LNG TANDEM OFFLOADING SYSTEM

Similar documents
Single Point Mooring System (SPM) for an Offshore LNG Terminal

Design methodology and numerical analysis of a cable ferry

Safe Offloading from Floating LNG Platforms (SAFE OFFLOAD) R. V. Ahilan Noble Denton Europe

Design and Construction of LNG Regasification Vessel

AN INNOVATIVE SOLUTION FOR FIXED OFFSHORE LNG REGASIFICATION TERMINALS

Engineers at Liftech designed the structure of the first container crane and have designed and reviewed thousands of container cranes since.

Simulation of Dynamic Behaviour of a FPSO Crane

creating progress for the future

Boom and fly capacities for this machine are listed by the following sections:

Lifting Appliances

Communication Links for Offshore Platforms. A User s Guide to Troposcatter Communications

Pandora FLNG Wison Offshore & Marine

Simulation of Offshore Structures in Virtual Ocean Basin (VOB)

Manual: Nearshore CPT Testing NEARSHORE CONE PENETRATION TESTING (TOP PUSH TECHNIQUE)

Air Eliminators and Combination Air Eliminators Strainers

CONTAINMENT BOOM OBJECTIVE & STRATEGY TACTIC DESCRIPTION. Mechanical Recovery Containment and Recovery

CRANES WINCHES WINDLASSES CAPSTANS

LNG Fuel Gas Infrastructure from terminal to onboard system The Motorship Gas-fuelled Ships 12 to 14-Sep-2012, Bergen

Study of the Stability of Turret moored Floating Body

Marine Transportation of Compressed Natural Gas

OIL & MARINE PRODUCT RANGE. Dock & onshore Floating roof tank drain Mooring Rig supply

DeepWind'2013, January, Trondheim, Norway. Measurement of wind profile with a buoy mounted lidar. Jan-Petter Mathisen

Offshore Structures. Offshore Drilling Equipment

Wind influence on container handling, equipment and stacking

Engineering and technologies Floating LNG

Example. Fluid Power. Circuits

Helping Our Customers Achieve Superior Results. Top Drive

Passenger Terminal Amsterdam

LNG A Different Approach The Teesside GasPort Project

OFFSHORE WIND Peter Robert

Monobuckets and the competitiveness versus monopiles and jacket structures.

Maersk Resilient. Maximised drilling efficiency and uptime. Optimised for concurrent activities

Laws and price drive interest in LNG as marine fuel

The Dalian Developer A new approach to oil spill response

Supply, storage and handling of LNG as ship s fuel Björn Munko LNG 17, Houston

Vertical Pumps for the Oil & Gas Industry

Conceptual benefits with a cylindrical hull for FPSO, FLNG, drilling and floating powerplant applications

LECTURE 28 to 29 ACCUMULATORS FREQUENTLY ASKED QUESTIONS

HOW HYDRAULIC TRUCK CRANES WORK

Safety of Life at Sea, 1974 (SOLAS)

DOUBLE DRUM TRACTION WINCH SYSTEMS FOR OCEANOGRAPHIC RESEARCH 1.0 TRACTION WINCH SYSTEM ADVANTAGES 11-2

Increase Life Cycle and Decrease Cost for Navigation Buoys

il Castorone la più avanzata nave posatubi al mondo: acquisti e logistica Paolo Daleffe Armando Favi

GOLIATH DPIII OFFSHORE SUPPORT VESSEL. Vessel Specification - December 2011

Blue Logic Auto Release STAVANGER 2015

Azimuth thrusters. propulsors

GENERAL HULL FORM EQUATIONS

RT100 ROUGH TERRAIN CRANE DATASHEET - IMPERIAL. Features:

Geotechnical Design Monopile Foundations for Offshore Wind Turbines

HMIS Top Drive System

APPLICATION OF INNOVATIVE METHODS FOR DESIGN AND CONSTRUCTION OF OFFSHORE STRUCTURES

RODADEACO. Diesel Engine Air Intake Shutoff Valves. Model RDS1 Swing Gate Valve. by AMOT. Overview. Typical Applications. Key Features and Benefits

Fire Sprinkler System Maintenance and Testing Page 1 MAINTENANCE AND TESTING OF FIRE SPRINKLER SYSTEMS

skirt Appendix A Mechanical Containment and Cleanup Technologies Containment Booms

Application of a Tightly-Coupled CFD/6-DOF Solver For Simulating Offshore Wind Turbine Platforms

