SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY

Similar documents
SPACE TYPE: AUTOMATED DATA PROCESSING CENTER (ADP) (MAINFRAME)

SPACE TYPE: AUDITORIUM

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Building Condition Assessment Report

ESTIMATE ORIG. ESTIMATE: TOTAL: $204,249 DATE: 01/15/08 DESCRIPTION OF WORK QUANTITY DIVISION TOTAL

Whitley Manufacturing Co., Inc. 201 W. First Street S. Whitley, IN Phone (260) Sales Fax (260)

DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS

MRI RF SHIELDING DESIGN

Irvinton Village Apartments 2901 Fulton Houston, Texas Houston Housing Authority J. Allen Management Managing Agent

Clear Creek Business Center 187,865 Sq. Ft. OFFICE/FLEX/INDUSTRIAL

TURN-KEY LAB SPACE AVAILABLE

Laboratory Design & Construction Guidelines

Alpha System ADAPTABLE KEWAUNEE LABORATORY FURNITURE. encouraging new discovery

Nominal Life Expectancy for Building Components

Building Condition Assessment Report

COST OF WORK FORM. Abbreviations: ea = each, LF = linear feet, SF = square feet, HSF = square feet of living area (including garage conversion space)

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

DCSS (ACB) Data Center Fire Suppression Procedures

Subpart 1. Installation. All plumbing systems must be. installed and tested according to this chapter and chapter 4715,

QUOTATION FOR EXAMPLE BATHROOM RENOVATION

Schedule of Maintenance Fees

GENERAL WIRING RULES FOR HOUSES

Element D Services Heating, Ventilating, and Air Conditioning

The UPLANDS at ORO VALLEY Sterling Features

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

BUILDING ASSESSMENT QUESTIONNAIRE. B. TENANTS Is there more than one tenant in the building? YES

SHELL & CORE: UTILITY BUILDING

Mechanical, Plumbing, and Fire Protection Conditions

17,280 square feet Overview:

SECTION PACKAGED ROOFTOP AIR CONDITIONING UNITS NON-CUSTOM

Core & Shell Construction. Rules and Regulations

Your Basement Remodeling Specialist LLC

PUBLIC RESTROOMS, DESIGN INTENT

SECTION FIRE AND SMOKE ALARM SYSTEM. City of San Diego, CWP Guidelines

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Aurora Mall. Aurora (Denver), Colorado

Summit Series Single Section and Double Section Homes

SHELL & CORE: OFFICE BUILDING

Restaurant & café guide

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Turnkey Projects, Conversions, Restorations & Property Management. Marsalforn - Gozo APARTMENT FINISHING EXCLUSIVE PACKAGE

October 5, 2015 Dear Client,

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

Occupancy: Assembly (A-3) and Business -Includes offices, seminar rooms, classrooms, and café facility. Duke University Medical School

#506 New Multi-Family Buildings & Additions Plan Intake Submittal Checklist

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

Replacement Costs and Cleaning & Service Charges for Northwood

IMPROVEMENT COST ESTIMATE powered by HomeFixers

Crawford Inspection Services C.C.B. #

Building Permit Application

Element D Services Plumbing

Name Of Occupancy Date. Yes No Describe

SECTION GENERAL PROVISIONS FOR HVAC WORK

Excerpts from the Canadian National Building Code (NBC)

MECHANICAL AND PLUMBING BASIS OF DESIGN FOR BRIDGING DOCUMENT

15430 SAFETY SHOWERS AND EYEWASHES

Building Code Clarifications - 7. Fire Resistance

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS. 1. All Floors (inspect from top floor to basement): Yes No

GENERAL ELECTRICAL REQUIREMENTS

FIRE-FIGHTING DESIGN BRIEF REPORT

Inspection Report Atlanta Strip Mall Commercial Building Property Address:

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

Orlando Home Inspection Services

220.5" Basic Features. Electrical Features

PLAN REVIEW GUIDE FOR FIRE ALARM

City of Oviedo Commercial Shell Building Permit Application Guidelines

1.2 Refrigerant Equipment. General

Inspecting to a higher standard.

Holz Choices & Specifications

Water Leak 1: Intrusion Policy

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

Gramercy Place Condo Association, Inc.

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST

NYC Department of Education Building Condition Assessment Survey BROADWAY EDUCATION CAMPUS - MANHATTAN, 26 BROADWAY, MANHATTAN, NY, 10004

Emergency Showers and Eyewashes Mike Adkins Wednesday, October 31, 10:00-11:1511:15 a.m.

