Overview of current market trends for Solar Thermal Electricity plants Dr. Luis Crespo President of ESTELA Secretary General of Protermosolar



Similar documents
Solar Thermal Electricity. Eduardo Garcia Iglesias Deputy Secretary General of Protermosolar

ABENGOA SOLAR Solar Power for a Sustainable World

CONCENTRATING SOLAR POWER ON THE ROAD TO 2030

CSP-gas hybrid plants: Cost effective and fully dispatchable integration of CSP into the electricity mix

Sensitivity analysis for concentrating solar power technologies

Prospects and Incentives for Use of Alternative Energy Technologies in the Arab Electric Power Generation Sector

Molten Salt Solar Tower: The Possible Way Towards Competitiveness

SOLARRESERVE. BASELOAD SOLAR Power. Improving Mining Economics with Predictable Energy Costs

Financing of Renewable Energy in India: Implications for Policy. Gireesh Shrimali Climate Policy Initiative

Reflections on the Spanish Regulation Framework. Dr. Luis Crespo Secretary General of Protermosolar President of ESTELA

Engineering and Construction for Sustainability Solar Concentration Workshop World Bank November 5th, 2008

Solar Tower Systems. Status and Perspective. CSP Industry Days Dr. Reiner Buck. DLR Institute of Solar Research

Renewable Energy Partnership EU-MENA

ABENGOA ABENGOA SOLAR

Planning for Arizona s Energy Future

October, 2011 Regional Center For Renewable Energy and Energy Efficiency RCREEE

REN Global Status Report Renewable energy in the MENA region. Presented by the UAE Ministry of Foreign Affairs 3 July 2014

The Power of Concentrating Solar

CONCENTRATED SOLAR PLANTS

VGB Congress Power Plants 2001 Brussels October 10 to 12, Solar Power Photovoltaics or Solar Thermal Power Plants?

Concentrating Solar Power

Concentrating Solar Power (CSP) Market Shares, Strategies, and Forecasts, Worldwide,

Moroccan plan for solar energy

NOORo: the largest concentrated solar power complex in Africa increases the share of renewable energy in electricity generation in Morocco

Concentrating Solar Power

Contents. Wind power sector facts. Growth drivers. Immediate challenges. Innovative and global response

CSP. Feranova Reflect Technology. klimaneutral natureoffice.com DE gedruckt

Outline. Solar Energy II. Solar Power II March 10, ME 496ALT Alternative Energy 1. Alternative Energy

DOE Concentrating Solar Power 2007 Funding Opportunity Project Prospectus

Algeria Potentials for CSP/PV and Applications

Testimony of Barbara D. Lockwood, P.E. Manager, Renewable Energy Arizona Public Service Company

Fichtner s activities in Solar Engineering. Georg Brakmann Managing Director Fichtner Solar GmbH

CONCENTRATING SOLAR POWER NOW CLEAN ENERGY FOR SUSTAINABLE DEVELOPMENT

The CTF MENA CSP Scale-up Investment Plan

Financing Concentrating Solar Power in the Middle East and North Africa Subsidy or Investment?

Solar Energy Alternative and their Potential in the Arab World

Dii creating a market for renewable energy from the deserts in Europe, North Africa and the Middle East

Renewable Energies in Egypt Activities of TU Berlin. Dipl.-Ing. Johannes Wellmann TU Berlin, Campus El Gouna

Receiver für Salzschmelzen Der nächste Schritt in der Parabolrinnentechnologie

H LEVELISED COST OF ELECTRICITY - PV

TRENDS 2015 IN PHOTOVOLTAIC APPLICATIONS EXECUTIVE SUMMARY

Steam turbines for solar thermal power plants. Industrial steam turbines. Answers for energy.

