1 (July 2003) (Rev.1 July 2014) Guidelines for Securing by Welding of Chain Cable Studs in Service Guidance for Anchoring Equipment in Service 1. General 1.1 This document gives the guidelines for maximum wear down of anchor cable fittings, joining shackles, the looseness of studs within anchor cable and the securing by welding of studs found loose during survey of chain cables links in service. 2. Anchor Cable Fittings 2.1 Where considered necessary, joining shackles, D-shackles and other cable fittings should be gauged at their point of greatest weardown. Consideration should be given to replacement when the wear down equates to 12% loss of diameter over original. 2.2 When a Kenter joining shackle is opened, care should be taken to ensure that the tapered locking pin is in good condition. The steel securing pin is to be held in position by lead plugs, hammered in place to maintain a good fit. 2.3 In the case of swivel eyelet axle wear down, consideration should be given to replacement where the maximum lateral movement equates to 5% of the eyelet axle diameter. 3. Anchor Pin Weardown Figure 1: Swivel eyelet 3.1 All anchor pins should be closely examined for weardown. Where the weardown of the pin equates to 12% loss of diameter, consideration should be given to pin replacement. 3.2 Where the pin housing retains strength and if there is excessive clearance, consideration may be given to a sleeved connection between pin and housing in order to constrain the relative movement of pin and anchor. Page 1 of 10 IACS Rec. 2003/Rev
2 4. The Looseness of Studs in Anchor Chain Cable 4.1 During the Special Survey Hull (SSH) when the anchor chains are ranged, gauged and examined, there should be no looseness of studs within links of the anchor cable. Where loose studs exist, the affected cable should be replaced, or where considered feasible, welded in accordance with the procedure specification below. 4.2 Loose studs in anchors cable found prior to the Special Survey may be permitted, subject to the following criteria: Maximum Axial Stud movement Maximum Lateral Stud movement Maximum gap between Link and Stud 3% of cable diameter 5% of cable diameter 3mm 4.3 Where studs are missing from the anchor cable, the lengths of affected cable should be replaced. 5. The Securing by Welding of Chain Cable Studs in Service Where it is proposed to secure loose anchor cable studs by welding, Tthe proposal for repair is to be submitted to the Surveyor for evaluation and approval. The approval will be based on the conditions of the link to be repaired and of remaining links (see para. A1.6 Permissible Weardown of Stud Link Chain Cable for Bower Anchors in UR A1). 5.2 Any such repairs should be carried out in a clean environment as far as practicable. The attachment of earthing straps to cable links should be specially considered prior to welding Welding pprocedure sspecification 26.1 Welds are to be made in accordance with a qualified and approved welding procedure and accepted approved by the Surveyor Welding consumables used are to be approved with grading 3 or 3Y. For Grades 1 and 2 chain cables consumables should have low hydrogen grading H15 or better and for Grade 3 chain cables a very low hydrogen grading of H5 or better A preheating temperature suitable to limit hardness and to prevent the risk of cold cracks is to be applied. In general the following applies: - Grade 1 and 2: 100 C - Grade 3: 175 C 26.4 The welding practice and the welding parameters are to be selected to permit a large single weld deposit to be made. A temper bead at the stud side is allowed and may be advisable depending on the link grade After welding, links should be wrapped to allow a slow cooling. Page 2 of 10 IACS Rec. 2003/Rev
3 3.7. Welding pprocedure aapproval ttests 37.1 The approval test procedure should be representative of the actual welding conditions. The scope of testing of the test sample should include macrosection test specimens and hardness measurements The hardness of the weld metal and of the heat affected zone should not exceed: Hv10 for Grade 1 and Grade 2 chain cables and for Grade 3 chain cables in the normalized and normalized and tempered conditions Hv10 for Grade 3 chain cables in the quenched and tempered condition Repair pprocedure 48.1 The abutting surfaces of the link and stud to be welded are to be ground to produce a good fit with an acceptable root gap to prevent cracking. The surfaces are to be free from moisture, grease, rust etc., just prior to welding Magnetic particle examination to check that the link is free from cracks is to be performed before welding at Surveyor satisfaction Welding is to be performed by qualified