Steel - MAX Building Systems "The right choice"

Similar documents
Timber Decks. Technical Note. March 2007

Connection Solutions

Residential Deck Safety, Construction, and Repair

FLAT ROOF BOX SPAN CARPORTS

HOPLEYS OPENWEBSTEELJOISTS

Detailing of Reinforcment in Concrete Structures

Chapter 3 Pre-Installation, Foundations and Piers

Wisconsin Building Products Evaluation

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

Installation guide for the SafeLine type anchorage device. Tested in compliance with EN 795: No.: SE-...

FLAT ROOF CARPORT RECOMMENDED INSTRUCTION MANUAL

December J-Ply Roofing, Flooring and Decking

EAST LYME HIGH SCHOOL

Structural Failures Cost Lives and Time

COMMONLY USED RESIDENTIAL BUILDING CODES

LEGACY REPORT ER ICC Evaluation Service, Inc. Reissued November 1, Legacy report on the 1997 Uniform Building Code

SECTION VIBRATION AND SEISMIC CONTROLS FOR ELECTRICAL SYSTEMS

Owner's Manual & Assembly Instructions

MEZZANINE SPECIFICATIONS PART 1 GENERAL 1.1 SCOPE 1.2 APPROVED MANUFACTURER 1.3 REGULATORY ORGANIZATIONS AND GROUPS 1.4 QUALITY ASSURANCE

Superform Products Ltd.

Page & Turnbull imagining change in historic environments through design, research, and technology

6 RETROFITTING POST & PIER HOUSES

FCA CARPENTRY & JOINERY THEORY. 10 SIMPLE ROOF CONSTRUCTION Part 2

Uncovered Decks & Porches

TECHNICAL SPECIFICATION SERIES 8000 PRECAST CONCRETE

Report on Sanctuary/Chancel Crawl Space Inspection. St. John in The Wilderness, 2896 Old Lakeshore Road Bright s Grove. Project No.

POST AND FRAME STRUCTURES (Pole Barns)

Instruction Manual 19/9/01. Flat Roof Carport

HURRICANE MITIGATION RETROFITS FOR EXISTING SITE-BUILT SINGLE FAMILY RESIDENTIAL STRUCTURES

AA Solar and Sun Power Plus

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Residential Decks. Planning and Development Services Department

Post and Beam Construction

SECTION COLD-FORMED METAL DECK FRAMING Elevations Steel Deck Framing by Trex

STANDARD OPEN PATIO COVER

DESIGN OF SLABS. 3) Based on support or boundary condition: Simply supported, Cantilever slab,

The Stabilizer TM. Benefits. Supplemental support system for sagging beams and floor joists within a crawl space

1997 Uniform Administrative Code Amendment for Earthen Material and Straw Bale Structures Tucson/Pima County, Arizona

Page 1 of Sven Alexander Last revised SB-Produksjon STATICAL CALCULATIONS FOR BCC 250

STEEL BUILDINGS RECOMMENDED INSTALLATION GUIDE

STRUCTURAL ASSESSMENT. Full Metal Jacket Building 0 Prince Street, Alexandria, VA

PRESENTATION ON REPAIR AND REHABILITATION OF BUILDINGS DAMAGED IN EARTHQUAKE. By H P Gupta & D K Gupta

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

CPA Steel Stud Framing Page 1 of 11

Residential Foundations and Basements

Index Series Prestressed Florida-I Beams (Rev. 07/12)

The WANZ Guide to Window Installation

INSTALLATION. General. Important Note. Design. Transport

Materials. Estimating Steel. Players. Materials. Shop Drawings. Detailing Process. Standard shapes. Fabricated members, Built-up sections

Chapter 6 ROOF-CEILING SYSTEMS

June 2007 CHAPTER 7 - CULVERTS 7.0 CHAPTER 7 - CULVERTS 7.1 GENERAL

Property Inspection. 83A Ascot Avenue North New Brighton Christchurch STRUCTURAL REPORT

INTRODUCTION TO BEAMS

METHOD OF STATEMENT FOR STATIC LOADING TEST

Since it was established in 1989, with a small manufacturing base in Qwa Qwa and a hire yard in Botswana, Uni-Span

We urge you to read and follow the attached installation instructions. Failure to do so may void the warranty of this garden window unit.