Overturning Stability of Offshore Wind Power Substructure with Bucket Foundation

Basic Symbols. Lines. Circular. Square. Diamond. Miscellaneous Symbols. -continuous line - flow line. -dashed line - pilot, drain

Total Subsea Solutions

AUTORIDAD DEL CANAL DE PANAMÁ

27th session 20 December Resolution A.1045(27) Adopted on 30 November 2011 (Agenda item 9) PILOT TRANSFER ARRANGEMENTS

METHOD OF STATEMENT FOR STATIC LOADING TEST

Reeling. Heavy Duty. Contents

Anchored by excellence

Chapter 10: Linear Kinematics of Human Movement

The Secret of Hydraulic Schematics. BTPHydraulics

Design Methodology and Numerical Analysis of a Cable Ferry

A Leader In Maritime Technology

Horizontal Jet Pumps 1/3-1-1/2 HP

Fall Protection Equipment

MONDOATHENS BASKETBALL SET (Reference PK110)

T-SERIES INDUSTRIAL INCLINOMETER ANALOG INTERFACE

NavDP4000 Series Dynamic Positioning Systems

Various Technics of Liquids and Solids Level Measurements. (Part 3)

KNC Model 3666 Automatic Pressure Calibration System

Top Drive Service Loops. Conventional, Enhanced and Superior Solutions for Drilling Applications

The entire document shall be read and understood before proceeding with a test. ISTA 3B Page 1 of 35

GAS FLAWLESS - FORM C

UNIT 1 INTRODUCTION TO AUTOMOBILE ENGINEERING

Keep Your Head Above Water

Measurement & Analytics. VIS Multiphase Flow Meter High gas content applications solved with no radioactive source - Measurement made easy

Transducer Installation

Module Title: General Ship Knowledge

DOEN THRUSTMASTER WATER JETS. 100 Series. 100kW to 900kW. History. Innovation. Power. thrustmaster.net

Boat Launch and Recovery A Key Enabling Technology For Flexible Warships Andy Kimber, BMT Defence Services Limited, Bath UK Info@bmtdsl.co.

Working Drawing and Assemblies. Chapter 10

Scana Offshore Technology

Crowley LNG. Puget Sound Harbor Safety Committee June 3 rd, Matthew Sievert Director Business Development LNG

Fourth Generation Modular Construction

Using Computational Fluid Dynamics (CFD) Simulation to Model Fluid Motion in Process Vessels on Fixed and Floating Platforms

SERIES ASM NEOPRENE/EPMD FLANGED SINGLE SPHERE CONNECTOR CONNECTORS. Pressures to 225 PSIG (15.51 barg) Temperatures to 230ºF (110ºC)

MICROPACK Visual Flame Detection Application Note

Nautilus Minerals. presentation to AFTP. Paris, October

FILLING AND PURGING THE SYSTEM

Brochure. Electric generators to power the world

2100 AD Mirror Elevator Ball Nut Replacement Procedure

Case Study 10 R/V WESTERN FLYER Chronic Cracking in an Aluminum SWATH Research Vessel

Why and How we Use Capacity Control

NAVIGATE VESSEL SAFELY AT THE CHITTAGONG PORT ( BANGLADESH) ANCHORAGE- by Zalal Uddin Ahmed

VITOSOL r 200-T SP2A. VITOSOL 200-T Type SP2A

Transcription:

84b LNG TANDEM OFFLOADING SYSTEM Terry Boatman, Stephen Jones, and Ron Mack FMC Energy Systems 6677 North Gessner Road Houston, Texas 77040 Prepared 2003 AIChe Spring National Meeting: LNG & Gas Transportation Session Copyright Terry Boatman, Stephen Jones, and Ron Mack, FMC Energy Systems AIChe shall not be responsible for statements or opinions contained in papers or printed in its publications.

TABLE OF CONTENTS 1- ABSTRACT 2- BACKGROUND OF LNG TRANSFER SYSTEMS 2.1 ONSHORE PROTECTED 2.2 ONSHORE EXPOSED 2.3 OFFSHORE (SHIP TO SHIP) SIDE BY SIDE BOOM TO TANKER 3- LNG TANDEM OFFLOADING SYSTEM 3.1 MOORING SYSTEM YOKE CONVENTIONAL YOKE DUPLEX YOKE CONNECTION AND DISCONNECTION MODEL BASIN TESTING 3.2 LNG TRANFER SYSTEM DOUBLE PANTOGRAPH CONNETION AND DISCONNECTION 4- THE NEXT STEPS

