SECTION PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE

Similar documents
SECTION SUBSTATION TRANSFORMERS

Contents. Description. Product Selection Guide

2a. IEM Indoor Metal Clad Medium Voltage Switchgear 15KV a. Section INDOOR METAL CLAD MEDIUM VOLTAGE SWTICHGEAR (Std.

Specification Guide. for RVAC. Direct Replacement. AC Medium Voltage. Circuit Breakers

Secondary Unit Substations

Submit shop drawings for equipment provided under this section Shop drawings shall indicate:

This section applies to the design and installation of transformers.

SECTION 16346A METAL-CLAD MEDIUM VOLTAGE ARC RESISTANT SWITCHGEAR

Sample - No Commercial Use

CAT ATC POWER BREAKER & POWER CASE SWITCH AUTOMATIC TRANSFER SWITCH

SURGE PROTECTIVE DEVICES (SPDs) LOW VOLTAGE AC INTEGRATED SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION SYSTEMS SECTION 16671A SECTION 16671A

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Switchboards. Basis of Design. Design Evaluation

PRODUCT GUIDE. SL Medium Voltage IEC Vacuum Contactors

Section 9: Power Distribution Equipment Bill Brown, P.E., Square D Engineering Services

How To Choose A Transformer

SECTION WEB-BASED POWER MONITORING COMMUNICATIONS SYSTEM

SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS. Presented by SAI Advanced Power Solutions

SECTION POWER MONITOR FOR ELECTRICAL, STEAM CONDENSATE, AND WATER PART I - GENERAL

SECTION VARIABLE FREQUENCY DRIVES

Primary and Secondary Electrical Distribution Systems

All work must conform to the National Electric Code, latest edition, and all other applicable codes and regulations.

FFI. Advances in Medium and Low Voltage Power Distribution ESS Metron Expo and Technical Seminars. Presented By: Greg Pelster & Robert Schmid

Unified requirements for systems with voltages above 1 kv up to 15 kv

MEDIUM VOLTAGE METAL CLAD SWITCHGEAR

Effective: September 10, 2006 Vermont Attachment 1 to Rule Public Service Board Page 1 of 6

Switchgear Capabilities. NexGear is a Division of PowerSecure NASDAQ: POWR

Diesel Engine Driven Generators Page 1 of 6

Eaton Electrical Inc Cherrington Parkway Moon Township, PA United States tel:

SURGE PROTECTIVE DEVICES (SPDs) LOW VOLTAGE AC EXTERNAL SIDEMOUNT SURGE PROTECTION FOR ELECTRICAL DISTRIBUTION SYSTEMS SECTION 16671B SECTION 16671B

SECTION HEATING, VENTILATION AND AIR CONDITIONING EQUIPMENT

Electrical Distribution Services for Mining and Metals Industries

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Electrical. Metering and Monitoring. Basis of Design

SUGGESTED SPECIFICATION for Series 185 Service Entrance Rated Automatic Transfer Switches

Engineers Edge, LLC PDH & Professional Training

Medium Voltage Motor Control Assemblies

SECTION DRY-TYPE TRANSFORMERS

Fusible Disconnect Switch

SECTION MEDIUM VOLTAGE SWITCHGEAR

ADDENDUM #1(BID PACKAGE # 3)

PacifiCorp Original Sheet No. 476 FERC Electric Tariff, Substitute 6 th Rev Volume No. 11 APPENDIX 2 TO SGIP

MCC Ratings. Voltage Rating

FIT TIER 2 Application

Digital Energy ITI. Instrument Transformer Basic Technical Information and Application

Dead Tank Circuit Breaker 72PM40-C Proven reliability through common platforms

SECTION ELECTRICAL ACCEPTANCE TESTS

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components

GUIDELINES FOR WATER-DAMAGED ELECTRICAL EQUIPMENT

CalMod Design-Build Electrification Services

EXPRESSION OF INTEREST

SECTION 16426C ARC RESISTANT DRAWOUT SWITCHGEAR (MAGNUM DS) LOW VOLTAGE

A Comparison of Contemporary Electrical Distribution Equipment Standards. San Francisco IEEE Industry Applications Society May 26, 2009

Presentation of the France Transfo factories

Recommended Product Specifications Fuel Day Tank System Tramont UTRS Fuel Day Tank

Data Center Solutions. Envirotran HDC Transformers Deliver Superior Reliability and Efficiency for Substantial Savings Everyday

Seismic Certification Requirements For Hospital Facilities

3.) Remove Page Nos. 15, 16, 17, 18, 19, 20, 21, 22 of 30 and replace with Page Nos. 15, 16, 17, 18, 19 & 20 of 28 marked, REVISED 10/18/2013.