SPANISH EXPERIENCE IN RENEWABLE ENERGY AND ENERGY EFFICIENCY. Anton Garcia Diaz Economic Bureau of the Prime Minister

Science, Sustainability and Global Responsibility Desy Hamburg Germany

CSP Parabolic Trough Technology for Brazil A comprehensive documentation on the current state of the art of parabolic trough collector technology

Green Industries, Department of Trade and Industry

Saudi Arabia s Renewable Energy Strategy and Solar Energy Deployment Roadmap

ALONE. small scale solar cooling device Project No TREN FP7EN Project No TREN/FP7EN/ ALONE. small scale solar cooling device

Adapting Gas-Power Generation to New Role in Low-Carbon Energy Systems

Business Opportunities in the Mexican PV market. September 2013 Nikolai Dobrott, Managing Partner

Eng.Mostafa. Ibrahim Khamis. Dr. Shaher Anis Mahmoud. Eng.Ehab. Ehab Ismaeel Amin. Acc. Hazem Ahmed Abdelhalim

Photovoltaik und globale Energieversorgung

Solar Thermal Power Plants From Vision to Realisation

Abstract. s: phone: , fax:

GLOBAL RENEWABLE ENERGY MARKET OUTLOOK 2013

SOLAR PURCHASE POWER AGREEMENT (PPA) FREQUENTLY ASKED QUESTIONS. UPDATED: October 28, 2015

SunEdison Global Services. Safeguard Your Assets, Maximize Your Performance

CHILE LEVELISED COST OF ENERGY

International Solar Energy Arena January 23rd, 2009, Istanbul STEAM (Strategic Technical Economic Research Center)

CSP FIT GUIDE CSP TODAY SEVILLA th International Concentrated Solar Thermal Power Summit. November 29-30, Sevilla, Spain

4 DAY Course Outline. Power Purchase Agreements. for Emerging Countries

Wind and solar reducing consumer bills An investigation into the Merit Order Effect

Delivering renewable energy investments in MENA Region

SOLAR ENERGY PERSPECTIVES IN EGYPT

REDUCTION OF BUREAUCRATIC BARRIERS FOR SUCCESSFUL PV DEPLOYMENT IN THE EU KEY RECOMMENDATIONS

Key Performance Indicators for the Solar Europe Industrial Initiative

Innovative technology solutions for sustainable development Abengoa in the USA

An Overview of CSP in Europe, North Africa and the Middle East

U.S. Concentrating Solar Power

Renewable Energy Financing point view

Technological developments and market perspectives for renewable energy cooling systems

RENEWABLE ENERGY IN EGYPT

WORLD ENERGY INVESTMENT OUTLOOK 2014 FACTSHEET OVERVIEW

Solar One and Solar Two

Energy storage in the UK and Korea: Innovation, Investment and Co-operation Appendix 4.1: Stakeholder interviews from Korea

Solar Energy Systems

Mini-grid Implementation Experience as an EPC Contractor. Fabian Jochem Juwi international GmbH

Arab Republic of Egypt Ministry of Electricity & Energy New & Renewable Energy Authority (NREA)

ORGANIZATION CHART OF MINISTRY OF ELECTRICITY & RENEWABLE ENERGY MoERE

Summary of the Impact assessment for a 2030 climate and energy policy framework

Solar Energy and Water Use in Arizona

ESBI Carbon Solutions. Partnering with Countries to Achieve their Full Carbon Credit Potential

KERALA STATE ELECTRICITY REGULATORY COMMISSION THIRUVANANTHAPURAM IN THE MATTER OF

Centralized vs. distributed power generation in developing countries: what's smarter? Marco Raganella. September the 16 th, Rabat

Solar Millennium AG. European Climate Foundation 3 December 2009

GDF SUEZ. Introduction. Jean-François Cirelli

System-friendly wind power

FIGHT, FLIGHT OR ADAPT: HOW UTILITIES ARE RESPONDING TO PV & STORAGE

Solar power for sustainable energy

Prospects of the Renewable Energy in Egypt

Joint IEA-RETD and IRENA Workshop. The Business case of New Generation RE-COST1 STUDY Preliminary Results. Mercedes Mostajo


CSP- Biomass Hybrid cogeneration system offers synergistic solution for continuous process industries. 9 th May 2013 Chennai

CHP & ENVIRONMENTAL COMMODITIES: MARKET & POLICY UPDATE FOR MONETIZING RENEWABLE ENERGY CREDITS FROM CHP PROJECTS. Thomas Jacobsen October 2012

Lo Stoccaggio dell Energia negli Impianti Solari a Concentrazione

R ENEWABLE SOURCES CSP. Sustainable and cost-efficient solar thermal energy

Solar Energy Commercial Applications. Agenda. Venture Catalyst Inc. Intro. Opportunity. Applications. Financing. How to start

Solar Energy Utilization in the United States. For the American Nuclear Society Nor Cal Ali Moharrer, P.E. February 21, 2013

Time for take-off The MEED Insight Renewable Energy Webinar 29 April 2013

Page 1 of 11. F u t u r e M e l b o u r n e C o m m i t t e e Agenda Item 7.1. Notice of Motion: Cr Wood, Renewable Energy Target 9 September 2014

Transcription:

IEA TECHNOLOGY ROADMAPS WORKSHOP Overview of current market trends for Solar Thermal Electricity plants Dr. Luis Crespo President of ESTELA Secretary General of Protermosolar Paris, 3 February 2014

Current market trends for STE The short answer is not to brilliant Do you want I stop here or hear more?

