Portable Power Solutions

Similar documents
RENEWABLE ENERGY SUBSTATIONS SOLAR PHOTOVOLTAIC AND WIND POWER. tgood.com. Energy. Fast.

Modular Systems, PPMV, 2014 UniPack-G Glass Fiber Reinforced Polyester Compact Secondary Substation

Containerized Infrastructure Solutions Fast and efficient deployment, anywhere, anytime

Product overview brochure. ABB Medium Voltage Products Our one-stop approach for every medium voltage application

Siemens Integrated Substation Condition Monitoring System. Circuit Breaker Monitoring

Modular Systems wind portfolio overview Power Collection and Grid Connection products

Product brochure Multi Functional Switchgear PASS M kv Flexible and compact switchgear solutions for windfarms

ABB s Disconnecting Circuit Breakers Higher substation availability and lower environmental impact

Ralf Christian, CEO Low and Medium Voltage. Making Things Right with Totally Integrated Power (TIP)

Data Center Solutions - The Containerized Evolution

DC Traction Power Supply. Powerful, efficient and safe. siemens.com/mobility

High-Voltage Compact Switchgear 3AP1 DTC for 145 kv and 245 kv

AMSC s Superconductor Cable Technologies for Electric Utilities

Power Voltage Transformers for Air Insulated Substations. THE PROVEN POWER.

S c h n e i d e r E l e c t r i c BUSINESS IMPACT. Jack Hack Enterprise System Engineer 19 November 2015

ABB Power Systems. Substations References

Totally Integrated Power SIESTORAGE. The modular energy storage system for a reliable power supply.

CONNECTING YOU TO SPECIALIST ELECTRICAL SUPPORT services

IBM Portable Modular Data Center Overview for Critical Facilities Round Table

Emirates Aluminium starts up World s first fully integrated power distribution system from ABB

RCP2 Portfolio Overview Document

Siemens ENEAS solutions for substation automation and protection

Whitepaper. Modular Substation Cable Termination Design. Author: Allan Bozek P.Eng, MBA, EngWorks Inc, Calgary, Canada

Fundamentals of Modern Electrical Substations Part 1: Mission of Electrical Substations and their Main Components

Addendum #2 Contract UK-11-13

IPX AUTOMATIC IP NETWORK LOSS BACKUP A/B SWITCH INSTRUCTION BOOK IB

ADMS(Advanced Distribution Management System ) in Smart Grid

Modular architecture for high power UPS systems. A White Paper from the experts in Business-Critical Continuity

ISIO 200. Binary Input/Output (I/O) Terminal with IEC Interface

WATER / WASTEWATER & POWER PROJECTS LAST 5 YEARS. No of Staff Provided by BCE. Overall Project Value (SR)

Industrial IT for Substation Automation & Protection

Brochure. Electric generators to power the world

An Alternative Approach to Improving SAIDI and SAIFI Indicators

Emergency Response Solution- Keyspan

Hyperlinks are Inactive

e 2 ALPHA Medium Voltage Switchgear Data Sheet K EN

ELECTRICAL INSULATION TESTING OF HV EQUIPMENT UP TO 33kV

Dry-type transformers. Dry-type transformers from ABB The ideal solution for the oil and gas industry

High-Voltage GIS yesterday - today - tomorrow

METAL-CLAD AND METAL-ENCLOSED SWITCHGEAR 3.6KV~40.5KV. tgood.com. Energy. Fast.

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

SWITCHGEAR SOLUTIONS FOR MISSION CRITICAL APPLICATIONS. Presented by SAI Advanced Power Solutions

Permissible ambient temperature Operation Storage, transport

ABB PSPS Erich Steinmann; Generator control-2013

PAYGO for Data Center -- Modular Infrastructure

MAINTENANCE STRATEGIES FOR DISTRIBUTION NETWORKS

CONNEX. The plug-in system for power transformers and gas-insulated switchgear.

Submit shop drawings for equipment provided under this section Shop drawings shall indicate:

Medium voltage products UniSec for Smart Grid Air-insulated medium-voltage secondary distribution switchgear

Solutions for Photovoltaic Systems. Large buildings and power plants

ACTURA V DC, 3-40 kw, A. The Regional DC power system with Global Muscle

Earthing Guidance Notes

Secondary Unit Substations

How the National Grid System Operates. Chris Gorman Lead Account Executive Syracuse

Comparison of GIS and AIS systems for urban supply networks

Gas turbine power plants

LIMITING SHORT-CIRCUIT CURRENTS IN MEDIUM-VOLTAGE APPLICATIONS

Our brand POWER DYNAMIC PASSION COMMITMENT CREATIVITY. A strong brand for strong products: 8PU Premium. MV Energy