1.0 ABSTRACT FMC Energy Systems has combined two industry proven technologies to create the safest and most reliable tandem LNG loading/offloading system available to the offshore industry. The LNG Tandem Offloading System, which is capable of transferring LNG at a rate of 15,000 m 3 /hr, is comprised of two totally independent systems, the LNG transfer system and the mechanical mooring system. The LNG transfer system utilizes industry proven LNG transfer technology from FMC Loading Systems in France. It provides simple LNG connection by vertically suspending the LNG Chiksan loading arms system, a double pantograph comprised of four sixteeninch product lines, from a fixed outboard boom. The mechanical mooring system uses a robust duplex yoke that minimizes the sway motions between vessels to maximize the FPSO s ability to offload in harsh weather locations. This new concept in mooring yoke technology decouples lateral stiffness from fore and aft stiffness resulting in a dual, or duplex action. This duplex yoke, made by FMC SOFEC Floating Systems, moors the vessels using a combination of industry proven yoke and high load connector technology. The mechanical mooring system is connected using a simple and safe procedure that minimizes assistance from auxiliary vessels. The duplex yoke has been very successful in wave basin model testing as well as extensive computer simulation. Fully integrated, these two systems have resulted in an excellent combination of proven technologies. This paper will discuss the evolution of FMC Energy Systems LNG Tandem Offloading System, the major design features, as well as relevant project experience relating to tandem LNG offloading. 1

2.0 BACKGROUND OF LNG TRANSFER SYSTMES When transferring LNG, there are many variables that limit the options available for designing the structure. A few examples of these variables include: types of ships, mooring variations, water level variations (tides), and wave conditions. These variables help define the operating envelope of the transfer system. The larger the operating envelope, the stronger the system must be in order to function properly in the dynamic conditions. A representation of the operating envelope is shown below in Figure 1. However, the most limiting factor in LNG transfer systems is the relative motions of the flanges during connection. Figure 1: Operating Envelope Operating Envelope Arm Berth 2.1 ONSHORE, PROTECTED The most common type of loading facility is an onshore facility that is connected via a jetty and ship-berthing and mooring dolphins. These facilities are in very benign waters or they have a breakwater. The relative motions during connection of the flanges would be small: Vertical Displacement +/- 0.1 m Horizontal Displacement +/- 0.1 m Velocity +/- 0.05 m/s Acceleration +/- 0.025 m/s 2 The typical installation would include 3 to 5 loading arms (2 to 4 liquid and 1 vapor) to unload a gas carrier at rates ranging from 4,000 to 12,000 cubic meters per hour (m 3 /hr). These loading arms also vary in size from 8 to 24 in diameter and usually include emergency release systems, manual couplers, and position monitoring systems. 2.2 ONSHORE, EXPOSED Due to the high costs of a breakwater, some onshore installations are exposed to slightly more turbulent waters. These facilities, while similar to protected onshore facilities, have larger relative motion requirements for connecting the flanges: Vertical Displacement +/- 0.5 m Horizontal Displacement +/- 0.5 m Velocity +/- 0.25 m/s Acceleration +/- 0.125 m/s 2 2

These larger motions dictate that the exposed offshore facilities use loading arms that have constant motion swivels and a hydraulic coupler rather than manual couplers. The arms typically include emergency release systems and position monitoring systems. 2.3 OFFSHORE (SHIP TO SHIP) Offshore LNG introduces many operational and logistical challenges that must be compensated for in the design of the facility. However, the financial benefits of recovering stranded gas or offloading to a regasification barge have driven new developments in floating LNG. Side-by-Side - One development in offshore LNG is the side-by-side arrangement developed by FMC Energy Systems. This system is comprised of a dynamic loading arm and a targeting system. The maximum relative flange movements during connection are: Vertical Displacement +/- 2.5 m Horizontal Displacement +/- 1.7 m Velocity +/- 1.0 m/s Acceleration +/- 0.5 m/s 2 This range of motion requires a cable assisted connection system for each of the 3 arms (2 liquid and 1 vapor). The connections are made by maneuvering the arms over the LNG carrier s manifold and dropping a messenger line. The line then guides the arm into the proper alignment. Figure 2 below shows the connection sequence. Figure 2: Side-by-Side Connection Sequence Boom to Tanker - Another variable that limits the options for designing an offshore facility is the percent availability of the facility. For an FPSO or regasification barge, limited LNG storage requires that the facility must have a high percent availability of LNG transfer. Therefore the vessel may sometimes offload to a carrier in relatively harsh conditions. One solution that FMC Energy Systems has developed for this situation is the FMC Boom to Tanker. This system utilizes a pantograph that is vertically suspended from a 3

