DAMAGE TO 9-STORY PRECAST CONCRETE FRAME BUILDINGS IN LENINAKAN

Similar documents
EAST LYME HIGH SCHOOL

Expected Performance Rating System

STRUCTURAL ASSESSMENT REPORT BOLINAS MARINE STATION - BOLINAS, CALIFORNIA

How To Understand The World Trade Center'S Structural Design

Building Condition Assessment: North Howard Street Baltimore, Maryland

What is Seismic Retrofitting?

Building Condition Assessment: West Lexington Street Baltimore, Maryland

Re: Damages to Alaska Building from Legislative Information Office Construction

SECTION 3 ONM & J STRUCTURAL ANALYSIS

The minimum reinforcement for the stem wall is the placement of:

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

ASSESSMENT AND RETROFITTING OF EXISTING RC BUILDINGS IN VIETNAM IN TERMS OF EARTHQUAKE RESISTANCES

Chapter 3 DESIGN AND CONSTRUCTION FEATURES IMPORTANT TO SEISMIC PERFORMANCE

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

4B The stiffness of the floor and roof diaphragms. 3. The relative flexural and shear stiffness of the shear walls and of connections.

Construction Laborer Dies after Falling off Collapsed Precast Concrete Floor Slab

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Five reasons buildings fail in an earthquake and how to avoid them

Earthquake damaged building structures demolition (removal) guideline, 2072

Fame Design Ltd (10295) Plot # A-115/116,BSCIC Hosiery I/A, Narayangonj, Bangladesh ( , ) 18.June.2014

WI LEY Blackwell. Multi-storey Precast Concrete Framed Structures. Colin K. Jolly MSc, PhD, CEng, MICE, FIStructE

PERFORMANCE BASED SEISMIC EVALUATION AND RETROFITTING OF UNSYMMETRICAL MEDIUM RISE BUILDINGS- A CASE STUDY

Current Status of Seismic Retrofitting Technology

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

Prepared For San Francisco Community College District 33 Gough Street San Francisco, California Prepared By

Analysis II Façade Redesign: Architectural Precast Panels

Rehabilitation of a 1985 Steel Moment- Frame Building

The Collapse of Building 7 by Arthur Scheuerman December 8, 06

King Post Wall Information

Page & Turnbull imagining change in historic environments through design, research, and technology

Diameter. Swift Lift Round Recess Plug. Note: The diameter of the narrow recess plug is the same as the diameter of the round recess plug.

Simpson Engineering A state licensed engineering firm F-1607

Hunter College school of Social Work Thesis Proposal

Chapter 6 ROOF-CEILING SYSTEMS

REPAIR AND RETROFIT OF BRIDGES DAMAGED BY THE 2010 CHILE MAULE EARTHQUAKE

A Report on Post-Earthquake Rapid Visual Damage Assessment of Buildings Of Tribhuvan International Airport

Chapter. Restoration of Damaged Structures

SLAB DESIGN. Introduction ACI318 Code provides two design procedures for slab systems:

Important Points: Timing: Timing Evaluation Methodology Example Immediate First announcement of building damage

POST AND FRAME STRUCTURES (Pole Barns)

Formwork for Concrete

Guidelines for Promotion of Earthquake-resistance School Building July 2003

ISO Types 1-6: Construction Code Descriptions

Seismic Risk Prioritization of RC Public Buildings

DISASTER RESISTANCE EARTHQUAKES AND STRUCTURES

SITE SPECIFIC FALL PROTECTION PLAN

Technical Assignment 2 TABLE OF CONTENTS

SEISMIC RETROFITTING TECHNIQUE USING CARBON FIBERS FOR REINFORCED CONCRETE BUILDINGS

OSHA GUIDANCE DOCUMENT FALL PROTECTION IN RESIDENTIAL CONSTRUCTION

Lighthouse Engineering, L.L.C.

REVISION OF GUIDELINE FOR POST- EARTHQUAKE DAMAGE EVALUATION OF RC BUILDINGS IN JAPAN

Photo 2. View showing flour mill, machine shed, veranda and saw mill + storage shed.

PANELIZED HOME INSTALLATION GUIDELINE

RAILROAD DAMAGE FROM THE OCTOBER 16, 1999 HECTOR MINE EARTHQUAKE

Fall protection systems and practices Duty to have fall protection Protection at or above 6' level.