welders Welding consumables are to be dried adequately prior to welding in accordance with manufacturer s recommendation In general the stud should be welded at the end opposite to the flash butt weld of the link and it should be welded completely around the circumference All weld stop-starts shall be grounded to remove any defects and to blend smoothly with the base material Examination 59.1 All welds are to be subjected to visual and magnetic or liquid particle examination. In the case of Grade 3 chain cables, inspection is recommended to be delayed for at least 48 hours after the weld has cooled to ambient temperature Studs should be located in the links centrally and at right angles to the sides of the link. Page 3 of 10 IACS Rec. 2003/Rev
4 Anchor and Anchor Chain Terminology Annex 1. Crown / Shackle 2. Shank 3. Flukes 4. Crown pin 5. Crown plate 6. Anchor chain with swivel Page 4 of 10 IACS Rec. 2003/Rev
5 Fore Runner (End Length or Guy Pendant) Terminology 1. Anchor shank 2. Link shackle 3. Swivel 4. Open link 5. Enlarged link 6. Kenter shackle 7. Anchor shackle (Crown shackle) Page 5 of 10 IACS Rec. 2003/Rev
6 Anchor Chain Links Typical Design of Anchor Chain Links Note: All dimensions are shown as multiples of the nominal diameter d of the common link. The dimensions in brackets may be chosen for end studless links in outboard end swivel pieces. Page 6 of 10 IACS Rec. 2003/Rev
7 Anchor Chain Link and Shackles Typical Measurements 1) Anchor chain calibration location of the chain link measurements and wearing limits D 1 = average of measured diameter (mm) = d1 d 2 2 d 1 and d 2 measured diameters of the chain link in the area of maximum wear D 1 0,88 D O D O = original diameter (mm) 2) Loose stud of anchor chain links location of the measurements a) Maximum lateral stud movements 0,05 D o where D O = original diameter (mm) D O D O = original diameter (mm) Page 7 of 10 IACS Rec. 2003/Rev
8 b) Maximum axial stud movements D O 0,03 D o D O = original diameter (mm) c) Maximum gap between Link and Stud 3 mm Page 8 of 10 IACS Rec. 2003/Rev
9 3) Joining shackle Area of maximum weardown D 1 D 2 D1 D2 D 0, 88 2 D o D O = original diameter (mm) 4) End shackle Area of maximum weardown D 1 D 2 D1 D2 D 0, 88 2 D o D O = original diameter (mm) Page 9 of 10 IACS Rec. 2003/Rev
10 5) Swivel Areas of maximum weardown D 1 D 2 D a D1 D2 D 0, 88 2 D o D O = original diameter (mm) 0,05 D a End of Document Page 10 of 10 IACS Rec. 2003/Rev
Guidelines for the Survey of Offshore Mooring Chain Cable in Use
(1995) (Rev.1 Oct 2010) Guidelines for the Survey of Offshore Mooring Chain Cable in Use 1. Application and Purpose The information herein is intended to provide guidance to Surveyors for inspection of
Rules for Testing and Certification of Materials
PART Chapter 2: Equipment 2 Rules for Testing and Certification of Materials CHAPTER 2 Equipment CONTENTS SECTION 1 Anchors... 52 1 General Requirements...52 1.1 Scope...52 1.3 Types of Anchor...52 3 Materials
FIELD ACCEPTANCE OF FIELD WELDING GUIDE
Page 1 of 17 Oklahoma DOT Materials & Testing January 14, 2004 Publication: GFA-FW (Updated to reference current Structural Materials Branch of the ODOT Materials Division URL 07/06/2016) FIELD ACCEPTANCE
Webinar Series. Committee. Disc Brake Wheels Off Inspection and Reline. Presents
1 APTA Bus Webinar Technical Series Maintenance Committee Webinar Series Presents Disc Brake Wheels Off Inspection and Reline January 21, 2015 2 Introduction Welcome to today s webinar in which we will
CERTIFICATION OF OFFSHORE MOORING CHAIN
Guide for the Certification of Offshore Mooring Chains GUIDE FOR THE CERTIFICATION OF OFFSHORE MOORING CHAIN DECEMBER 2009 (Updated February 2014 see next page) American Bureau of Shipping Incorporated
Rules for Classification and Construction Materials and Welding
II Rules for Classification and Construction Materials and Welding 1 Metallic Materials 4 Equipment Edition 2009 The following Rules come into force on April 1 st, 2009 Alterations to the preceding Edition
Field Welding Inspection Guide
Field Welding Inspection Guide Assistance in interpretation of any specification or questions concerning field welding issues can be obtained from the Office of Materials Management, Structural Welding
Butt Fusion Welding of HDPE Pipes Work Procedure
Butt Fusion Welding of HDPE Pipes Work Procedure A pipeline is as good as its weakest point. Accordingly it is not only important that quality pipes and components are used in a piping system, but also
ASTM A860/A860M-09 Standard Specification for Wrought High Strength. Ferritic Steel Butt Welding Fittings. 1. Scope :- 2. Reference Documents :-
