District IT Infrastructure Upgrade Plan



Similar documents
Technology Department Infrastructure & Support

Upper Perkiomen School District

The primary goals of the technology plan are to support the goals of the district strategic plan:

SYSTEM REQUIREMENTS Single User & Red River Software ASP Users (See Specific Info for Tills and/or Meters) are not Supported in RRS

TECHNOLOGY PLAN SUMMARY

IVAN WINDON - CCENT NETWORK / SYSTEMS ADMINISTRATOR AREAS OF EXPERTISE:

BASEHOR-LINWOOD SCHOOL DISTRICT

LHRIC Network Support - Additional Service Features

Northeast Georgia Regional Library System. Request for Proposals 2015

REQUEST FOR PROPOSALS INFORMATION TECHNOLOGY SUPPORT SERVICES. Bid Packets are Due:

Information Technology Division Technology Operations & Systems Management

IT Services Network Assessment Pittsville Public School District March 24, 2009

Case Study: Oconomowoc Area School District

REQUEST FOR QUOTE. All out of date servers contain approximately 1 TB of data that needs to be migrated to the new Windows domain environment.

Service Description. Remote Consulting Service. Introduction to your service agreement. The scope of your service agreement

DALLAS INDEPENDENT SCHOOL DISTRICT PURCHASING DEPARTMENT ADDENDUM No. 2 NETWORK ELECTRONICS

TECHNICAL SUPPORT. and HARDWARE/SOFTWARE/NETWORK MAINTENANCE. for SCHOOL OF EDUCATION DOLNICK CENTER

Managed Network Services RFP. Q&A Document. Q1: What types of hardware does Clark County Department of Job & Family Services (CCDJFS) currently have?

Network Infrastructure

Top 10 Most Common Malware - How to Avoid Them

Executive/Management bios

Service Description. Remote Consulting Service. Introduction to your service agreement. The scope of your service agreement

This Request for Proposal consists of providing the IT Infrastructure Setup and Ongoing Support RFP requirements outlined in this RFP.

ACME Enterprises IT Infrastructure Assessment

Chabot Las Positas Community College District

2015 Piqua City Schools RFP for Network Equipment under E-Rate Category 2

Services that will be provided to the City include:

Seward County Community College

This Request for Proposal (RFP) consists of providing the IT Infrastructure Setup and Ongoing Support requirements outlined in this RFP.

Three Areas of Focus. * Infrastructure * Systems * Processes

1. Can you clearly state which piece of equipment we will be support and each site location?

City of Coral Gables

Statement of Work (SOW) For Technology Services Issued By Minnesota Office of the State Auditor

WINNEBAGO COUNTY INFORMATION TECHNOLOGY STANDARDS 2014/2015

1.0 Purpose of Solicitation

Parkview School District Request for Proposals

MSP Service Matrix. Servers

Huntsville City Schools

PASADENA AREA COMMUNITY COLLEGE DISTRICT 1570 E. COLORADO BLVD. PASADENA, CALIFORNIA RFP MICROSOFT SYSTEMS CENTER INTERGRATION

IT Assessment Report. Prepared by: Date: BRI Works East Main Street, Suite 200 Charlottesville VA

IT Solutions Savings through IT

Cloud Computing Thunder and Lightning on Your Horizon?

Determine dates with you telecom suppliers so that the new office is online before your move for both Phones and Data connections.

Server Infrastructure Upgrade Proposal

RAS Associates, Inc. Systems Development Proposal. Scott Klarman. March 15, 2009

Compulink Advantage Cloud sm Software Installation, Configuration, and Performance Guide for Windows

Network Bandwidth and Infrastructure Study Report EXECUTIVE SUMMARY

Milsoft IVR SIP Upgrade (Virtual Server) Presented by George Buckner (Central Florida Electric Cooperative, Inc.)

Request for Proposals: Systems Replacement & Cloud Services. April 19, 2012

Current/Future /Long Term. Project Name. Intrusion Detection. LAN POE Switch Rollout. Interactive Board Rollout. Laptop Cart Trial

Network Status Review University of Moratuwa. Mr. Nadeesha Ranaweera (Systems Engineer, Center for IT Services)

ADDENDUM NO. 03 August 22, 2014

Citizen Machinery UK Ltd

VoIP SYSTEM REQUEST FOR PROPOSAL QUESTIONS POSED BY VENDORS AS OF JUNE 23, 2014

Request for Proposal

Warner CNR Computer Desktop Support Policy

- Brazoria County on coast the north west edge gulf, population of 330,242

Network Attached Storage Common Configuration for Entry-Level

PROTECTION AND SYSTEM MAINTENANCE COMPUTER AND COMUNICATION SYSTEM OF EXECUTIVE COUNCIL OF AUTONOMOUS PROVINCE OF VOJVODINA.