DESIGN OF SLABS. Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia

How to Identify, Evaluate & Repair Shrinkage Cracks in Poured Concrete

HEDDERMAN ENGINEERING, INC. Office , Fax

OFFICE OF FINANCIAL MANAGEMENT

Presentations. Session 1. Slide 1. Earthquake Risk Reduction. 1- Concepts & Terminology

Miss S. S. Nibhorkar 1 1 M. E (Structure) Scholar,

201 WATER STREET FORWARDERS MUSEUM AND VISITORS INFORMATION CENTRE

Protecting Your Home From Hurricane Wind Damage

Residential Sheltering: In-Residence and Stand-Alone Shelters

SECTION 7 Engineered Buildings Field Investigation

How to secure your property after a disaster

Slavic Village Building Condition Review

GEORGE J. CAMBOURAKIS, P.E., C. ENG. PRESIDENT & CHIEF STRUCTURAL ENGINEER

Structural Failures Cost Lives and Time

SEISMIC ANALYSIS AND RETROFITTING OF R.C.C STRUCTURE

Control of Seismic Drift Demand for Reinforced Concrete Buildings with Weak First Stories

Cecil Courts BE 1047 EQ2 Detailed Engineering Evaluation Quantitative Assessment Report

9.3 Two-way Slabs (Part I)

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

Draft Table of Contents. Building Code Requirements for Structural Concrete and Commentary ACI

BUTE Department of Construction Management and Technology

Residential Deck Safety, Construction, and Repair

Structural Evaluation of McClung Bldg 4 and 5 Following the February 1, 2014 Fire 500 West Jackson Avenue Knoxville, TN.

CONCRETE FLOOR SLAB & CASTING BED CONSTRUCTION

Seismic Isolation Retrofitting of Japanese Wooden Buildings

Post Earthquake Quick Damage Inspection of Buildings in Nepal

Article 5: Building Regulations

Analysis and Repair of an Earthquake-Damaged High-rise Building in Santiago, Chile

Seattle Public Schools Building Excellence IV Projects Under Construction

LAYING BLOCK AND BRICK

14 September Sarah Zorn Planning and Economic Development 25 West Fourth Street, Ste St. Paul, MN 55102

SEISMIC DESIGN. Various building codes consider the following categories for the analysis and design for earthquake loading:

Bernie Nimer, Dave Seton Mayfair Hotel Development Corporation

If stepping is required, step at 180mm as seen in this picture.

Photos showing the change in condition from 2006 to 2012 are located in Appendix A.

Investigation of Foundation Failure. Step 1 - Data Collection. Investigation Steps

Major Areas of Street Repair and Development

Strong earthquakes in seismic regions are inevitable! Build your house safely to avoid future disaster!

MEMORANDUM. General: Foundation:

STRUCTURAL ASSESSMENT

Residential Prototype III. Multi-Story. The Multi-Story. Your connection to ideas + answers. Prepared by: AISC Steel Solutions Center

Fall Protection Susan Harwood Grant Training Program 2013 Fall Arrest. OSHA Susan Harwood Training - AGC

May 5, Client Client Address. Re: Inspection Address, Chicago, Illinois. Dear Mr. Client,

Chapter 3 Pre-Installation, Foundations and Piers

Analysis of the Interstate 10 Twin Bridge s Collapse During Hurricane Katrina

Transcription:

Photographed by H. S. Lew, National Institute for Standards and Technology DAMAGE TO 9-STORY PRECAST CONCRETE FRAME BUILDINGS IN LENINAKAN Collapsed and damaged nine-story precast concrete frame buildings in Leninakan. Poor diaphragm action due to lack of connections between the floor planks (flexicore precast floor panels) contributed to the failures. SURFACE FAULT RUPTURE The vertical displacement of the upthrown block was 1-1/2 m, typical of a M = 6.8 earthquake. The fault broke the surface over 15 km and is assumed to be the causative fault. Professor Millernovsky (USSR) had mapped the fault 30 years earlier.

