DOWNTOWN HAMILTON Mobility Hub Profile

Similar documents
GTA Cordon Count Program

Rapid Transit Backgrounder

Integrating GO RER and SmartTrack. Leslie Woo, Chief Planning Officer February 10, 2016

Primer on Transportation Funding and Governance in Canada s Large Metropolitan Areas

Stouffville Corridor Rail Service Expansion

Submission from Living Streets Aotearoa Wellington City Public Transport Spine Study

Coordinated Transit Planning in Toronto SmartTrack Eglinton West LRT Eglinton East LRT Scarborough Subway Extension Relief Line Waterfront Transit

Transitways and the RouteAhead for Calgary Transit

Appendix E Transportation System and Demand Management Programs, and Emerging Technologies

Overview of the Travel Demand Forecasting Methodology

3. FORECASTING TRAVEL DEMAND IN THE CORRIDOR

VISION, DESIGN PRINCIPLES & OVERALL PLANNING STRATEGY

1. REPORT CONTEXT Description of the development (include all of the following that are known at the time of the application):

11. Monitoring Performance monitoring in LTP2

Appendix J Santa Monica Travel Demand Forecasting Model Trip Generation Rates

Growth Management in the City of Brampton

ORANGE COUNTY TRANSPORTATION AUTHORITY. Final Long-Range Transportation Plan - Destination Attachment A

Bus Priority Measures in Calgary: Past, Present and Future. Chris Jordan, M.Sc., P.Eng., Coordinator, Strategic Transit Planning, Calgary Transit

Integrated Public Transport Service Planning Guidelines. Sydney Metropolitan Area

Rapid City Downtown Area Master Plan. Draft Plan Concepts April 2016

Proposed Planning Incentives to Support the Replacement of Office Space in New Mixed Use Developments Draft Zoning By-law Amendments

Growth of Addis Ababa

Median Bus Lane Design in Vancouver, BC: The #98 B-Line

The BIG Move: Transforming Transportation in the Greater Toronto and Hamilton Area

Connecticut s Bold Vision for a Transportation Future

Tripp Umbach developed a detailed survey with input from the PDP and distributed the survey to six Downtown Pittsburgh market segments:

2012 Saskatoon Transit Services Annual Report

Mayors Welcome Strong Surrey Votes Yes Coalition Support. Yes Vote Would Vastly Improve Transit and Transportation in Fast Growing City

Advantages and Disadvantages of One Way Streets October 30, 2007

Ten Year Local Transit Strategy

Evergreen Line Rapid Transit Project Business Case Executive Summary. February Reviewed by

Article. Commuting to work: Results of the 2010 General Social Survey. by Martin Turcotte

Evaluation Criteria and Mode Progression for RouteAhead Rapid Transit Projects

KEEP YOUR BUSINESS MOVING

We would be pleased to discuss these issues with you at your convenience.

INTEGRATION OF PUBLIC TRANSPORT AND NMT PRINCIPLES AND APPLICATION IN AN EAST AFRICAN CONTEXT

RESOLUTION NO. WHEREAS, the City Budget Forecast estimates that housing

GO RAIL OPTIONS BENEFITS CASE ASSESSMENT. June 2010

Department of State Development, Infrastructure and Planning. State Planning Policy state interest guideline. State transport infrastructure

Goals & Objectives. Chapter 9. Transportation

STAFF REPORT ACTION REQUIRED. SmartTrack Work Plan ( ) SUMMARY. Date: January 16, Executive Committee. To: City Manager.

and 7 Queensland Transport, Moving People Connecting Communities: A Passenger Transport Strategy for Queensland , 2006

SMART COMMUTE TORONTO PAN AM/PARAPAN AM WORKSHOP

About the Model. Unit. Cost Structure. Modal Characteristics

Questions and Answers about the Orange Bus/Rail Investment Plan

When is BRT the Best Option? 1:30 2:40 p.m.

6 REGIONAL COMMUTE PATTERNS

Mount Royal College Transit Service Plan

PEDESTRIAN PLANNING AND DESIGN MARK BRUSSEL

CROYDON MAJOR ACTIVITY CENTRE PARKING STUDY

Examples of Transportation Plan Goals, Objectives and Performance Measures

Downtown Tampa Transportation Vision

Guiding Principles. McCauley Area Focused Urban Design Plan. 1 Connect: Chinatown and Little Italy with downtown and surrounding areas

Managing the Transit Network A Primer on Key Concepts

Sustainable urban mobility: visions beyond Europe. Brest. Udo Mbeche, UN-Habitat

APPENDIX 7 POPULATION AND EMPLOYMENT PROJECTIONS

GO News. gotransit.com GO Transit s Newsletter for Customers summer Keeping You in the Know.

