1 System Requirement Checklist Page 1 System Requirement Checklist The System Requirement (SR) document template (IDA-MS-SR) provides guidance and template material for use by IDA projects in producing project-specific documents. This checklist summarises the recommended structure and contents of documents based on the template. ion Title 1 Introduction Overview of the SR document and description of what is to be produced and delivered for the IDA Project Document purpose and scope (1.1) author(s), readership, system (products, benefits, relationship with other systems) Document overview (1.2) References (1.3) all applicable and reference documents Definitions, acronyms and abbreviations (1.4) 2 Background Information about the general factors that affect the product(s) and their Function and purpose (2.1) expand on 1.1 Environmental considerations (2.2) physical, hardware, operating environments specify where system is to be used and by whom; networks and platforms involved; operation in different member states etc Relation to other systems (2.3) state whether the system is independent, subsystem of a larger one or a replacement Model (2.4) logical model at all levels, explained top-down describe functionality at all levels provide means to walk through model level-by-level, function-by-function and flow-by-flow Relationship to other projects (2.5) put project in context of others past, present or future identify parent projects or project(s) being replaced identify applications, tools and techniques used in other IDA or OSN projects General constraints (2.6) identify limitations on options for building software provide background information to justify constraints consider applications, tools and techniques from other projects especially Horizontal Actions and Measures
2 System Requirement Checklist Page 2 ion Title 3 Specific 4 Hardware 5 Telecommunication services Information about project : Overview (3.1) provide complete top-level statement of products and services to be delivered include pre-development services (eg analysis), hardware, software, documentation, training, warranty etc provide overview of specific pertaining to these deliverables Detailed (3.2) structured top-down consider using specification language only one requirement in each statement must be verifiable some may have to be provisional to be marked essential or non-essential prioritise Pre-development services (3.3) describe services to be procured at the same time as main system development examples are: Feasibility study, Benchmarking study, Requirements Analysis, Project Planning, Evaluation of available products, Technological trials, Development of demonstrator (system mock-up) If the contract delivers hardware, specify for each item of equipment; specify: type, number, functionality, standards, interfaces, performance, capacity, expansibility, reliability, availability, durability, maintainability, running cost limitations, operational etc Specify if telecommunication facilities are to be delivered by the project. Omit this section if the project makes use of existing telecommunication facilities
3 System Requirement Checklist Page 3 ion Title 6 System capability Sets of to be described Functional (6.1) purpose of system Interfaces (6.2) Software: e.g., operating systems, software environments, file formats, database management systems and other software applications Hardware: hardware configurations Communications: for example, use of a particular network protocol External interface should be described or referenced in Interface documents. User interface should be specified under Operational (see be low). Interface can be illustrated with system block diagrams Operational (6.3) running of system and its communication with users include all user interface and interactions include also logistical and organisational examples are: screen layouts, error message contents etc Security (6.4) protect against threats to confidentiality, integrity and availability take account of physical and electronic protective measures particular attention to telecommunication related security, e.g. encryption, authentication, virus attack Safety (6.5) managing damage from system failure Quality (6.6) ensuring system is fit for purpose
4 System Requirement Checklist Page 4 ion Title 7 System management 8 Operational characteristics 9 System architecture Requirements concerned with facilities to support operational management of system: Installation support (7.1) facilities for installation and configuration of whole system or replacement components Diagnostic tools (7.2) verification of correctness of system operation and diagnosis of faults Configuration, release control and faults (7.3) system component registration, management and change control Instrumentation (7.4) mechanisms to measure system activities and associated analytical/reporting tools Tuning (7.5) mechanisms to affect system performance Back-up and recovery (7.6) mechanisms for back-up copies of data and system restoration including failure during recovery Operational control (7.7) (sometimes called System Administration) system support facilities, e.g. user registration focus on telecommunications aspects, e.g. network control Other (7.8) system management not yet covered Requirements about system performance: Capacity (8.1) physical resources required eg processing power, memory, disc space etc; include expansibility Performance (8.2) must be quantitative, not qualitative, statements; possibly include worst/best cases and nominal value to be used for planning Availability (8.3) details of days/times, tolerable breaks, system failure notification, usage during failure and availability monitoring Reliability (8.4) acceptable mean time between failure (MTBF), minimum acceptable MTBF; reliability verification Requirements specifically affecting the system architecture itself: Maintainability (9.1) fault repair and adaptability in quantitative terms; influence of user availability/adaptability Portability (9.2) software ability to work on other (named) systems Prescribed components (9.3) applications, tools and techniques available from other projects and OSNs; consider Horizontal Actions and Measures Software constitution and structure (9.4) name actual products 10 Documentation Requirements for project-specific documentation, including number of copies and medium of documentation. Documents may include user training, user reference, system management, operational support, release notes, configuration control files, system maintenance, supplier reference, warranties