Situation of commercial STE plant deployment Spain Latest news Completion of the last 7 previously approved plants (350 MW) in 2013 Total power in operation 2304 MW (mainly PT, 40% with storage and 60% without storage) Proven operational experience. Positive reference for other countries Prospects No more plants envisaged in the short term Further deployment could be based on the Cooperation Mechanisms of the RES Directive Rest of Europe Italy: Demo plant in Sicily (5 MW, PT). FiT system in force 3 plans (PT) in the approval process (55 MW, 50 MW, 12 MW) Another few more plants (150 MW) in promotion stage France: 2 plants (10 MW, F each aprox.) ready to start construction UE level: Big frustration with the 5 NER-300 projects (Greece, Spain, Italy and Cyprus)

A wide variety of STE plants has been built in Spain

1 5 9 13 17 21 25 29 33 37 41 45 49 53 57 61 65 69 73 77 81 85 89 93 97 101 105 109 113 117 121 125 129 133 137 141 145 149 153 157 161 165 Operational references from the Spanish STE plants Important milestones in 2013: Max. contribution 7,6 % (July the 18 th at 12:00) Max. daily contribution 4,6% (August the 11 th ) 40000,0 38000,0 36000,0 34000,0 32000,0 July the 18th Monthly production 3,6% 30000,0 (776 GWh in July) 28000,0,0 39000,0 37000,0 35000,0 33000,0 31000,0 29000,0 27000,0 25000,0 23000,0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 Week of July (15th to 21st) July 2013 Demand (MWh) STE (MWh) 2500,0 2000,0 1500,0 1000,0 500,0 2000,0 1500,0 1000,0 500,0,0 Demand (MWh) STE (MWh) Source REE

Situation of commercial STE plant deployment USA Latest News Completion of Solana (280 MW, PT), Ivanpah (390 MW, T) and the first phase of Genesis (125 MW, PT) in 2013 Total power in operation 1325 MW in operation Plants in advanced construction stages Crescent Dunes (110 MW, T), Mojave (280 MW, PT) and second phase of Genesis (125 MW, PT) There are some 20 more large projects in promotion or early development stages but only few of them have chances to be built in the next future. Palen (2 x 250 MW, T) under environmental analysis and tribal protests, Rice (150 MW, T) under negotiations with the utilities, Prospects Strong competition with PV Future STE plants will depend on the position of the utilities regarding dispatchability. Rising of Portfolio Standards in some states will help.

Ivanpah / BrightSource 390 MW Solana / Abengoa 280 MW

Situation of commercial STE plant deployment MENA Region (Arab countries) Completion of Shams 1 (100 MW, PT) in 2013 Total STE power in operation: 165 MW (considering equivalent power of the ISCCs) Noor I (160 MW PT) is under construction in Ouarzazate (Morocco) Noor II (200 MW PT) and Noor III (100 MW T) in the RfP phase after PQ of bidders Al Shagaya (50 MW PT) with big storage and dry cooling recently awarded in Kuwait Ambitious plans in Saudi Arabia two first rounds (900 and 1200 MW) and 25 GW by 2032 (White paper). STE plans announced in many other countries South Africa 200 MW (150 PT / 50 T) under construction Rounds 1 & 2 100 MW (50 PT / 50 T) MW recently approved in round 3 ESKOM plant (100 MW ) in RfP. Rounds 3.5 and 4 (300 MW) to be launched shortly Interesting FiT approach with hourly discrimination (Time Of Day tariff +270%) Increased interest in the dispachability features and local content of STE plants. Clear possibilities to increase the 2020 goal from 1100 MW to 3300 MW India Completion of Godawari (50 MW PT) and Reliance (100 MW F) Megha (50 MW PT) in advance construction. The other 4 plants of the JNNSM will -most likely- not be completed (unrealistic FiT) Two new plants (50 MW PT & 50 MW T) will be soon announced for bidder PQ

