AEC (UK) BIM Protocol Project BIM Execution Plan Implementing UK BIM Standards for the Architectural, Engineering and Construction industry.

Similar documents
BIM for Interior Designers BIM IN PRACTICE

Customer requirements. Asset management planning Inspection and assessment Route asset planning Annual work plans Contracting strategy

HULLEY & KIRKWOOD CONSULTING ENGINEERS LIMITED BIM PROJECT EXECUTION PLAN FOR [PROJECT TITLE] Date

Collaboration. Jason Howden. Archaus Architects

IT Professional Standards. Information Security Discipline. Sub-discipline 605 Information Security Testing and Information Assurance Methodologies

Getting More Value from your BIM Process with Autodesk Collaboration and Data Management Products

BIM Strategy for NHSScotland

Practical Strategy and Workflow for Large Projects: A Realistic Solution

The Scottish Wide Area Network Programme

BIM BASICS AIRAH PRESENTATION SERIES. Mark Jacobson National BIM Operations Manager AE Smith & Son

Synchronous Building Information Model-Based Collaboration in the Cloud: a Proposed Low Cost IT Platform and a Case Study

INSIGHTS. Are some services too important to outsource? Service Integration & Management (SIAM)

Getting Started with BIM (Building Information Modeling)

Questions and Answers

New Zealand BIM Handbook Appendix D - BIM Uses definitions July A guide to enabling BIM on building projects

Resource efficiency through BIM: A Guide for BIM Managers

Project Management Manual

Asset Factory is a software service that allows you to manage the value, costs, risks and performance of your property, people and supply chain

Case Study: ICICI BANK INTERNAL AUDIT DEPARTMENT PENTANA AUDIT WORK SYSTEM IMPLEMENTATION

CEN/BT/WG 215 N th draft BUSINESS PLAN

ADOPTION OF BUILDING INFORMATION MODELLING (BIM): AN EVALUATION THROUGH A CASE STUDY OF A REGIONAL CONTRACTOR 1

BUILDING A STRATEGY FOR BIM

Major Project Governance Assessment Toolkit

ALPINE NEWSLETTER. INSIDE CitySUMs INDICATE CI-NERGY FASUDIR FORTISSIMO iurban MIRIAM Glasgow TSB Future Cities

Project Coordination Using Cloud- Based BIM Computing in Education

ESKISP Direct security testing

Building an Effective Business Architecture & Metrics Capability

Asset Data: A New Beginning, A New AURIZON. OmniSurveyor3D - The one source of truth

JOB DESCRIPTION. Principal Duties and Responsibilities (supported by Web Editor and Web Administrator)

Coordinating and Sharing Information with Revit Architecture and Revit Structure Best Practices!

A director s guide How to prepare an RFI for an HR & payroll software system

The South Staffordshire and Shropshire Health Care NHS Foundation Trust Digital Strategy

Employer s Information Requirements Version Core Content and Guidance Notes

Robert M. Ford Director of Technology Entry Plan

Delivering Excellence in Insurance Claims Handling

Role Description dotnet and SharePoint Developer; Enterprise Systems Integration; IT & Business Systems; BBC Engineering.

BIM: The Legal and Contractual Risks and How to Deal With Them. May Winfield Kennedys LLP

BIM: FOR PROJECT MANAGERS CSI Southwest Region Conference Program 1B 8:45am 11:00am

How To Design A Bim Project

ARCHITECTURE SERVICES. G-CLOUD SERVICE DEFINITION.

Project Management Process

BIM Essential Guide. For BIM Adoption in an Organization

e Brochure of Caliber Tech Solutions Pvt. Ltd.

