RATE ANALYSIS FOR SUNIL EARTH WORKS

Similar documents
PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE

CHAPTER NO. 27 QUANTITIES OF MATERIALS

BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP"

- From the Makers of India s Finest Designer Homes

Tender schedule. Rate in

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

LAYING BLOCK AND BRICK

BILL OF QUANTITIES FOR CIVIL WORKS FOR 8MW POWER PLANT

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

TYPICAL ESTIMATE OF A RAINWATER COLLECTION UNIT (110 mm / 150 mm dia PVC Pipelines)

Chapter. Restoration of Damaged Structures

BOQ for Plumbing, Sanitary Works

If stepping is required, step at 180mm as seen in this picture.

HOUSE BUILDING DIGEST

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY

STEP-BY-STEP. construction guide. Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet.

ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Schedule of Quantities

SUMMARY (PLUMBING WORKS)

PROPOSAL FOR THE CONSTRUCTION OF LOW COST HOUSE AT IBRAHIM HYDERY, KARACHI

SCHEDULE OF PRICES CIVIL WORK (PART-A)

Saint Gobain Gyproc India Ltd. (Formerly India Gypsum Ltd.)

RESIDENTIAL MASONRY A BEST PRACTICES GUIDE

SECTION STORM DRAIN SYSTEM

Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI

Revised Specifications & Scale of Amenities for General Pool Residential Accommodation (Type I to VI) Revised Amenities.doc

CONSTRUCTION SUMMARY OF THE PEREIRA HOUSE AT MADOL, VERNA GOA.

By K M Chanda, HUDCO

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

How to build a Pizza Oven in 4 days

STATE BANK OF INDIA.

CONSTRUCTION MATERIAL

QS 004 DEPARTMENT OF PUBLIC WORKS REPUBLIC OF SOUTH AFRICA BUILDING COST DATABASE

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

LEGACY REPORT. (800) (562) A Subsidiary of the International Code Council. *Corrected March 2014

Building Condition Assessment: West Lexington Street Baltimore, Maryland

GENERAL SPECIFICATION FOR CIVIL ENGINEERING WORKS SECTION 13 WORK FOR ELECTRICAL AND MECHANICAL INSTALLATIONS

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

The minimum reinforcement for the stem wall is the placement of:

Exploring Ferrocement

STANDARD INSPECTION & TEST PLAN (ITP) FOR CIVIL WORKS :

Mineral waterproof coating PCI Dichtschlämme

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

DISASTER RESISTANCE EARTHQUAKES AND STRUCTURES

C31 Property Damage Appraisal

Sports Buildings: budget costs for the Flood Relief Fund

Always. Reliable. Tight. Wall sleeves Versatile solutions for building entries. cablepipebuildingentry+

AIR RELEASE, CLEANOUT, AND SEWER MANHOLES

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete

Wecryl Waterproofing System under surfacing supplied by others

BUDGETARY COST ESTIMATE OF INTERIOR WORK OF LOWER PAREL BRANCH FOR CENTRAL BANK OF INDIA

DENVER MODEL 30 X 30 SPECIFICATIONS

RENOVATION AND RESTORATION OF OLD BUILDINGS IN SRI LANKA

Free-Form Concrete Pool

Hanson Building Products. precast basement solutions

Technical Advice Note

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP)

0331 Brick and block construction

Puddle Flange. FRANK Puddle Flange

GRC Porticos. Lightweight entrance porticos ABBEY ARTSTONE

BILL OF QUANTITIES Part No.: Part Description

CHAPTER 2 QUANTITY TAKE-OFF

Schlüter -KERDI-BOARD Substrate, structural panel, bonded waterproofing

RESTORATION + DECORATION OF BALCONIES AND TERRACES. Decorative, Easy to Maintain and Slip-Resistant Surfaces

GUIDELINES FOR REHABILITATION OF TRADITIONAL COMMERCIAL BUILDINGS DESIGN GUIDELINES

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

Construction. Pre-Bagged Structural Waterproofing System. Product Description. Product Data. Tests. Form

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

SCOPE OF WORK VAN BUREN WATERPROOFING AND PAINTING MAY 2011 US DEPARTMENT OF STATE ATHENS BY NP

Guide to working on Public Sewers

CONSTRUCTION OF PERIMETER FENCE - COMMERCIAL AND T&D OFFICE COMPOUND, ONVERWAGT

Cost Guide MARKET SUMMARY OVERVIEW REPAIRS AND MAINTENANCE ELECTRICAL ROOFING & ROOF DRAINAGE (UP TO TWO STOREYS; FIXED TO EXISTING ROOF FRAME)

International Greenhouse Company

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

BOQ SPECIFICATIONS. The Blind system consist of a coated aluminium tube of 38 mm diameter with provision of fabric clamping.