CHAPTER 5-CMPO TRANSPORTATION VISION PLANS (2035 & BEYOND)

{insert employer} Employee Transportation Survey

Welcome to the LRT Overview Open House

Intelligent Transport for Smart Cities Conference. Bruce McCuaig, President and CEO, Metrolinx

Victoria City 2010 Community Energy and Emissions Inventory Monitoring and reporting on progress towards greenhouse gas emissions reduction targets

Metrolinx wishes to acknowledge the invaluable contribution of IBI Group to the preparation of this backgrounder.

Introduction to Station Area Planning The Charlotte Story

d r a f t Division Street: 15.4 du/a Damen Avenue: 14.1 du/a Western Avenue: 12.8 du/a

College of Southern Maryland. Hughesville Transportation Study

Caledon Transportation Needs Study. Study Report

Doing a little can accomplish a lot. Proposed Change of Municipal Class Environmental Assessment from Schedule from B to A+

6. Social & Community Facilities

Policies and progress on transport access, including access for the rural population and low-income households

Transport planning in the Stockholm Region

TABLE OF CONTENTS. Executive Summary 1-3. Introduction 4-6. Illustrative Site Plan 7. East-West Streets 8. Cooper Street Market Street 11-14

Light Rail Transit in Phoenix

2 Integrated planning. Chapter 2. Integrated Planning. 2.4 State highway categorisation and integrated planning

Ticketing and user information systems in Public Transport in Thessaloniki area

FIRST STREET NORTH CREATING PLACES FOR PEOPLE

Washington Metropolitan Area Transit Authority Board Action/Information Summary

Forecasting Demand for Demand Forecasting. Abstract

WELCOME PROPOSALS FOR PENTAVIA RETAIL PARK WELCOME TO OUR EXHIBITION WHICH SETS OUT OUR PLANS TO DEVELOP THE PENTAVIA RETAIL PARK SITE.

Customer Satisfaction Index 2014

Integrated Public Transport. Planning. National workshop on promoting sustainable transport solutions for East Africa

Bus Users in Sydney. Transport Data Centre ISSUES PAPER 2002/02 DECEMBER 2002 ISSN ISBN

Transit Technology Alternatives

Residential Development Travel Plan

Transport Demand Management

Los Angeles Metro Rapid

Cities for Mobility. World Congress 2008 City of Stuttgart June 1-4, The Transport System in the City of Yaoundé, Cameroon.

Recommendations for regional cycling developments of Budapest metropolitan area

Transportation Alternatives

Chapter 9: Transportation

The Way We move. transportation master plan September 2009

Bicycle Safety Webinar December 1 st 2010

What we build today will create Denver s tomorrow. Signature development projects will strengthen our economy, create jobs and improve neighborhoods.

THE IMPLICATIONS OF ALTERNATIVE GROWTH PATTERNS ON INFRASTRUCTURE COSTS

Traffic Signal Priority (TSP) and Automatic Vehicle Tracking System (AVTS) For Calgary Transit Buses

Chapter 1: Background

Significant investment and improvement of infrastructure and transport networks, delivered at no cost and no risk

Estevan Student and Market Rental Housing Project. Assessment Report

Performance Measures for a Sustainable Transportation Network Pasadena s Approach Frederick C. Dock, Ellen Greenberg, Mark Yamarone

Transportation Breakout Session. Curvie Hawkins Mark Rauscher Mike Sims Paul Moore

Transcription:

Mobility Hub Profile Downtown Hamilton GO Anchor Hub Gateway Hub N MOBILITY HUBS: Places of connectivity between regional and rapid transit services, where different modes of transportation come together seamlessly. They have, or are planned to have an attractive, intensive concentration of employment, living, shopping and enjoyment around a major transit station. There are two types of mobility hubs identified in The Big Move: Anchor Hubs and Gateway Hubs. Anchor Hubs are major transit station areas associated with an urban growth centre (as defined in the Province's Growth Plan for the Greater Golden Horseshoe). Gateway Hubs are major transit station areas that are located at the interchange of two or more current or planned regional rapid transit lines with anticipated high levels of ridership. DOWNTOWN HAMILTON is identified as an ANCHOR HUB in the Greater Toronto & Hamilton Area () and includes Hamilton Centre on the Lakeshore West Line. This hub is planned to integrate Regional Express Rail, Rapid Transit and local bus service. LAKESHORE LINE 800 METRE RADIUS 8 9 10 7 6 5 4 3 1 JAMES ST W 1 KING ST MAIN ST 11 HAMILTON CENTRE GO Train DESTINATIONS 1 St. Joseph's Hospital - Carlton Campus Whitehern Historic House & Garden 3 Canadian Football Hall of Fame & Museum 4 Hamilton City Hall 5 Hamilton Convention Centre 6 Art Gallery of Hamilton 7 College Boreal 8 Copps Coliseum 9 Hamilton Farmer's Market 10 Hamilton Public Library 11 Opera Hamilton 1 Theatre Aquarius, Dofasco Centre for the Arts N

