1 Foundation Code compliance and Best Practices By Michael Coello
2 Background Graduated cum laude in 1992 with a Bachelor of Science degree in finance from University of Wisconsin - Parkside Started poured concrete foundation division at Coello & Associates, Inc. in 1993 Member of MBA arbitration commitee since 1997 and co-chairman of UDC commitee from 2005 to Certified Concrete technician of the American Concrete Institute. Appointed to the Wisconsin Uniform Dwelling code council for one and two family dwellings in November of Help maintain the MBA Masonry and Concrete standard.
3 Overview Code compliance consists of the Uniform Dwelling code and by adopting standards also includes ACI 318 and 530. Three primary functions of a full depth residential foundation. Soils Concrete and Steel
4 American Concrete Institute Instruction manual for concrete and masonry. ACI 318 (Engineering guidelines and minimum requirements for concrete) ACI 530 (Engineering guidelines and minimum requirements for masonry) ACI 332 (Guidelines for residential construction)
5 Three jobs of full depth residential foundations Support the live and dead loads from above. Resist backfill soil pressures. Keep water out.
6 Point loads and lintels
7 Soil loads
8 Types of soil and weight Granular soils deposited by the Glaciers. Typically a stone sand mix. Weighs from 30 to 60 pcf depending on the clay content. As you get to Madison it is 100% sand. Will provide very high bearing capacities with great draining characteristics. Compressive or expansive soils that are prevalent within the Great Lakes water shed basin. Mostly clay and when wet will weigh up to 120 pcf. When in contact with moisture it becomes a very unstable soil with very low bearing capacity and usually does not drain well. Noncompacted Fill or organic soils. No bearing capacity and when wet is extremely heavy and drains very poorly.
9 Soil type tables
10 Cohesive Soils Vs Granular Soils
11 Fill soils
12 Too heavy for the wall design A competitor s wall in New Berlin. Very heavy wet clay blew in wall.
13 Prescriptive design Tables from ACI
14 Keeping the foundation dry is in the details! Need to control the surface water. Grade should be down from the top of the foundation wall no less than 8 inches. Proper pitch away from home should be ¼ for ten feet or 2% minimum. Drainage plain details looked after at the interface between the foundation and the rim joist/ skirt. Water table height of all bodies of water need to factored in. Retention pond outlets and spill ways need to be factored into footing height. No less than 18 above water table. Topographical features of the lot must be factored into the foundation design. In a lot of municipalities no thought is put into where the water will go especially on large lots. Proper foundation drainage system. One of the issues of older foundations is that the drain tile system plugs or has improper pitch to the sump system. Even if you have a great drainage system it may plug with silt. Poured concrete walls only leak through ties, cracks or honey comb.
15 Ties
16 Critical factors with foundation systems as it pertains to moisture intrusion Exterior and interior drainage system. Standard 3 drain tile and form-a-drain systems. Temperature steel Good consolidation techniques Low water to cement ratio with a dense concrete mix design to reduce shrinkage
17 Perforated drain tile Positives are that it is inexpensive, can conform to most any shape, and is readily accessible at most hardware stores and supply houses. Negative is that it is not all installed at one time making it easily corruptible and it is hard to keep at a set height. Therefore valleys can become an issue and cause a negative pitch from the sump area.
18 FORM-A-DRAIN System for enhanced performance Patented 3-in-1 foundation solution forms footings, provides integrated drainage, & can be easily adapted to vent radon if needed
19 Standard layout. Code change now requires 15 feet between crossovers.
20 Can Easily Adjust For Drainage And Cannot Be Corrupted
21 How to deal with silty soils.
22 Soils may be fine at the time of the footing but unforeseen circumstances may affect the system later.
23 Proper consolidation during the pour will reduce a significant amount of call backs. Right mix poured at the right slump when compacted properly will yield a very dense, strong, water impervious structure. If crews are pouring with little or no effort the mix may be too viscous unless proper admixtures were added. Vibrators and puddling must be utilized to compact all elements of the concrete.
