIFT. Before You Begin S. Read and understand instructions before using this gantry..
Elkhorn Construction, Inc. Safety Manual Title: Fall Protection Policy Effective Date: 03-01-2000
1. General Requirements (OSHA References: OSHA 29 CFR 1926.503) 1.1 Elkhorn Construction, Inc. employee-owners and subcontractors are required to use fall protection equipment or systems when an assessment
EQUIPMENT SAFETY EARTHMOVING MATERIAL HANDLING NAVFAC MIDLANT
EQUIPMENT SAFETY EARTHMOVING MATERIAL HANDLING COMMON EARTHMOVING EQUIPMENT SKID LOADERS BACKHOE FRONT END LOADER GRADERS SCRAPERS BULL DOZERS Lots of stuff Here! COMMON MATERIAL HAULING TRUCKS ALL TYPES
Section 14. Forklift Safety Contents 14.1 Operator Safety
Section 14. Forklift Safety Contents 14.1 Operator Safety... 14-1 14.2 Inspection and Maintenance... 14-2 14.3 Handling the Load... 14-3 14.4 Fueling Liquefied Petroleum (LP) Gas Forklifts... 14-3 14.5
CHAPTER 2 GENERAL SAFETY REQUIREMENTS
Bridge Inspection Handbook 2-1 2.1 INTRODUCTION CHAPTER 2 GENERAL SAFETY REQUIREMENTS Safety is everyone's business. As an employer, MassDOT is obligated to promote job safety and furnish safe tools, equipment,
What is Fall protection?
What is Fall protection? The Occupational Safety and Health Administration s (OSHA s) fall protection standard deals with both human and equipment-related issues. The standard identifies areas or activities
TABLE OF CONTENTS PART 5 - CRANES, HOISTING AND LIFTING
May 17, 2006 TABLE OF CONTENTS PART 5 - CRANES, HOISTING AND LIFTING Page DEFINITIONS...5-1 STANDARDS...5-1 GENERAL...5-3 EQUIPMENT OPERATION...5-7 LIFTS...5-8 WIRE ROPE CLIPS AND TERMINATION EFFICIENCY...5-10
Record of Performance Inspection and Test Crawler, Locomotive, Truck, and Wheel Cranes
Appendix F Record of Performance Inspection and Test Crawler, Locomotive, Truck, and Wheel Cranes General All mobile cranes must be performance inspected and tested by the owner and/or contractor in accordance
Cleveland Tramrail Bridge Components
Cleveland Tramrail Bridge Components 1 Tarca Rail Tarca Track features specially rolled high-carbon alloy steel rail with raised treads welded to a steel flange and web. Tarca is designed to provide maximum
Working Copy WP 05-WH1401. Revision 4. 6-Ton Electric Forklifts 74-H-010B. Technical Procedure EFFECTIVE DATE: 01/04/06. John Guy APPROVED FOR USE
WP 05-WH1401 Revision 4 6-Ton Electric Forklifts 74-H-010B Technical Procedure EFFECTIVE DATE: 01/04/06 John Guy APPROVED FOR USE WP 05-WH1401 Rev. 4 Page 2 of 10 TABLE OF CONTENTS INTRODUCTION... 3 REFERENCES...
OPERATOR S MANUAL WARNING
ELECTRIC PALLET TRUCK E30 SERIES OPERATOR S MANUAL WARNING DO NOT INSTALL, OPERATE OR SERVICE THIS PRODUCT UNLESS YOU HAVE READ AND FULLY UNDERSTAND THE ENTIRE CONTENTS OF THIS MANUAL. FAILURE TO DO SO
Most Asked Action Alerts
Most Asked Action Alerts CMAA 70 & 74 Section 1 General Specifications 1.2 Building Design Considerations Q. I am working on the structural frame that will support the rails for a top-running underslung
Cable Hoist. Operating, Maintenance & Parts Manual. Follow all instructions and warnings for LMCA680. Americrane & Hoist Corp.