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

MEDIUM VOLTAGE CE-BF SWITCHBOARDS. UP TO 40.5 kv. CE - BF - C - en - REV

NRG. Intelligent Engine Start Battery Charger. The Smart Choice for Mission-Critical Engine Starting

HPS Universal. Single and Three Phase Potted. Buck-Boost Transformers. Buck-Boost Applications & Standard Specification... 80

Title 20 PUBLIC SERVICE COMMISSION. Subtitle 50 SERVICE SUPPLIED BY ELECTRIC COMPANIES. Chapter 02 Engineering

Element D Services Electrical

Guidelines on the Short Circuit Current Rating for Industrial Control Panels

QUESTIONS and ANSWERS RFB , Metal Clad Switchgear and Power Control Room

Product Description Full Voltage Starting Electric Fire Pump Controllers FTA1000

DESIGN CLARIFICATION (DC)

FIRE ALARM SYSTEM. A. Shop drawings shall be submitted as follows: 1. Manufacturer's published literature. for aspproval.

Bussmann. All-In-One Module. Bussmann Power Module Switch. How to configure Part Numbers: Step 1: Select Switch Amperage 1

MTE SERIES RLW. World REACTORS USER MANUAL PART NO. INSTR 030 REL MTE Corporation

3) What is the difference between "Insulating", "Isolating", and "Shielded Winding" transformers?

PROPER SELECTION OF CONTROL CIRCUIT TRANSFORMERS WHITE PAPER BULLETIN 1497, 1497A, AND 1497B

ABB ! CAUTION. Type COQ Negative Sequence Generator Relay. (50/60 Hertz) J. Instruction Leaflet

Rotary Phase Converters

Unit substation solutions with type SIMOSEC primary switches quick reference guide E50001-F710-A389-X-4A00. Answers for energy.

FTA1100-J DIESEL ENGINE FIRE PUMP CONTROLLERS STANDARD SUBMITTAL PACKAGE

SECTION LOW VOLTAGE LIGHTING CONTROLS

Evaluating Fire- and Heat-Damaged Electrical Equipment

LEHI CITY POWER NET METERING STANDARDS For Customer-Owned Electric Generating Systems

2013 RESIBLOC transformers Product presentation. ABB Group October 2, 2013 Slide 1

3.0 CHARACTERISTICS. AR Auxiliary Relay High Speed, High Threshold C

Short Circuit Current Calculations

SnoTrace KSR Surface Snow and Ice Melting INSTALLATION PROCEDURES

Design & Construction Standards, Revised January

N.J.A.C. 14:8-4 NET METERING FOR CLASS I RENEWABLE ENERGY SYSTEMS

BT300 HVAC Drives Conventional Bypass (C-Bypass) Options

The following components are common to most cubicles; this example is an ABB HK cubicle.

Medium Voltage Electrical Distribution

Circuit Breakers and Switchgear. Thomas Greer Director of Engineering TLG Services

Atlanta Chapter IEEE Industry Applications Society

INTERNATIONAL STANDARD

Discussion on Class I & II Terminology. IEEE PES Transformers Committee Fall Meeting 2011 Boston, MA

UNIFIED FACILITIES GUIDE SPECIFICATIONS

MEDIUM AND HIGH VOLTAGE CAPACITORS, CAPACITOR BANKS AND SYSTEMS

Facilities Development Division. The Building Department for California s Hospitals

Overview Brochure Integrated Power Distribution. Medium Voltage Assembly Solutions

Switchgear and Metal-Enclosed Bus

AMP CO Plus Insert for Cat. 6 A Applications

Fire Pump Plan Review March 2010

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope

Transcription:

PRIMARY UNIT SUBSTATIONS SECONDARY 1000 V AND ABOVE PART 1 GENERAL 1.01 1.02 1.03 SCOPE The Contractor shall furnish and install the primary unit substation(s) complete from the incoming line terminals to the outgoing line terminals as specified herein and as shown on the contract drawings. The primary unit substation shall consist of primary equipment, transformer, and secondary equipment as specified below. The manufacturer of the unit substation shall furnish and coordinate all major components of the substations, including incoming primary equipment section, transformer and low-voltage section, as well as circuit breakers, fusible switches, and metering components. Provide a single warranty covering all substation assemblies, transformers and components. Connections between the primary device and transformer shall be *[cable] [bus], and between the transformer and secondary shall be flexible bus braid. D. Outdoor primary and secondary equipment, where specified, shall be of weatherproof construction, rodent proof and shall contain 120-volt space heaters, receptacles and lighting as required. RELATED SECTIONS D. E. F. Section 16322A Substation Transformers Liquid-Filled Section 16322B Substation Transformers Dry-Type Section 16322C Substation Transformers Resibloc Cast Resin Section 16322D Substation Transformers Vacuum Cast-Coil Design Section 16346 Metal-Clad Switchgear (VacClad-W) Medium Voltage Section 16347A Metal-Enclosed Breaker Switchgear Medium Voltage Drawout Mounted (MEB) G. Section 16347B Metal-Enclosed Breaker Switchgear Medium Voltage Fixed Mounted (MSB) H. I. Section 16349 Motor Starters (AMPGARD) Medium Voltage Section 16361A & B Medium Voltage Switches REFERENCES The primary unit substation shall be designed, assembled, tested and installed in accordance with latest applicable standards of NEMA, IEEE and ANSI, applicable to its three (3) major sections: 1. MV Metal-Clad Switchgear NEMA SG4, SG5; ANSI C37 * Note to Spec. Writer Select one 16312-1 03/06/14