24 Improper consolidation
25 Control Joints with Waterstop For Water Tightness! Forms create a V in the wall to control where cracking occurs Metal Waterstop is placed in wall at the control joint to prevent water from entering the basement
26 Temperature steel vs. Structural steel
27 Basement wall not design as retaining wall. Sill plate connection restrains the top of the foundation wall. Size and spacing of anchors need to be determined based on unbalanced fill height ACQ lumber treating requires double dipped galvanized or zinc plated fasteners
28 Jump steel reinforcement
29 Window steel reinforcement
30 Different types of deformed steel Grade 60 steel is required in all structural reinforcing applications.
31 Durable concrete Key concrete terms are slump and strength tests
32 One extra gallon of water per yard will: Will increase the slump approx. 1 Cut the compressive strength by as much as 200 psi Waste ¼ bag of cement Increase shrinkage potential 10% Decrease freeze/thaw resistance by 20% Decrease resistance to deicing attack There are several other ways to get work ability / flow ability without adding water.
33 Minimum for strength and slumps
34 Big Or Small Basements Are More Apt To Be Finished Than Ever Before This makes the need for a dry and comfortable basement greater than ever!
RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS
RESIDENTIAL FOUNDATION GUIDELINE Johnson County, KS Johnson County Building Officials Association January 2008 Residential Foundation Guideline Foundation designs for one-and two-family dwellings may use
More informationFoundation Experts, LLC Specializes in Foundation Repair and Waterproofing
1 Most basements show some signs of leaking and cracking. Through the years, problems with water, poor soils, grading, drainage and possible settling affect the integrity of a basement. Being able to recognize
More informationDesigned and Engineered to Perform
History EARTH CONTACT PRODUCTS, L.L.C., is a family owned company, based in Olathe, Kansas. This company was built upon Don May s U.S. Patented fourth-generation Steel Piering System that has led to the
More informationBasement Moisture Problems
Foundations Foundation Purpose The purpose of a foundation is to distribute the weight of a structure securely into the ground. Engineering data regarding soil, rock and water conditions are used to design
More informationSECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)
SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701) 55-1 GENERAL The Contractor shall perform all work required by the plans for construction of pipe for storm drains, precast polymer trench drains
More informationResidential Foundations and Basements
Residential Foundations and Basements Disclaimer All of the following information is based on the 2006 International Residential Code with Kentucky Amendments. As some information is paraphrased, article
More informationFoundation Water Problems. An Overview and Discussion of some Causes and Cures for Water Infiltration into Basements and Foundation Structures
Foundation Water Problems An Overview and Discussion of some Causes and Cures for Water Infiltration into Basements and Foundation Structures This presentation was prepared and presented by Dwight Walker
More informationA Guide to Detached Residential Garages and Residential Workshops (based on 2006 BCBC)
A Guide to Detached Residential Garages and Residential Workshops (based on 2006 BCBC) Note: this general guide has been prepared to assist homeowners and is not to be considered as a substitute for RDOS
More informationNCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)
NCMA TEK National Concrete Masonry Association an information series from the national authority on concrete masonry technology CONCRETE MASONRY FOUNDATION WALL DETAILS TEK 5-3A Details (2003) Keywords:
More informationRESIDENTIAL MASONRY A BEST PRACTICES GUIDE
RESIDENTIAL MASONRY A BEST PRACTICES GUIDE Build With Brick Build With Boral CONTENTS BRICK :01 MASONRY CEMENT :03 MASONRY SAND :04 WALL TIES :05 STEEL LINTELS :07 DRAINAGE WALL SYSTEM :09 FLASHING :11
More informationLAYING BLOCK AND BRICK
LAYING BLOCK AND BRICK Products highlighted in this section: SAKRETE Type N Mortar Mix SAKRETE Type S Mortar Mix Brick And Block Laying Basics The first step in building a brick or block wall is to construct
More informationWhat you need to know about concrete block basement construction.
Designing and planning your new residence is a vitally important process, which will have a great influence on the future enjoyment of your home. A successful process will ensure all areas of the home
More informationMetropolitan Builders Association Masonry & Concrete Standard
Metropolitan Builders Association Masonry & Concrete Standard Background Masonry and concrete work in residential construction often provides the base structure upon which the house is built or as a veneer.
