Chapter 2 Basis of design and materials

DESIGN OF SLABS. Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia

Detailing of Reinforcment in Concrete Structures

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,

FUTURE SLAB. PENETRATIONS and. DEMOLITION of POST-TENSIONED FLOORS

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

The following sketches show the plans of the two cases of one-way slabs. The spanning direction in each case is shown by the double headed arrow.

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI

CURRENT PRACTICE SHEET

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig some of the trusses that are used in steel bridges

16. Beam-and-Slab Design

Hardened Concrete. Lecture No. 14

How To Build A Luxury Apartment Complex In London

Eurocode 2: Design of concrete structures

Eurocode 4: Design of composite steel and concrete structures

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

8 EXTRA LIGHT GRC SANDWICH ELEMENTS FOR ROOFING IN INDUSTRIAL BUILDINGS

Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps

Precast Concrete Parking Structures

FATIGUE CONSIDERATION IN DESIGN

DESIGN OF BLAST RESISTANT BUILDINGS IN AN LNG PROCESSING PLANT

Optimum proportions for the design of suspension bridge

Chapter 5 Bridge Deck Slabs. Bridge Engineering 1

FORM DESIGN. easy to work with, and generally available.

Fifteen years experience of design, production and assembling of prestressed Bridge decks in Timber

DESIGNING STRUCTURES IN EXPANSIVE CLAY

Technical Notes 3B - Brick Masonry Section Properties May 1993

INCREASE OF DURABILITY AND LIFETIME OF EXISTING BRIDGES. PIARC TC 4.4 EXPERIENCE.

SEISMIC DESIGN. Various building codes consider the following categories for the analysis and design for earthquake loading:

SLAB DESIGN. Introduction ACI318 Code provides two design procedures for slab systems:

Advancements in GPR for a Sustainable Tomorrow

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

EAST LYME HIGH SCHOOL

Post and Beam Construction

Basics of Reinforced Concrete Design

Lessons 6 and 7 Foam Bridge Experiment- Forces and Stresses Lab

FORMWORK INTRODUCTION

SECTION 5 ANALYSIS OF CONTINUOUS SPANS DEVELOPED BY THE PTI EDC-130 EDUCATION COMMITTEE LEAD AUTHOR: BRYAN ALLRED

HIGH PERFORMANCE PRE-APPLIED SYSTEM FOR BLIND SIDE & BELOW GRADE WATERPROOFING APPLICATIONS

Safe & Sound Bridge Terminology

Formwork Direct International Ltd Phone No +44 (0151) Fax no +44 (0151)

4B The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.

September 1, 2003 CONCRETE MANUAL CONCRETE PAVEMENT REHABILITATION

EDEXCEL NATIONAL CERTIFICATE/DIPLOMA MECHANICAL PRINCIPLES OUTCOME 2 ENGINEERING COMPONENTS TUTORIAL 1 STRUCTURAL MEMBERS

Welded Fabric. The CARES Guide to Reinforcing Steels Part 5. Installation of welded fabric on a major contract. 1.0 Introduction

1.2 Advantages and Types of Prestressing

Design and Construction of Cantilevered Reinforced Concrete Structures

Structural Products. CI/SfB (23) Nh2 P356 August 2008

HOW TO DESIGN CONCRETE STRUCTURES Foundations

METHOD OF STATEMENT FOR STATIC LOADING TEST

Preliminary steel concrete composite bridge design charts for Eurocodes

Embedded Parts Introduction - Anchors

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

Concrete Design Manual

Lightweight, Heavy Duty

ADVANTAGES OF STEEL FIBRE REINFORCED CONCRETE IN INDUSTRIAL FLOORS

MEGA GUARD COLUMN CORE GUARD DAWG COLUMN PROTECTOR. Smart Investments in Plant Safety

The Analysis of Open Web Steel Joists in Existing Buildings

CAUSES, EVALUATION AND REPAIR OF CRACKS IN CONCRETE

Scope of EN Clarification Document

Breakaway Walls

Cannon T4 Modular Data Centres. For Outside Deployment & Challenging Environments

bi directional loading). Prototype ten story

PANELIZED HOME INSTALLATION GUIDELINE

King Post Wall Information

Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.)