Standard Specification for Wrought High Strength Ferritic Steel Butt Welding Fittings 1. Scope :- 1.1 This specification covers wrought high strength ferritic steel butt-welding fitting of seamless and
Reproduced with the permission of the American Welding Society (AWS), Miami, Florida - 09/15/2011. 7. Stud Welding
7. Stud Welding 7.1 Scope Section 7 contains general requirements for welding steel studs to steel (see 7.2.7 and 1.2.2 for approved steels). In addition, it stipulates specific requirements for the following:
Part B Repair Quality Standard for Existing Ships
Part B Repair Quality Standard for Existing Ships PART B SHIPBUILDING AND REPAIR QUALITY STANDARD FOR EXISTING SHIPS CONTENTS: 1. Scope 2. General requirements to repairs and repairers 3. Qualification
Application of Welding Standards in Hong Kong. S. K. Babu Laboratory Manager - Foundation Techniques Ltd
Application of Welding Standards in Hong Kong S. K. Babu Laboratory Manager - Foundation Techniques Ltd Introduction: This paper summarizes the current welding standards practiced in Hong Kong & also outlines
Conceptual Design of Buildings (Course unit code 1C2)
(Course unit code 1C2) Module C Design of Steel Members J.P. Jaspart (University of Liège) 520121-1-2011-1-CZ-ERA MUNDUS-EMMC Bolts are the main type of fasteners used in steel joints. The main geometrical
SAMPLE TEST QUESTIONS STEAMFITTER/PIPEFITTER - ITA WEBSITE
1 Which tool is used to correct internal hi-low when preparing a 4-in. steel pipe for welding? A. 4-in. grinder with cutting disc. B. Mini-grinder with flapper disc. C. Pencil grinder with cone stone.
7. PRINCIPAL STEPS 8. POTENTIAL HAZARDS 9. RECOMMENDED CONTROLS
ACTIVITY HAZARD ANALYSIS (AHA) 1. Contract Number: 2. Contractor Name: 3. Date prepared: 4. Title/Activity Performed: FIXED SCAFFOLDING 5. Location: 6. Estimated Date of Completion: 7. PRINCIPAL STEPS
JIS G3445 Carbon steel tubes for machine structural purposes
JIS G3445 arbon steel tubes for machine structural purposes 1. Scope This Japanese Industrial Standard specifies the carbon steel tubes, hereinafter referred to as the "tubes", used for machinery, automobiles,
INTERNATIONAL LABOUR ORGANISATION. REGISTER OF LIFTING APPLIANCES and ITEMS OF LOOSE GEAR
INTERNATIONAL LABOUR ORGANISATION REGISTER OF LIFTING APPLIANCES and ITEMS OF LOOSE GEAR Model Form and Certificates as required by Article 25(2) of the ILO Convention concerning Occupational Safety and
Product Specification
Product Specification Model No.: DC-240-L01-00-TR Description: H=3.00mm Horizontal SMD DC Power Jacks Pin Shaft Diameter: 0.65mm Packing Method: Tape & Reel (600pcs./R) 1. General 1a. Scope The jacks should
INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Requirements concerning MOORING, ANCHORING AND TOWING
INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES Requirements concerning MOORING, ANCHORING AND TOWING CONTENTS Equipment Rev.5 June 2005 A2 Shipboard fittings and supporting hull structures associated
DiscPlus DX195 and DX225 Air Disc Brakes
Revised 11-04 Technical Bulletin Revised 1 Technical 11-04 Bulletin DiscPlus DX195 and DX225 Air Disc Brakes Inspection, Installation and Diagnostics Air Disc Brake Inspection Intervals and Procedures
RIGGING HARDWARE ASME B30.26. Addresses detachable lifting hardware for lifting purposes
RIGGING HARDWARE ASME B30.26 Addresses detachable lifting hardware for lifting purposes Adjustable Hardware (Turnbuckles, Eye nuts, Swivel Hoist Rings and Eyebolts Compression Hardware (Wire Rope Clips
Operating instructions. 3-in. x 6-ft. Anchor Strap for Skyline Horizontal Lifeline
Reliance Industrial Products, LLC Operating instructions for 3-in. x 6-ft. Anchor Strap for Skyline Horizontal Lifeline Model # 6095 Reliance Industrial Products PO Box 140008 Denver, CO 80214 Ph. (800)
TECHNICAL SPECIFICATION FOR HIGH TENSION LINE HARDWARE AND ACCESSORIES FOR ACSR PANTHER & WOLF CONDUCTOR
TECHNICAL SPECIFICATION FOR HIGH TENSION LINE HARDWARE AND ACCESSORIES FOR ACSR PANTHER & WOLF CONDUCTOR 1.1.0 SCOPE : This specification covers design, manufacture, testing at manufacture s works before
FLAME CuTTIng te la P is utting B c
FLAME CUTTING Both Oxy-LPG and Oxy-acetylene processes are acceptable for sectioning all thicknesses of BISPLATE. With these processes, the following techniques are recommended: Gas pressure to be the
Deluxe Welding Tool Chest
Item# 164782 OPERATOR S MANUAL Read carefully and understand RULES FOR SAFE OPERATION and instructions before operating. Failure to follow the safety rules and other basic safety precautions may result
Treatment of a surface or structure to resist the passage of water in the absence of hydrostatic pressure. presence of hydrostatic pressure.