More informationCOMMONLY USED RESIDENTIAL BUILDING CODES
COMMONLY USED RESIDENTIAL BUILDING CODES INTERNATIONAL RESIDENTIAL CODE (2009) form revised 5/10 FOUNDATION 1. DESIGN OF FORMWORK. Section 1906.1 IBC 2009, Section R404.1.2.3.6 IRC 2009, ACI 318 Section
More informationBEST MANAGEMENT STANDARDS FOR FOUNDATION REPAIR MARCH 2003 REVISED JUNE 13, 2012
BEST MANAGEMENT STANDARDS FOR FOUNDATION REPAIR MARCH 2003 REVISED JUNE 13, 2012 Prepared in cooperation with the Building Inspectors Association of Southeastern Wisconsin www.biasew.net 1 BEST MANAGEMENT
More informationBest Basement Water Management Practices
Best Basement Water Management Practices Guide written by Patrick Sluss Sluss Construction (330) 224 5394 When a home owner is faced with a leaking basement there is a way to correct the problem and a
More informationChapter 3 Pre-Installation, Foundations and Piers
Chapter 3 Pre-Installation, Foundations and Piers 3-1 Pre-Installation Establishes the minimum requirements for the siting, design, materials, access, and installation of manufactured dwellings, accessory
More informationWhat Causes Foundation Leaking?
A home's foundation has the odds stacked against it from the day it's built. When a home is excavated to make room for the foundation walls, space is left between the outer edge of the foundation wall
More information6 RETROFITTING POST & PIER HOUSES
Retrofitting Post & Pier Houses 71 6 RETROFITTING POST & PIER HOUSES by James E. Russell, P.E. 72 Retrofitting Post & Pier Houses Retrofitting Post & Pier Houses 73 RETROFITTING POST AND PIER HOUSES This
More informationWET/DAMP BASEMENTS ANSWER: BASEMENT WALLS AND FLOORS CAN BECOME WET BY A LEAK, CAPILLARY SUCTION OR CONDENSATION.
WET/DAMP BASEMENTS PROBLEM. IS THIS BASEMENT LEAKING OR COULD WE HAVE ANOTHER PROBLEM? Water line arching up on wall in corners of basement. Water collecting on concrete floor starting in corners. ANSWER:
More informationThe minimum reinforcement for the stem wall is the placement of:
PolySteel creates an ideal insulated stem wall for concrete slabs that can make this part of your project easier and faster, in addition to making your finished project more energy-efficient. Figures 3.20
More informationSpecification Guidelines: Allan Block Modular Retaining Wall Systems
Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's
More informationSTATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA.
STATE OF OHIO DEPARTMENT OF TRANSPORTATION SUPPLEMENTAL SPECIFICATION 888 PORTLAND CEMENT CONCRETE PAVEMENT USING QC/QA October 21, 2011 888.01 General 888.02 Materials 888.03 Concrete Proportioning 888.04
More informationSuffolk County Department of Health Services. Division of Environmental Quality
Suffolk County Department of Health Services Division of Environmental Quality Guidelines For the Construction of Storage Areas for Portable Containers ~~~~ Clare B. Bradley, M.D., M.P.H. Suffolk County
More informationInvestigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps
Foundations on Expansive Clay Soil Part 3 - Investigation of Failed Foundations Presented by: Eric Green, P.E. Structural Engineer Slide 1 Copyright Eric Green 2005 Investigation of Foundation Failure
More informationSPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised 11/5/13)
Page 1 of 7 STONE STRONG SYSTEMS SPECIFICATIONS FOR PRECAST MODULAR BLOCK RETAINING WALL SYSTEM (revised ) PART 1: GENERAL 1.01 Description A. Work includes furnishing and installing precast modular blocks
More informationThe better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs
The better way to build TM Installation Manual FOUNDATION SIPs & FROST WALLS SIPs February 2016 PWF FOUNDATION & FROST WALL SIPs Installation Manual Table of Contents Topics General Requirements...................................