5 System Requirement Checklist Page 5 ion Title 11 Other services Requirements for services commissioned for provision during or after development. Need to specify for each: when detailed specification will be produced; procedure for approving these specifications; responsiveness and level of service to be provided by contractor; complaints and disputes procedure. Examples (not exhaustive) are: Training (11.1) specific courses, training material for users, support staff, system operators, maintainers and trainers Installation processes (11.2) supply and delivery methods Data set-up (11.3) developer or user to install data? Parallel running (11.4) developer involvement, if any Operational support (11.5) developer provision, if any Warranty (11.6) validity criteria for, and procedure to invoke, warranty; levels of service for corrections and warranty for corrections Maintenance (11.7) developer s obligations outside warranty 12 Developmental A B Requirements traceability matrix Services provided by the Commission including procedures for upgrades and system changes Requirements relating to the conduct of the contract: Roles and responsibilities (12.1) details of team s structure and roles to include points of contact, people with decision authority and quality control mechanisms Phases (12.2) timing details for product delivery Verification (12.3) details of constraints on how system will be verified, e.g. testing location, performers and timings; dispute resolution; validation of system against user needs Tabular information summarising how each requirement from User Requirement has been met in System Requirement document Specify any tools, services or facilities to be provided by or on behalf of the European Commission. Examples are equipment, software licences, telecommunication facilities, software from earlier systems, office facilities and services, staff time. (These are not and are therefore shown in an appendix) Document control, signoff and change record
Montana Department of Transportation Information Services Division. System Development Life Cycle (SDLC) Guide
Montana Department of Transportation Information Services Division System Development Life Cycle (SDLC) Guide Version 2 August 2, 2007 \mdt_sdlc_process\mdt_sdlc_v02.doc Table of Contents 1 Business Analysis...3
More informationComputer System Validation for Clinical Trials:
Computer System Validation for Clinical Trials: Framework Standard Operating Procedure (F-SOP) Author: Tim Cross Version History: 0.1di DRAFT 24-April-2013 0.2 DRAFT 12-June-2013 Current Version: 1.0 17-June-2013
More informationFully Managed IT Support. Proactive Maintenance. Disaster Recovery. Remote Support. Service Desk. Call Centre. Fully Managed Services Guide July 2007
Fully Managed IT Support Proactive Maintenance Disaster Recovery Remote Support Service Desk Call Centre London Office ITVET Limited 2 nd Floor 145 157 St John Street London EC1V 4PY t: +44(0)8704 232
More informationCity of Moreno Valley Date Adopted: April 6, 2007 CLASS SPECIFICATION Applications and Database Administrator
City of Moreno Valley Date Adopted: April 6, 2007 CLASS SPECIFICATION Applications and Database Administrator GENERAL PURPOSE Under direction, plans, organizes, oversees and participates in the work of
More informationService Support. 2005 Kasse Initiatives, LLC. ITIL Configuration Management - 1. version 2.0
Service Support Configuration Management ITIL Configuration Management - 1 Goals of Configuration Management The goals of Configuration Management are to: Account for all the IT assets and configurations
More informationInformation Technology Engineers Examination. Network Specialist Examination. (Level 4) Syllabus. Details of Knowledge and Skills Required for
Information Technology Engineers Examination Network Specialist Examination (Level 4) Syllabus Details of Knowledge and Skills Required for the Information Technology Engineers Examination Version 2.0
More informationSoftware Test Plan (STP) Template
(STP) Template Items that are intended to stay in as part of your document are in bold; explanatory comments are in italic text. Plain text is used where you might insert wording about your project. This
More informationColorado Department of Health Care Policy and Financing
Colorado Department of Health Care Policy and Financing Solicitation #: HCPFRFPCW14BIDM Business Intelligence and Data Management Services (BIDM) Appendix B BIDM Project Phases Tables The guidelines for
More informationWEST LOTHIAN COUNCIL INFORMATION SECURITY POLICY
WEST LOTHIAN COUNCIL INFORMATION SECURITY POLICY DATA LABEL: PUBLIC INFORMATION SECURITY POLICY CONTENTS 1. INTRODUCTION... 3 2. MAIN OBJECTIVES... 3 3. LEGISLATION... 4 4. SCOPE... 4 5. STANDARDS... 4
More informationNOS for Network Support (903)
NOS for Network Support (903) November 2014 V1.1 NOS Reference ESKITP903301 ESKITP903401 ESKITP903501 ESKITP903601 NOS Title Assist with Installation, Implementation and Handover of Network Infrastructure
More informationSample Career Ladder/Lattice for Information Technology
Click on a job title to see examples of descriptive information about the job. Click on a link between job titles to see the critical development experiences needed to move to that job on the pathway.