Other countries China Apart from some demo plants the only real project is the completed first phase (10 MW, T) of a 50 MW plant in Delingha. There are many projects in promotion but still uncertain FiT conditions. Ambitious plans for 2015 (1000 MW, unrealistic) and for 2020 (3000 MW) Israel 2 plants (110 MW PT & T) under early construction phases. Another few hundred MW in promotion stage. Australia The ISCoalPlant in Kogan Creek (44 MW F) is near to completion. The Solar Dawn project (250 MW F) under the SFP didn t get the financial support and it was withdrawn. New expectations based on the Renewable Energy Target and the financial support of ARENA Chile The first plant (110 MW T / base load) has been recently awarded Increasing interest in other Latin American countries and African neighbors of SAR

Big differences between industrialized / developing countries which explain the current penetration of STE Industrialized countries (Where Wind and PV have been mainly deployed) Non dispatchable RE technologies contribute to savings on fossil fuels without longer-term considerations or backup requirements. Overcapacity in the systems leads to operation restrictions for conventional plants and curtailments for RES plants. STE will play an essential role when phasing out conventional plants Quick developing countries Substantial additional generation (2 or 3 times over the next 10-20 years) will be required. This can t be firmly supplied by non dispatchable technologies alone and a considerable amount of backup power -combined cycles- have to be included when planning the investments. In this context STE plants - with storage and/or hybridization - will provide major advantages, besides their macroeconomic impacts. Therefore STE can be considered as a competitive option today

Barriers for quicker STE deployment Longer Project Development and Construction periods Higher Current Investment and O&M costs Delays in Technology Development feedback WIND 330 GW There is an urgent need to remove blocking perceptions among Policy Makers and to show them the value proposition of STE S T E PV 4 GW 120 GW

What has been done so far (Stars mean achievements) Cost = Performance increase Cost reduction Cost reduction: Structure Tubes Mirrors Performance increase Cost = % apply to 2010 cost breakdown The increase of financing costs has counteracted this effort to some extend

Trying to understand cost issues. LCOE vs PPA LCOE is being used in institutional reports to show the situation of different technologies and to make comparisons among them. The LCOE is -by definition- the constant value that makes the Net Present Value of the sales of electricity equal to the NPV of all incurred costs along the life span of the plant. But what really matters when deciding building a STE plant is whether the PPA (or FiT) for a shorter period than the life span of the plant will provide a reasonable profit over the costs to the developer. Incomes associated to the PPA might be variable and might depend on the dispatch profile and some other factors. One should be careful when using LCOE for comparisons among technologies as the variety of system designs - specially for STE -, the different life span, the site dependence of costs when there are different local contents, the differences on financing costs, the impact of the breakdown between DNI/global radiation, other relevant meteorological factors, etc., makes extremely difficult to provide precise basis for comparison. PPA references can be tracked - although they need to be duly harmonized - in order to inform Policy Makers on the gap that need to be filled when considering launching a STE program in their countries. LCOEs must be consistent with this references incorporating the corresponding differences in the formula.

Real cost references from current projects c /kwh? 30 30 c /kwh 13 c$/kwh 10 20 c /kwh 20 c$/kwh 14 c /kwh 0 21 c$/kwh

The harmonization model for STE costs Discount factors Plant size Actual PPA for a given project at a certain location under specific support circumstances PPA or FiT duration PPA escalation rate Grants Concessional loans Harmonized PPA for a typical project at the same location WITHOUT PUBLIC SUPPORT Specific Financial conditions Loan duration DISCLAIMER: This attempt to provide reference prices must be considered approximated. There are many default values that might be not applicable to all projects as well as some country specific requirements.