More informationCeramic Glazed Brick Exterior Walls
TECHNICAL NOTES on Brick Construction 13 1850 Centennial Park Drive, Reston, Virginia 20191 www.gobrick.com 703-620-0010 Ceramic Glazed Brick Exterior Walls Abstract: Buildings and other structures employ
More informationEngineered Wood Foundations
Engineered Wood Foundations Emeraldfoundations.com 1 EWF Planning and Installation manual This manual will serve as a guide to planning and installing an Emerald Foundation system. This system is comprised
More information1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona
for Earthen Material and Straw Bale Structures SECTION 70 - GENERAL "APPENDIX CHAPTER 7 - EARTHEN MATERIAL STRUCTURES 70. Purpose. The purpose of this chapter is to establish minimum standards of safety
More information4. ANCHOR BOLTS AND STRAPS a. ½" anchor bolts shall be embedded 7" into concrete a maximum of 6' on center and 12" from corners and ends of plates.
GENERAL CODE REQUIREMENTS (BASEMENTS) 1. FOOTINGS a. Footings shall be below frost line depth (42"). b. For an 8" foundation wall, footings shall be no less than 8" deep and 16" wide. c. Steel reinforcement
More informationRenovating Your Basement
building science.com 2006 Building Science Press All rights of reproduction in any form reserved. Renovating Your Building America Report - 0309 2003 (revised 2007) Building Science Corporation Abstract:
More informationInstallation PowerPoint for Grasscrete Formers
Installation PowerPoint for Grasscrete Formers 1 This document describes the two single-use tools utilized to create the Grasscrete product. The original Former is a vacuum formed light gauge plastic mold
More informationSANITARY SEWER SPECIFICATIONS
SANITARY SEWER SPECIFICATIONS OCTOBER 2003 HARVEST-MONROVIA WATER, SEWER, AND FIRE PROTECTION AUTHORITY SECTION 1.00 1.10 Purpose The purpose of this document is to assemble the sewer specifications, policies,
More informationSTEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION SOURCES OF MOISTURE IN NEW CONSTRUCTION. Natural ground slope
FOUNDATIONS STEPS TO CONSTRUCTING A MOISTURE-RESISTANT FOUNDATION Build a Better Home Details are critical when constructing a sound building foundation that will withstand water and control dampness.
More informationWisconsin Building Products Evaluation
Safety & Buildings Division 201 West Washington Avenue P.O. Box 2658 Madison, WI 53701-2658 Evaluation # 200813-O Wisconsin Building Products Evaluation Material Best Management Standards for Foundation
More informationGOOD NEWS BUT NOT ALWAYS
GOOD NEWS BUT NOT ALWAYS The prospective homebuyer and homeowner in the Amarillo area are indeed fortunate. Typically, he has a wide choice of type home, size, and location for wide ranges of pricing.
More informationIssue of the Guidelines on Prevention of Water Seepage in New Buildings
graphic: Buildings Department Your REF 來 函 檔 號 :. OUR REF 本 處 檔 號 :.BD GR/1-55/173 FAX 圖 文 傳 真 :..28400451 TEL 電 話 :..2626 1717 www.info.gov.hk/bd To : All Authorized Persons 7 March 2005 Registered Structural
More informationPOST AND FRAME STRUCTURES (Pole Barns)
POST AND FRAME STRUCTURES (Pole Barns) Post and frame structures. The following requirements serve as minimum standards for post and frame structures within all of the following structural limitations:
More informationThe Ultimate Guide To Protecting Your House From Water In The Basement
The Ultimate Guide To Protecting Your House From Water In The Basement Table of Contents 3 Causes of Water in the Basement!... 3 Reason Number 1: Poor Grading!... 3 Reason Number 2: Improper Drainage!...
More informationFoundation Drainage. Gable Roof Runoff. Hip roof Runoff. By: Brent Anderson, P.E. Moisture Control Engineering Leader STRUCTURAL TECHNOLOGIES
Foundation Drainage By: Brent Anderson, P.E. Moisture Control Engineering Leader STRUCTURAL TECHNOLOGIES As a concrete contractor, I have a vested interest in how well the water on site is controlled.
More informationSTANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
More informationBEST MANAGEMENT STANDARDS FOR FOUNDATION REPAIR
BEST MANAGEMENT STANDARDS FOR FOUNDATION REPAIR MARCH 00 REVISED JANUARY 8, 008 Prepared in cooperation with the Building Inspectors Association of Southeastern Wisconsin www.biasew.org. /6/00 rev. 0/08/008
More informationFOUNDATIONS CHAPTER 4
CHAPTER 4 FOUNDATIONS SECTION R401 GENERAL R401.1 Application. The provisions of this chapter shall control the design and construction of the foundation and foundation spaces for all buildings. Wood foundations
More informationR E S I D E N T I A L H O U S I N G
HL 252 Rev. April 1997 R E S I D E N T I A L H O U S I N G CONTROLLING EXTERNALWATER PROBLEMS FOR RESIDENCES I II III IV V Lot Drainage Gutter Water Management Foundation Waterproofing Floor Slab Waterproofing
More informationChapter 3 FOUNDATIONS AND FOUNDATION WALLS
Chapter 3 FOUNDATIONS AND FOUNDATION WALLS This chapter discusses foundations and foundation walls constructed using the two most common foundation materials concrete and masonry. Although the IRC permits
More informationTABLE OF CONTENTS. Roof Decks 172 B, BA, BV Deck N, NA Deck. Form Decks 174.6 FD,.6 FDV Deck 1.0 FD, 1.0 FDV Deck 1.5 FD Deck 2.0 FD Deck 3.
Pages identified with the NMBS Logo as shown above, have been produced by NMBS to assist specifiers and consumers in the application of New Millennium Building Systems Deck products. Pages identified with
More informationPTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE
FORM A PTS HELICAL PIERS INSTALLATION SPECIFICATIONS NOTICE The following suggested specifications are written as a guide to assist the specifier in writing his own specifications. Specific circumstances
More informationFoundation. Foundation
Moisture Aside from structural concerns, the most important consideration for foundation design is moisture. No client wants a wet basement. No client wants a damp basement. No client wants mold in their
More informationEFFECTIVE FEBRUARY 2014. note: drainage permit required to call for a dampproof inspection
EFFECTIVE FEBRUARY 2014 note: drainage permit required to call for a dampproof inspection 1. ROOF DRAINS/DECK DRAINS (INTERIOR ) All roof and deck drains within the perimeter of the building shall be APPROVED
More informationCHAPTER 11 STORM DRAINAGE
CHAPTER STORM DRAINAGE SECTION PC 0 GENERAL 0. Scope. The provisions of this chapter shall govern the materials, design, construction and installation of storm drainage. Storm water discharge shall be
More informationVer. 2. Guide to. Inspecting Residential Brick Veneer
Ver. 2 Guide to Inspecting Residential Brick Veneer 1. A guide created by industry professionals. The knowledgeable staff at MASONPRO together with technical support from the Masonry Institute of Michigan
More informationSECTION 33 41 13 PUBLIC STORM UTILITY DRAINAGE PIPING
SECTION 33 41 13 PUBLIC STORM PART 1 - GENERAL 1.01 SECTION INCLUDES A. Storm drainage piping, fittings, and accessories at proposed station areas and locations other than under and immediately adjacent
More informationSEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER
Village of Shorewood, Wisconsin SEWER BACKUPS & BASEMENT FLOODING PREVENTATIVE SOLUTIONS FOR THE BUILDING OWNER Prepared By: Thomas A. Zoulek, P.E., LEED A.P. Vice President Mid City Plumbing & Heating
More informationIn many parts of the country, foundations and basement. Repair Options for Cracked CMU Foundations
Repair Options for Cracked CMU Foundations Photo Courtesy of RamJack In the last issue of this magazine, we addressed fixing failing poured wall foundations. Part II, printed below, offers solutions for
