Server Technology Inc.



Similar documents
Server Technology, Inc.

Server Technology Inc.

Server Technology Intl.

Server Technology, Inc.

Server Technology Inc.

Server Technology, Inc.

Alternating Phase Power Distribution at the Data Center Rack PDU

Data Center Power Distribution at the Cabinet Level: The top 12 questions you need to ask to improve data center energy effciency

One unbelievable solution for rack-level data center power management. Sentry Power Manager. Solutions for the Data Center Equipment Cabinet

Voltage Loss Formula s

Operational Solution for Service Providers deploying Metro Ethernet, Carrier Ethernet or Wireless Ethernet Backhaul Applications.

Voltage Drop (Single-Phase)

Who do the biggest names in servers, search, healthcare, cloud & financial services trust to provide power management solutions?

Advantages of Wire- Free Power Monitoring in the Data Center

How do I... POPS Smart & Switched CDU. If you manage a datacenter, we have a solution for you.

Voltage Drop. Voltage Drop 1

Three-Phase Electric Power Distribution for Computer Data Centers

POWER AND VOLTAGE RATING

Capacity Planning in the Modern Datacenter

Integrated Wire-Free Solution for Monitoring Power and Environment with RF Code and Sentry Power Manager (SPM)

Sentry Power SystemSM. More Intelligent. More Reliable. Easier to Manage.

Managing Data Centre Heat Issues

Table of Contents. 2 Why IT Organizations Everywhere Need to go Green. 3 Greening the Data Center

Uptime is Revenue. ...the average datacenter outage costs about $7900/minute, or roughly $474K/hr. YOUR POWER STRATEGY EXPERTS

Errors Related to Cable Resistance Imbalance in Three Wire RTDs

Wire types and sizes

GENERATOR SELECTION. a. Three phase - 120/208V, 3 phase, 4W wye; 277/408, 3 phase, 4W wye; * 120/240V 3 phase, 4W Delta

I = V/r P = VI. I = P/V = 100 W / 6 V = amps. What would happen if you use a 12-volt battery and a 12-volt light bulb to get 100 watts of power?

DATA CENTER ASSESSMENT SERVICES

Evaluating the Opportunity for DC Power in the Data Center

Chapter 9. Bonding and Grounding

Electric Motor Brake Horsepower Calculations

A kilowatt-hour (kwh) is a unit for measuring energy. It is, as its name suggests, one kilowatt of power used over a period of one hour.

Includes customer case study. February 28, 2013

Module 1 : Conduction. Lecture 5 : 1D conduction example problems. 2D conduction

Alternative data center power

Definition AC Power Distribution

White Paper SolarEdge Three Phase Inverter System Design and the National Electrical Code. June 2015 Revision 1.5

Direction of current flow through conductor. Fig. 1 Magnetic field generated by current flow

7. What is the current in a circuit if 15 coulombs of electric charge move past a given point in 3 seconds? (1) 5 A (3) 18 A (2) 12 A (4) 45 A

Gain agility with remote management and reporting.

Fundamentals of Power

Panduit 28 AWG Patch Cords Installation Guideline

AMFA-27 AMFA-29. Operator s Manual & Installation Instructions. Rev. 2.5

Business Benefits. Infrastructure Management. Adrian Parry Technical Consultant.

Unit 4: Electricity (Part 2)

Line Loss WSDOT Winter 2008 BZA

Power over Ethernet with Panduit Copper Cabling

Re Engineering to a "Green" Data Center, with Measurable ROI

415V DISTRIBUTION FOR GREEN DATA CENTERS

Advantium 2 Plus Alarm

Great Lakes Data Room Case Study

Executive Summary. Technical Description

WHITE PAPER. Creating the Green Data Center. Simple Measures to Reduce Energy Consumption

Copper wire figures. AWG Table

Convergence of Complexity

Grounding Practice at Data and Communications Centers. David Brender, P.E., CPQ National Program Manager Copper Development Association Inc.