More informationDomain 1 The Process of Auditing Information Systems
Certified Information Systems Auditor (CISA ) Certification Course Description Our 5-day ISACA Certified Information Systems Auditor (CISA) training course equips information professionals with the knowledge
More informationSystem Requirements Specification (SRS) (Subsystem and Version #)
of the (Subsystem and Version #) () (Document Revision Number) Contract (No.) Task (No.) GSA Contract (No.) Prepared for: The United States Department of Agriculture Food & Nutrition Service (FNS)/ Information
More informationRelease: 1. CPPSEC4015A Maintain networked security system
Release: 1 CPPSEC4015A Maintain networked security system CPPSEC4015A Maintain networked security system Modification History Not Applicable Unit Descriptor Unit descriptor This unit of competency specifies
More informationInformation Security Policies. Version 6.1
Information Security Policies Version 6.1 Information Security Policies Contents: 1. Information Security page 3 2. Business Continuity page 5 3. Compliance page 6 4. Outsourcing and Third Party Access
More informationSystem Development Life Cycle Guide
TEXAS DEPARTMENT OF INFORMATION RESOURCES System Development Life Cycle Guide Version 1.1 30 MAY 2008 Version History This and other Framework Extension tools are available on Framework Web site. Release
More informationREGULATIONS FOR THE SECURITY OF INTERNET BANKING
REGULATIONS FOR THE SECURITY OF INTERNET BANKING PAYMENT SYSTEMS DEPARTMENT STATE BANK OF PAKISTAN Table of Contents PREFACE... 3 DEFINITIONS... 4 1. SCOPE OF THE REGULATIONS... 6 2. INTERNET BANKING SECURITY
More informationSECTION C: DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
PAGE 6 of 51 SECTION C: DESCRIPTION/SPECIFICATIONS/WORK STATEMENT Article C.1 Statement of Work This contract is designed to permit the Institutes and Centers (ICs) of NIH, the Department of Health and
More informationManaging and Maintaining Windows Server 2008 Servers
Managing and Maintaining Windows Server 2008 Servers Course Number: 6430A Length: 5 Day(s) Certification Exam There are no exams associated with this course. Course Overview This five day instructor led
More informationCTR System Report - 2008 FISMA
CTR System Report - 2008 FISMA February 27, 2009 TABLE of CONTENTS BACKGROUND AND OBJECTIVES... 5 BACKGROUND... 5 OBJECTIVES... 6 Classes and Families of Security Controls... 6 Control Classes... 7 Control
More informationHHSN316201200042W 1 QSSI - Quality Software Services, Inc
ARTICLE C.1. STATEMENT OF WORK This contract is designed to permit the Institutes and Centers (ICs) of NIH, the Department of Health and Human Services (DHHS), and all other federal agencies to acquire
More informationOverview of how to test a. Business Continuity Plan
Overview of how to test a Business Continuity Plan Prepared by: Thomas Bronack Phone: (718) 591-5553 Email: bronackt@dcag.com BRP/DRP Test Plan Creation and Exercise Page: 1 Table of Contents BCP/DRP Test
More informationTICSA. Telecommunications (Interception Capability and Security) Act 2013. Guidance for Network Operators. www.gcsb.govt.nz www.ncsc.govt.