Demographics 18,100 POPULATION DENSITY 7.9 people per hectare POPULATION GROWTH (009-014) AGE 1 0-14 15-64 78% TOTAL POPULATION 1 90 people per hectare 65+ 14% 1 70% 13% $37,000 $97,000 INCOME <$30,000 55% AVERAGE HOUSEHOLD INCOME 1 AVERAGE $30-$70K 34% 0% 3 49% JOB DENSITY 0,500 3.8 jobs per hectare TOTAL JOBS 3 >$70K 1 10.1 jobs per hectare 74% >5 Storey 1.5.8 AVERAGE RESIDENTS PER HOUSEHOLD 1 AVERAGE HOUSEHOLD COMPOSITION 1 63% HOUSEHOLD GROWTH (009-014) HOME TENURE 1 OWN 14% HOUSING TYPE 1 4% Single family 0.7 1.4 VEHICLE OWNERSHIP 0 43% RENT 86% 3 6% 69% 3 Semi-detached Rowhouse % Duplex AVERAGE CARS PER HOUSEHOLD 3 AVERAGE 1 48% 19% <5 Storey 9% 4+ 4% 3+ 13% 40% 36% 10% Note: document percentages may not add to 100 due to rounding 40% 36%

Mobility MORNING COMMUTE 3 ARRIVAL MODE SPLIT Peak Period: 6:00-9:30 a.m. 16% Public transit Bike 9% Walk 0,810 People END their trip here every morning 74% Drive 7,570 People START their trip here every morning Bike 15% Public transit DEPARTURE MODE SPLIT Peak Period: 6:30-9:30 a.m. 16% Walk 6 Drive ACCESS + URBAN PATTERN PROPOSED RAPID TRANSIT NETWORK Intersection Parking lot Bikeway LAKESHORE LINE HAMILTON LRT JAMES ST RT 3 SMART COMMUTE WORKPLACES 98% WALKSCORE TM - WALKER'S PARADISE 4 167 0.83 INTERSECTIONS 5 INTERSECTIONS PER HECTARE 8. KM OF BIKEWAYS 6 8.4 HECTARES OF SURFACE PARKING 15% OF MOBILITY HUB AREA IS USED FOR SURFACE PARKING EXISTING GO Train NEXT WAVE Hamilton LRT OTHER BIG MOVE PROJECTS James St RT RER* Regional Express Rail *Based on 015 RER Service Concept 3

Station Information HAMILTON CENTRE 7 HAMILTON CENTRE INFORMATION PUBLIC WASHROOMS 6 BIKE RACKS 4 BIKE SHELTERS BIKE SECURITY WHEELCHAIR ACCESSIBLE NO DEDICATED PARKING SPACES NO PAID PARKING SPACES NO CARPOOL SPACES RETAIL GO STATION ACCESS 9 AM PEAK start of service -9:30 a.m. 35% Walk GO TRAIN USE 8 AM PEAK 6% Drive 19% Drop off 4% Bike 33% Public transit start of service-9:30 a.m. Union Carpool % Other 460 Departures PM PEAK 3:30-7:30 p.m. REFERENCES 1. Environics Analytics, "DemoStats 011," (Toronto, ON). Environics Analytics, "DemoStats 009 and 014," (Toronto, ON) 3. University of Toronto, "Transportation Tomorrow Survey," (Toronto, ON: 011) 4. Walk Score, "https://www.walkscore.com/score/36-hunter-st-ehamilton-on-canada", (, ON: 015) 5. Based on LEED Neighbourhood Development Rating System Connectivity definition 6. Metrolinx, "Mobility Hubs Cycling Network Interface Analysis," (Toronto, ON: 013) 7. Metrolinx Intranet Site, "Facilities Inventory," (Toronto, ON: 015) 8. GO Transit, "Rail Cordon Counts - Fall 013," (Toronto, ON: 013) 9. GO Transit, "013 GO Rail Passenger Survey", (Toronto, ON: 013) Additional mobility hub profiles and the documentation methodology is available at metrolinx.com/mobilityhubs % of GO Customers 30% 0% 10% 0% Hamilton PROXIMITY TO GO STATION 9 570 Arrivals 1KM KM 3KM 4KM 5KM + 85 % of GO Train users live within 5.3KM of the station. 4