FOUNDATION TECHNICAL CATEGORY 3 (TC3) AUGUST 2012

Numerical modelling of shear connection between concrete slab and sheeting deck

Monocouche Best Practice Guide. New-Build Housing Managing movement to avoid cracking

SECTION 3 DESIGN OF POST TENSIONED COMPONENTS FOR FLEXURE

SECTION 1 GENERAL REQUIREMENTS

Example Specification for Concrete using Current Building Code Requirements

Services Enclosures and Protected Shafts - Maintaining Compartmentation

MECHANICS OF SOLIDS - BEAMS TUTORIAL 2 SHEAR FORCE AND BENDING MOMENTS IN BEAMS

Technical handbook Panel Anchoring System

SECTION GUARDRAILS

Handling, Erection and Bracing of Wood Trusses

Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE

The WANZ Guide to Window Installation

Screw Patterns Roof & Walls TR-36 MD-36 TSM-32. PBR-Panel

Sisal Composite Ltd. Apparel 4 Ltd. JM Knit Ltd. Natun Para, Hemayetpur, Savar, Dhaka-1340 ( N, E)

SERIES NG 1800 STRUCTURAL STEELWORK

March 19, Ms. Jean McDonald CAP Management th Street, Suite 1010 Denver, Colorado 80202

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Tension Development and Lap Splice Lengths of Reinforcing Bars under ACI

Weld Cracking. An Excerpt from The Fabricators' and Erectors' Guide to Welded Steel Construction. The James F. Lincoln Arc Welding Foundation

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

PART E SPECIFICATIONS

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON THE USE OF WATERPROOFING MEMBRANES ON CONCRETE BRIDGE DECKS

LAYING BLOCK AND BRICK

Formwork for Concrete

SECTION 3 DESIGN OF POST- TENSIONED COMPONENTS FOR FLEXURE

Design Manual to BS8110

CORROSION ENGINEERING RESIN-BASED POLYMER CONCRETES AND GROUTS

TABLE OF CONTENTS. Roof Decks 172 B, BA, BV Deck N, NA Deck. Form Decks FD,.6 FDV Deck 1.0 FD, 1.0 FDV Deck 1.5 FD Deck 2.0 FD Deck 3.

Chapter 7: Pavement Rehabilitation 7-1 Asphalt Pavement Overlays 7-1 Surface Preparation Methods 7-2 Concrete Pavement Preparation 7-3 Recycling

DESIGN OF PRESTRESSED BARRIER CABLE SYSTEMS

Transcription:

Cracks in Industrial Concrete Floors This Flooring Technical Note considers the types of cracks specific to concrete industrial floors and the typical causes of non-structural cracks. It does not look at the subject of crazing which is covered separately in Flooring Technical Note 03 - Surface Crazing. Association of Concrete Industrial Flooring Contractors (ACIFC) 6-8 Bonhill Street, London, EC2A 4BX T: 0844 249 9176 F: 0844 249 9177 E: info@acifc.org W: www.acifc.org

Introduction This Flooring Technical Note covers the typical causes of non-structural cracks in concrete industrial floors. It should be noted that different crack types are often linked, and some cracks may exhibit characteristics attributed to a number of potential crack inducers. For example, a mid-panel shrinkage crack may be physically connected to a re-entrant corner crack located nearby; this does not necessarily mean that one has affected or created the other. This flooring technical note does not cover cracking in cold store floors, any floors subject to extreme temperatures or pre-stressed floors, which are rarely used in industrial flooring. The subject of crazing is also not included as this is covered in a separate ACIFC Flooring Technical Note 03. Further, more in-depth guidance can be found in The Concrete Society Technical Report 22 Fourth Edition; Nonstructural cracks in concrete. However, it should be noted that TR22 is not flooringspecific, and many topics covered are not directly related to internal industrial floors subject to just ambient temperatures. Commentary The following types of cracks are specific to concrete industrial floors: 1. Re-entrant corner cracks Figure 1. ACIFC 2014 all rights reserved 2

Freshly cast concrete panels shrink towards the centre of the body of concrete, so any intrusions within this panel can provide a potential for restraint, effectively stopping the free movement of the concrete. The threat of cracks emanating from any re-entrant corner, such as walls or columns, can be reduced by good isolation detailing; however, it is common practice to introduce crack control mesh/bars placed at 45 degrees to the re-entrant corner with nominal top cover. The crack control measures are there to arrest the crack opening and not prevent crack formation. It is the job of isolation detailing and joint positioning to reduce the risk of crack formation at re-entrant corners. Figure 2. Generic examples of detailing around floor intrusions, such as columns and adjacent office areas ACIFC 2014 all rights reserved 3