TICSA Telecommunications (Interception Capability and Security) Act 2013 Guidance for Network Operators www.gcsb.govt.nz www.ncsc.govt.nz Contents Introduction...2 Overview of the Guidance...3 Focus of
More informationITIL A guide to release and deployment management
ITIL A guide to release and deployment management The goal of release and deployment management Release and deployment management aims to build, test and deliver services to the customers specified by
More informationInformation Security Team
Title Document number Add document Document status number Draft Owner Approver(s) CISO Information Security Team Version Version history Version date 0.01-0.05 Initial drafts of handbook 26 Oct 2015 Preface
More informationGatekeeper PKI Framework. February 2009. Registration Authority Operations Manual Review Criteria
Gatekeeper PKI Framework ISBN 1 921182 24 5 Department of Finance and Deregulation Australian Government Information Management Office Commonwealth of Australia 2009 This work is copyright. Apart from
More informationPHASE 5: DESIGN PHASE
PHASE 5: DESIGN PHASE During the Design Phase, the system is designed to satisfy the requirements identified in the previous phases. The requirements identified in the Requirements Analysis Phase are transformed
More informationSoftware Project Management Plan (SPMP)
Software Project Management Plan (SPMP) The basic template to be used is derived from IEEE Std 1058-1998, IEEE Standard for Software Project Management Plans. The following is a template for the SPMP.
More informationInformation Security Policy September 2009 Newman University IT Services. Information Security Policy
Contents 1. Statement 1.1 Introduction 1.2 Objectives 1.3 Scope and Policy Structure 1.4 Risk Assessment and Management 1.5 Responsibilities for Information Security 2. Compliance 3. HR Security 3.1 Terms
More informationWhat methods are used to conduct testing?
What is testing? Testing is the practice of making objective judgments regarding the extent to which the system (device) meets, exceeds or fails to meet stated objectives What the purpose of testing? There
More informationCapacity Plan. Template. Version X.x October 11, 2012
Template Version X.x October 11, 2012 This is an integral part of infrastructure and deployment planning. It supports the goal of optimum provisioning of resources and services by aligning them to business
More informationITIL A guide to service asset and configuration management
ITIL A guide to service asset and configuration management The goal of service asset and configuration management The goals of configuration management are to: Support many of the ITIL processes by providing
More informationCLOUD MIGRATION. Celina Alexandre M6807
CLOUD MIGRATION M6807 S Content 1. Introduction 2. Methodology 3. Requirements Definition Phase 3.1. Strategy 3.2. Knowledge 06/05/15 2 Content 4. Analysis Phase 4.1. Aplications and Systems 4.2. Development
More informationAdlib Hosting - Service Level Agreement
Adlib Hosting - Service Level Agreement June 2014 This service level agreement (SLA) applies to the Adlib Hosting services provided by Axiell ALM Netherlands BV, and includes the activities and facilities
More informationIT Project: System Implementation Project Template Description
2929 Campus Drive Suite 250 IT Project: System Implementation Project Template Description Table of Contents Introduction... 2 Project Phases... 3 Initiation & Requirements Gathering Milestone... 3 Initiation
More informationProject Management Plan for
Project Management Plan for [Project ID] Prepared by: Date: [Name], Project Manager Approved by: Date: [Name], Project Sponsor Approved by: Date: [Name], Executive Manager Table of Contents Project Summary...
More informationQueensland recordkeeping metadata standard and guideline
Queensland recordkeeping metadata standard and guideline June 2012 Version 1.1 Queensland State Archives Department of Science, Information Technology, Innovation and the Arts Document details Security
More information70-646 R3: Windows Server 2008 Administration. Course Overview. Course Outline. Course Length: 4 Day
70-646 R3: Windows Server 2008 Administration Course Length: 4 Day Course Overview This course will prepare the student for Exam 70-646: Pro: Windows Server 2008, Server Administrator. Topics covered include
More informationLecture 17: Requirements Specifications
Lecture 17: Requirements Specifications Why we need to write specifications Purpose and audience Choosing an appropriate size and formality Desiderata for Specifications Properties of good specifications
More informationNHS Information Governance:
NHS Information Governance: Information Risk Management Guidance: Maintenance and Secure Disposal of Digital Printers, Copiers and Multi Function Devices Department of Health Informatics Directorate July
More informationAmes Consolidated Information Technology Services (A-CITS) Statement of Work
Ames Consolidated Information Technology Services (A-CITS) Statement of Work C.1 Mission Functions C.1.1 IT Systems & Facilities Support System Administration: The Contractor shall provide products and
More informationINFORMATION ASSURANCE
Service Definition Thomson Reuters Legal Matter Management service (Serengeti Tracker) is the highest rated legal matter management, e-billing and analytics system designed for inhouse legal departments.