2. 3. 4. 5. MV Metal-Enclosed Switchgear NEMA SG4, SG5; ANSI C37 MV Load Interrupter Switchgear NEMA SG4, SG5; ANSI C37 MV Motor Controllers ANSI/NEMA ICS-3-Part 2, UL347 Primary Substation Transformers NEMA 201, IEEE 100, ANSI C57 1.04 1.05 SUBMITTALS FOR REVIEW/APPROVAL The following information shall be submitted to the Engineer: 1. Master drawing index 2. Front view elevation 3. Floor plan 4. Single line 5. Schematic diagram 6. Nameplate schedule 7. Component list 8. Conduit entry/exit locations 9. Assembly ratings including: a. Short-circuit rating b. Voltage c. Continuous current d. Basic impulse level for equipment over 600 volts e. kva 10. Major component ratings including: a. Voltage b. Continuous current c. Interrupting ratings 11. Cable terminal sizes 12. Connection details between close-coupled assemblies 13. Composite front view and floor plan of close-coupled assemblies 14. Impedance for transformers 15. Product data sheets Where applicable, the following additional information shall be submitted to the Engineer: 1. Busway connection 2. Key interlock scheme drawing and sequence of operation SUBMITTALS FOR CONSTRUCTION The following information shall be submitted for record purposes: 1. Final as-built drawings and information for items listed in Paragraph 1.04, and shall incorporate all changes made during the manufacturing process 2. Wiring diagrams 3. Certified production test reports 16312-2 03/06/14

4. 5. Installation information Seismic certification as specified 1.06 1.07 1.08 QUALIFICATIONS The manufacturer of the assembly shall be the manufacturer of the major components within the assembly. For the equipment specified herein, the manufacturer shall be ISO 9001 or 9002 certified. The manufacturer of this equipment shall have produced similar electrical equipment for a minimum period of five (5) years. When requested by the Engineer, an acceptable list of installations with similar equipment shall be provided demonstrating compliance with this requirement. D. *Provide Seismic tested equipment as follows: 1. The equipment and major components shall be suitable for and certified by actual seismic testing to meet all applicable seismic requirements of the [latest International Building Code (IBC)] [latest California Building Code (CBC) with OSHPD Amendments]. [The equipment shall have OSHPD Special Seismic Certification (OSP) Pre-Approval.] 2. The Project Structural Engineer will provide site specific ground motion criteria for use by the manufacturer to establish SDS values required. 3. The IP rating of the equipment shall be 1.5 4. The Structural Engineer for the Site will evaluate the SDS values published on the [Manufacturer s] [OSHPD] website to ascertain that they are "equal to" or "greater than" those required for the Project Site. 5. The following minimum mounting and installation guidelines shall be met, unless specifically modified by the above referenced standards. a. b. c. The Contractor shall provide equipment anchorage details, coordinated with the equipment mounting provision, prepared and stamped by a licensed civil engineer in the state. Mounting recommendations shall be provided by the manufacturer based upon the above criteria to verify the seismic design of the equipment. The equipment manufacturer shall certify that the equipment can withstand, that is, function following the seismic event, including both vertical and lateral required response spectra as specified in above codes. The equipment manufacturer shall document the requirements necessary for proper seismic mounting of the equipment. Seismic qualification shall be considered achieved when the capability of the equipment, meets or exceeds the specified response spectra. REGULATORY REQUIREMENTS *Certified copies of production test reports shall be supplied demonstrating compliance with these standards when requested by the engineer.] DELIVERY, STORAGE AND HANDLING * Note to Spec. Writer Optional 16312-3 03/06/14