MOBILITY HUBS Glossary ANCHOR HUBS Mobility hubs that have strategic importance due to their relationship with urban growth centres (UGCs), as well as Pearson Airport and Union Station due to their roles as the s primary international gateways. Anchor Hubs have the potential to transform the regional urban structure and act as anchors of the regional transportation system. Anchor Hubs are identified in Schedules 1 and of The Big Move Regional Transportation Plan (RTP). (For more information see the backgrounder Mobility Hubs, December 008 ). BIKEWAYS Bikeways in the Mobility Hub Profiles include the following types of cycling infrastructure: segregated or protected bike lanes, marked bike lanes, paved shoulders, multi-use paths, bicycle boulevards (local streets optimized for bicycle travel), marked shared-use lanes, and signed routes. Bikeways were identified in the Mobility Hub Cycling Network Interface Analysis (013) developed by Metrolinx. The purpose of the analysis was to better understand cycling access to mobility hubs within the and involved providing a common bikeway typology for the, allowing cycling infrastructure to be compared across the region. BUS RAPID TRANSIT (BRT) Similar to light rail transit operating predominantly in protected rights-of-way, separate from other traffic, but using advanced bus technology. Also includes buses operating in mixed traffic on controlled-access expressways that employ congestion management such as tolls, thereby allowing the buses to maintain high average speeds. The capacity of BRT is typically,000 to 10,000 passengers per hour, peak direction. Average speed: 15 to 40 km/h depending on station spacing, with higher speeds possible on grade-separated rights-of-way on controlled access highways. Example: York Region Transit s Viva. DESTINATIONS Destinations are unique places within the region that have significant drawing and trip-generating power. Destinations have the potential to influence travel demand within the hub and signify the diversity of land uses, an important factor in creating dynamic and interesting places. FIRST WAVE PROJECTS First Wave projects were identified as priority projects in The Big Move based on their ability to strengthen transit in the by improving regional connectivity and bringing new rapid transit services to underserved areas. Metrolinx has allocated funds to deliver the majority of the First Wave transit projects that were identified in Metrolinx s Investment Strategy (Investing in our Future, Investing in our Region, 013) and work is currently underway on many of these key pieces of transit infrastructure. GATEWAY HUBS Metrolinx has defined gateway hubs as major transit station areas that are located at the interchange between two or more current or planned regional rapid transit lines as identified in The Big Move RTP and have 4,500 or more forecasted combined boardings and alightings in 031 (in the morning peak period). In addition, these areas are generally forecasted to achieve or have the potential to achieve a minimum density target of approximately 10,000 people and jobs combined within 800 metres. GO REGIONAL EXPRESS RAIL (RER) RER will provide electrified service on Metrolinx-owned rail corridors with 15-minute frequencies in core areas. Service will be provided in both directions, throughout weekdays, in evenings and on weekends. All-stop and limited stop service will help to meet demand and reduce travel times. RER was formerly referred to as Express Rail in The Big Move. GREATER TORONTO & HAMILTON AREA () The metropolitan region encompassing the City of Toronto, the four surrounding Regional Municipalities (Durham, Halton, Peel and York) and the City of Hamilton. GROWTH PLAN FOR THE GREATER GOLDEN HORSESHOE The Growth Plan for the Greater Golden Horseshoe is a comprehensive strategy to maximize the benefits of growth and maintain our high quality of life. It is a plan to grow in a more complete way so communities offer a good mix of places to live, work, shop and play. It is a plan that will create communities where it is easier for people to walk, bike or take transit to get around. LIGHT RAIL TRANSIT (LRT) Trains (up to three or four cars per train) operating on protected rights-of-way adjacent to or in the medians of roadways or rail rights-of-way. Generally at-grade, possibly with some sections operating in mixed-traffic and/or in tunnels. Electric power is normally via an overhead trolley or pantograph. Capacity of,000 to 10,000 passengers per hour in the peak direction, with higher capacities where there are significant stretches of completely segregated rights-of-way. Average speed: 15 to 35 km/h depending on station spacing and extent of grade separation. Examples: Eglinton Crosstown LRT. MAJOR TRANSIT STATION AREA The area including and around any existing or planned higherorder transit station within a settlement area, or the area including and around a major bus depot in an urban core. Station areas generally are defined as the area within an approximate 500 metre radius of a transit station, representing about a 10-minute walk. 5