INTRODUCTION TO NETGUARD

OPM. Dell Laptop Docking Station Lenovo Thinkpad Mini-Dock

WORKSHOP SYSTEM REQUIREMENTS & GUIDELINES CONTENTS

Industrial Security for Process Automation

The I.T. Experience Service and Pricing List 2015

Dell Open Manage System Administrator (Free software to manage and maintain your server hardware) Hardware Dell PowerEdge T320 or R320

Service Catalog. Office of Information Technology Lenoir-Rhyne University

Statement of Work RFP-DF Virtual Desktop Infrastructure

Connect With Axiom

Sagari Ltd. Service Catalogue and Service Level Agreement For Outsource IT Services

Information Technology Mission Statement. Information Technology Goals

GaLIX NETWORKING Pty Ltd YOUR TRUSTED PARTNER IN NETWORK SERVICES

Levittown Public Schools Information Technology Proposed Budget

Data Network Security Policy

Updated 7/02/2012 Infrastructure Opportunity Map

* * * AGENDA TRANSMITTAL FORM * * *

MAYA ANGELOU PUBLIC CHARTER SCHOOL

IT Setup Services IT SUPPORT SERVICES

MOUNTAIN EMPIRE UNIFIED SCHOOL DISTRICT REQUEST FOR PROPOSAL

RFQ IT Services. Questions and Answers

Planning Process and Methodology

CURRICULUM Based on guidelines from the State, developed by Subject Area Committees

The Portable Datacenter R E F E R E N C E A R C H I T E C T U R E

REQUEST FOR PROPOSALS INFORMATION TECHNOLOGY MANAGEMENT SERVICES AT THE SYRACUSE HANCOCK INTERNATIONAL AIRPORT

Addendum No. 1 to Packet No Enterprise Data Storage Solution and Strategy for the Ingham County MIS Department

Three Year District Technology Plan. Pasco School District #1 July 1, 2013 to June 30, 2016

Project Scope Statement


Information Technology Standards Document

Enterprise Backup Solution Vendor Questions

Gigabit Passive Optical

HP E-PCM Plus Network Management Software Series

Information Technology Services in UB Owned, Controlled and Managed Space

NEWSTAR ENTERPRISE and NEWSTAR Sales System Requirements

Part-1: SERVER AND PC

Proven Technical and Management skills over a career spanning more than 10 years. Brunswick Vic 3056 Australia

ERP Infrastructure Guide APPENDIX B

5. Infrastructure, Hardware, Software, & Technical Support

K1 Internet Service Fast, qualified and individual Management of your hosting.

Faculty Curriculum Development Workstation Replacement

Compulink Advantage Online TM

Transcription:

District IT Infrastructure Upgrade Plan This document contains two different plans, one consisting of accomplishing all upgrades at one time the other is a plan to accomplish all upgrades over a 3 year period. Primary School cabling initiative costs not included in any of the totals due to undecided future of the building. Possible closing of this building can greatly effect total costs: fewer workstations, fewer data switches, fewer VoIP phones, fewer UPS units, lower Charter Business Networks cost. Single Year Upgrade (Summer 2014 or 2015) HP Data Switches (Redundant 10GB Core Fiber, POE, VoIP support) = $185,000 4 @ Primary School, 7 @ Elementary School, 11 @ Middle School, 22 @ High Recurring Annual Service Agreement per Data Switch VoIP Phone System & Voicemail = $75,000 - $125,000 Recurring Annual Service Agreement APC Smart UPS with Environmental Monitoring = $28,000 1 @ Primary School, 2 @ Elementary School, 4 @ Middle School, 6 @ High Recurring Battery Replacement required District installed Unitrends Backup Appliance - R712 4TB = $6,200 Windows Pro Upgrade & Software Assurance = $2887.50 $19.25 per FTE @ 150 Symantec Endpoint Protection Enterprise Anti-Virus = $11,662 $13.72 per 850 workstations SonicWALL Firewall Appliance - Redundant Internet Protection = $6,000 Upgrade Novell OES, ZCM11, VMWare ESX, Update iscsi SAN Configuration, Anti- Virus, Win7/8 Images. Approximately 160 Technical Support Hours = $20,000 Approximately 160 Technical Support Hours @ $125 per hour