2. Cracks due to rutting of sub-base level The saying that your floor is only as good as the ground beneath is particularly true when considering the levels on which concrete is physically placed. Failure to prepare the final sub-base layer to a satisfactory tolerance can result in crack inducing folds being present in the sub-base. These ruts can effectively create localised weak spots in the floor slab where the nominal design depth is not achieved, and also where restraint will be created, hindering uniform concrete shrinkage. For this reason, a heavy roller should be on standby aside the floor construction process if traffic is likely to disturb the already prepared sub-base material. Any plastic sheeting placed beneath the floor should be free of folds, and if the construction process disrupts the placing of this sheet, it is advisable that any laps be taped. 3. Mid-aisle cracks Figure 3. ACIFC 2014 all rights reserved 4

Mid-aisle cracks are often associated with jointless floors (i.e. large area panels free of saw-cut joints, separated by leave-in-place permanent formwork joints with integral dowelling systems) reinforced with steel fibres, however. Many jointed floors, whether reinforced with steel fabric or fibres with a regular grid of induced saw-cuts, can also exhibit these types of cracks. The main reason for mid-aisle cracks should more often than not be attributed to the early loading of racking systems as opposed to the actual floor type constructed. Early liaison between client and contractor(s) is advisable if storage systems are to be (a) installed, and (b) loaded quickly after floor construction, to gauge whether excessive cracking may be likely. The rapid shrinkage expected in concrete during its first few weeks cannot really be reduced effectively, although it can be minimised by using concrete mixes with lower cement contents whilst still maintaining the compressive strength required for the floor slab to carry the intended loadings. However, the positioning of joints in certain locations can be the key to minimising the occurrence of these types of cracks. It should be noted by the client that a joint is essentially a planned crack. Whilst seeing a crack is not desirable, these can often stay tighter than saw-cut induced contraction joints. A non-structural crack of this type is simply a sign of the concrete doing what it does when it shrinks; the occurrence of a crack is not always the fault of the contractor or designer, and if the crack only propagates within specified tolerances, no repair is required. 4. Mid-panel cracking Figure 4. ACIFC 2014 all rights reserved 5

This can be caused by a number of things, including the positioning of joints at too large a centre; this is easy to diagnose with hindsight, but not always obvious until cracking has actually occurred. It should be noted, however, that mid-panel cracking is probably more desirable than having dominant joints; the phenomena of one induced joint accumulating all of the shrinkage intended for a series of joints. For this reason, solutions with minimal joints and a slightly higher risk of cracking can still be the best solution. 5. Cracking due to retrospective floor intrusions Many buildings are designed to give clients future flexibility, for example, to accommodate the possibility of a mezzanine system being erected, or different machinery being used in a production area, etc. As such, retrospective drilling to allow the connection of baseplates to a slab can have a detrimental effect, but only aesthetically if it has actually been designed for these new loadings. Whilst many changes of use are carried out years after construction of a building, any that are implemented early, certainly within two years of the floor being cast, can be a potential form of crack inducement. These details are extremely difficult to cater for at the original design stage due to the unpredictability of future (often unknown) client requirements, therefore any cracks formed which are deemed excessive should be repaired by the client to maintain the integrity of the floor. 6. Changes in slab depth, tapers etc. Where different slab depths are required in the same building due to changes in localised floor usage (or differing ground conditions), it is good practice to separate the floor areas using a suitably located joint. Failure to do so, and hence casting the two slab depths using a tapered sub-base level, can create a localised weakness due to restraint, and hence a high risk of unwanted cracking. If the two areas must be cast in the same pass for some reason, additional traditional reinforcement should be utilised locally at the position of change in slab depth. ACIFC 2014 all rights reserved 6