Recommend Approval: Team Leader Date Division Chief Date Approved: Director Date Maryland Department of Transportation State Highway Administration Office of Materials Technology MARYLAND STANDARD METHOD
SAFE HANDLING OF PRECAST CONCRETE PRODUCTS
SAFE HANDLING OF PRECAST CONCRETE PRODUCTS Safety Handling of Precast Concrete Products The lifting of any precast product requires the use of special equipment and substantial planning and knowledge.
A PRODUCT OF NEMAG HOLLAND
USER MANUAL ROPE PEAR SOCKETS SIZE: 1-17 A PRODUCT OF NEMAG HOLLAND 1. INTRODUCTION 1.1 Field of application 1.2 Technical specifications of NEMAG Rope Pear Sockets 1.3 Technical specifications of the
Self-aligning ball bearings
Self-aligning ball bearings Designs... 470 Basic design... 470 Sealed bearings... 470 Bearings with an extended inner ring... 472 Bearings on sleeves... 473 Self-aligning ball bearing kits... 474 Appropriate
Volkswagen Jetta, Golf, GTI 1999, 2000 2.8 Liter VR6 2V Engine Mechanical, Engine Code(s): AFP 17 Engine-Lubrication (Page GR-17)
17 Engine-Lubrication (Page GR-17) Lubrication system components, removing and installing Oil filter housing, disassembling and assembling Oil pan, removing and installing Oil pressure and oil pressure
Guidelines for Earthquake Bracing Residential Water Heaters
Guidelines for Earthquake Bracing Residential Water Heaters Department of General Services Division of the State Architect In accordance with the Health and Safety Code Section 19215, the Division of the
Specification for Rotary Drill Stem Elements
Addendum 1 March 2007 Effective Date: September 1, 2007 Specification for Rotary Drill Stem Elements ANSI/API SPECIFICATION 7-1 FIRST EDITION, MARCH 2006 EFFECTIVE DATE: SEPTEMBER 2006 ISO 10424-1:2004
INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES. Interpretations of the FTP
INTERNATIONAL ASSOCIATION OF CLASSIFICATION SOCIETIES Interpretations of the FTP CONTENTS FTP1 Adhesives used in A or B class divisions (FTP Code 3.1, Res A.754 para. 3.2.3) June 2000 FTP2 Pipe and duct
PUMP MAINTENANCE SCHEDULE AND CHECKLISTS
PUMP MAINTENANCE SCHEDULE AND CHECKLISTS Providing a maintenance schedule defined specifically by run hours or yardage pumped serves only as a general guideline given the large amount of variables a unit
BRAKE DRUM AND ROTOR SERVICE INFORMATION
SERVICE INFORMATION To achieve maximum drum life and optimum performance, proper brake maintenance and brake balance are essential. Consult your truck or trailer manufacturer s maintenance manual for proper
SECTION 15076 CEMENT-MORTAR LINED AND COATED STEEL PIPE
SECTION 15076 CEMENT-MORTAR LINED AND COATED (CML&C) STEEL PIPE PART 1 GENERAL 1.01 DESCRIPTION This section designates the requirements for steel pipe fabrication, test in shop, installation of steel
WARNING! Failure to follow these inspection procedures can cause personal injury and property damage.