Cement Plaster.

Technical Notes 3B - Brick Masonry Section Properties May 1993

Estimating Database Checklist

12.1 Schlüter -KERDI-BOARD

Chapter 3 Pre-Installation, Foundations and Piers

PROJECT COST ESTIMATES & FEASIBILITIES

Cascade Remodeling Inc. PO Box Portland, OR Catalyzing Euphoria Phone (503) , FAX (503) CCB # 67007

Timber Decks. Technical Note. March 2007

Foundation Code compliance and Best Practices By Michael Coello

Painting, Estimating. Hourly Rate Guide

Squash Court Design general points

Repair and Remodeling Estimating Methods. 4th Edition. RSMeans

COMMONLY USED RESIDENTIAL BUILDING CODES

SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

PROJECT PROFILE ON CEMENT CONCRETE HOLLOW BLOCKS

Superform Products Ltd.

TECHNICAL SPECIFICATIONS CONCRETE SIDEWALKS, DRIVEWAYS AND CURB AND GUTTER

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

KANTI BIJLEE UTPADAN NIGAM LIMITED (KBUNL) SCHEDULE (BILL) OF QUANTITIES (Percentage Rate Contract)

Chapter. Earthquake Damage: Types, Process, Categories

SECTION 7: C - STRUCTURAL ENGINEERS SPECIFICATIONS

Transcription:

RATE ANALYSIS FOR SUNIL Date : 2/3/2004 Description / Work EARTH WORKS 1 Earth work excavation for foundation trenches in all classes of soil and depositing on bank with initial lead upto 50 mt. and lift upto 1.5 m including breaking clods, watering ramming and sectioning of spoil bank etc. complete. GROUND FLOOR 55.76 Cu.M. Total 85.00 4,739.60 85.00 4,739.60 4,739.60 2 Filling the plinth and side of the foundation with the earth brought from outside the site including breaking clodes,levelling,watering,ramming etc. complete as instructed by the site engineers. Measurements will be taken only the filledand compacted earth. GROUND FLOOR 44.53 Cu.M. EARTH 1.00 m3 100.00 100.00 44.53 4,453.00 100.00 4,453.00 Total 140.00 6,234.20 PCC 40.00 1,781.20 6,234.20 10,973.80 3 Providing and laying P.C.C. 1:4:8 using 40mm nominal size broken stone well consolidated including curing etc. complete for foundation. GROUND FLOOR 4.14 Cu.M. CEMENT 171.00 Kg 3.60 615.60 707.94 2,548.58 SAND 0.48 m3 600.00 288.00 1.99 1,192.32 STONE BALLAST 40 MM 0.95 m3 640.00 608.00 3.93 2,517.12 1,511.60 6,258.02 450.00 1,863.00 Total 1,962.00 8,122.68 1 of 8

/ Work 8,122.68 4 Providing and laying P.C.C. 1:4:8 using 40mm nominal size broken stone well consolidated 100mm thick including ramming, curing etc. complete for flooring. GROUND FLOOR 17.60 Cu.M. CEMENT 171.00 Kg 3.60 615.60 3,009.60 10,834.56 SAND 0.48 m3 600.00 288.00 8.45 5,068.80 STONE BALLAST 20 MM 0.95 m3 620.00 589.00 16.72 10,366.40 1,492.60 26,269.76 450.00 7,920.00 Total 1,943.00 34,196.80 RUBBLE MASONRY 34,196.80 42,319.48 5 Dry random rubble masonry for foundation using approved quality rubble, at all heights with necessary binding stones etc. in line and levels instructed by the site engineer including the scaffolding charge etc. complete.. GROUND FLOOR 44.60 Cu.M. STONE 1.05 m3 300.00 315.00 46.83 14,049.00 315.00 14,049.00 200.00 8,920.00 Total 515.00 22,969.00 22,969.00 6 Random rubble masonry in C.M 1:6 for basement using approved quality rubble, at all heights with necessary binding stones etc. in line and levels instructed nby the site engineer including the scaffolding charge etc. complete. GROUND FLOOR 13.93 Cu.M. CEMENT 72.00 Kg 3.60 259.20 1,002.96 3,610.66 SAND 0.30 m3 600.00 180.00 4.18 2,507.40 STONE 1.05 m3 300.00 315.00 14.63 4,387.95 754.20 10,506.01 300.00 4,179.00 Total 1,054.00 14,682.22 14,682.22 2 of 8

