West of England Rapid Transit Ashton Vale to Temple Meads and Bristol City Centre

Similar documents
Cathkin Relief Road Planning Statement

and 7 Queensland Transport, Moving People Connecting Communities: A Passenger Transport Strategy for Queensland , 2006

Speed Limit Policy Isle of Wight Council

What do we already know about Bradford-on-Avon community area?

2 Integrated planning. Chapter 2. Integrated Planning. 2.4 State highway categorisation and integrated planning

ANNEX 8 Contract Management Strategy

Car Club Strategy. London Borough of Richmond upon Thames

3.0 Planning Policies

Focus. Assessing the benefits of public transport. 1. Why focus on appraisal?

Why build the Silvertown Tunnel?

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

Residential Development Travel Plan

Major Improvement Schemes in Basingstoke

HIGHWAYS ENGLAND STRATEGIC BUSINESS PLAN OVERVIEW

Coventry Development Plan 2016 Appendix 89. Glossary of Key Terms

South East Wales Valleys Local Transport Plan

11. Monitoring Performance monitoring in LTP2

May The Right Direction. The Mayor s Strategy for improving transport safety, security and reliability in London Executive Summary

Highway Network Management Plan 2008 to 2017

Gateshead Economic Growth Acceleration Plan

Bedford s Network Management Strategy ( ) November 2010

usage of these types of fuels with production price far higher then diesel and petrol, is also a measure. We can say that in Bulgaria there are

Midlands Connect. Economic Impacts Study

Place Scrutiny Briefing AGENDA ITEM 13

Submission to the Assembly Regional Development Committee Inquiry into Sustainable Transport. September 2009

Growth of Addis Ababa

Key Facts. Passenger growth at the airport is projected to grow to approximately 3 million passengers per annum by 2030.

COPCUT RISE COPCUT RISE DROITWICH SPA CONSULTATION STATEMENT. November Prepared by Capita Lovejoy on behalf of William Davis Limited

Promote sustainable development and energy conservation. Facilitate the operation and use of public transport.

TRANSPORT ASSESSMENT GUIDANCE

Draft New Museums Site Development Framework Supplementary Planning Document SUSTAINABILITY APPRAISAL SCREENING REPORT

DEPARTMENT OF TRANSPORT CYCLING STRATEGY 29 February 2008

Rapid Transit Backgrounder

Submission from Living Streets Aotearoa Wellington City Public Transport Spine Study

Segregation of Shared Use Routes

PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL

A RESPONSIBLE, COLLABORATIVE AND AGILE ORGANISATION

Cycle Strategy

TRANSPORT FOR LONDON BOARD CROXLEY RAIL LINK PROPOSED TRANSPORT AND WORKS ACT ORDER

Performance Measurement for the better utilisation of New Zealand s existing Transport Network

The Mersey Gateway Project

Policies and progress on transport access, including access for the rural population and low-income households

Major and Minor Schemes

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City

Route Strategies. Our high-level approach to informing future investment on roads

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

A new Garden Neighbourhood for West Guildford An opportunity for Smart Growth. university of surrey November 2013

Network Rail Consultation on Draft West Coast Main Line Route Utilisation Strategy Consultation Response by Birmingham International Airport Limited

1. The consultation seeks views on the vision, targets and measures for improving road safety in Great Britain for the period beyond 2010.

How To Develop A Balanced Transport System In Devon

St Albans Local Development Framework. Core Strategy: Spatial Strategy Options

Development proposals will require to demonstrate, according to scale, type and location, that they:-

The Mersey Gateway Project

Integrated Public Transport. Planning. National workshop on promoting sustainable transport solutions for East Africa

FIRST STREET NORTH CREATING PLACES FOR PEOPLE

Parking Services Annual Report

ECO Stars Fleet Recognition Scheme Improving Local Air Quality Through Operator Engagement

A Greener Transport System in Denmark. Environmentally Friendly and Energy Efficient Transport

Seamless journeys from door to door.