DESIGN OF SLABS. Department of Structures and Materials Engineering Faculty of Civil and Environmental Engineering University Tun Hussein Onn Malaysia

Chapter 10 - Scaffolding Systems

MECHANICS OF SOLIDS - BEAMS TUTORIAL 1 STRESSES IN BEAMS DUE TO BENDING. On completion of this tutorial you should be able to do the following.

PERGOLAS AND CARPORTS

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details

ENGINEERING SCIENCE H1 OUTCOME 1 - TUTORIAL 3 BENDING MOMENTS EDEXCEL HNC/D ENGINEERING SCIENCE LEVEL 4 H1 FORMERLY UNIT 21718P

Technical Notes 3B - Brick Masonry Section Properties May 1993

1.02 SYSTEM DESCRIPTION

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1

REPAIR AND STRENGTHENING OF HISTORICAL CONCRETE BRIDGE OVER VENTA RIVER IN LATVIA

Calvert USA, Inc. Attic Stairs

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Structural Analysis. EUROCODE 2 Background and Applications

SCHEMATIC AND PROJECT BUDGET APPROVAL EAST CAMPUS NURSING EDUCATION AND CLASSROOM

By SP Partners, LLC. INSTALLATION GUIDE. Prestige

PB301 July Lightweight Building Solutions. Bushfire Protection.

The following sketches show the plans of the two cases of one-way slabs. The spanning direction in each case is shown by the double headed arrow.

CONTENTS 1. INTRODUCTION METHODOLOGY RESULTS & FINDINGS...9 APPENDIX

Design and Construction of Cantilevered Reinforced Concrete Structures

ASHULIA APPARELS LTD. Client Summary Report

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

MANUFACTURED HOME INSTALLATION FOR PERMANENT FOUNDATIONS (TRANSVERSE FLOORS) (SUPPLEMENT TO MANUFACTURED HOME INSTALLATION MANUAL)

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS

Design Manual to BS8110

European Technical Approval ETA-10/0153

European Technical Assessment ETA-10/0153 of 10/06/2015

Design of Steel Structures Prof. S.R.Satish Kumar and Prof. A.R.Santha Kumar. Fig some of the trusses that are used in steel bridges

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

Chapter 5 Bridge Deck Slabs. Bridge Engineering 1

FORMWORK INTRODUCTION

HORIZONTAL INSTALLATION

Light Steel Modular Construction

The minimum reinforcement for the stem wall is the placement of:

8/18/14. Introduction to. Framing. Terminology and Concepts

The WANZ Guide to Window Installation

Good Craftsmanship Guide. Carpentry and Joinery- Carcassing

DENVER MODEL 30 X 30 SPECIFICATIONS

PART 1 GENERAL 1.1 SECTION INCLUDES

Mark Cramer Inspection Services, Inc.

Energy Company Obligation (ECO): Technical Monitoring Questions

How to secure your property after a disaster

Top 10+ Mistakes of DWV plumbing design

MECHANICS OF SOLIDS - BEAMS TUTORIAL 2 SHEAR FORCE AND BENDING MOMENTS IN BEAMS

Removable Aluminium posts

Transcription:

"C" bearer Back to back bearers "C" joists "C" bearers for LBW. "C" bearer Channel in-plane panels, supported on Steel-MAX "Smart stumps" CHANNEL Contents :- 1. STUMPS 2. BRACING 3. CONNECTORS 4. DURABILITY 5. TECHNICAL SUPPORT 6. ENGINEERING & CERTIFICATION 7. JOB DESIGN 8. FIXINGS 9. AVAILABILITY 10. APPLICATION DETAILS Steel - MAX Distribution enquiries Ph: (07) 3831 5444 Design enquiries Ph: (07) 5450 6070 Contact: Greg Yorkston. Mob: 0438 748 381 info@steelmax.com.au distribution@steelmax.com.au ( As at 12/07/8 ) Page 1