/ Work 37,651.22 Reinforced cement concrete using 20mm machine crushed blue metal including all form work, watering, curing etc. complete, but excluding the cost of reinforcement. Steel staging and supports along with shutter ply or steel plates to be used and machine mixing and mechanical vibration to be done to the satisfaction of the site engineer.the rate includes application of double stage form work and the application of approved brand of mould releasing agents. 7 RCC for Lintels using M15. RCC GROUND FLOOR 1.42 Cu.M. CEMENT 330.00 Kg 3.60 1,188.00 468.60 1,686.96 SAND 0.45 m3 600.00 270.00 0.64 383.40 STONE BALLAST 20 MM 0.90 m3 620.00 558.00 1.28 792.36 2,016.00 2,862.72 1,800.00 2,556.00 Total 3,816.00 5,418.72 8 RCC for Sun Shades using M15. 5,418.72 GROUND FLOOR 2.43 Cu.M. CEMENT 330.00 Kg 3.60 1,188.00 801.90 2,886.84 SAND 0.45 m3 600.00 270.00 1.09 656.10 STONE BALLAST 20 MM 0.90 m3 620.00 558.00 2.19 1,355.94 2,016.00 4,898.88 1,100.00 2,673.00 Total 3,116.00 7,571.88 9 RCC for Roof Slabs using M15. 7,571.88 GROUND FLOOR 16.21 Cu.M. CEMENT 330.00 Kg 3.60 1,188.00 5,349.30 19,257.48 SAND 0.45 m3 600.00 270.00 7.29 4,376.70 STONE BALLAST 20 MM 0.90 m3 620.00 558.00 14.59 9,045.18 2,016.00 32,679.36 1,100.00 17,831.00 Total 3,116.00 50,510.36 10 RCC for Columns using M20. 50,510.36 GROUND FLOOR 0.55 Cu.M. CEMENT 432.00 Kg 3.60 1,555.20 237.60 855.36 SAND 0.45 m3 600.00 270.00 0.25 148.50 STONE BALLAST 20 MM 0.90 m3 620.00 558.00 0.50 306.90 3 of 8

/ Work 2,383.20 1,310.76 2,100.00 1,155.00 Total 4,483.00 2,465.65 11 RCC for Columns Round using M20. 2,465.65 GROUND FLOOR 0.85 Cu.M. CEMENT 432.00 Kg 3.60 1,555.20 367.20 1,321.92 SAND 0.45 m3 600.00 270.00 0.38 229.50 STONE BALLAST 20 MM 0.90 m3 620.00 558.00 0.77 474.30 2,383.20 2,025.72 3,000.00 2,550.00 Total 5,383.00 4,575.55 STEEL REQUIREMENTS 4,575.55 70,542.16 Supplying, cutting, bending and straightening reinforcement for R.C.C work; binding with 22 gauge binding wire etc. complete in all respects with deformed bars conforming to I.S 1786-1961 or IS 1139 and placing in position.weight of steel=7850 Kg/m3. 12 Steel Requirements for Columns, Beams, Lintels, Slabs etc. GROUND FLOOR 1,812.09 Kg STEEL 1.05 Kg 20.00 21.00 1,902.69 38,053.89 BLACK IRON WIRE 0.01 Kg 15.00 0.15 18.12 271.81 21.15 38,325.70 Total 25.00 45,302.25 BRICK WORKS 4.00 7,248.36 45,302.25 45,302.25 13 First class brick work masonry in C. M. 1:6 (1 cement 6 coarse sand) with approved good quality country burnt bricks of compressive strength 35 kg/m2 of standard size of on super structure of all thickness. The rate shall include cost of all materials labour and other incidental charges of all materials to complete the work. GROUND FLOOR 48.86 Cu.M. CEMENT 58.00 Kg 3.60 208.80 2,833.88 10,201.97 SAND 0.24 m3 600.00 144.00 11.73 7,035.84 4 of 8