Technical note. 1. Background. 2. Document Purpose. Project: A350 Chippenham Dualling

Basics of Sustainability. Environmental Impact Assessments (EIA)

Sustainable Mobility in Almada

Dominic McGrath Economy, Transport and Environment Dept Hampshire County Council The Castle Winchester Hampshire SO23 8UD 21st March 2016

TRANSPORTATION SERVICE STANDARDS ELEMENT GOALS, OBJECTIVES & POLICIES

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016

Site Deliverability Statement Development at: Beech Lane, Kislingbury. Persimmon Homes Midlands March 2015

Vote on for a: PUTTING PEOPLE FIRST

St Mary s and Penzance Harbours

The Business and Community Case for the Exeter to Plymouth complementary route via Okehampton G R O UP

Guildford Station Regeneration

RICHARD REID & ASSOCIATES LTD CITYMAKERS

Sustainable transport in Stockholm. Gustaf Landahl City of Stockholm

How to implement cycling solutions in a post-communist street system (and mentality) Marcin Hyła, VeloForum, 16 Oct.

Site Assessment for Neighbourhood Plans: A toolkit for neighbourhood planners

transport SCOTLAND S NATIONAL STRATEGY

Goals & Objectives. Chapter 9. Transportation

Bristol Development Framework Infrastructure Delivery Programme

Recommendations for regional cycling developments of Budapest metropolitan area

Introduction to. Aalborg s Sustainability Strategy

Transport Mobility Management: Small Changes - Big Impacts

Welcome Welcome to the public exhibition for development at Bowman Field. This exhibition provides an overview of the proposals for the site.

For businesses and other organisations, developing a walk-if-you-can culture can help:

7 Guiding delivery - next steps: efficient transport network management

INTRODUCTION AND PLANNING CONTEXT

2014/15 Performance Measures and Targets

Planning Policy Statement 3 (PPS 3 Revised Feb 2005) Access, Movement and Parking

28 St Thomas Court, Bristol, BS1 6JG

Rotherham Metropolitan Borough Council. Appendix A. Street Lighting. Sustainable Energy Action Plan

Welcome to our proposal for Greenwich Peninsula

Background to the Norwegian Ministry of Transport and Communications support for the measures

Map 13: Devon Rail Network (July 1999)

Neighbourhood Plan for Medstead and Four Marks

Leeds Local Implementation Plan and Transport Strategy

Transport Scotland Strategic Transport Projects Review Report 3 Generation, Sifting and Appraisal of Interventions Annex 2

City Plan Part 1 Sustainability Appraisal Summary February 2012

Planning should achieve high quality urban design and architecture that: Contributes positively to local urban character and sense of place.

Appendix E Transportation System and Demand Management Programs, and Emerging Technologies

Planning and Design for Sustainable Urban Mobility

BACKWELL FUTURE BACKWELL NEIGHBOURHOOD PLAN

London Freight Plan Data Modelling

Transcription:

West of England Rapid Transit Ashton Vale to Temple Meads and Bristol City Centre Scheme Summary II - Spring 2010

The West of England subregion is made up of Bath and North East Somerset, the City of Bristol, North Somerset and South Gloucestershire councils. The West of England sub-region is a prosperous area with an excellent quality of life and a growing national and international profile. The travel demands that accompany this prosperity and growth are increasing pressure on infrastructure, particularly provision of transport. The West of England Authorities are working together to deliver high quality public transport measures to provide alternatives to the car that are a realistic choice for the majority of trips. This will meet the area s growing needs, whilst safeguarding its environmental and economic future. Rapid transit, as one of these measures, will play a significant role in reducing traffic congestion. Background About a million people live in the West of England sub-region and it provides around 500,000 jobs. Most of these people live in the major urban areas of Bristol, Bath and Westonsuper-Mare and in the area s seven towns. One in six live in villages and the wider countryside. The South West region contributes nearly 8% towards the National Gross Value Added of the UK, with the West of England sub-region contributing one quarter of this. Figure 1: The West of England