MOBILITY HUBS Glossary MOBILITY HUB Major transit station areas, as defined in the Growth Plan for Greater Golden Horseshoe, that are particularly significant given the level of transit service that is planned for them and the development potential around them. They are places of connectivity between regional rapid transit services, and also places where different modes of transportation, from walking to high-speed rail, come together seamlessly. They have, or are planned to have an attractive, intensive concentration of employment, living, shopping and enjoyment around a major transit station. To be identified as a mobility hub, a major transit station area must be located at the interchange of two or more current or planned regional transit lines as identified in the RTP, and be forecasted in the RTP to have 4,500 or more combined boardings and alightings in the morning peak period in 031. In addition, these areas are generally forecasted to achieve a minimum density of approximately 10,000 people and jobs within an 800 metre radius. The primary major transit station area associated with an urban growth centre are also identified as mobility hubs, as are Pearson Airport and Union Station due to their roles as the s primary international gateways.transit station. There are two types of mobility hubs identified in The Big Move: Anchor Hubs and Gateway Hubs. NEXT WAVE PROJECTS Next Wave projects have been identified in Metrolinx s Investment Strategy (Investing in our Future, Investing in our Region, 013) as the successive priority transit projects that are required to achieve the objectives set out in The Big Move. The Next Wave project represent additional investment in the region s transit infrastructure. Most Next Wave projects have secured funding. RAPID TRANSIT (RT) Transit service separated partially or completely from general vehicular traffic and therefore able to maintain higher levels of speed, reliability and vehicle productivity than can be achieved by transit vehicles operating in mixed traffic. REGIONAL RAIL IN THE REGIONAL TRANSPORTATION PLAN Diesel or electric trains serving primarily longer-distance regional trips; approximate capacity at 10-minute headways of 5,000 to 0,000 passengers per hour peak direction; service can be enhanced by electrification, enabling better train performance (acceleration) and therefore higher average speeds even with relatively close station spacing. Average speed: 30 km/h with two km station spacing; 50 km/h with wider station spacing or electrified trains. Example: GO Transit rail system. REGIONAL RAPID TRANSIT NETWORK The network of Express Rail, Regional Rail, Subway, and Other Rapid Transit services identified in Schedules 1 and of The Big Move. SMART COMMUTE Smart Commute is a program of Metrolinx and the municipalities of the. The program mandate is to encourage those living and working in the region to choose more efficient transportation choices that reduce congestion, make best use of our transportation infrastructure, and help to improve the quality of life in the. At Metrolinx, the program incorporates workplace, school and community travel. THE BIG MOVE The Regional Transportation Plan for the entitled The Big Move is Metrolinx s 5-year transportation plan. It sets the vision, goals and objectives that are to guide transportation planning in the region for the future. The RTP also establishes a transportation network to guide future investments in transportation infrastructure. UP EXPRESS UP Express connects the country s two busiest transportation hubs, Toronto Pearson International Airport and Union Station in downtown Toronto. UP Express departs from both Pearson Airport and Union Station every 15 minutes, providing a quick and reliable connection between downtown Toronto and the airport. URBAN GROWTH CENTRE (UGC) Urban growth centres are identified in the Growth Plan for the Greater Golden Horseshoe, 006 as focal areas for directing significant high-density employment and population growth, major transit infrastructure, and a mix of land uses such as commercial, recreational, cultural, entertainment, institutional and public services. As such, they contain current or planned major regional destinations such as major institutions, employment centres, town centres or regional shopping centres, and they have significant potential to attract and accommodate new growth and development. The Growth Plan designates 5 UGCs in the Greater Golden Horseshoe, of which 17 are in the. WALKSCORE Walk Score is a widely used indicator that measures an area s walkability based on accessibility and proximity to amenities. Walk Score both describes the quality of the walking environment and can explain differences in walking behaviour across space. Walk Score identifies four neighbourhood walkability categories: Walker s Paradise (where daily errands do not require a car), Very Walkable (where most errands can be accomplished on foot), Somewhat Walkable (where some errands can be accomplished by foot), and Car-Dependent (where almost all errands require a car). 6