More informationProtecting Your Pools Crack Treatments
1 Protecting Your Pools Crack Treatments Scuba Pool Repair Inc. 800 Cristich Lane Campbell, CA 95008 Phone: 408-866-1945 Fax: 408-866-1931 Email: office@scubapoolrepair.com www.scubapoolrepair.com Scuba
More informationSite Grading and Drainage to Achieve High-Performance Basements
Construction Technology Update No. 69 Site Grading and Drainage to Achieve High-Performance Basements By M.C. Swinton and T.J. Kesik Proper site grading and foundation drainage strategies are required
More informationBaton Rouge Foundation Repair
Baton Rouge Foundation Repair 13822 Florida Blvd Bldg 3 Baton Rouge, LA 70819 Baton Rouge Foundation Repair offers services to correct the settlement of both Slab foundations and Pier & Beam foundations
More informationState of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
More informationCH. 2 LOADS ON BUILDINGS
CH. 2 LOADS ON BUILDINGS GRAVITY LOADS Dead loads Vertical loads due to weight of building and any permanent equipment Dead loads of structural elements cannot be readily determined b/c weight depends
More informationSECTION 02400 - STORM DRAIN SYSTEM
SECTION 02400 - STORM DRAIN SYSTEM CONTENTS: Part 1 - General... 1 1.01 Work Included... 1 1.02 Related Requirements... 1 1.03 Reference Standards... 1 1.04 Quality Assurance... 1 1.05 Measurement And
More informationWater Damage & Repair
Water Damage & Repair Chinatown Preservation Talks 2015 James Engler, P.A Glenn Mason, AIA Mason Architects Program Outline Terminology & Waterproofing Basics Discussion of why this is important Below
More informationSTRUCTURES. 1.1. Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.
STRUCTURES 1. General. Critical structures may impact the integrity of a flood control project in several manners such as the excavation for construction of the structure, the type of foundation, backfill
More informationThe Difference Between Cast Stone and Adhered Manufactured Stone Masonry Veneer
Submitted 9/16/08 For publication - Feb 2009 Masonry Construction Magazine by Bill Russell Chairman, Cast Stone Institute Committee on Educational Standards On many construction documents today, there
More informationOhio Board of Building Standards Building on the Code Education Series. Residential Code of Ohio Chapter 4 March 1, 2013. Presentation Handout
Ohio Board of Building Standards Building on the Code Education Series Residential Code of Ohio Chapter 4 March 1, 2013 Presentation Handout Ohio Board of Building Standards 6606 Tussing Road PO Box 4009
More informationsymptoms of a faulty foundation
symptoms of a faulty foundation How does drought impact your home's foundation? For many Texas families, their home becomes the single largest investment and also the family fortune. The home's foundation
More informationA perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.
BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. PurRoses 1. To prevent sloping soils from becoming
More informationMUNICODE SERVICES LTD.
The Preserved Wood Foundation Guide MUNICODE SERVICES LTD. Prepared by MuniCode Services Ltd. Outline and Restrictions of this Guide The following information required for the construction of Preserved
More informationProposed Minimum Subterranean Termite Treatment Standards
Proposed Minimum Subterranean Termite Treatment Standards Introduction This document is intended to serve as a model for states considering the adoption of standards for soil application of termiticides.