ADDENDUM NO. 1. DATE: February 10, 2015 INVITATION FOR BID: IFB K Commerce Road Renovations Project DATED: February 9, 2015

Report for. Dick and Jane Homeowner Lovers Lane, Houston, Texas 77000

City of St. Charles Basement Finish or Remodel

Fire Alarm System Plans Review Checklist Property location Date of Review

Doc Ref: baselayer.com 2015 BASELAYER TECHNOLOGY, LLC

Laboratory Safety and Environmental Health Assessment Program

LEASE BETWEEN RALEIGH PORTFOLIO JH RETAIL, LLC AND CITY OF DURHAM FOR SPACE IN THE BUILDING AT 2945 S. MIAMI BOULEVARD; DURHAM, NC EXHIBIT A

REFLEC TIONS I & II AT CIRCLEPORT

LAB BENCHES & SPECIALTY INSTRUCTOR'S BENCHES

A1.5 Classroom Standards

FIRE SAFETY SELF-INSPECTION FORM FOR CULTURAL INSTITUTIONS

Print Shop/Mail Room

SODA SPRINGS JOINT SCHOOL DISTRICT NO. 150 RECOMMENDED REPAIRS, REPLACEMENT, AND ADDITIONS OPINIONS OF PROBABLE COST

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

This directive establishes Department of Homeland Security (DHS) policy regarding the physical protection of facilities and real property.

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

Sub-Bid Contractor Update Statement. Tab A - Invitation for Bids. Tab B - Instructions to Bidders

What to Expect From the Examination. How to Study the Plumbing Codes

Replacement of Heating, Ventilation, Air Conditioning (HVAC) Units In Apartments Located at 641 Fifth Avenue. Photo Essay

Transcription:

SPACE TYPE: LABORATORY (WET) FOR CHEMISTRY AND BIOLOGY Construction Criteria The unit costs for (Wet) space types are based on the construction quality and design features in the following table. This information has been generally organized under Uniformat headings. Items marked with a have a space-related cost impact on the building shell and core. Interior Construction Partitions Suite Perimeter and Public Corridor Enclosed Lab Module Utility Shafts Telephone Closets, Communications Closets Doors Main Suite Public Entrance ½ GWB on metal studs at 16 OC Floor-to-ceiling grid Structural slab-to-slab Two layers ½ GWB both sides on metal studs at 16 OC Acoustical insulation 45 STC Floor-to-structural slab with under-floor plenum divider One layer 5 / 8 GWB both sides on metal studs at 24 OC Acoustical insulation 40 STC 2 hr 50 STC Type X rated GWB shaft wall system with 1 layer 1 channelmounted GWB and one layer ½ GWB outside face 5 / 8 GWB on metal studs at 24 OC Structural slab-to-slab Solid core 1¾ hardwood veneer doors 3-0 (w) by 7-0 (h) Hardware to be latch sets with levers Solid core 1¾ hardwood veneer double doors 6-0 (w) by 7-0 (h) Automatic closers (Wet) 8-1

Suite Perimeter Exits Solid core 1¾ hardwood veneer doors 3-0 (w) by 7-0 (h) Frame and threshold sound gasketing Automatic closers Brushed stainless steel kick plate room side Service door to be solid core 1¾ hardwood veneer door 3-0 (w) by 7-0 (h) with matching leaf 1-6 (w) by 7-0 (h) with head and threshold bolts Public door to be solid core 1¾ hardwood veneer door 3-0 (w) by 7-0 (h) Signage Suite Entrance Room Signage System Brushed stainless steel kick plate room side Room identification signage to be raised plastic letters mounted beside the door with ADAAG compliant tactile Braille signage Signage for life safety and public convenience within the functional areas of the tenant will be included in the unit costs and will be modular vinyl lettering on plastic laminate signage frame system with ADAAG compliant tactile Braille vinyl signage modules Interior Finishes Walls Floors Storage, Service Corridor Ceiling Storage, Service Corridor Low VOC semi-gloss paint with vinyl cove base Epoxy paint Base integral with floor material Steel corner guards Monolithic seamless chemical resistant vinyl flooring with integral coved based Resilient vinyl tile with vinyl cove base Mylar finish 24 (w) by 48 (l) ceiling tile in suspended ceiling grid Exposed structure 8-2 (Wet)