boom. The pantograph is capable of transferring LNG at a rate of 10,000m3/hr and is comprised of one liquid arm (24 ) and one vapor arm (16 ). The LNG carrier is moored using two hawser lines that are kept in tension with the reverse thrust of the carrier. The crane boom system is mechanically operated to follow the lateral movements of the carrier to ensure the LNG pantograph remains within its 23.0m diameter operating envelope. The relative flange movements during connection are: Vertical Displacement +/- 5.0 m Horizontal Displacement +/- 5.0 m Velocity +/- 2.5 m/s Acceleration +/- 2.5 m/s 2 The FMC Boom to Tanker system requires a targeting system similar to that of the sideby-side arrangement. The pantograph is equipped with an emergency release system, hydraulic couplers, constant motion swivel joints and a position monitoring system. A 1/5 th -scale model, shown below in Figure 3, has been built and successfully tested in Sens, France. The rest of this paper discusses another viable solution to the offloading of LNG in relatively harsh weather conditions. Figure 3: Boom to Tanker Model 4

3.0 LNG TANDEM OFFLOADING SYSTEM FMC Energy Systems has developed a proprietary LNG Tandem Offloading System specifically for harsh weather environments. This system is the combination of two independent industry-proven technologies that results in the safest and most reliable tandem LNG loading/offloading system available to the offshore industry. The LNG Tandem Offloading System, which is capable of transferring LNG at a rate of 15,000 m 3 /hr, is comprised of two totally independent systems, the LNG transfer system and the mechanical mooring system. A representation of the LNG Tandem Offloading System is shown below in Figure 4. Figure 4: LNG Tandem Offloading System The Tandem Offloading System uses a duplex yoke to limit the motion of the carrier and a double pantograph to offload the LNG. This system does not require hawser lines or stern thrust during the offloading operation. LNG carriers can be purpose built with the bow connection assembly or an existing carrier can be readily converted without the need for dry-docking. The modifications do not interfere with the existing OCIMF bow mooring equipment. 3.1 MOORING SYSTEM The mechanical mooring system uses a robust duplex yoke that minimizes the sway motions between vessels to maximize the FPSO s ability to offload in harsh weather conditions. This new concept in mooring yoke technology decouples lateral stiffness from fore and aft stiffness resulting in a dual, or duplex action. This duplex yoke, made by FMC SOFEC Floating Systems, moors the vessels using a combination of industry proven yoke and high load connector technology. The mechanical mooring system is connected using a simple and safe procedure that minimizes assistance from auxiliary 5

vessels. The duplex yoke has been very successful in wave basin model testing as well as extensive computer simulation. The environmental design criteria for the yoke is shown in Table 1 below. Figure 5: Conventional Soft Yoke Table 1: Design Criteria 100-Year Seastates 99.40% Wave Only Crossed 1 Crossed 2 Connection Water Depth 64 64 64 64 m Wave Wave Spectral Model P-M P-M P-M P-M Significant Wave Height 5.5 5.5 5.5 3.5 m Peak Period 12 10.5 12 9.5 sec Direction 180 180 180 180 deg Wind Velocity 42.9 42.9 23.5 knots Wind Spectral Model API API API Direction 225 225 225 deg Current Velocity 1.45 1.45 0.58 knots Direction 270 270 270 deg Conventional Yokes - Traditionally, yoke moorings have been used to permanently moor FSOs and FPSOs in shallow water. They permit the vessel to move in response to the environmental conditions while limiting the vessel s surge motions and maintaining a safe distance between the FSO/FPSO and the mooring platform. However, utilizing a conventional yoke for a tandem offloading mooring would not adequately reduce the swaying motion of the carrier and as a result, a crane boom would be required to mechanically follow the carrier to ensure the LNG transfer system would remain within a safe operating envelope. An example of a conventional soft yoke is pictured below in Figure 5. 6