More informationThe Stabilizer TM. Benefits. www.griptite.com. Supplemental support system for sagging beams and floor joists within a crawl space
The Stabilizer TM Supplemental support system for sagging beams and floor joists within a crawl space Pre-drilled holes in steel plate allow for connection to beam or floor joists. Benefits Levels and
More informationMANUFACTURED HOME INSTALLATION FOR PERMANENT FOUNDATIONS (TRANSVERSE FLOORS) (SUPPLEMENT TO MANUFACTURED HOME INSTALLATION MANUAL)
MANUFACTURED HOME INSTALLATION FOR PERMANENT FOUNDATIONS (TRANSVERSE FLOORS) (SUPPLEMENT TO MANUFACTURED HOME INSTALLATION MANUAL) NOTE: THIS MANUAL IS INTENDED TO INSTRUCT AND TO ASSIST ALREADY QUALIFIED
More informationPage & Turnbull imagining change in historic environments through design, research, and technology
DCI+SDE STRUCTURAL EVALUATIONS OFFICE BUILDING, TOOL SHED & WATER TANK, AND BLACKSMITH & MACHINE SHOP BUILDINGS SAN FRANCISCO, CALIFORNIA [14290] PRIMARY PROJECT CONTACT: H. Ruth Todd, FAIA, AICP, LEED
More informationFoundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training
Foundations 65 5 FOUNDATIONS by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. 66 Foundations Foundations 67 FOUNDATIONS Let's assume that the retrofit has been done correctly from the roofline
More informationSUMP PUMP. City of Ann Arbor & C O L L E C T I O N S Y S T E M G L O S S A R Y
Foundation A foundation is the bottom part of a building. It s the element that anchors the building to the ground and transmits the building s gravity load directly to the earth. Water damage weakens
More informationPREVENTING GROUNDWATER POLLUTION: SECONDARY CONTAINMENT
PREVENTING GROUNDWATER POLLUTION: SECONDARY CONTAINMENT PREVENTING GROUNDWATER POLLUTION IS EVERYONE S JOB! Even if our drinking water comes from rivers, lakes, or reservoirs, we need to be mindful of
More informationBasements are Changing. Basements Part of the Enclosure. Basements. Energy Efficient, Durable, Healthy. Below grade enclosure
Basements are Changing John Straube, Ph.D., P.Eng Basements: New & Retrofit Energy Efficient, Durable, Healthy Increasingly used as living space Not a root /coal cellar anymore! High quality space expected
More informationSimplifying design and construction. Alan Tovey, Director The Basement Information Centre
Simplifying design and construction Alan Tovey, Director The Basement Information Centre Simplifying design and construction Grades of construction Construction options Design and waterproofing issues
More informationTITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09
TITLE: MASONRY PARAPET WALLS AND FLAT ROOF REQUIREMENTS 11/1/09 PMT GUIDE # 10 Book of Order Section G-10.0102o: "The session is responsible for the mission and government of the particular church. It
More informationIRC 2009 CODE REQUIREMENTS FOR CIP CONCRETE FOUNDATIONS SUPPORTING LIGHT FRAME CONSTRUCTION IN SEISMIC DESIGN CATEGORY B (WITH QUESTIONS AND ANSWERS)
IRC 2009 CODE REQUIREMENTS FOR CIP CONCRETE FOUNDATIONS SUPPORTING LIGHT FRAME CONSTRUCTION IN SEISMIC DESIGN CATEGORY B (WITH QUESTIONS AND ANSWERS) R109.1.1 Foundation inspection. Inspection of the foundation
More informationENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE
ENGINEERED FOUNDATIONS Department of Public Works Jeff Hill, PE What is an engineered foundation. A Foundation Design Developed by a Trained Professional (Engineer) Types of Foundations (All of which can
More informationEMERGENCY HOME PROTECTION. Homeowner's Guide for Emergency Flood Control. Contents INTRODUCTION
EMERGENCY HOME PROTECTION Homeowner's Guide for Emergency Flood Control Contents Discussion or Section Page Number Introduction 3 Potential Flooding Periods 4 General Rules and Control Aids 5,6 Sandbags
More informationNRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS
NRDCA 400 GUIDELINE FOR FIELD APPLICATION of LIGHTWEIGHT INSULATING CONCRETE REROOFING/RECOVER SYSTEMS The (NRDCA) has prepared this document to provide customers and installers information that the industry
More informationResidential Decks. Planning and Development Services Department
Building Safety Division 8500 Santa Fe Drive Overland Park, KS 66212 (913) 895-6225 Fax (913) 895-5016 Email: permitservices@opkansas.org Planning and Development Services Department Residential Decks
More informationCONCRETE SEGMENTAL RETAINING WALL SYSTEM