Plumbing and Piping Service Corridor HVAC Air Distribution System Air Handling Unit VAV System Air Supply An allowance for fittings and connections to the building distribution system for six nominal piping systems is included in the (Wet) space type Tenant Improvements unit costs Fittings and connections to distilled water system with high purity dual bed deionized water feed, with polypropylene piping Fittings and connections to central natural gas supply with medical grade copper tubing Fittings and connections to special gas supply systems including O2, N2, He, CO2 with medical grade copper tubing Fittings and connections to central vacuum of 18 to 22 of mercury in medical grade copper tubing Fixtures, fittings, and connections to acid waste and vent, with polypropylene piping Fixtures, fittings, and connections to solvent waste and vent with glass piping Floor drain with automatic primer Sink with hot and cold water supply and clinical solvent drain; sinks to be acid resistant self-rimming sinks; faucets to have wrist lever and hands free operation, goose neck spout, and serrated hose connection; sinks to have high purity distilled water faucet Eye wash Deluge shower at each module quad Utility connections including vacuum, pneumatic supply, natural gas, O2, CO2 Floor drain with automatic primer Fan coil variable air volume provided as part of building shell and core provisions Pre-filters and after-filters for 90% efficiency Terminal humidifier AHUs are part of the building shell and core provisions VAV system is part of the building shell and core provisions Separate zones for individual lab modules See building shell and core provisions for other zoning requirements Ducted ceiling supply Sound baffles at all acoustically rated partitions Lab modules to have negative pressure relative to other spaces; no return air from lab to other spaces (Wet) 8-3

Exhaust Air Provide 100% exhaust for all lab areas; ducted ceiling exhaust ducts with economizer exhaust and connections to individual fume hoods Fume hoods to be 6-0 chemical fume hood; provide one fume hood for each laboratory modules; provide direct 100% exhaust Thermostat Controls Flexible exhaust duct connection one per laboratory module Provide individual room thermostats Provide setback thermostat even in areas of 24 hr operation with override by building shell and core BAS Fire Protection Fire Suppression Module Fire and Smoke Detection Fire Alarms Toxic Gas Sprinkler system is part of the building shell and core provisions Fire and smoke dampers to be provided in rated walls Hand-held chemical emergency fire extinguisher in emergency equipment cabinet One fire alarm pull station by each egress point Audible and visible (strobe) alarm in each occupiable space Toxic gas monitors in each lab module and gas storage area with audio and visual (strobe) alarms both inside and outside the lab Electrical Electrical Outlets Lab Module Service Core and Storage Area Telephone Closet, Communications Closet Lighting Wall mounted duplex outlets every 50-0 OC Provide 2-120v, 3 wire polarized grounding duplex outlets per 2 LF at counters with 20 amp capacity, and 2-208 single and 2-208 three phase; and 1-120v 1500w emergency power outlet per module Provide electrical connections for tenant equipment located in the core, such as fan units, system regulators, monitors and similar devices Provide special NEMA types as required for equipment Two dedicated duplex outlets on emergency power, plus additional outlets for every 5-0 of wall space Provide a separate 120-volt panel with master switch, and five 20-amp circuits lighting provided as part of the building standard shell and core provisions with a minimum of one 24 (w) by 48 (l) recessed parabolic fluorescent fixture with two T-8 lamps and electronic ballasts per room and additional fixtures per every 80 SF (or T-5 equivalent) Automated lighting controls with programmable systems and room occupancy sensors Independent switch control for each module with 3 way switches at each entrance Sealed acrylic lens fluorescent 24 (w) by 48 (l) recessed ceiling fixtures located every 80 SF 8-4 (Wet)

Telephone and Communication Outlets Equipment Equipment Conduit and pathways for services from the core to the tenant demised space provided as part of the building shell and core provisions; conduit and boxes within the tenant suite are part of the Tenant Improvement unit costs Conduit and telephone outlet boxes are part of the Tenant Improvement unit costs; telephone systems and data LAN systems are provided by tenant Conduit and boxes for one telephone outlet for each laboratory module; wiring and equipment provided by tenant Conduit and boxes for four LAN connections for each laboratory module (288 SF); cabling and equipment provided by tenant Conduit and boxes for one ceiling mounted PA speaker for each module; wiring and equipment provided by tenant Provide one 6-0 chemical fume hood for each module Safety cabinet, Class II, Type B2, 100% Exhaust Acid and corrosive vented storage cabinet located under fume hood Storage for emergency equipment Furnishings Casework Module All casework to be pre-manufactured laboratory metal casework system, with cantilever support off of central service chase system to include upper cabinets and adjustable shelving system with dust cap Counter to be epoxy resin with integral splash Chase system to have metal channel support, with horizontal distribution of utilities 16 LF of 36 (h) cabinets 16 LF of 24 (h) cabinets (Wet) 8-5