Data Center:Build-to-Suit

vacon ac drives for mining & minerals

MEDIUM AND HIGH VOLTAGE CAPACITORS, CAPACITOR BANKS AND SYSTEMS

6. The estimated costs here do not include any applicable ITCC tax

Modular Chiller Plants for data centers. Downtime isn t acceptable

4160: THE GREEN 480 MEDIUM VOLTAGE ELECTRICAL SYSTEMS

Adaption of Cable Accessories for Onshore and Offshore Substation

Request for Information National Power Transformer Reserve. Contact: Department of Energy Office of Electricity Delivery and Energy Reliability

Electrical Engineering

Bulk Storage the OIL SAFE Way. Three System Types. Establish Best Practice

Medium Voltage (MV) & High Voltage (HV) Training Module 6. Date of the presentation

ENERGY NETWORKS ASSOCIATION. Electricity Industry EMF Measurement Protocol for High Field Areas

SOLARCARE SERIES PRODUCT AND APPLICATION GUIDE

Brochure Introducing HVDC

Automation's Modular Containerized Datacenter Solutions

Utilization of Automatic Meter Management in Smart Grid Development

Investor day. November 17, Energy business Michel Crochon Executive Vice President

Does your new building

RESIDENTIAL PHOTOVOLTAIC SUBMITTAL REQUIREMENTS

Business Continuity White Paper

SF 6 Gas Insulated Switchgear Type SDF for 170 kv

OPERATIONS CAPITAL. The Operations Capital program for the test years is divided into two categories:

HYBRID POWER SYSTEMS for TELECOM applications

F.C. Chan General Manager, CLP Engineering Ltd., Hong Kong SAR, China

Agenda do Mini-Curso. Sérgio Yoshio Fujii. Ethan Boardman.

CITY OF GLENDALE CALIFORNIA REPORT TO CITY COUNCIL

MEDIUM VOLTAGE. Michael Mosman, PE. CCG Facilities Integration Incorporated FACILITIES INTEGRATION INCORPORATED

Turn-key Versus Site Erected. Transmission, Distribution

Types of Prefabricated Modular Data Centers

Introduction to The Trans Bay Cable Project

Distribution Substation Manual (DSM) Section I - Introduction

EFFICIENT ELECTRICAL ENERGY TRANSMISSION AND DISTRIBUTION INTERNATIONAL ELECTROTECHNICAL COMMISSION

SENTRON Switching and Protection Devices Air Circuit Breakers

ES281 COMPANY-SPECIFIC APPENDICES TO ENA ENGINEERING RECOMMENDATION G81 PART 1

ELEKTROTEHNI KO PODJETJE Leskoπkova cesta 12, 1000 Ljubljana, SLOVENIA

Best Practices for Data Archiving...1 Prudent Policies...2 Data Vaulting Policies...2 Defining the Data Life Cycle...3 Keeping Data Current...

Technical Electrical Field Service Support. Knowledge + Experience = Power. Field Service

HYDROMATRIX Jebel Aulia - Sudan

Magnus Callavik, ABB Power Systems, HVDC, Västerås, Sweden Phone: +46(0)

Wholesale Data Center Suites Available Now

How To Grow A Global Power Company

Transmission and distribution service level agreements

Transcription:

http://siemens.com/energy/portable-power-solutions Portable Power Solutions Plug and play High Voltage E-Houses, skids and mobile high voltage substations up to 420 kv

Plug & play solutions for flexible grid connection All over the world, grid operators, electrical power producers, and energy intensive industries work to ensure reliable power supplies for their customers or processes. Power demand has to be met at short notice without disruption - despite tight construction timeframes and potential eventualities such as natural disasters or operational restrictions. Siemens Portable Power Solutions ensure a safe and reliable grid connection to fit the most demanding environments anywhere, anytime. The Siemens Portable Power Solutions consists of a plug and play high and medium voltage substation built as fully mobile substation on trailer, on skid or inside a shelter as a HV E-House. The modules contain all the necessary components for a complete substation: power transformer, AIS or GIS switchgear, MV/HV cable drums, protection and control systems as well as AC and DC auxiliary power supplies. Modules are fully factory-tested before dispatch and simply need to be connected to each other on site. Siemens Portable Power Solutions ensure maximum flexibility of design and utilization combined with excellent reliability and a high return on investment.

The benefits are : Limited space requirement Minimum interface management Reduced on-site work (no major civil work, short installation and commissioning duration) Easy expansion and relocation Resistance to weather and harsh environments Environmental friendliness thanks to customizable visual appearance and easy removal, if required