Current cost references and the view of the Industry on future cost reductions Required value of a 25 years PPA for a 150 MW, 4 hours storage, without any public financial aids and no escalation Stars corresponds to normalized PPAs or FiTs at their respective locations in Spain, USA, India, Morocco, Israel and South Africa 2100 Hypothesis: 30 GW will be built at that time. Some breakthroughs might accelerate this trend. Source: ESTELA Position Paper

Efficiency Opportunities and value of different STE technologies Strong PV competition Compressed Air Rec. Tower Hybridization will enhance competitiveness Parab. trough Fresnel Steam Tower Parab. trough Fresnel Molten salt tower Parab. trough Molten salt tower Parab. trough Integrated Solar Field Peak Power (No storage) Dispatchable (Medium size storage) Base Load (Large storage)

My personal views on the trends The greatest push for STE will come from developing countries. Dispatchability and local content will be the main drivers for STE deployment Interconnections in big regions (i.e. Europe) will allow for a large RE penetration and optimum combination among RE technologies. STE will play a great role Decisions on new STE plants will still consider linear systems (PT & F) and molten salt towers in the medium term. In the future the tower could be the winning concept due to higher efficiency and storage matters Nevertheless parabolic troughs could be preferred for lower latitudes - where the M curve is not too strong and night temperatures are mild - due to scale advantages Fresnel could be preferred for direct steam generation to integrate solar fields in fossil fired thermal plants Optimum working fluid temperature is related to the concentration factor. This principle along with feasibility issues bring doubts in increasing the fluid temperature in linear concentrating systems Clever hybrid systems than just heating the working fluid must be implemented to increase STE competitiveness

Thank you for your attention lcr@estelasolar.eu www.estelasolar.eu www.protermosolar.com

Convincing materials for Policy Makers (Not for this audience but to share with this audience) As you can see STE is the right choice

The tool for policy makers Making the business case for my country Cost/kWh STE Plant Gap1 Year 1 Year n Conventional Plant Years The basic questions: How much will a support program cost? How much can the economy of my country benefit from it? Power Energy Cost Returns of all kind Diference Year -2 0 0 0 R1 Positive Year -1 0 0 0 R2 Increasing Year 1 Gap 1 P 1 E 1 G1xE1 R3 Increasing Year 2 Gap 2 P 2 E 2 G1xE1 + G2xE2 R4 Increasing Year 3 Gap 3 P 3 E 3 G1xE1 + G2xE2 + G3xE3 R5 Increasing Increasing Year n 0 Pn En G1xE1 + G2xE2 + G3xE3 + Gn-1xEn-1 Rn Increasing Year n+1 0 En+1 idem Rn+1 Increasing Increasing Year 25 0 P25 E25 G2xE2 +. R25 Golden End starts

ESTELA is proud to offer assessment to Policy Makers in order to build up their specific country cases M 2 3 4 1 Years

ESTELA is proud to offer assessment to Policy Makers in order to build up their specific country cases 1. Start up phase First positive impacts of the construction of the first plants and no payments 2. End of the promotion program Until this point the returns will be continuously growing based on the construction plus the electricity generation effects while the increase of the supports for new plants will be lower At this point commercial plants can be deployed without Further supports and the country will be prepared to get the maximum return 3. Mature phase Two years after the stop of the promotion program -when the breakeven with the conventional energy is reached- the contribution of the construction will finish but the corresponding one to the generation will be continuously increasing while the supporting cost will remain constant 4. Golden end After the PPA period the supports will fall down to cero in few years while the benefits from the generated electricity will be continuously growing

Solar Thermal Electricity: The great opportunity for sunbelt countries Net importers: reduction of imports / energy independency / potential exports Net exporters: Adding value to their resources / Additional exports / preparing for the future A usual opinion of Policy Makers: As STE will be cost competitive in some years it is advisable to wait But this is a big mistake because: 1. There is much more to gain than to loose for the country s economy in the first years (and beyond) 2. If the program is launched today the country will be prepared to provide a high percentage of local content when the technology become competitive

Solar Thermal Electricity: The great opportunity for sunbelt countries Countries are loosing money every single day as long as they do not launch a specific STE support program Programs must be straight forward and clear Rules should facilitate both investors and industry commitments

The reasons for a brilliant STE future 1. Technical STE is the only dispatchable and grid-friendly renewable technology with potential enough to meet the electricity needs worldwide in order to achieve a carbon free generation system A wise mix with other R.E. technologies will be the right choice 2. Local Economic Development Local content of STE plants -and corresponding contribution to the GDP- will be one of the main drivers behind the supporting policies in many countries of the sun belt 3. Affordable cost and positive macroeconomic impact The cost of STE plants will show important reductions when approaching from the current 4 GW installed to the similar values of Wind (330 GW) and PV (120 GW)