/ Work BRICK 500.00 Nos 2.00 1,000.00 24,430.00 48,860.00 1,352.80 66,097.81 300.00 14,658.00 Total 1,653.00 80,765.58 FLOOR AND WALL FINISHES 80,765.58 80,765.58 14 Flooring with cermic tiles 225x225mm (NS) laid in 12mm thick cement 1:3 one coat and pointing with coloured coment to mortar the tiles including cost of materials labour charge etc. complete for all levels. GROUND FLOOR 9.12 Sq.M. CEMENT 8.80 Kg 3.60 31.68 80.26 288.92 PIGMENT 0.31 Kg 55.00 17.05 2.83 155.50 CERAMIC TILES 1.05 m2 400.00 420.00 9.58 3,830.40 468.73 4,274.82 Total 534.00 4,870.08 DOORS AND WINDOWS 65.00 592.80 4,870.08 4,870.08 15 Supplying and fixing of doors and windows frames using good quality wood including M.S. clamps and fittings,fixing complete including a coat of tar at the contact surface of the frame. GROUND FLOOR 1.11 Cu.M. WOOD 1.05 m3 20,000.00 21,000.00 1.17 23,310.00 21,000.00 23,310.00 2,200.00 2,442.00 Total 23,200.00 25,752.00 25,752.00 16 Supplying and fixing of shutters of good quality panelled wood. GROUND FLOOR 11.28 Sq.M. WOOD 0.05 m3 20,000.00 1,000.00 0.56 11,280.00 1,000.00 11,280.00 820.00 9,249.60 5 of 8

/ Work Total 1,820.00 20,529.60 20,529.60 17 Supplying and fixing of fully glazed shutters of good quality wood. GROUND FLOOR 28.87 Sq.M. GLASS 3 MM 1.00 m2 120.00 120.00 28.87 3,464.40 WOOD 0.02 m3 20,000.00 400.00 0.58 11,548.00 520.00 15,012.40 820.00 23,673.40 Total 1,340.00 38,685.80 PLASTERING AND POINTING 38,685.80 84,967.40 18 Plastering witth cement mortar to walls, columns and other structural architectural features at all heights, floated hard and trowelled get smooth finish. The rate shall include provision of grooves scaffolding at any height curing etc. complete as directed by the Engineer. GROUND FLOOR 584.02 Sq.M. CEMENT 4.30 Kg 3.60 15.48 2,511.29 9,040.63 SAND 0.02 m3 600.00 12.00 11.68 7,008.24 27.48 16,048.87 Total 57.00 33,289.14 30.00 17,520.60 33,289.14 19 Plastering witth cement mortar to ceilings, stairs, steps, slabs and other structural architectural features at all heights, floated hard and trowelled get smooth finish. The rate shall include provision of grooves scaffolding at any height curing etc. complete as directed by the Engineer. GROUND FLOOR 279.58 Sq.M. CEMENT 3.60 Kg 3.60 12.96 1,006.49 3,623.36 SAND 0.01 m3 600.00 6.00 2.80 1,677.48 18.96 5,300.84 Total 59.00 16,495.22 40.00 11,183.20 16,495.22 6 of 8

/ Work 20 Plastering with C.M. 1:4, 12mm thick with a neat flushing coat of cement slurry 2.20kg/m2 over water proofed roof slab by adding integral water proofing admoretere of approved brand as per specification including etc. complete. GROUND FLOOR 162.08 Sq.M. CEMENT 5.40 Kg 3.60 19.44 875.23 3,150.84 SAND 0.02 m3 600.00 12.00 3.24 1,944.96 31.44 5,095.80 Total 56.00 9,076.48 PAINTING 25.00 4,052.00 9,076.48 58,860.84 21 Providing and applying two coats of approved brand and shade water proof cement paint over a coat of cement primer to give an ever shade on plastered surfase thereof includes watering and cleaning surface etc. complete as per the instruction of the site engineer. GROUND FLOOR 584.02 Sq.M. CEMENT PAINT 0.50 Kg 22.00 11.00 292.01 6,424.22 11.00 6,424.22 Total 29.00 16,936.58 18.00 10,512.36 16,936.58 22 Providing and applying two coats of approved brand and shade water proof cement paint over a coat of cement primer to give an ever shade on plastered surfase thereof includes watering and cleaning surface etc. GROUND FLOOR 279.58 Sq.M. CEMENT PAINT 0.50 Kg 22.00 11.00 139.79 3,075.38 11.00 3,075.38 Total 29.00 8,107.82 23 Providing and applying two coats of approved brand and shade water proof cement paint over a coat of cement primer to give an ever shade on plastered surfase thereof includes watering and 18.00 5,032.44 8,107.82 7 of 8

/ Work cleaning surface etc. complete as per the instruction of the site engineer. GROUND FLOOR 162.08 Sq.M. CEMENT PAINT 0.50 Kg 22.00 11.00 81.04 1,782.88 11.00 1,782.88 18.00 2,917.44 Total 29.00 4,700.32 4,700.32 29,744.72 465,997.53 8 of 8