System Requirement Checklist

Future Council Programme Evaluation Framework

Implementing & Managing Revit

Department of the Environment and Local Government. Project Management. Public Private Partnership Guidance Note April 2000

NOS for Network Support (903)

CASE STUDY 6 SECTOR: NHS DELIVERABLE: NEW MULTIFUNCTION SERVICE DESK THE CLIENT:

RUP Design. Purpose of Analysis & Design. Analysis & Design Workflow. Define Candidate Architecture. Create Initial Architecture Sketch

Overview of Routing between Virtual LANs

A WORKFLOW ANALYSIS FOR BIM SOFTWARE: ARCHITECTURAL AND MECHANICAL ENGINEERING DEPARTMENT OF ARUP TURKEY

Web Content Management System, Migration and Maintenance Services for ECDC Web Portal

Clinical Risk Management: Agile Development Implementation Guidance

Project Charter. Project Sponsor: Prepared By: S. Vassilatos

ITIL Introducing service transition

CONFORMED COPY. Method Statement Helpdesk Services. Revision History. Revision Date Reviewer Status. 23 March 2007 Project Co Final Version

MSc in Applied Building Information Modelling & Management. Postgraduate Diploma in Collaborative BIM. Postgraduate Certificate in BIM Technologies

The use of BIM in plumbing projects creates deeper project knowledge, delivers a more robust product, and can reduce total project costs.

Asset Management Strategy ( ) Doing things Differently A New Approach for a sustainable future

G-Cloud 7 Service Description Document. Third Party Services. Zendesk Licences 1. Zendesk Services (Consulting) 2. Nexus Pro Licences & Services 3

Mapping and Geographic Information Systems Professional Services

Execution Plan Template Design Modeling

RIBA Plan of Work 2013: Consultation document. You are invited to complete the online questionnaire by 12 August 2012.

Value for Money Assessment Guidance: Capital Programmes and Projects

ESKITP5023 Software Development Level 3 Role

UMHLABUYALINGANA MUNICIPALITY IT CHANGE MANAGEMENT POLICY

reality Revit check Autodesk have long Identify possible Utilize structural Tool Works Building bcg.com

SOFTWARE REQUIREMENTS

Exhibit F. VA CAI - Staff Aug Job Titles and Descriptions Effective 2015

Createmaster Ltd, Paul Street, London EC2A 4LB

t e c h n o l o g y BIM Services 1

IT Change Management Policy

HOW TO RESPOND TO THE BASIC NEED CHALLENGE

Mobile 2D Barcode/BIM-based Facilities Maintaining Management System

10 top tips to reviewing recruitment software (0)

An Oracle White Paper June Cutting Cost through Consolidation

Get to know your Autodesk Design and Creation Suites 2014

Procurement policy Working with our suppliers to support strategic growth

SharePoint for Engineering Document Management & Control

Project Management Framework

UoD IT Job Description

CPIx on Line. Post Contract-Award Building Information Modelling (BIM) Execution Plan (BEP) Supporting the HMG Construction Strategy.

Power of Oracle in the Cloud

ISO :2005 Requirements Summary

National Competency Standards. For. Mobile Application Developer

Plymouth Council & Asset Management

THE OSI REFERENCE MODEL LES M C LELLAN DEAN WHITTAKER SANDY WORKMAN

1 TABLE OF CONTENTS. 1. BIM Execution Plan. BIM Execution Plan- UF Minor Projects Template UF of 20 pages Processes...

Specialist Cloud Services Lot 4 Cloud EDRM Consultancy Services

Chap 1. Introduction to Software Architecture

Transcription:

AEC (UK) BIM Protocol Project BIM Execution Plan Implementing UK BIM Standards for the Architectural, Engineering and Construction industry. Version 2.0 September 2012 A pro-forma and guidance document to developing a Project BIM Execution Plan.

AEC (UK) BIM Protocol Project BIM Execution Plan Contents Execution Plan Checklist 3 Project Information 3 Project Objectives & Goals 3 Collaborative Working 3 Project Resources & IT Requirements 4 Execution Plan Guidance 5 Project Information 5 Project Objectives & Goals 6 Collaborative Working 8 Project Resources & IT Requirements 10 BIM Uses (1 of 2) 12 BIM Uses (2 of 2) 13

Execution Plan Checklist The following headings are to be used to form the basis of a project BIM Execution Plan. Project Information Project Description Project Scope Unique Project Challenges Key Project Stakeholders Key BIM Personnel Project Objectives & Goals Project BIM Objectives Project Stakeholders BIM Objectives Programming Level Of Development Matrix Key Performance Indicators Collaborative Working Project BIM Standards Project Coordinates Modelling Standards