FAILURE MECHANISMS OF STONE-BEARING-WALL BUILDINGS Shows the failure of the stone bearing wall systems at the corners where the two walls meet. Slide #5 FAILURE MECHANISMS OF STONE-BEARING-WALL BUILDINGS Shows damage to a stone bearing wall building in Leninakan. The floor planks were not tied to the supporting bearing walls.

FAILURE MECHANISMS OF STONE-BEARING-WALL BUILDINGS Shows the failure of a typical 4-story stone bearing wall building in Leninakan. The failure has exposed both the exterior and interior walls, revealing the method of construction of the walls as well as the flooring system. The floor is of light weight concrete planks with simple, narrow supports on the walls. Note that the floor planks at the fourth level have also fallen.

Photographed by H. S. Lew, National Institute of Standards and Technology FAILURE MECHANISMS OF STONE-BEARING-WALL BUILDINGS Shows damage to an old stone bearing wall building in Leninakan which was a hat and glove factory.

CORNER REINFORCEMENT OF STONE WALLS IN LENINAKAN In their newer stone bearing wall buildings, Soviet engineers built a reinforced concrete member at the corner that provides continuity to both walls along the edges. In this slide, failure of the stone wall appears to have been arrested by this member. There were many cases, however, where this member many not have helped to stop the failure at the corner. Further study is required to evaluate the beneficial effects of this system.

FAILURE MECHANISMS OF PRECAST CONCRETE FRAME-PANEL BUILDINGS Shows the failure of floor planks of a building under construction which was to become the new building of the Polytechnic Institute. The floor planks, of lightweight concrete, hollow- core, and approximately 4 ft x 6 ft x 8 inches are simply supported on the beams over a 2 to 3 inch seat. There are no ties between the planks or between the planks and the beam reinforcement. FAILURE MECHANISMS OF PRECAST CONCRETE FRAME-PANEL BUILDINGS Brittle failure of welded rebars can be observed. Some rebars from the column above are not contained in the column below. This kind of failure at the connection between the precast column elements was very common.

Brittle failure of welded rebars can be observed. Some rebars from the column above are not contained in the column below. This kind of failure at the connection between the precast column elements was very common. One of the collapsed cast-in-place and probably precast buildings of the granary. The building is at least the equivalent of a 10 to 15 story building. Collapse occurred in the third floor of the building which was a soft floor.

PRECAST CONCRETE PANEL BUILDINGS In the Soviet design of precast concrete panel buildings, virtually every precast interior wall is used as a load-bearing element having shear capacity. This design gives a stiff, redundant structure. Floors and roofs are precast concrete planks, but with positive intrastructural connections between the various elements. In this photo, the performance of precast frame-panel and precast panel buildings can be compared. Many precast frame-panel buildings in Leninakan collapsed and are shown in the foreground, including one under construction. Precast panel buildings, in contrast, performed very well and are shown standing in the background. The difference in performance is due to the basic differences in their design as well as possibly to specific characteristics of the ground motion. Site amplification in the 1.0 to 2.5 second band was found in the strong motion records of the aftershock sequence recorded in Leninakan may have generated a greater load on the concrete frame-panel buildings.

DAMAGE TO 9-STORY PRECAST CONCRETE FRAME-PANEL APARTMENT BUILDING IN LENINAKAN This slide shows the type of building that performed poorly in Leninakan the precast concrete frame-panel building constructed in the 1970 s. Although this one is still standing in Leninakan, 54 percent of these buildings in Leninakan collapsed, 41 percent required demolition, 5 percent needed repair, and none of them escaped damage. Throughout the total area affected by the earthquake, 314 buildings collapsed, 641 needed to be demolished, and 1,264 needed repairs or strengthening. Only 712 (24 percent) remained inhabitable after the earthquake. Although at the present time, very little is known about what distinguishes those who survive in an earthquake from those who do not, the morbidity (injuries) and mortality (deaths) from the Spitak earthquake were clearly related to: structural factors of the building, search and rescue activities, evacuation procedures, and medical relief action in the immediate pos disaster phase. For example, deaths were 68 times and injuries rates more than 7 times higher in trapped than in nontrapped victims. This slide shows the failure of the building at the site fabricated joints. The precast floor planks contributed in a major way to the failure.

16-story lift-slab concrete building in Leninakan. The building is leaning about 1 meter to the right and is a total loss due to a general failure of the cast-in-place concrete shear core at the ground level.