Basic Electrical Technology Dr. L. Umanand Department of Electrical Engineering Indian Institute of Science, Bangalore. Lecture phase System 4

Data Center Power Distribution and Capacity Planning:

Is an energy-wasting data center draining your bottom line?

3. TYPES OF SERVICE AVAILABLE. 3.1 Scope

415V DISTRIBUTION FOR GREEN DATA CENTERS

Qualitative Analysis of Power Distribution Configurations for Data Centers

PXL-250: Network Wiring

IP DSLAM IDL Quick Installation Guide

Electrical Design Training Class Ampacity WSDOT Winter 2008 BZA

Best Practices for Wire-free Environmental Monitoring in the Data Center

Packet Power. Data Center Solutions. Packet Power for Data Centers. Benefits. Features. The Packet Power Solution. Data Center Monitoring Made Easy

Doc Ref: baselayer.com 2015 BASELAYER TECHNOLOGY, LLC

Virtualization of IT environments as ecological alternative in the data center

IMPROVING DATA CENTER EFFICIENCY AND CAPACITY WITH AISLE CONTAINMENT

rpsa FIRE PROTECTION ENGINEERS

Solutions to Make Your Data Center Energy Effi cient

Chapter 24. Three-Phase Voltage Generation

Environmental Data Center Management and Monitoring

ETC TWO STAGE ELECTRONIC TEMPERATURE CONTROL

Objectives 200 CHAPTER 4 RESISTANCE

ELECTRIC CONVECTION BUILT-IN OVEN

EMAC. Environmental Monitoring & Access Control

QuickSpecs. Overview. HP Power Distribution Rack. HP Power Distribution Rack. DA North America Version 5 August 22, 2008 Page 1

The following are general terms that we have found being used by tenants, landlords, IT Staff and consultants when discussing facility space.

Improving Rack Cooling Performance Using Airflow Management Blanking Panels

Power Distribution in Data Centers: STARLINE Track Busway, PX ipdus and Power IQ

How Much Voltage Drop Is Acceptable?

CHAPTER 2 EXAMPLES AND TABLES

Radial Distribution Test Feeders

CenterMind P+ Solution for efficient power management

Understanding How Cabinet Door Perforation Impacts Airflow by Travis North

No Phone Line II-48 System

Data Center Cooling A guide from: Your partners in UPS Monitoring Systems

Beware of Simplistic Voltage Drop Calculations. By Aaron Hesse, PE, Coffman Engineers, Spokane, Washington INTRODUCTION

Model #: SMART2200VS. 2200VA / 2.2kVA line interactive tower UPS. Maintains 120V nominal output over an input range of 79 to 147V

Improving Rack Cooling Performance Using Airflow Management Blanking Panels

Cable Size Selection for Energy Efficiency

Comprehensive Data Center Energy Management Solutions

SWITCH! DESCRIPTION. ENVIRONMENTAL SPECIFICATIONS Operating Temperature: 0 C to +40 C SPECIFICATION SHEET:

TIA-942 Data Centre Standards Overview WHITE PAPER

Power Distribution Considerations for Data Center Racks

6 ELECTRICAL PARAMETERS

Transcription:

Server Technology Inc. Phase Balancing: The Last Few Inches Of a High-Efficiency Power System White Paper STI-100-009 2010-June-25 Headquarters Server Technology, Inc. 1040 Sandhill Drive Reno, NV 89521 United States of America +001 (775) 284 2000 Tel +001 (775) 284 2065 Fax sales@servertech.com www.servertech.com www.servertechblog.com EMEA Server Technology Intl. Sienna Court The Broadway Maidenhead Berkshire SL6 1NJ United Kingdom +44 (0) 1628 509053 Tel +44 (0) 1628 509100 Fax salesint@servertech.com APAC Server Technology, Inc. 37 th Floor, Singapore Land Tower 50 Raffles Place Singapore, 048623 +65 (0) 6829 7008 Tel +65 (0) 6234 4574 Fax salesint@servertech.com