GARDNER-DENVER TECHNICAL MANUAL CPTEN-136 07/03 Hoist Inspection and Maintenance Guide Inspection Record For: Hoist Model.: Hoist Serial.: WARNING! Failure to follow these inspection procedures can cause
Slings, Rigging and Lifting Equipment
A printed or saved copy is an UNCONTROLLED copy. Check that it is the latest available version before use. Title: Number: SLINGS, RIGGING AND LIFTING EQUIPMENT GM-11-038-02 Version Number: 13.0 Date Revised:
Chapter 5 - Aircraft Welding
Chapter 5 - Aircraft Welding Chapter 5 Section A Study Aid Questions Fill in the Blanks 1. There are 3 types of welding:, and, welding. 2. The oxy acetylene flame, with a temperature of Fahrenheit is produced
NORSOK Compact Flange Installation and Assembly Procedure
NORSOK Compact Flange Installation and Assembly Procedure Hytorc Norway www.hytorc.no P.Nødland. Page 2 INTRODUCTION Scope The following main operations are covered in this section: Assembly/disassembly
www.klmtechgroup.com TABLE OF CONTENT
Page : 1 of 45 Project Engineering Standard www.klmtechgroup.com KLM Technology #03-12 Block Aronia, Jalan Sri Perkasa 2 Taman Tampoi Utama 81200 Johor Bahru Malaysia TABLE OF CONTENT 1.0 SCOPE 2 2.0 CONFLICTS
Reasons for reissue are provided in Section 6, REVISION SUMMARY.
Reasons for reissue are provided in Section 6, REVISION SUMMARY. The FRONT OF TOOL has the AMP marking on the link. The BACK OF TOOL (Wire Side), into which the wire is inserted, has the wire size marked
NDT Procedure for Liquid Penetrant Inspection TRINITY NDT. An ISO 9001:2008 Certified Company
NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified
STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES
ROOFING APPLICATION STANDARD (RAS) No. 117 STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES Scope 1.1.
NYLON 6 RESINS CORRECTING MOLDING PROBLEMS A TROUBLE SHOOTING GUIDE
NYLON 6 RESINS CORRECTING MOLDING PROBLEMS A TROUBLE SHOOTING GUIDE A. TROUBLESHOOTING GUIDE FOR INJECTION MOLDERS. I. INTRODUCTION The source of problems in injection molding of nylon resins can depend
Structural welding is a process by which the parts that are to be connected are heated and
CHAPTER 6. WELDED CONNECTIONS 6.1 INTRODUCTORY CONCEPTS Structural welding is a process by which the parts that are to be connected are heated and fused, with supplementary molten metal at the joint. A
SERIES NG 1800 STRUCTURAL STEELWORK
MANUAL OF CONTRACT DOCUMENTS FOR HIGHWAY WORKS VOLUME 2 NOTES FOR GUIDANCE ON THE SPECIFICATION FOR HIGHWAY WORKS SERIES NG 1800 STRUCTURAL STEELWORK Contents Clause Title Page NG 1800 (08/14) General
SAMPLE TEST QUESTIONS MOTOR VEHICLE BODY REPAIRER- ITA WEBSITE
1 How are spot welds located on the underside of an apron? A. Heat the undercoat with a torch. B. Visually inspects with a trouble light. C. Grind the surface with an angle grinder. D. Clean factory seams
Guidelines for Earthquake Bracing of Residential Water Heaters
Guidelines for Earthquake Bracing of Residential Water Heaters Department of General Services Division of the State Architect 1102 Q Street, Suite 5100 Sacramento, CA 95814 Phone: (916) 324-7099 Fax: (916)
3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form
3M Mobile SkyWalk Series Horizontal Lifeline Product Return Form THIS FULLY COMPLETED DOCUMENT MUST BE INCLUDED WITH EACH RETURN SHIPMENT IN ORDER FOR CREDIT TO BE ISSUED. ALL CREDITS WILL BE ISSUED TO
CHAPTER 13 LOAD HOOKS
CHAPTER 13 LOAD HOOKS This chapter provides safety standards for the inspection, testing, and maintenance of load hooks installed on cranes or hoists and implements the requirements of ASME B30.10, Chapter
Material test chamber with mechanical convection
FP series 400 Material test chambers Material test chamber with mechanical convection A BINDER material test chamber with mechanical convection of the FP series provides reliably short drying times and
James M. Pleasants Company
James M. Pleasants Company SUBMITTAL DATA GAINESVILLE MECHANICAL DECEMBER 20, 2013 PROJECT: GSU: J-183 HUMANITIES LAW BLDG. QUOTE NO:12116 ENGINEER: STEVENS & WILKINSON GASKETED PLATE HEAT EXCHANGER Tag:
Operations and Instruction Manual Might Swivel - Part # 310273 Concrete and Steel Anchorage Connector ANSI Z359.1 10,000 lbs / 44kn
Safety.. Operations and Instruction Manual Might Swivel - Part # 310273 Concrete and Steel Anchorage Connector ANSI Z359.1 10,000 lbs / 44kn Description: Technical: Zinc plated forged heat treated steel,
NDT Procedure for Liquid Penetrant Inspection
NDT Procedure for Liquid Penetrant Inspection A Nondestructive testing (NDT) Procedure suitable for General Liquid/Dye Penetrant Inspections. This is a sample LPT procedure and may be required to be modified
American Petroleum Institute Purchasing Guidelines Purchase API Spec 7K online at www.api.org/publications
Purchase API Spec online at www.api.org/publications 7.9.3 Forgings and Castings All repair welding shall be performed in accordance with the manufacturer s written welding specifications. WPSs shall be
GB Tubulars RECOMMENDED PRACTICE For CASING on LOCATION
GB Tubulars RECOMMENDED PRACTICE For Released: October, 2011 Revision: 1.0 APPROVED BY: Eugene J. Mannella, P.E., Vice President Engineering Page 2 of 10 TABLE OF CONTENTS 1.0 SCOPE... 3 2.0 APPLICABLE
Chapter 5 FLOOR LOADING AND WEIGHTS
Chapter 5 FLOOR LOADING AND WEIGHTS Section 1.0 Floor Loading Section 2.0 Seismic Data The CT system has a total floor load of approximately 6660 lbs (3021 kg). About 5050 lbs (2291 kg), including patient
Trouble shooting guide
guide DPR/PSR Leak Insuffi ciently tightened, shallow bite Tighten the nut according to correct number of turns, direct assembly only for maintanance/repair, use of recommended pre-assembly machines Mark
DO NOT attempt to repair hub and wheel bearing assembly.
Page 1 of 6 HUB & WHEEL BEARINGS (WITH PULSE VACUUM HUBLOCK) DO NOT attempt to repair hub and wheel bearing assembly. Removal DO NOT remove hub lock assembly by prying on hub lock legs. This can crack
General Guidelines for Building Aluminum Production Injection Molds
General Guidelines for Building Aluminum Production Injection Molds Using 7000 series Aluminum Mold Plate By David Bank Aluminum Injection Mold Company Rochester, New York 1 Introduction This high strength
K Standard Grade Ni-Cr vs Ni-Al (Chromel vs Alumel)
SureGrip TM 80PK-24 Air Temperature Probe Instruction Sheet XWWarning To avoid electrical shock, do not use this probe when voltages exceeding 24 V ac rms or 60 V dc are present. The probe tip is electronically
DETACHABLE WINDSHIELD AND DOCKING HARDWARE KIT
-J00 REV. 00-- DETACHABLE WINDSHIELD AND DOCKING HARDWARE KIT GENERAL Kit Number -A, 0-, -, 0-, -, - 0, -0 Models These kits fit and later FXST, FXSTB, FXSTC, and and later FXDWG Harley-Davidson model
Tool Holder Catalog TRAUB TNX 65/42 VDI 30 HSK 40 142856-21.02.2014. 0214/Rö
Tool Holder Catalog TRAUB TNX 65/42 VDI 30 HSK 40 142856-21.02.2014 0214/Rö Disclaimer The illustrations in this documents may deviate from the delivered product. We reserve the right to make changes due
Weld Cracking. An Excerpt from The Fabricators' and Erectors' Guide to Welded Steel Construction. The James F. Lincoln Arc Welding Foundation
Weld Cracking An Excerpt from The Fabricators' and Erectors' Guide to Welded Steel Construction The James F. Lincoln Arc Welding Foundation Weld Cracking Several types of discontinuities may occur in welds
Guide to understanding Welding Procedure Specification (WPS), Procedure Qualification Record (PQR), and Welder Performance Qualification Record (WPQR)
An AEIS White Paper 265 Birdsall Dr. Yorktown Heights, NY 10598 914 214 8460 www.aeis.us Guide to understanding Welding Procedure Specification (WPS), Procedure Qualification Record (PQR), and Welder Performance
Pump Skid Fabrication for Magnetic Coupling. Rick Soltis Chief Mechanic City of Bedford
Pump Skid Fabrication for Magnetic Coupling Rick Soltis Chief Mechanic City of Bedford Contents Magnetic Couplings What They Are, How They Work, Where They re Used Fabrication and Manufacturing of Pump