Communication & Meetings Data Exchange Protocols Model/Data Validation Protocols Model/Data Subdivision Modelling Units BIM Mock-ups Area Calculation Methodology Project Resources & IT Requirements Stakeholders BIM Software Expertise Common Data Environments Hardware / Technology Infrastructure Requirements(all Stakeholders) Software (all Stakeholders) Project Specific BIM Content

Execution Plan Guidance Project Information Project Description: Project Scope: Briefly describe the project in terms of: Project Owner Project Name Project Type (School, Office Etc.,) Geographic Location. Briefly describe the project scope in terms of: Project Phasing Approximate Site Area Approximate Gross Internal Floor Area Contract / Delivery Type Unique Project Challenges: Identify any unique project conditions / challenges which may influence the approach to the project design / delivery. For example: Steep sided site topography. Limited access route widths. Congested city centre location. Key Project Stakeholders: Record all Key Project Stakeholder details including: Company Role Company Name Company Contact

Key BIM personnel: Record the Key Building Information Modelling personnel responsible for each discipline including: Company Name BIM Personnel Email Address Telephone Number Project Objectives & Goals Project BIM Objectives: The BIM execution plan should document the overall Project BIM objectives. These should be discussed and agreed between all Stakeholders. The selection of these objectives will be dependent on many factors such as: Client Requirements Stakeholders Requirements Stakeholders Skillsets Project Fee Levels It can be helpful to prioritise the Project BIM Objectives into Primary and Secondary Objectives. Note: Project BIM Objectives will change in line with various phases of project development. Project Stakeholder s BIM Objectives: Programming As well as the agreed Project BIM Objectives it is often the case that individual Stakeholders will have their own BIM Objectives running in parallel. Documenting these can help promote a better understanding of individual Stakeholders approaches to BIM. Project BIM Objectives and Goals will change in line with the project phases. The programming of the agreed Project BIM Objectives must be taken into consideration

and agreed between all Stakeholders. Document the programming of the Project BIM Objectives within the BIM Execution Plan. Level of Development Matrix To assist in the exchange and delivery of collaborative BIM data it recommended that all Stakeholders collectively develop and agree a Level of Development Matrix. The purpose of this matrix is to plan and communicate the collective BIM deliverables. It should address the following items: Who is modelling each element? When each model element is being modelled. To what Level of Development is each element being modelled? Who is the responsible stakeholder for model elements at each stage? What is the authorised use of each model element? Key Performance Indicators Key Performance Indicators (KPIs) are ways to periodically assess the performance and effectiveness of the project delivery as well as individual Stakeholders. In order to quantify the performance of the project delivery it is recommended that the BIM Execution Plan incorporates some Key Performance Indicators. For Example: No. of Clash Detections No. of Construction Clashes Delivery Timescales Costs Resources

Collaborative Working Project BIM Standards Common BIM Standards should be established and agreed between all Project Stakeholders. This can take the form of an established industry standard (such as the AEC(UK) Standards) or could be an agreed project specific standard. Project Coordinates Establishing agreed Project Coordinates is essential to efficient collaborative working. This should be established and documented at the soonest opportunity. For Example: Geo-referenced Locally referenced origin point Modelling Standards Common modelling standards should be established between all Stakeholders. Examples of areas of consideration could include: Modelling Methodologies. (3D, 2.5D, Placeholders etc.) Level of Development. Level of Detail. (Revit Specific) Incorporation of Meta data. Use of Material properties. Use of In-Place Families (Revit Specific) Communication & Meetings Efficient and regular communication is essential to the running of a BIM based project. To facilitate this regular BIM project meetings are to be encouraged. The frequency of these meetings may vary as the project progresses however they are an essential part of a successful BIM project. In addition consideration should be given to potential co-location of Project Stakeholders. This has been proven to improve Stakeholders communication and encourage efficient collaborative working.