CONCRETE SEGMENTAL RETAINING WALL SYSTEM PART 1: GENERAL SPECIFICATIONS 1.01 Work Included A. Work shall consist of furnishing and constructing a Rockwood Classic 8 with PCS unit segmental retaining wall
More informationRESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000
RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000 SECTION R905 REQUIREMENTS FOR ROOF COVERINGS R905.1 Roof covering application. Roof coverings
More informationBuilding, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements
Building, Plumbing, Electrical and Residential Water and Sewer Inspection Requirements Charles County Government Planning and Growth Management P.O. Box 2150, La Plata, MD 20646 (301) 645-0692 Schedule
More informationSpecification for Cast-in-Place Concrete Pipe
ACI 346-01 Specification for Cast-in-Place Concrete Pipe Reported by ACI Committee 346 Eric T. Moran Chairman Curtiss W. Gilley Secretary James B. Bennett Gordon Bluth Robert G. Gofonia Alfred L. Kaufman,
More informationAdvancements in Permeable Pavements
Advancements in Permeable Pavements Engineers Workshop Saint Vincent College March 14 & 15 2013 Permeable Pavements There are several different words that are used to describe a pavement that water drains
More informationImproving the flood resistance of your home. Advice sheet 6: Flood-resilient floors
Improving the flood resistance of your home Advice sheet 6: Flood-resilient This sheet provides guidance on identifying different types of floor, assessing the routes floodwater may enter, and describes
More informationROOF CONSTRUCTION Roof Styles Gable Roof Hip Roof Gambrel Roof
ROOF CONSTRUCTION The overall appearance of a building is greatly affected by the roof lines and the roofing materials. The designer has many standard designs to choose from and should be able to find
More informationMoisture Management of Below-Grade Construction Basements
Moisture Management of Below-Grade Construction Basements John Koester, CEO Masonry Technology Inc. Building on a strong foundation has been a well-recognized principle of construction for thousands of
More informationFirst in Service First in Safety
7840 Nagle Avenue Morton Grove, Illinois 60053 847-470-5235 Fax - 847-965-9511 Wind Damage; Frequently Asked Questions: What can I do with branches that fall in my yard? Bring them out to the parkway;
More informationT R A N S F E R A B L E F U L LY
HSTOPS A WALL OF WATER 22 FT. HIG! F U L LY T R A N S F E R A B L E RESISTS10 PSI ! 1 F U L LY T R A N S F E R A B L E HSTOPS A WALL OF WATER 22 FT. HIG RESISTS10 PSI Guaranteed To Stop Water Even Under
More informationProperties of Fresh Concrete
Properties of Fresh Concrete Introduction The potential strength and durability of concrete of a given mix proportion is very dependent on the degree of its compaction. It is vital, therefore, that the
More informationGRADATION OF AGGREGATE FOR CONCRETE BLOCK
GRADATION OF AGGREGATE FOR CONCRETE BLOCK Although numerous papers have been written concerning the proper gradation for concrete mixes, they have generally dealt with plastic mixes, and very little published
More informationWastewater Capital Projects Management Standard Construction Specification
CITY AND COUNTY OF DENVER ENGINEERING DIVISION Wastewater Capital Projects Management Standard Construction Specification 10.1 Precast Concrete Pipe 10.1.1 General This section covers material requirements,
More informationCold Weather Concrete Practices
Cold Weather Concrete Practices The Information below is an outline of common practice for residential foundation placement and winter construction utilize Edmonton and surrounding Area. Conditions in
More informationConstruction Specification for Concrete Curb and Concrete Curb and Gutter
Engineering & Construction Services Division Standard Specifications for Road Works TS 3.50 April 2015 for Concrete Curb and Table of Contents TS 3.50.01 SCOPE... 3 TS 3.50.02 REFERENCES... 3 TS 3.50.03
More informationAIR RELEASE, CLEANOUT, AND SEWER MANHOLES
AIR RELEASE, CLEANOUT, AND SEWER MANHOLES **From Hartford IM BLDG(10) DESCRIPTION. This work shall consist of the construction of air release, cleanout, and sanitary sewer manholes; and the furnishing
More informationResidential Deck Safety, Construction, and Repair
Juneau Permit Center, 4 th Floor Marine View Center, (907)586-0770 This handout is designed to help you build your deck to comply with the 2006 International Residential Building code as modified by the