Autobody/Collision and Repair Technology/Technician CIP 47.0603 Task Grid
1 Secondary Task List 100 ORIENTATION 101 Identify opportunities in the auto body field. 102 Identify basic auto body construction. 103 Identify program rules and policies. 104 Identify government agencies
STORAGE, INSTALLATION AND MAINTENANCE PROCEDURES
GATE VALVE O.S. & Y 1.0 Periodic Inspections 1.1 The valve stem packing should be inspected at least monthly. If the stem packing shows signs of leakage, simply tighten the adjusting nuts to compress the
INDIAN STANDARDS (BIS) ON WELDING
** IS 82:957 Glossary of terms relating to welding and cutting of Sep 2008 metals 2 IS 83:986 Scheme of symbols for welding (revised) Sep 2008 3 IS 84:2004 Covered electrodes for manual metal arc welding
SEMPEO2-54 - SQA Unit Code FP47 04 Carrying out heat treatment of engineering materials
Overview This standard covers a broad range of basic competences that you need, to apply specified heat treatment processes to engineering materials/components. It will prepare you for entry into the engineering
One and Two-piece Torque Rods and Replacement Bushings LIT NO: 45745-148
One and Two-piece Torque Rods and Replacement Bushings LIT NO: 45745-148 DATE: January 2008 REVISION: B HENDRICKSON ULTRA ROD PLUS Torque Rod Bonded Bushing Provides Longer Life Bonding makes a better
11. NONDESTRUCTIVE TESTING
11. NONDESTRUCTIVE TESTING Nondestructive testing includes magnetic particle testing (MT), Liquid Dye Penetrant testing (PT), Radiographic Testing (RT) and Ultrasonic Testing (UT). The purpose of nondestructive
ENGLISH FORK GUIDE 2013
FORK GUIDE 2013 ENGLISH 1 With a brand which is synonymous with specialists in forest products handling attachments, BOLZONI AURAMO offers its expertise and market leading attachments for all requirements,
Volkswagen New Beetle 2.0 Liter 4-cyl General, Engine (Engine Code AEG) 17 Engine-Lubrication system (Page GR-17)
17 Engine-Lubrication system (Page GR-17) Lubrication system components, removing and installing Oil pan, removing and installing Oil pressure and oil pressure switch, checking Dynamic oil pressure warning
SELF-STEERING AXLE TABLE OF CONTENTS
SELF-STEERING AXLE TABLE OF CONTENTS Section 1 - Introduction Section 2 - Pre-Installation Check List Section 3 - Ride Height Adjustments Section 4 - Suspension Mount Section 5 - Axle Mount Section 6 -
PUMP JACK SYSTEM AND ACCESSORIES
Pump Jack Model # 2200 A low cost, easy to operate, safe, portable scaffolding built of rugged steel. It's perfect for shingling, siding, sheathing, insulating, painting, building, roofing, home repair
PART E SPECIFICATIONS
PART E SPECIFICATIONS Page 1 of 5 PART E - SPECIFICATIONS GENERAL E1. APPLICABLE SPECIFICATIONS, STANDARD DETAILS AND DRAWINGS E1.1 The City of Winnipeg Works and Operations Division Standard Construction
Problems in Welding of High Strength Aluminium Alloys
Singapore Welding Society Newsletter, September 1999 Problems in Welding of High Strength Aluminium Alloys Wei Zhou Nanyang Technological University, Singapore E-mail: [email protected] Pure aluminium has
Linear Luminaire for Fluorescent Lamps Series EXLUX 6001
> As wall, ceiling and pendant light fitting or side entry lamp > Version with 2 lamps: 18 W, 36 W and 58 W > Central locking > All-pole disconnection by means of an N/C switch when the lamp is opened
Oil and Coolant Circulating Heating System. Model - OCSM
Oil and Coolant Circulating Heating System Model - OCSM Installation & Operation Manual 216280-000 REV 2 Identifying Your System The HOTSTART heating system is designed to heat fluids for use in marine
The India Thermit Corporation
The India Thermit Corporation World Leaders in Rail Welding Alumino - Thermic Welding Flash Butt Welding The Company The India Thermit Corporation (ITC) is the world's largest executor of rail welds. We
Technical Data. 7. Bearing Fits. 7.1 Interference. 7.2 Calculation of interference F B LLLLLLLLL( A-54