Overview Within enterprise data centers, power used for operating the facility, lighting, running IT loads and cooling is the largest operational expense. Numerous papers and articles have been published by The Green Grid, The Uptime Institute, PG&E, Lawrence Berkeley Laboratories and others discussing ways to measure, monitor and increase efficiencies. This paper discusses the effect on efficiency of load balancing across phases in a 3-phase distribution system. Though it is well known that an attempt should be made to balance loads in a 3-phase system, losses attributed to the failure to balance are not typically discussed. As amperage delivered to the data center cabinet continues to increase from 30A to 60A to 100A+, losses in the feeder wiring should be considered. 2 Phase Balancing: The Last Few Inches Of a High-Efficiency www.servertech.com

The Math: Joule s First Law Joule's first law describes the relationship between the heat generated within and the current flowing through an electrical conductor. It is named for James Prescott Joule who studied the phenomenon in the 1840s. It is expressed as: Q = I 2 R t where Q is the heat generated by a constant current I flowing through a conductor of electrical resistance R, for time t. When current, resistance and time are expressed in amperes, ohms, and seconds respectively, the unit of Q is the joule. Dividing both sides of the equation by t gives: P = I 2 R where P is power in watts. One watt equals one joule per second. For any conductor with a specific known resistance, as the current increases, the power loss through that conductor increases as the square. For instance, a doubling of current will quadruple the power loss and thus heating from that conductor. Feeder Cable Resistance This table provides a quick reference for solid copper wire resistance for a range of gauges. AWG Ohms / 1000 AWG Ohms / 1000 AWG Ohms / 1000 AWG Ohms / 1000 0 0.1 10 1 20 10 30 100 1 0.125 11 1.25 21 12.5 31 125 2 0.16 12 1.6 22 16 32 160 3 0.2 13 2 23 20 33 200 4 0.25 14 2.5 24 25 34 250 5 0.32 15 3.2 25 32 35 320 6 0.4 16 4 26 40 36 400 7 0.5 17 5 27 50 37 500 8 0.64 18 6.4 28 64 38 640 9 0.8 19 8 29 80 39 800 Highlighted are 12-gauge which is common for 20A circuits, 10-gauge which is common for 30A circuits, and 6-gauge which is common for 60A circuits. These are rule of thumb values. Slight variation in resistance will be seen due to tolerance in the wire diameter, ambient temperature, insulation, and self-heating effects. These variations can be ignored for this analysis. Phase Balancing: The Last Few Inches Of a High-Efficiency www.servertech.com

Delta Loads When utilizing a 120/208V 3-phase circuit in North America and applying loads in a delta configuration for 208V, balancing reduces losses in the feeder cables to the distribution point in the cabinet. Example 1: A 60A 208V 3-phase circuit is loaded in a delta configuration such that 13A is plugged into each of the three outlet phases: XY, YZ, and ZX. The current on the input lines are calculated using the following equations. X 2 = XY 2 + ZX 2 + XY ZX Y 2 = YZ 2 + XY 2 + YZ XY Z 2 = ZX 2 + YZ 2 + ZX YZ Thus the current through the X, Y, and Z input lines equals 22.52A each. Losses can be calculated using Joule s Law. P/R = X 2 + Y 2 + Z 2 P/R = (22.52) 2 + (22.52) 2 + (22.52) 2 = 1521 watts/ohm or 61 watts/100 of cable Worst case out of balance would be that all 48A are plugged into one of the outlet phases. In this case losses are: P/R = (39) 2 + (39) 2 + (0) 2 = 3042 watts/ohm or 122 watts/100 of cable This result shows that power loss and heat generated in feeder cables on out-of-balance circuits can be as much as double that of balanced delta loaded circuits. 4 Phase Balancing: The Last Few Inches Of a High-Efficiency www.servertech.com