More informationVersion 1.0. IT Service Management & IT Asset Management Services (ITSM & ITAM Services) Governance Process
Version 1.0 IT Service Management & IT Asset Management Services (ITSM & ITAM Services) Governance Process Table of Contents 1 Planning and Organization... 6 1.1 Executive Overview... 6 1.1.1 ITSM & ITAM
More informationITIL 2011 Lifecycle Roles and Responsibilities UXC Consulting
ITIL 2011 Lifecycle Roles and Responsibilities UXC Consulting Date November 2011 Company UXC Consulting Version Version 1.5 Contact info@uxcconsulting.com.au http://www.uxcconsulting.com.au This summary
More informationNewcastle University Information Security Procedures Version 3
Newcastle University Information Security Procedures Version 3 A Information Security Procedures 2 B Business Continuity 3 C Compliance 4 D Outsourcing and Third Party Access 5 E Personnel 6 F Operations
More informationPlease Note: Temporary Graduate 485 skills assessments applicants should only apply for ANZSCO codes listed in the Skilled Occupation List above.
ANZSCO Descriptions This ANZSCO description document has been created to assist applicants in nominating an occupation for an ICT skill assessment application. The document lists all the ANZSCO codes that
More informationSECTION A: DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
SECTION A: DESCRIPTION/SPECIFICATIONS/WORK STATEMENT Article A.1 Introduction This contract is intended to provide IT solutions and services as defined in FAR 2.101(b) and further clarified in the Clinger-Cohen
More informationProject Management Process
Project Management Process Description... 1 STAGE/STEP/TASK SUMMARY LIST... 2 Project Initiation 2 Project Control 4 Project Closure 5 Project Initiation... 7 Step 01: Project Kick Off 10 Step 02: Project
More informationSECTION C: DESCRIPTION/SPECIFICATIONS/WORK STATEMENT Article C.1 Introduction This contract is intended to provide IT solutions and services as
SECTION C: DESCRIPTION/SPECIFICATIONS/WORK STATEMENT Article C.1 Introduction This contract is intended to provide IT solutions and services as defined in FAR 2.101(b) and further clarified in the Clinger-Cohen
More informationModule: Sharepoint Administrator
Module: Sharepoint Administrator Mode: Classroom Duration: 40 hours This course teaches IT Professionals to design and deploy Microsoft SharePoint 2010. Course Outline: Module 1: Designing a Logical Architecture
More informationSYSTEMS AND SOFTWARE REQUIREMENTS SPECIFICATION (SSRS) TEMPLATE. Version A.4, January 2014 FOREWORD DOCUMENT CONVENTIONS
SYSTEMS AND SOFTWARE REQUIREMENTS SPECIFICATION (SSRS) TEMPLATE Version A.4, January 2014 FOREWORD This document was written to provide software development projects with a template for generating a System
More informationCopyright 2006 Quality Excellence for Suppliers of Telecommunications Forum
Release 4.0 4.2.3 4.2.3.C.1 Control of Customer- Supplied Documents and Data The organization shall establish and maintain a documented procedure(s) to control all customer-supplied documents and data
More informationInformation Technology Project Oversight Framework
i This Page Intentionally Left Blank i Table of Contents SECTION 1: INTRODUCTION AND OVERVIEW...1 SECTION 2: PROJECT CLASSIFICATION FOR OVERSIGHT...7 SECTION 3: DEPARTMENT PROJECT MANAGEMENT REQUIREMENTS...11
More informationOPERATIONAL REQUIREMENTS DOCUMENT
TEMPLATE OPERATIONAL REQUIREMENTS DOCUMENT [Name of System or Product] to be developed by the [Name of Acquisition Program] [Name of Program Manager] Program Manager, [Name of Acquisition Program] [Name
More informationMANDATORY EMR FUNDING ELIGIBILITY SCHEDULE
MANDATORY EMR FUNDING ELIGIBILITY SCHEDULE The following terms and conditions form a part of the terms and conditions of the contract to which it is attached as a schedule. The subscriber/licensee (in
More informationASIAN PACIFIC TELECOMMUNICATIONS PTY LTD STANDARD FORM OF AGREEMENT. Schedule 3 Support Services
ASIAN PACIFIC TELECOMMUNICATIONS PTY LTD STANDARD FORM OF AGREEMENT Schedule 3 Support Services December 2013 Table of Contents 1. SERVICE SCHEDULE 3 SUPPORT SERVICES... 3 1.1 OVERVIEW... 3 1.2 STANDARD
More informationTELEFÓNICA UK LTD. Introduction to Security Policy
TELEFÓNICA UK LTD Introduction to Security Policy Page 1 of 7 CHANGE HISTORY Version No Date Details Authors/Editor 7.0 1/11/14 Annual review including change control added. Julian Jeffery 8.0 1/11/15
More informationService Catalog. it s Managed Plan Service Catalog
Service Catalog it s Managed Plan Service Catalog 6/18/2012 Document Contents Contents Document Contents... 2 Overview... 3 Purpose... 3 Product Description... 3 Plan Overview... 3 Tracking... 3 What is
More informationThe Project Management Plan will be used to guide, communicate and coordinate project efforts.