Data Exchange Protocols The regular exchange of BIM data is an essential part of a successful BIM project. All Stakeholders should establish agreed Project Data Exchange Protocols. This should include the following: Method of Data Exchange (Shared Data Environment / Temporary Shared Area / Direct Access) Use of Work In Progress (WIP) data. Agreed format of exchanged model data. Model naming convention. Model / Data Validation Protocols All Stakeholders should have in place suitable procedures for Model Data validation for both issuing and receiving BIM data. In addition each Stakeholder should in place documentation confirming that these procedures are being followed throughout the life of the project. For Example: Model Transmittal documentation. Model Validation documentation. Model / Data Subdivision BIM projects often require the segregation of data into manageable sized pieces. This can take many forms and is often unique to each project. Describe and diagram how the project model data will be subdivided. For Example: Modelling Units Number of models for each discipline. Subdivision of key worksets within each model. Details of linked models within each sub model. Details of model link types (Overlay / Attachment) Common modelling units should be established and agreed between all Project Stakeholders. This becomes may take on a greater importance when working with international Stakeholders. For Example: Metric / Imperial

BIM Mock-up As part of planning BIM data exchange methodologies it may be beneficial to test the exchange workflows prior to commencing the project models. This process can help establish the most efficient ways of collaboratively exchanging information as well as reducing the risk of problems later in the process. Area Calculation Methodology Common agreed methods and standards for area calculations must be established between all Stakeholders. For Example: Gross Internal Floor Areas Net Floor Areas Embedded Carbon Energy Modelling Project Resources & IT Requirements Stakeholder s BIM Software Expertise: It is essential that the stakeholder s BIM software skills and experience match the required BIM deliverables. Should there be a mismatch between the required BIM deliverables and the Stakeholder s Bim skillsets agreement must be reached between all Stakeholders as to the appropriate course of action to be taken. This could include: Revise the agreed Project BIM Deliverables to match the project teams BIM Software Expertise. Identify and agree individual Stakeholder BIM training requirements and timetable. Recruit the required skillsets. Incorporate additional skillsets from external resources such as BIM consultants. Common Data Environments: The exchange of information between all stakeholders is a key factor in execution of a successful BIM project. As such it is important to establish a Common Data Environment at the soonest possible opportunity. Examples of a Common Data Environment are: Shared network location. Online project portals.

Cloud based collaboration tools. Hardware / Technology Infrastructure Requirements: BIM deliverables often have their own inherent hardware / technology infrastructure requirements. It is important to recognise and understand these and ensure that the required infrastructure needs can be met by the Project Stakeholders. Examples of these are: Suitably specified workstations Suitable network connectivity (Both internal and external) Required site based hardware (RFID readers, Total Stations, BIM access points) Software (all Stakeholders): Consideration should be given to the compatibility of all Stakeholders software. Particular attention should be paid to the interoperability of BIM authoring tools. Any known compatibility issues should be acknowledged and documented. Project specific workflows may need to be developed to overcome any known compatibility issues. Project Specific BIM Content: Establish if project specific BIM content is available or required. This could be in the form of agreed standardised client product libraries, specific manufacturer data or bespoke project content. In the absence of pre-configured BIM content it may be prudent to allocate resources to the creation / collation of suitable content libraries. Consideration should be given to the varying requirements of the BIM content and the differing stages of a project.

BIM Uses (1 of 2) Below is a list of common BIM uses. Additional BIM uses can be added to the list as needed. BIM Uses Primary Secondary Building Maintenance Scheduling Building System Analysis (operational) Asset Management Space Planning & Tracking Disaster Planning Record Modelling Existing Conditions Modelling Engineering Analysis Energy Analysis Structural Analysis Lighting Analysis Mechanical Analysis Other Engineering Analysis Sustainability (BREEAM) Evaluation Code Validation Programming Cost Estimation Digital Fabrication 3D Control & Planning (Digital Layouts)

BIM Uses (2 of 2) BIM Uses Primary Secondary Visualisation Design Authoring Design Reviews Phase Planning (4D Modelling) 3D Coordination Site Utilisation Planning Site Analysis Construction Systems Design (Virtual Mock-up)