Technical Data 7. Bearing Fits 7.1 Interference For rolling s the rings are fixed on the or in the housing so that slip or movement does not occur between the mated surface during operation or under. This
16 April 2012 1032011-F 1994-2002 Dodge Adjustable Track bar with Relocation Bracket 1
16 April 2012 1032011-F 1994-2002 Dodge Adjustable Track bar with Relocation Bracket 1 BD Adjustable Track Bar w/bracket Dodge 2500-3500 4WD Models 1994-2002 Dodge 1500 4WD Model 1994-2001 P/N# 1032011-F
METHOD STATEMENT FOR INSTALLATION OF CABLE TRAY/TRUNKING/LADDER
Page 1 of 6 FOR INSTALLATION OF CABLE TRAY/TRUNKING/LADDER 0 Issued for Review & Comments Rev. Date Description Eng. A.H Prepared by Checked by Approved by Page 2 of 6 REVISION CONTROL SHEET REV. NO. DATE
Wearpipe. Induction Hardened Chromium Carbide Overlay Ceramic Lined
Wearpipe Induction Hardened Chromium Carbide Overlay Ceramic Lined WEAR PIPE OPTIONS St. Lawrence Steel is a provider of wear resistant solutions serving heavy industry since 1955. We are a leader in supplying
It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool
It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool H Craft Print Project No. 272 ERE'S a metal bender that will enable you to bend
Owner s Manual & Safety Instructions
Owner s Manual & Safety Instructions Save This Manual Keep this manual for the safety warnings and precautions, assembly, operating, inspection, maintenance and cleaning procedures. Write the product s
Instructions Manual. Electromagnetic sensor Series FLOMID FX. instrumentation for fluids. R-MI-FlomidFX Rev.: 0 English version
instrumentation for fluids Electromagnetic sensor Series FLOMID FX Instructions Manual! Conforms with the Pressure Equipment Directive 97/23/EC. 0830 This equipment is considered as being a pressure accessory
GOST 632-80 CASING AND COUPLINGS
GOST 632-80 CASING AND COUPLINGS Casing to this standard shall be seamless, with round and buttress-type threads (OTTM-type casing), with high-seal thread connection (OTTG-type casing) and respective couplings;
Socket Heat Fusion Techniques. A Guide for Instruction and Training in Vanguard Socket Heat Fusion
Socket Heat Fusion Techniques A Guide for Instruction and Training in Vanguard Socket Heat Fusion TABLE OF CONTENTS This brochure has been developed to assist those responsible for socket fusion joining
Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors
Installation Manual Elo Touch Solutions Wall-mounting Kit for the 5501L IDS Touchmonitors SW602206 Rev B Table of Contents Chapter 1: Safety Warning... 3 Chapter 2: Kit Contents... 4 Included in Kit...
Maintenance and Service Instruction
Screw pumps E4 Maintenance and Service Instruction E4 1 IMO AB This instruction is valid for all E4 pump models shown on page 2 Contents Page List of components 2 Exploded view/ordering code 3 Service
-1- SPECIFICATIONS 002085 CONE SETTER PLATFORM ATTACHMENT INDEX
-1-002085 CONE SETTER PLATFORM ATTACHMENT INDEX I. GENERAL EQUIPMENT : A. Intent Statement B. Cone Setter Platform II. III. 1. Understructure Frame 2. Mounting Components 3. Paint 4. Basket 5. Labels 6.
EMPLOYEE FALL PROTECTION
EMPLOYEE FALL PROTECTION You can fall from any height and be seriously injured or killed. In the construction industry, as well as any other industry, when falls from heights happen, they are usually very
BoWex SD, SD1 and SD2 Operating-/Assembly Instructions
D-807 Rheine 0111 E 1 curved-tooth gear couplings are flexible shaft connections. They are able to compensate for shaft displacement caused by, as an example, inaccuracies in production, heat expansion,
ASK THE EXPERT: Burner Troubleshooting Information & Maintenance
ASK THE EXPERT: Burner Troubleshooting Information & Maintenance The burner is the heart of your BBQ. It is subject to a number of conditions that can cause damage, and lead to potential safety issues.
External Visual Inspection Form
Tank ID Code Part 1 (a): Information on Registered Facility Name of Registered Facility: Address: Town: Postal Code: Province: Phone Number: Person Conducting the Inspection: Transport Canada Facility