Cracks in Piled Floors Figure 5. Because a piled floor is designed to actually be suspended between piles, it should be noted that floors of this type could be deemed as structures, not just floors. For this reason, cracking exhibited in a piled floor should not automatically be deemed non-structural, and further investigation may be needed to deduce the importance of the crack, and a suitable remedial action. Similarly though, the principles of shrinkage cracks exhibited in ground bearing slabs still apply to floor on piles. Cracks can often occur in floors on piles due to the slab being restrained by the piles beneath, particularly when small precast piles are used (and less so with large pile caps or formed flared heads). Even through slab self-weight, cracks can occur in the top surface due to this type of restraint; the amount of imposed load is not always critical in influencing this type of restraint. Any physical tie between pile and floor will result in the slab cracking. If every pile is tied into the slab, a two-way grid of cracks which mirrors the pile locations beneath can be expected. For this reason, the design should be based around the top-of-pile level being at the underside of slab soffit level (i.e. no intrusion into the slab). A negative tolerance on the pile level has less of an impact and should be allowed (to approximately 25mm below the underside of the slab level), but piles located too far down can also create unwanted slab thickening locally, which will also result in crack formation. ACIFC 2014 all rights reserved 7

The most common failure mode of floor on piles is due to hogging moments over piles (punching shear, and even less so, sagging moments between piles, are very rarely identified as the worst case during the floor design process). Cracks occurring over pile locations do not immediately indicate floor failure, as most reinforcement concepts and design methodologies use reinforcement which adds post-crack strength; in other words, the reinforcement doesn t work until an initial yield is created, so some cracks are expected, and indeed needed for the reinforcement to become active. For further information refer to TR34 4 th edition. 7. Parallel cracks aside joint locations When using traditional dowels (round or square) in daywork construction joints, these must be positioned accurately and remain in place, straight and true, both in plan (the view from above) and in section (when viewed head-on). Dowels which are misaligned in either plane can restrain joint movement, creating cracks parallel to the joint position. A simple remedy to dowel-lock is to use a leave-in-place steel formwork joint, with an integral but non-continuous dowelling system. 8. Cracks in Floors on Composite Steel Decking As most floors on composite steel decking are often cast when cladding is not in place, prevailing winds can cause increased rates of concrete drying during the casting operation. There is a significant risk of cracking in all composite slabs due to restrained drying shrinkage and bending, and these factors cannot be eliminated. As the deck profile has peaks and troughs at regular centres, concrete is not free to move when it contracts, causing restraint and subsequent tension in the top surface of the slab; this can produce a series of parallel cracks which follow the direction of span. Bending is prevalent when decking is un-propped at construction stage, and the movement of secondary beams under load can cause hogging effects over these deck support positions. The presence of shear connectors can also produce cracks because of the local stress concentrations these cause. It should also be noted that, as free water from the concrete mix can only leave the concrete through the slab s top surface, the hydration process of cement in decking concrete is often increased at the surface compared to some ground floors cast on sub-base, for example. Any cracks in floors on composite steel decking should be closely monitored by the client to assess movement over time. ACIFC 2014 all rights reserved 8

Summary In summary, shrinkage related cracks will not form unless there is some type of restraint; however, cracks will form when the tensile stress exceeds the tensile strength of the concrete. Once a crack has been identified as being non-structural in nature, the client should only consider having it repaired if the practical floor usage (i.e. forklift truck movements etc.) is compromised. Early repair of non-structural cracks may be unwise as further concrete shrinkage over time may result in failure of an early repair; a second (or more) round of repairs will undoubtedly disrupt the building usage for a further period, so ideally one repair should be sought, not several. Further Reading The Concrete Society, Non-Structural Cracks in Concrete, Technical Report 22 (4th Edition, 2010) The Concrete Society, Cracking in composite/corrugated metal decking floor slabs, Concrete Advice No. 13 (July 2003) The Concrete Society, Concrete Industrial Ground Floors; A guide to design and construction, Technical Report 34 (4th Edition, 2013) The Concrete Society, Composite concrete slabs on steel decking; guidance on construction and associated design considerations, Good Concrete Guide 5 (2008) ACIFC, Steel Fibre Reinforced Concrete Industrial Ground Floors; An Introductory Guide (1999) Disclaimer This guide is issued by ACIFC to give general guidance and dissemination of current knowledge. ACIFC and the organisations responsible for its content do not accept any liability arising in any way from relying on this guide. If you require advice on a specific issue, you should seek your own independent professional advice. Requests to use any part of this guide should be made in writing to: Association of Concrete Industrial Flooring Contractors (ACIFC) 6-8 Bonhill Street, London, EC2A 4BX E: info@acifc.org Part-funded by CITB ACIFC 2014 all rights reserved 9