Content. OCCR at a glance Facts Many parties involved Need for cooperation/partnership

Similar documents
chain, a Rotterdam experience

EMERGENCY EVACUATION PROCEDURES

FASTER. EASIER. COOLER.

ACTION PLAN

Board Seminar Facilities. School Year Submitted by Joseph L. Lisa-Director of Facilities

SQUIZ SOLUTIONS. Disaster Recovery and Security October 13. Zetland House Clifton Street London EC2A 4LD

E-logistics platform for the support of small and medium seized enterprises

Arizona Health Care Association DISASTER PLANNING AND EMERGENCY MANAGEMENT GUIDE POST INCIDENT DAMAGE ASSESSMENT CHECKLIST

The risk of derailment and collision, and safety systems to prevent the risk

The Dutch Railway System. Logistics & Railway Infrastructure Forum NL Indonesia April 30 th 2015

Welkom. Dutch Track. IRSE Seminar: Delivering Business Performance. More Capacity, Less Complexity. Vincent Weeda 29 maart 2012

DB2020 guiding us toward the future Annual Results Press Conference Deutsche Bahn AG DB Mobility Logistics AG Frankfurt, March 27, 2014

ABBVIE C-TPAT SUPPLY CHAIN SECURITY QUESTIONNAIRE

Haagse Poort. The Beatrixkwartier is part of The Hague New Center. Further information can be found online on the website:

Your Company Name. Your Company Address Your City, State, Zip Your Phone Number Your Address. Project Information

Railway traffic optimization by advanced scheduling and rerouting algorithms

RailML use in the project

Seoul Metro line 9 O&M Contract

Reporting»»

Philips remote monitoring and control systems

Acoustical Surfaces, Inc.

Saffron Square (Keats) Unit 6.05 apt 36

HOW TO LOAD A TRUCK OR A CONTAINER IN 5 MINUTES?

Developing a Security Training and Awareness Program

Community Anchor Institution Service Level Agreement

Why Invest in Holland? Jeroen Nijland, Commissioner NFIA Madrid, 4 March 2015

The State Of The Netherlands IT Recruitment Market

Hitachi s Involvement in Nuclear Power Plant Construction in Japan

Colt Colocation Services Colt Technology Services Group Limited. All rights reserved.

Security Service de Services sécurité. Security Alarm Monitoring Protocol

English. Trapeze Rail System.

Chips New Islington Manchester

How To Manage Traffic In Berlin

Jim Kelly. Chuck Morganson

220.5" Basic Features. Electrical Features

Comfort and superior energy efficiency through intelligent home automation

CLEANING CONTRACT BID SPECIFICATIONS

IEA SHC Task 47 Renovation of Non-Residential Buildings towards Sustainable Standards

Taylor Family Digital Library Meeting Space Booking Guide

Supply Chain Acceleration: Our Offering for Enabling Growth

Security Alarm Monitoring Protocol

Application for the UIC Sustainability Awards 2010 Category: "Energy Efficiency and CO2" Ecotrainbook Driver assistance system

Security from a customer s perspective. Halogen s approach to security

Hospitality Safety Solutions

Global Supply Chain Security Recommendations

Support & Field Services

IQ-C Action plan for rail freight corridor Rotterdam-Genoa

AVIATION TRANSPORTATION SPECIALISTS WHATEVER IT TAKES. WHEREVER IT S GOING.

DB Schenker Rail ECM Registration and Impact on Strategy

Transport System Telematics. Rai lway geolocation and communication-management platforms

Lower Level (Level L) Exhibit Halls A, B & C

Turkey Railway Infrastructure and Rolling Stock Summit

Home Designer. Interiors. New Version!

API AIMM PHILADELPHIA INSTALLATIONS FURNITURE INSTALLATIONS RECONFIGURATION RELOCATION PROJECT MANAGEMENT WAREHOUSING

The Art Institute of Houston Summer 2010 Instructor : Rhonda Jones. 1. Concept Statement 7. One Line Diagram. 2. Program 8. Preliminary Floor Plan

Requirement of Office Space (4000 sq. ft.) for REC Transmission Projects Company Limited

Janitorial Service. Scope of Work

Trucking & Warehouse Solutions. Ranjit Mahadeva Ranjit.mahadeva@sprint.com

Priority decision. High-Frequency Rail Transport Programme

DHL INTERNATIONAL SUPPLY CHAIN DISCOVER THE ADVANTAGE OF A SMARTER SUPPLY CHAIN

Assigning Severity Codes

Commercialization of Transport and Logistics Storage Logistics Supply Logistics Administrative Management of International Trade

Emergency Response Plan

New Providence Wharf, London, E14 Price: 449,888 Tenure: Leasehold Lease 999 from 2004

Amsterdam Smart City project

Damage Charge Lists. FLOORING Replace Repair Carpet per square foot (Mohwak heat carpet tile)

Legislative Council Panel on Transport Subcommittee on matters relating to railways

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

Austin Independent School District Police Department Policy and Procedure Manual

DB technology strategy. Technology, CTO Board Division Infrastructure, Services and Technology

Page 1 of 6 COMPLIANCE CHECKLIST. > Long Term Care Facility - Nursing Unit

The schedule is based upon a five (5) day work week (Monday through Friday). Weekend service is only when requested.