Wye Loads and Neutral Current When utilizing a 415V 3-phase circuit in North America or elsewhere around the world and applying loads in a wye configuration for 240V, balancing reduces losses in the feeder cables to the distribution point in the cabinet just as in the case of delta loads. Additionally, with wye loads, the current through the neutral wire should be considered. Using vector math and assuming the phases are mutually 120 apart, the current N through the neutral wire in a 3-phase wye loaded circuit where X, Y, and Z are the currents through the three input phases is expressed as: N 2 = X 2 + Y 2 + Z 2 X Y Y Z Z X When all three input lines are balanced such that X = Y = Z, zero current flows through the neutral wire. Worst case for the amount of current through the neutral wire comes when one or two of the input lines are without load. For instance, if Y = Z = 0, then N = X ; and if X = Y and Z = 0, then N = X = Y. The neutral current will never exceed the highest input line current. Current flowing through the neutral wire results in pure loss per Joule s First Law. Example 2: A 30A 240/415V 3-phase circuit is loaded in a wye configuration such that 8A is plugged into each of the three outlet phases: XN, YN, and ZN. Simply, the current through each input phase is 8A and the current through the neutral is 0A. Losses are: P/R = X 2 + Y 2 + Z 2 + N 2 P/R = (8) 2 + (8) 2 + (8) 2 + (0) 2 = 192 watts/ohm or 19 watts/100 of cable Worst case out of balance would be that all 24A are plugged into one of the outlet phases. In this case losses are: P/R = (24) 2 + (0) 2 + (0) 2 + (24) 2 = 1152 watts/ohm or 115 watts/100 of cable This result shows that power loss and heat generated in feeder cables on out-of-balance circuits can be as much as 6 times that of balanced wye loaded circuits. In this example, supposing the end user had 100 feeder cables at 100 feet in length each and was paying 10 cents a kilowatt hour, the cost to the facility would be $8410 per year. Phase Balancing: The Last Few Inches Of a High-Efficiency www.servertech.com

Monitoring Phase Balancing Server Technology 3-phase Cabinet Power Distribution Units (CDU s) such as the CWG-24VYM311A1 provide three (3) LED digital displays to simultaneously view the amperage flowing through the three input phases. At a glance, a technician can examine their load balancing while installing equipment and during power auditing, even behind a locked cabinet door. Or, view the loading over the network using the integral web-based GUI and get SNMP alerts and/or email notification of a breach of a user-set balancing tolerance. For instance, an administrator can be notified if one of the input phases is more than 20% higher or lower than the average. Although it is useful to get spot measurement data of the distributed loads, it is known that that those loads may vary significantly over time due to changes in allocated usage. When that is the case, trending of usage can help an administrator make decisions about how to best improve efficiency. The Sentry Power Manager by Server Technology provides single point access to all network CDU s for outlet managing, power and environmental monitoring, and alarm/trap handling. By polling and then storing data from the CDU s, it is possible to view the loading over time for the input phases of the CDU s to determine long-term balance conditions. 6 Phase Balancing: The Last Few Inches Of a High-Efficiency www.servertech.com

Summary With large data centers operating in the tens of megawatts, incremental increases in efficiency translate into appreciable savings. Although the amount of power loss and excess heat due to imbalanced loading is small in comparison with other system inefficiencies, it can be noticeable once all other points have been optimized. Implementing 240/415V power, as discussed in STI white paper Power Efficiency Gains by Deploying 415 VAC Power Distribution in North American Data Centers, goes a long way toward highest efficiency design. But as amperage requirements continue to increase in the data center cabinet, balancing of loads for efficiency becomes more and more important, especially in the wye distribution chain. A thorough analysis of the load balancing on a cabinet by cabinet basis, with trending of consumption over time is the first step to determine if additional steps should be taken to more optimize the load distribution. As with any potential improvement in the data center, an ROI should be calculated to determine if action is warranted. Phase Balancing: The Last Few Inches Of a High-Efficiency www.servertech.com