F.1 General Implementation Contractor Deliverables include critical system planning and development components. Sufficient deliverables have been identified at key steps in the project to guide the project
More informationSupplier Security Assessment Questionnaire
HALKYN CONSULTING LTD Supplier Security Assessment Questionnaire Security Self-Assessment and Reporting This questionnaire is provided to assist organisations in conducting supplier security assessments.
More informationAdministering a Microsoft SQL Server 2000 Database
Aug/12/2002 Page 1 of 5 Administering a Microsoft SQL Server 2000 Database Catalog No: RS-MOC2072 MOC Course Number: 2072 5 days Tuition: $2,070 Introduction This course provides students with the knowledge
More informationITIL Roles Descriptions
ITIL Roles s Role Process Liaison Incident Analyst Operations Assurance Analyst Infrastructure Solution Architect Problem Manager Problem Owner Change Manager Change Owner CAB Member Release Analyst Test
More informationDecember 21, 2012. The services being procured through the proposed amendment are Hosting Services, and Application Development and Support for CITSS.
Justification for a Contract Amendment to Contract 2012-01: Interim Hosting and Jurisdiction Functionality for the Compliance Instrument Tracking System Service (CITSS) December 21, 2012 Introduction WCI,
More informationPROJECT MANAGEMENT FRAMEWORK
PROJECT MANAGEMENT FRAMEWORK DOCUMENT INFORMATION DOCUMENT TYPE: DOCUMENT STATUS: POLICY OWNER POSITION: INTERNAL COMMITTEE ENDORSEMENT: APPROVED BY: Strategic document Approved Executive Assistant to
More informationInformation security due diligence
web applications and websites W A T S O N H A L L Watson Hall Ltd London 020 7183 3710 Edinburgh 0131 510 2001 info@watsonhall.com www.watsonhall.com Identifying information security risk for web applications
More informationRisk Management Plan template <TEMPLATE> RISK MANAGEMENT PLAN FOR THE <PROJECT-NAME> PROJECT
RISK MANAGEMENT PLAN FOR THE PROJECT Prepared by: Approved by: Reference: Version: Date: INTRODUCTION This document is the Risk Management
More informationOverview of Medical Device Design Controls in the US. By Nandini Murthy, MS, RAC
Overview of Medical Device Controls in the US By Nandini Murthy, MS, RAC 18 controls are a regulatory requirement for medical devices. In the US, compliance with the design controls section of 21 Code
More informationESKITP6036 IT Disaster Recovery Level 5 Role
Overview This sub-discipline is about the competencies required in order to manage all aspect of Disaster Recovery (DR), as it applies to IT within an organisation. ESKITP6036 1 Performance criteria You
More informationStatement of Service Enterprise Services - AID Microsoft IIS
Statement of Service Enterprise Services - AID Microsoft IIS Customer Proprietary Rights The information in this document is confidential to Arrow Managed Services, Inc. and is legally privileged. The
More information<name of project> Software Project Management Plan
The document in this file is adapted from the IEEE standards for Software Project Management Plans, 1058-1998, which conforms to the requirements of ISO standard 12207 Software Life Cycle Processes. Tailor
More informationR214 SPECIFIC REQUIREMENTS: INFORMATION TECHNOLOGY TESTING LABORATORY ACCREDITATION PROGRAM
The American Association for Laboratory Accreditation Document Revised: R214: Specific Requirements: Information Technology Testing Laboratory Accreditation July 13, 2010 Program Page 1 of 26 R214 SPECIFIC
More informationATTACHMENT I DATABASE PLATFORM
1 DESCRIPTION OF SERVICE 1.1 ORACLE SERVICES Provides physical database management of -based databases hosted at the Provider's Data Center or at select remote sites. Service includes installation, configuration,