High speed railway principles

Facilities Operations Customer Service Standards WORK ORDER PRIORITIES

ATOC Approved Code of Practice Incident Response Duties of Primary Support Operators

PPP in Practice High Speed Line Netherlands. Infraspeed Maintenance. Ruud Schellekens. Goal

High spec SERVICED OFFICES

Port of Narvik. The Gateway to the Arctic PORT LOGISTICS: RAIL-ROAD-SEA-AIR. No draft restrictions. Sheltered waters. Ice-free all year round

San Diego Convention Center Floor Plans

Flood Events Preparedness, Remediation and Restoration. Rev 3 Dec 2014

panel systems : diet Smart Building, Savvy Furniture.

Office building Laan op Zuid Rotterdam. van den Oever, Zaaijer & Partners architecten

CERTIFICATION, DESIGN, CONSTRUCTION, OPERATION AND MAINTENANCE GUIDELINES for BRITISH COLUMBIA COMMUTER RAILWAYS

Transcription:

Content OCCR at a glance Facts Many parties involved Need for cooperation/partnership The OCCR concept How it works? Cooperation One location Benefits The way forward Technology involved and facilities Future developments

Facts 5.900 passengertrains and 1,2 million travelers per day 400 freighttrains with 100.000 ton cargo per day 6.800 km track, 389 stations One of the bussiest networks of Europe 1300 trains each day to/from Utrecht Central 450 disruptions with major impact each year

Many parties involved Infrastructure Planning Logistics Personnel

Need for cooperation/partnership Computerstoring Utrecht legt treinen plat (bron: Rotterdams Dagblad) Iedereen is boos na de grote treinstoring Honderden wachtenden in Den Bosch door treinstoring (bron: Omroep Brabant) (bron: Haagsche Courant) Boze reacties op treinstoring teleurstellend (bron: Elsevier) Herstelplan biedt reiziger nog geen soelaas (bron: Trouw)

Need for cooperation/partnership Almost all operational parties involved were based/organized regionally: No country-wide approach Problems on boundaries Many escalations to higher management Focus on now No integration of processes

How does it work? Regional Central (each column) Co-location (= OCCR) OCCR X X X X X Y Y Y Y Y Z Z Z Z Z X X X X Stap 1 X X X X X Stap 2 Regional controlled processes Physically separated Central county-wide approach of process Cooperation between central and local/regional Country-wide control on one location Cooperation between processes From Via To

How does it work? Cooperation for Dutch Rail infrastructure Critical functions on one location 24/7 operational, 365 days a year 69 ( 100) desks

OCCR partnership model OCCR Countrywide Coördinator Rail EXTERNAL Controller Controller Controller Controller Controller Controller Controller Incident control AM + stoco s BNS CSD NedTrain MBN NSR + MRC LVL Carriers Supervisors Accident control + prevent Maintenance infra Maintenance ICT Rolling stock maintenance + failures Regional On-board personnel Control centres On-board personnel REGIONAL Algemene presentatie OCCR 9

One location OCCR COMMON/SHARED VIEW of SITUATION Shared Situation Awareness MUTUAL UNDERSTANDING Team Awareness OPTIMIZING PROCES

Partnership is the trend Traffic Control (VL) LVL Orderintake NSR LBC (+ MRC) Incidentcontrol Travel information Backoffice NedTrain MBN (LBM) Assetmgt. OBI (SMC) Stoco s On-site Arriva Syntus NS HiSpeed Connexxion Veolia BNS CSD KeyRail Infraspeed Freight Carriers (DB Schenker, ACTS, CapTrain, ERS) 11

Benefits Complete and up-to-date information of country-wide operational situation Less incidents and major disruptions faster recovery after incidents/disruptions Better capacity control Less delays Improvement of rail in general

Optimizing Country wide dispatch system (LVL) Country wide Coördinator Rail (LCR) NSR Customermonitor Incidentcontroller(s) located at OCCR Country wide coordination travel information (InfoPlus) Controller incident and Controller Travel information Weather forecast

Technology Voice-over-IP Video-conference New operational desks, chairs and video screens Deskconcept (1 keyboard/mouse per desk, no PC s on desk) Videowall Algemene presentatie OCCR

Environment Acoustics Measurements against telephonecalls (privacy) and sound in general Ceiling, carpets, panels between desks Light Dynamic controlled for OCCR area Individual dimming by use of LED-lights

Old location

New facilities Climate 100% redundant airco 5.000m 3 ventilationair (50m 3 /h per person) No air through floor (no draft) Safety Controlled access, visitors, glass General facilities, such as: Kitchen, pantries, lockers, smoke-area, showers and bedrooms, firstaid area, incidentcontrol- and pressroom, CO2 friendly roof, parking, network, UPS, power, videowall

Future developments 2011 Take-over of controlcentres (signalling floor) Take-over of local computerrooms 2012 OBI (SMC) to OCCR 24-12-2012 operational