Upgrade to 10GB Bandwidth between buildings Workstation Upgrades to Win7 - choose from following 400 Refurbished Optiplex 760 computers = @$200 x 400 = $80,000 OR 400 New Dell Optiplex 7010 computers = @$900 x 400 = $360,000 100 Refurbished Latitude E6500 laptops = @$400 x 100 = $40,000 OR 100 New Dell Latitude 15 3000 series laptops = @$850 x 100 = $85,000 Update data cabling at Middle School Office = Estimated $3,500 Move data drops and data switch to FACE closet Update data cabling at Primary School = Estimated $30,000 (not included in totals) Replace existing data cable with proper ducting Total Cost Estimates = $458,249.50 to $833,249.50 Recurring Annual Cost Increase = $14,549.50 plus Charter Business Networks increase *Note* VoIP Phone system requires Data Switch replacement and UPS installation be done

Immediate (2013-14) Replace failed drive in HP MSA 2000 SAN - $108.00 (Completed 11/5/13) Upgrade VMware to current version - $320.50 (Upgrade on order) Recurring annual license fee - $39.00 Replace failed UPS battery at High School Server Room (Replaced 10/31/13) Replace failed UPS battery at Elementary School MDF (Exchanged with PS UPS) Replace failed UPS at Primary School MDF (Retired server so no longer needed) Investigate alternative workstation anti-virus solution (Symantec Anti-Virus) Implement patch management solution for workstations Contract with Skyward to reprogram existing WSUS system Install Move Wireless access points as described in WiFi assessment Reposition AP in High School Commons Reposition AP in High School C wing Reposition AP from Primary School Room 205 to 200 hallway Reposition AP in Primary School Art/Music hallway Check on operation of AP in High School Auditorium Install New Wireless access points as described in WiFi assessment = $5000 Install additional AP in High School B wing Install additional AP in High School E wing Install additional AP in Elementary School Office Install additional AP in Primary School Speech/Language Room Install additional AP in Primary School Gymnasium

1st Year (Summer 2014) Upgrade Novell OES, ZCM11, VMWare ESX, Update iscsi SAN Configuration, Anti- Virus, Win7/8 Images. Approximately 160 Technical Support Hours = $20,000 Approximately 160 Technical Support Hours @ $125 per hour Upgrade to 1GB Bandwidth between buildings Workstation Upgrades to Win7 - choose from following 400 Refurbished Optiplex 760 computers = @$200 x 400 = $80,000 OR 400 New Dell Optiplex 7010 computers = @$900 x 400 = $360,000 100 Refurbished Latitude E6500 laptops = @$400 x 100 = $40,000 OR 100 New Dell Latitude 15 3000 series laptops = @$850 x 100 = $85,000 Windows Pro Upgrade & Software Assurance = $2887.50 $19.25 per FTE @ 150 Symantec Endpoint Protection Enterprise Anti-Virus = $11,662 $13.72 per 850 workstations Unitrends Backup Appliance - R712 4TB = $6,200 Update data cabling at Middle School Office = Estimated $3,500 Move data drops and data switch to FACE closet SonicWALL Firewall Appliance - Redundant Internet Protection = $6,000 Total Cost Estimates = $172,249.50 to $495,249.50 Recurring Annual Cost Increase = $14,549.50 plus Charter increase

2nd Year (Summer 2015) HP Data Switches (Redundant 10GB Core Fiber, POE, VoIP support) = $185,000 4 @ Primary School, 7 @ Elementary School, 11 @ Middle School, 22 @ High Recurring Annual Service Agreement per Data Switch Upgrade to 10GB Bandwidth between buildings Total Cost Estimates = $185,000 plus Charter Business Networks increase 3rd Year (Summer 2016) VoIP Phone System & Voicemail = $75,000 - $125,000 Recurring Annual Service Agreement APC Smart UPS with Environmental Monitoring = $28,000 1 @ Primary School, 2 @ Elementary School, 4 @ Middle School, 6 @ High Recurring Battery Replacement required District installed Update data cabling at Primary School = Estimated $30,000 (not included in totals) Replace existing data cable with proper ducting Total Cost Estimates = $130,000 to $153,000