More informationBest Practices For Department Server and Enterprise System Checklist
Best Practices For Department Server and Enterprise System Checklist INSTRUCTIONS Information Best Practices are guidelines used to ensure an adequate level of protection for Information Technology (IT)
More informationHow To Develop Software
Software Engineering Prof. N.L. Sarda Computer Science & Engineering Indian Institute of Technology, Bombay Lecture-4 Overview of Phases (Part - II) We studied the problem definition phase, with which
More informationG-Cloud Service Description. Atos: Cloud Professional Services: Requirements Specification
G-Cloud Service Description Atos: Cloud Professional Services: Requirements Specification Atos, the Atos logo, Atos Consulting, Atos Worldline, Atos Sphere, Atos Cloud, Atos Healthcare (in the UK) and
More informationRequest for Proposal for Application Development and Maintenance Services for XML Store platforms
Request for Proposal for Application Development and Maintenance s for ML Store platforms Annex 4: Application Development & Maintenance Requirements Description TABLE OF CONTENTS Page 1 1.0 s Overview...
More informationAttachment 7 Requirements Traceability Matrix (RTM) ATMS RFP. New York State Department of Transportation Advanced Traffic Management System
Attachment 7 Requirements Traceability Matrix (RTM) ATMS RFP New York State Department of Transportation Advanced Traffic Management System i 1. INTRODUCTION This Requirements Traceability Matrix (RTM)
More informationPost No: GEN75. Division/ Department: Schools
JOB DESCRIPTION Job information as shown on organisation chart Job Title: Senior School ICT Technician Directorate: People s Services Organisational information: Post No: GEN75 Division/ Department: Schools
More informationInformation Technology Engineers Examination. Information Security Specialist Examination. (Level 4) Syllabus
Information Technology Engineers Examination Information Security Specialist Examination (Level 4) Syllabus Details of Knowledge and Skills Required for the Information Technology Engineers Examination
More informationMicrosoft Enterprise Search for IT Professionals Course 10802A; 3 Days, Instructor-led
Microsoft Enterprise Search for IT Professionals Course 10802A; 3 Days, Instructor-led Course Description This three day course prepares IT Professionals to administer enterprise search solutions using
More informationREDCENTRIC MANAGED SERVER SERVICE DEFINITION
REDCENTRIC MANAGED SERVER SERVICE DEFINITION SD062 V1.4 Issue Date 01 July 2014 1) OVERVIEW The Managed Server service (MSS) provides access to Redcentric s 24x7 support capability, technical skills and
More informationICT SUPPORT SERVICES
ICT SUPPORT SERVICES SERVICE LEVEL AGREEMENT 2008 2009 Period of agreement: This document will run from 1st April 2008 to 31 st March 2009 and remains valid until superseded by a revised document. The
More informationHow To Write An Slcm Project Plan
SLCM 2003.1 Artifacts in a Nutshell ( as of 01/21/2005) Project Development Phases Pension Benefit Guaranty Corporation s (PBGC) System Life Cycle Methodology (SLCM) is comprised of five project development
More informationG - Cloud Service Definition IT Infrastructure Monitoring And Helpdesk
IT Professional Services G - Cloud Service Definition IT Infrastructure Monitoring And Helpdesk Registered Office: Technium Springboard Centre, Llantarnam Park Cwmbran Newport, South Wales. NP44 3AW Registered
More informationRekoop Limited Standard Terms of Business
Rekoop Limited Standard Terms of Business 1 Copyright 2012, rekoop Limited 1. DEFINITIONS... 3 2. BASIS OF AGREEMENT... 6 3. PROVISION OF THE SOFTWARE AND SERVICES... 6 4. TERM... 6 5. ACCESS AND SECURITY...