The West of England sub-region has a unique heritage and character, including Bristol s industrial and maritime past, and Bath s status as a world heritage site. The area has a wealth of natural environmental assets spread across the urban and rural areas including parkland, landscapes and natural resources but also contains areas of significant deprivation and disadvantage which suffer from poor transport links. Congestion is already a serious problem. Over the last ten years traffic on the area s roads has grown by 21% compared to 16% nationally. This has resulted in poor air quality, delays, unreliable journey times and unsustainable pressure on existing infrastructure and services. The continued growth of congestion, with its undesirable effects, threatens the quality of the environment and the quality of life for people who live within it. Our Future Transport Vision aims to: Improve our quality of life Tackle congestion Improve road safety Improve air quality Improve access to job opportunities Help us get to work and school efficiently Strengthen the local economy Each of the four councils has developed its Core Strategies which set out the spatial and strategic objectives for each region until 2026. These strategies are aligned with the South West Regional Spatial Strategy, which has yet to be finalised, and overall they plan to deliver 86,500 homes and 95,500 jobs in the West of England sub-region by 2026. To continue our success and achieve our aspirations for economic, environmental and social development, we require an ambitious but realistic vision for our future transport. The four councils are working together as the West of England Partnership to tackle transport and other major strategic issues

Rapid transit will provide a fast, frequent and reliable public transport service. Development of a West of England Rapid Transit Network A comprehensive transport study to assess the current and future strategic transport needs of the West of England region up to 2031 was completed in 2006. Known as the Greater Bristol Strategic Transport Study (GBSTS), it was commissioned by the Government Office for the South West in partnership with the Highways Agency, South West of England Regional Development Agency and the West of England authorities. GBSTS recommended a package of measures to support the sustainable growth of the sub-region. One of these is the development of a Rapid Transit Network with the aim being to provide high quality alternatives to the private car. GBSTS identified that this network should: Extend choice of transport modes for all, in particular for private car drivers, to encourage a shift to public transport. Promote sustainable development by providing high quality public transport links. Improve access to public transport for areas that currently have poor provision. Improve integration of the public transport network. Promote social inclusion by improving access to employment, retail, community, leisure and educational facilities. Improve safety along the corridors by reducing use of private cars. GBSTS set out the plan for the development of a Rapid Transit Network. It identified corridors in the network that would serve many of the new and existing residential and employment developments. This network is embedded in the Joint Local Transport Plan (JLTP) within the major schemes programme and has funding allocated in Regional Funding Allocation (2006) for the South West. The Ashton Vale to Temple Meads and Bristol City Centre (the Rapid Transit Scheme) is the next scheme 1 in the network to be taken forward for funding with the Department for Transport and applications for consents to build and operate the scheme. Scheme Description Rapid transit will provide a fast, frequent and reliable public transport service. Services will run on a largely segregated route, separate from car traffic, and will be given priority over other road users at traffic signals. 1 The first bus rapid transit scheme in the West of England is being pursued as part of the Bath Transport Package. There will be a set of core services running frequently from Long Ashton Park and Ride to Bristol Temple Meads and on to Cabot Circus, Broadmead and the Centre (running in an anticlockwise loop around the city). Additional services will make use of the Rapid Transit alignment to provide faster journey times and improved reliability for services to North Somerset (Weston-super-Mare, Clevedon and Nailsea).

Rapid transit will provide a high quality passenger experience ticket machines at stops, user-friendly electronic information displays, high quality stop design, safe and secure access to stops. The route between the Museum of Bristol and Long Ashton Park and Ride will include a parallel cycling and pedestrian route linking in to existing networks thereby providing a further sustainable transport option. Services will be run using modern, accessible, comfortable, low-emission vehicles that provide the quality and feel of a high quality metro-style system. The Authorities are committed to exploring the range of alternative fuel sources with potential operators. These would offer considerable environmental improvements with lower noise levels, fewer greenhouse gas emissions and less harmful local pollutants. Access to the rapid transit route will be open to operators meeting quality thresholds which will govern vehicle and service standards. Works Construction of a two-way segregated busway between Long Ashton Park and Ride and the Museum of Bristol including a parallel pedestrian/cycleway linking with the existing Chocolate Path and new routes proposed as part of the Connect2 and Cycling City projects. A new bridge over the Portbury Freight Line at Ashton Gate. Refurbishment of Ashton Avenue Bridge including a new pedestrian and cyclist facility. Parking restrictions along Cumberland Road. Strengthening works to Prince Street Bridge and closure to car traffic. Additional bus lanes and priority measures within Bristol City Centre on The Grove, Redcliffe Way, Temple Way, Haymarket, Rupert Street and Colston Avenue. Rapid Transit will provide a high quality passenger experience