Americrane & Hoist Corp. -800-5-93 Cable Hoist LMCA80 Operating, Maintenance & Parts Manual Cable Hoist Follow all instructions and warnings for inspecting, maintaining and operating this hoist. The use
FALL PROTECTION PROGRAM
FALL PROTECTION PROGRAM DEPARTMENT OF RISK MANAGEMENT AND SAFETY CREATED JUNE 2009 Table of Contents Fall Protection Requirements... 1 General Fall Protection... 1 Controlled Access Zones... 1 Guardrail
SCAFFOLDING RUNWAY SYSTEM
SCAFFOLDING RUNWAY SYSTEM HANDBOOK 10/2009.2 i) Further information and detailed component information can be found in the C1 Conveyor Systems Brochure: http://www.nikoltd.co.uk/downloads/brochures/c1_overhead_conveyors_monorails.pdf
SITE SPECIFIC FALL PROTECTION PLAN
1 THIS PLAN IS SPECIFIC TO: PROJECT & ADDRESS 1.1 THIS PLAN IS SPECIFIC TO THE FOLLOWING AREA(S) ON SITE: Parkade level: Typical level: Other: Between G/L: 1.2 THIS PLAN IS APPLICABLE TO THE FOLLOWING
TROPIC LIGHTNING CHECKRIDE PERFORMANCE MEASURE
TROPIC LIGHTNING CHECKRIDE PERFORMANCE MEASURES V4.0 TASK 1: PERSONAL PROTECTIVE EQUIPMENT PERFORMANCE MEASURE DOT Approved Helmet Proper Reflective Equipment Full Fingered Gloves Proper Eye Protection
Health and Safety Resources Caution to Users
Health and Safety Resources Caution to Users Many of the resources in this archive were originally prepared by WSN s predecessor organizations for use by industry clients. While much of the information
PORTAL CRANE STANDARD OPERATING PROCEDURES
PORTAL CRANE STANDARD OPERATING PROCEDURES Pre Start-Up Inspection (PSI) Ground: remove all 4 chock blocks check tracks for obstacles check wheels, flanges, park brakes and gears for lube and damage, wheel
Mobile (Truck) Cranes
Mobile (Truck) Cranes Definition: A truck or mobile crane consists of an upper carriage with front end attachment such as a box or lattice type boom and optional jib (boom extension). The upper carriage
`Fall Protection Guidelines in Construction
`Fall Protection Guidelines in Construction A Publication Provided by: 1681 Campus Delivery Fort Collins, Colorado 80523 (970) 491-6151 email: [email protected] web: http://www.bernardino.colostate.edu/public/
MATERIAL HANDLING PROGRAM (Section 10)
MATERIAL HANDLING PROGRAM (Section 10) OVERVIEW (WMI Facility) (1) Only certified personnel will operate powered industrial lifts. (2) Training will be provided to those who require to be certified or
SAFE USE OF LIFTING EQUIPMENT
Golden Rule 6 Mechanical Lifting SAFE USE OF LIFTING EQUIPMENT Do not operate any lifting equipment unless It has been approved for use The lift has been assessed by a competent person The load has been
STANDARD FOR NON-FIRE RATED ROLLING DOORS
ANSI/DASMA 203-2004 AMERICAN NATIONAL STANDARD STANDARD FOR NON-FIRE RATED ROLLING DOORS Door & Access Systems Manufacturers Association, International Sponsor: 1300 Sumner Ave Cleveland, Ohio 44115-2851
Walking and Working Surface Checklist:
Walking and Working Surfaces Purpose: This information is presented to improve the level of safety in our operations, and to inform you that we will comply with the OSHA Standard 29 CFR 1910.23. Responsibility:
WEEKLY SAFETY MEETING
Safety Meeting Contents Meeting Notice Leaders Guide Employee Handout Employee Quiz Meeting Sign-In Sheet Employee Puzzle PRIOR TO THE WEEKLY MEETING: - Post the meeting notice by the timeclock - Read
Fall Protection. Office of Risk Management. uottawa.ca. Guide
Fall Protection Guide Office of Risk Management.ca 1 Contents SCOPE... 1 INTENT... 1 LEGISLATION AND REQUIREMENTS... 1 RESPONSABILITIES... 2 Supervisors... 2 Workers... 2 Facilities... 2 HAZARD CONTROL...
RESCUE PLAN FALL PROTECTION PROGRAM
RESCUE PLAN IMPORTANT: This document is intended to provide guidance only for developing site-specific rescue plans for working at heights. GLOBAL LEADER IN FALL PROTECTION RESCUE PLAN This document is