Equipment shall be handled and stored in accordance with manufacturer s instructions. One (1) copy of these instructions shall be included with the equipment at time of shipment. 1.09 OPERATION AND MAINTENANCE MANUALS Equipment operation and maintenance manuals shall be provided with each assembly shipped and shall include instruction leaflets, instruction bulletins, and renewal parts lists where applicable, for the complete assembly and each major component. PART 2A PRODUCTS PRIMARY EQUIPMENT *Note to Spec. Writer: Select primary from one of the following: Metal-Clad Switchgear (VacClad-W) Section 16346 Part 2 Medium Voltage Metal-Enclosed Breaker Switchgear Section 16347A Part 2 Medium Voltage Drawout Mounted (MEB) Metal-Enclosed Breaker Switchgear Section 16347B Part 2 Medium Voltage Fixed Mounted (MSB) Medium Voltage Switches (MVS) Section 16361A, or B Part 2 PART 2B PRODUCTS TRANSFORMERS *Note to Spec. Writer: Select transformer from one of the following: Liquid Transformers Section 16322A Part 2 Dry-Type Transformers Section 16322B Part 2 RESIBLOC Cast Resin Transformers Section 16322C Part 2 Cast Coil Transformers Section 16322D Part 2 16312-4 03/06/14

PART 3C PRODUCTS SECONDARY EQUIPMENT *Note to Spec. Writer: Select secondary from one of the following: Metal-Clad Switchgear (VacClad-W) Section 16346 Part 2 Medium Voltage Metal-Enclosed Breaker Switchgear Section 16347A Part 2 Medium Voltage Drawout Mounted (MEB) Metal-Enclosed Breaker Switchgear Section 16347B Part 2 Medium Voltage Fixed Mounted (MSB) Medium Voltage Switches (MVS) Section 16361A, or B Part 2 Motor Starters (AMPGARD) Section 16349 Part 2 Medium Voltage PART 3 EXECUTION 3.01 FACTORY TESTING Standard factory tests shall be performed on the primary equipment provided under this section. All tests shall be in accordance with the latest version of ANSI and NEMA standards. The following factory tests shall be made on all transformers. All tests shall be in accordance with the latest revision of ANSI and NEMA standards. 1. Resistance measurements of all windings on the rated voltage connection of each unit and at the tap extremes of one unit only of a given rating on this project 2. 3. 4. 5. Ratio tests on the rated voltage connection and on all tap connections Polarity and phase-relation tests on the rated voltage connections No-load loss at rated voltage on the rated voltage connection Exciting current at rated voltage on the rated voltage connection 6. Impedance and load loss at rated current on the rated voltage connection of each unit and on the tap extremes of one unit only of a given rating on this project 7. 8. Applied potential test Induced potential tests *Temperature test(s) shall be made on *[all units] [one unit only of a project covering one 9. or more units of a given kva rating]. Tests shall not be required when there is available a record of a temperature test on an essentially duplicate unit. When a transformer is supplied with auxiliary cooling equipment to provide more than one kva rating, * Note to Spec. Writer Optional * Note to Spec. Writer Select one 16312-5 03/06/14

D. E. temperature tests as listed above shall be made on the lowest kva OA or AA rating and the highest kva FA rating 10. *ANSI impulse test on all primary windings The following standard factory tests shall be performed on the secondary equipment provided under this section. All tests shall be in accordance with the latest version of ANSI and NEMA standards. 1. The switchgear shall be completely assembled, wired, adjusted and tested at the factory. After assembly, the complete switchgear shall be tested to assure the accuracy of the wiring and the functioning of all equipment. The main bus system shall be given a dielectric test per ANSI standards between live parts and ground and between opposite polarities 2. The wiring and control circuits shall be given a dielectric test of 1500 volts for one minute or 1800 volts for one second between live parts and ground, in accordance with ANSI C37.20.1 The manufacturer shall provide three (3) certified copies of factory test reports. *Factory tests as outlined above shall be witnessed by the owner s representative. 1. The manufacturer shall notify the owner two (2) weeks prior to the date the tests are to be performed 2. The manufacturer shall include the cost of transportation and lodging for up to three (3) owner s representatives. The cost of meals and incidental expenses shall be the owner s responsibility 3.02 3.03 FIELD QUALITY CONTROL Provide the services of a qualified factory-trained manufacturer s representative to assist the Contractor startup of the equipment specified under this section for a period of * working days. The Contractor shall provide three (3) copies of the manufacturer s field startup report.. TRAINING The Contractor shall provide a training session for up to five (5) owner s representatives for * normal workdays at a job site location determined by the owner. The training session shall be conducted by a manufacturer s qualified representative. The training program shall include instructions on the assembly including primary equipment, transformer and secondary equipment. All circuit breakers, protective devices and other major components shall be included. 3.04 INSTALLATION * Note to Spec. Writer Optional * Note to Spec. Writer Insert data in blanks 16312-6 03/06/14

The Contractors shall install all equipment per the manufacturer s recommendations and the contract drawings. All necessary hardware to secure the assembly in place shall be provided by the Contractor. 3.05 3.06 FIELD ADJUSTMENTS FIELD TESTING 16312-7 03/06/14