More informationINFORMATION TECHNOLOGY SECURITY STANDARDS
INFORMATION TECHNOLOGY SECURITY STANDARDS Version 2.0 December 2013 Table of Contents 1 OVERVIEW 3 2 SCOPE 4 3 STRUCTURE 5 4 ASSET MANAGEMENT 6 5 HUMAN RESOURCES SECURITY 7 6 PHYSICAL AND ENVIRONMENTAL
More informationCLASS SPECIFICATION Systems Support Analyst I
San Diego Unified Port District Class Code: B837-UE03 CLASS SPECIFICATION Systems Support Analyst I FLSA Status: EEOC Job Category: Classified: Union Representation: Exempt Professionals No Unrepresented
More informationOPERATIONAL STANDARD
1 of 11 1. Introduction The International Safe Transit Association (ISTA), a non-profit association whose objective is to prevent product damage and excess packaging usage within the distribution environment.
More informationAppendix O Project Performance Management Plan Template
Appendix O Project Performance Management Plan Template Version 2 March 7, 2005 This page is intentionally left blank. Version 2 March 7, 2005 Title Page Document Control Panel Table of Contents List of
More informationCHAPTER 11 COMPUTER SYSTEMS INFORMATION TECHNOLOGY SERVICES CONTROLS
11-1 CHAPTER 11 COMPUTER SYSTEMS INFORMATION TECHNOLOGY SERVICES CONTROLS INTRODUCTION The State Board of Accounts, in accordance with State statutes and the Statements on Auditing Standards Numbers 78
More informationBusiness Continuity Exercise: Electricity Supply Failure Appendix 4.4
1 Business Continuity Exercise: Electricity Supply Failure Appendix 4.4 2 Housekeeping Fire safety Breaks and refreshments Toilets Mobiles and pagers 3 Introduction Respect each others contributions What
More informationGuide to applying the ESA software engineering standards to small software projects
BSSC(96)2 Issue 1 May 1996 Guide to applying the ESA software engineering standards to small software projects Prepared by: ESA Board for Software Standardisation and Control (BSSC) european space agency
More informationSoftware Requirements Specification
1 of 7 17.04.98 13:32 Software Requirements Specification The sub-sections : 1. What is a Software Requirements Specification 2. Why is a Software Requirement Specification Required 3. What is Contained
More informationDisaster Recovery. 1.1 Introduction. 1.2 Reasons for Disaster Recovery. EKAM Solutions Ltd Disaster Recovery
Disaster Recovery 1.1 Introduction Every day, there is the chance that some sort of business interruption, crisis, disaster, or emergency will occur. Anything that prevents access to key processes and
More informationConditions for ICT Partner Solutions Service Schedule for SecureData Service
1. Definitions & Interpretations Conditions for ICT Partner Solutions Service Schedule for The following definitions shall apply to the provisions of the Service, in addition to those in the General Terms
More informationCalifornia Department of Technology, Office of Technology Services WINDOWS SERVER GUIDELINE
Table of Contents 1.0 GENERAL... 2 1.1 SUMMARY...2 1.2 REFERENCES...2 1.3 SUBMITTALS...2 1.3.1 General...2 1.3.2 Service Request...3 1.4 EXPECTATIONS...3 1.4.1 OTech...3 1.4.2 Customer...3 1.5 SCHEDULING...4
More informationG-Cloud 6 Service Definition DCG Cloud Disaster Recovery Service
G-Cloud 6 Service Definition DCG Cloud Disaster Recovery Service 1 of 19 CONTACT INFORMATION Guy Silver T: 07733 008799 E: guy.silver@dcggroup.com W: www.dcggroup.com Data Continuity Group Limited, Bridge
More informationAdministrative Data Quality Assurance Toolkit
Administrative Data Quality Assurance Toolkit Version 1 January 2015 1 Administrative Data Quality Assurance Toolkit This toolkit is intended to help statistical assessors review the areas of practice
More informationComputer Security: Principles and Practice
Computer Security: Principles and Practice Chapter 17 IT Security Controls, Plans and Procedures First Edition by William Stallings and Lawrie Brown Lecture slides by Lawrie Brown Implementing IT Security
More informationCriteria for Flight Project Critical Milestone Reviews
Criteria for Flight Project Critical Milestone Reviews GSFC-STD-1001 Baseline Release February 2005 Approved By: Original signed by Date: 2/19/05 Richard M. Day Director, Independent Technical Authority
More information