New bespoke stops along the length of the route which have CCTV, real time service information and off-board ticketing. Appropriate environmental mitigation works which are likely to include water attenuation features, ecological and landscape planting, noise barriers where required and species specific measures (such as bat boxes). Urban design improvements in Bristol City Centre including removal of kerbside-clutter, improved wayfinding and street scene. The proposed rapid transit route is shown in Figure 2. Rapid transit will serve: Bristol Temple Meads Railway Station. New and planned development at Redcliffe and Temple Quay. Retail and employment areas of the new Cabot Circus development and Broadmead. Retail and employment areas around The Centre and interchange with bus services. Figure 2: Ashton Vale to Temple Meads and Bristol City Centre

The refurbished Museum of Bristol and planned Wapping Wharf development. Spike Island and the SS Great Britain. The potential new stadium and development of Bristol City Football Club. Long Ashton Park and Ride. Weston-super-Mare, towns and villages in North Somerset. Rapid transit will replace the existing Long Ashton Park and Ride service. The Authorities are reviewing a range of options for procuring an operator, or operators, to run services. The Authorities will use the powers afforded by the new Transport Act (2008) to ensure that arrangements are put in place that deliver the Rapid Transit Scheme s objectives and present value for money to the Authorities, central Government and the public. Rapid transit will improve journey times and reliability from the south west of the subregion to Bristol City Centre. Scheme Appraisal A `Major Scheme Business Case (MSBC) to apply for funding was submitted to the Department for Transport in March 2009. The MSBC sets out an appraisal of the scheme and its benefits, including: Rapid transit will improve journey times and reliability from the south west of the sub-region to Bristol City Centre. Provision of a high-quality, more sustainable choice of travel - rapid transit and cycling or walking and a shift of trips to a safer transport mode. Shift of trips to more environmentally sustainable transport modes, and improving physical activity and quality of life through encouraging walking and cycling. Improved connectivity between existing centres of activity with new and proposed development. Contributing to a more reliable and efficient transport network to improve business efficiency, movement of labour and connections to national and international networks. Improved accessibility to and from the south west of the sub-region to the existing public transport network, without the need for interchange, particularly Bristol Temple Meads Railway Station. The economic appraisal of the scheme results in a `Benefit to Cost Ratio of 3.15 : 1. This means the value of the benefits arising from the scheme substantially outweigh the cost of providing the scheme. The capital cost estimate for the Rapid Transit Scheme is 47.8 million. 43.2 million is allocated in the draft South West Regional Funding Allocation submitted to the DfT at the end of February 2009.

The South West Region fully supports the MSBC for this funding. Around 10% of the required funding will be provided from local sources. The Authorities will seek this funding from developments related to the Rapid Transit Scheme and potentially from operators. What Next? The Department for Transport awarded Programme Entry to the scheme in March 2010. This is the first step in a threestage process to access the available Government funding. The project will now submit an application for the powers and permissions to build and operate the scheme via a Transport and Works Act Order. It is anticipated that the application will result in a Public Inquiry. Construction could start in 2012 with services operational from 2014. Information on the scheme is provided on the West of England Partnership website at www.travelplus.org.uk/ rapidtransit/avtm You can contact the project team by email at transport@westofengland. org or by post at: Bristol City Council Major Projects Team, Wilder House Wilder Street Bristol, BS2 8PH If you would like this information in a different format, for example Braille, audiotape, large print or computer disc, or community languages, please contact West of England Partnership office.