A range of tailor made portable solutions Siemens Portable Power Solutions come fully preconfigured as plug and play substations to be connected to the grid via overhead or XLPE cables. They are available in several configurations to provide the upmost flexibility. Trailer & skid-mounted substations Trailer or skid-mounted power solutions are modular substations designed to provide maximum flexibility during mobilization and relocation. The substation comprises several compact modules to be inter-connected on site: Power transformer, HV/MV switchgears, HV/MV cables, control, telecom and auxiliary power systems The trailer external dimensions are sized to comply with local road transportation restrictions. Its base-frame is designed to protect switchgear from structural constraints despite transportation on rough road surfaces. HV E-House substations E-houses are prefabricated buildings designed to host switchgear, secondary and auxiliary systems in one single structure. These substations can comprise several switchgear bays forming various configurations such as single/double busbar, rings, or one and a half breaker The E-House generally comes as a single lift unit pre-wired and factory-tested. Depending on voltage level and transportation restrictions, the E-house can be fitted with a built-in overhead crane or removable roof to simplify maintenance work. Skid / E-House Mobile 72,5kV 145kV 170kV 245kV 420kV AIS GIS * AIS GIS * AIS GIS * AIS GIS * AIS GIS Nota : Suitable for PPS design Not recommended * including Dead Tank Compact Switchgear Restrictions may apply depending on expected substation architecture and equipment ratings.

Grid connection wherever and whenever required The flexibility and robustness of Portable Power Solutions are key benefits to several application fields covering power generation, grid development and energy intensive industries. Emergency alternative grid connection The mobile design of the Portable Power Solution helps grid operators to restore power after a grid failure or to avoid disruption during extension or rehabilitation works. Portable Power Solutions can easily be extended through the addition of further modules and relocated whenever required. Fast track projects The grid connection of power critical infrastructures such as electrical generation or energy intensive industries is often located on the critical path of the project. With little exposure to site work contingencies, the Siemens Portable Power Solution allows faster grid connection. Remote/hostile environments Mining and Oil & Gas works are often executed in isolated areas, thus generating high labor costs. This factor incites the reduction of on-site works to the strict minimum. The Siemens plug and play solutions are 100% factorytested in their final configuration. Their mobilization on site is optimized and minimum labor is required for final installation. Almost no civil works are required. The PPS can also be supplied with shelter protection providing protection against extreme weather conditions and harsh environment. Environmental integration Environment friendliness is a central concern when power infrastructures are required in the vicinity of natural, urban or business areas. The Siemens Portable Power Solution can be located in shelters or prefabricated buildings and the external appearance can be customized to maximize visual integration. Furthermore, they can easily be dismantled to restore the site to its original conditions if required. Tested and proven performances Oil & Gas: Canada : the 30 module GIS 245kV & 72kV E-House type substation enabled grid connection with minimum site works for a duration for a bituminous sand extraction site located in a very cold climate area. Industry: New Caledonia : an eigtheen bay GIS 72,5kV substation was shipped as a single lift prefabricated unit to meet the requirements of a copper mine for minimum site work due to lack of local resources. Power generation: Algeria : the 420kV mobile substation ensures fast track grid connection of a power plant in Biskra. Grid operators: Algeria : the 220/60kV-30kV and 60/10kV semi trailer type mobile substation provides the customer with a backup infrastructure to reinforce the grid in this area. Belgium : 5 bay 110kV GIS substations in 40 containers fitted for XLPE HV cable connection are used to bypass existing substations during extension & upgrading works in an urban environment.

High return on investment By reducing the interface management and site works to a minimum, Portable Power Solutions provide significant cost and time savings along with a low risk profile. Savings on grid maintenance and upgrading works With a Portable Power Solution as a temporary alternative grid connection, the upgrading or rehabilitation work on existing substations can be significantly faster and work process simplified. Black out impact limitations A mobile substation can act as a stand-by emergency grid restoration solution. It can be mobilized and set up within a few hours in the event of a grid failure, hence reducing the technical and financial impact of power outage. Streamline project execution With a fully comprehensive set of components, pre-designed interfaces and limited on site works, PPS substations simplify procurement tasks and substantially reduce interface management risks. Land acquisition savings The reduced footprint and modular concept of PPS substations allow optimized space usage. Earlier energization PPS substations ensure efficient and faster grid connection, hence enabling earlier energization and commercial operation of the connected plant. Time schedule optimization for a fast track substation construction project HV GIS conventional substation Off site work On site work Design Manufacturing Civil Work Transportation Installation Test & Commissioning HV PPS substation Off site work On site work Up to 30% time saving Later site work start

Typical configurations for Portable Power Solutions HV E-house: 123kV emergency restoration system This E-House substation is used in urban areas in the event of outages or maintenance works (ie. extension and modernization). The compact GIS enables the installation of bays and local control cabinets in a shelter protected from the environment. Thanks to its built-in jacking system, it can be unloaded without the need of a crane. Mobile substation: 220/60-30kV 40MVA This mobile substation is used as a backup infrastructure to reinforce the grid. Its configuration enables single line, single breaker grid connection with minimum space requirements and little civil work.

Published by: Siemens AG 2014 Energy Management 40 Avenue des Fruitiers 93210 Saint Denis, France For more information, please contact our Customer Support Center. E mail: energy.contact.fr@siemens.com Printed on elementary chlorine-free bleached paper. Subject to change without prior notice. The information in this document contains general descriptions of the technical options available, which may not apply in all cases. The required technical options should therefore be specified in the contract. The Portable Power Solutions by Siemens Décembre 2014