Duplex Yoke - The duplex yoke is a new concept in yoke mooring technology. Essentially, it is a mechanical linkage that decouples the lateral stiffness from the fore and aft stiffness of the carrier. By using the counterweight coupled with the articulated linkage, the yoke exerts a force in a dual, or duplex action. The result is an increase in lateral stiffness several times that of a conventional soft yoke while maintaining the same fore and aft stiffness. Figures 6 and 7 below show the duplex yoke just prior to connection. Figure 6: Yoke Prior to Connection Figure 7: Duplex Yoke Connection and Disconnection - The LNG Tandem Offloading System moors the LNG carrier using simple procedures and minimal, if any, assistance from auxiliary vessels. As the LNG carrier approaches the LNG facility, two hawser lines are connected to the bow of the carrier and are used for winching the carrier in closer to the LNG facility. Once these lines are established, the LNG carrier uses reverse thrust to ensure vessel separation. Next, the carrier is winched closer to the FPSO until the vessel is close enough to reach the yoke retrieval line. The vessel is then winched closer via the hawser and the yoke retrieval line. Figures 8 and 9 below show a representation of the connection sequence. Figure 8: Yoke Prior to Tension Figure 9: Connecting Cone 7

The cone enters the mating cone connection module and locks the yoke into place. The process and winches are controlled from the FPSO. At this stage, the carrier is ready to connect the LNG transfer system. Disconnection is the same sequence done in reverse. Model Basin Testing - In November of 2002, the LNG Tandem Offloading System was tested in a model basin at the State Key Laboratory of Ocean Engineering in Shanghai, China. The model LNG carrier and FPSO dimensions were scaled to the vessel specifications listed in Table 2 below. Figure 10: Double Pantograph Table 2: Vessel Specifications LNG Carrier LNG FPSO LNG Capacity 142,000 240,000 Cubic Meters Displacement... 114,465 168,220 Metric Tons Length of vessel at waterline... 270.8 300.0 Meters Beam of vessel at waterline... 45.3 54.5 Meters Vessel draft... 11.3 12.5 Meters Heave Period 9.8 11.4 Seconds Roll Period 14.2 14.0 Seconds Pitch Period 10.4 11.2 Seconds The results of the model basin testing successfully demonstrated the design of the mooring system. The duplex yoke controlled the relative motions within an operating envelope acceptable for the LNG transfer system. 3.1 LNG TRANSFER SYSTEM The LNG transfer system utilizes industry proven LNG transfer technology from FMC Loading Systems. It provides an LNG connection by vertically suspending the LNG Chiksan Loading Arms, arranged in a double pantograph, from a fixed outboard boom. Double Pantograph - The LNG transfer system uses 4 product lines, each 16 inches in diameter, to transfer the LNG at a rate of 15,000m3/hr. The product lines are configured in a double pantograph formation that allows them to retract, extend, and rotate in a motion similar to a pendulum of a clock from port to starboard as well as fore and aft. The pantograph uses industry proven swivel joints and quick connects/disconnects. Maintenance can be performed anywhere on the pantograph, while at sea, using a service platform that moves along the boom. A representation of both the pantograph and the service platform are shown below in Figures 10 and 11. Figure 11: Pantograph Service Platform 8

Connection and Disconnection To connect the product lines, the operator located on the shuttle carrier lowers a messenger line, similar to the side-by-side system, to connect the acquisition cable. This acquisition cable is Figure 12: Manifold System used to lower the double pantograph system to the manifold system, depicted in Figure 12 to the right, located on the LNG shuttle carrier bow. To avoid any shock, the heave of the vessels is compensated by managing the tension in the double pantograph cables. The centering device consists of a male and a female cone to secure the connection. An independent mechanical coupler is used to take all the loads applied on the pantograph system. Once the mechanical coupler is locked, the operator moves the two jumper assemblies to align them with the LNG quick connect/disconnect couplers. The hydraulic cylinders raise the ball valves of the LNG carrier in front of the couplers for the final connection of the product lines. Disconnection is basically the reverse of the connection sequence. When the pumps are stopped and the LNG piping drained with dry nitrogen gas, the operator then proceeds to disconnect. Interlocks forbid the release of the product couplers before the ball valves are closed. After the disconnection of the product couplers, the mechanical system can be released and the double pantograph system is raised while the heave compensation system is automatically engaged. To ensure optimal operating flexibility, emergency disconnection from the carrier is totally independent of the duplex yoke. 4.0 THE NEXT STEPS Over the next six months, FMC Energy Systems will continue to develop the LNG Tandem Offloading System working diligently in the following areas: Scale model testing of the yoke cone connector equipment Development of detailed installation and operational procedures Conduction of a comprehensive safety and risk analysis Obtain Approval in Principle or other certifications as appropriate (one or more from Lloyds, ABS, DNV or BV) 9