SMART stumps Top fitting System components Steel-MAX Smart Stump 75x75 SHS Stump tube:- use 2.0mm up to 1.8m high 2.5mm up to 2.5m high 4.0mm up to 3.4m high Post sleeve Bracing bracket STUMP TOPS Stump base fitting CT-75 / 180 T-75 / 180 T-75 / 230 T-75 / 280 Screw tops Mult-tops STUMP BASES Stump base fitting Moment base plates CONNECTOR BRACKETS "L' bracket "H' hinge bracket Joist connector 40x40x200 Joist connector 50x50x295 Page 2

1. SMART STUMPS Steel-MAX has designed a special range of stumps specifically to suit C channel bearers. STUMP TUBE:- The stump tube is 75x75 Gal. SHS and will vary in wall thickness to suit load requirements. STUMP BASES:- Stump bases are in the form of a U shaped bracket, for multi-position and multi-angle connection to footings. Special Moment Base plates are available for mezzanine floors and where maximum bracing stability is required. STUMP TOPS:- Stump tops fit any wall thickness tube and are telescopically height adjustable up to 75mm. They have vertical fin plates to suit B180, B240 & B280 C bearers. They provide maximum support and hold-down, through the bearer s web and are also designed to keep perimeter bearers as close to the outside of the building as possible. Special screw adjustable tops are also available and are particularly useful for reactive soil conditions. Centre-fin tops support back-to-back bearers so that the centre line of the stumps matches the centre of the abutting bearers. Multi-top stumps are also available for some applications where bearers can be joined at T intersections and 90 deg corners. POST SLEEVES:- Post sleeves may be used to carry bearers which need to be fixed to the face of a verandah post, or a higher stump which continues up to support a different level floor, such as in split levels. 2. BRACING:- U shaped bracing brackets are connected to stumps to carry either 12mm or 16mm threaded bracing rod, to form sub-floor cross bracing sets. They yield up to 15 kn or 22 kn capacities respectively. 3. CONNECTORS:- L fixed angle brackets may be used at 90 deg joist to bearer or bearer to bearer connections, where extra strengthening is required at the connection. They are also useful when connecting trimmers around stair voids. Hinged H brackets can be used at angled connections, similar to the L brackets. Joist connector brackets are in the form of an angle, which are usually fixed vertically to the webs of both the bearers & joists, in a joist-on-bearer application. They help support both members and provide good hold-down and lateral stability to joists. They are available in 200mm and 295mm lengths. The 200mm brackets can also be used to fix the ends of J240 & J280 C in-plane joists to bearers at T intersections when other fixing methods are difficult or impractical. 4. DURABILITY:- All Steel-MAX products have corrosion protection, such as Dacrotising ( refer to web site at:- http://www.dacro.co.kr/eng-3.htm ) as well as Galvanizing and Galvabond finishes. Refer to your channel manufacturer s durability selection criteria and protect all exposed members as per the Steel- MAX corrosion protection recommendations. 5. TECHNICAL SUPPORT:- Contact Steel-MAX via the web site, email, phone or fax; or ask your Steel-MAX distributor. 6. ENGINEERING:- Engineering design and certification is provided by H.R. Design Group P/L (Hunt Robinson Engineers) for the Steel-MAX products. H.R. Design has also produced the very useful S3R software for Stramit. A copy of the standard letter of certification is available from the Steel-MAX web site. Steel-MAX does not provide individual job certification, footing or sub-floor bracing designs, or certificates of compliance. These are generally site specific and should be provided by the project engineer. Page 3

7. JOB DESIGN:- When using Steel-MAX products in conjunction with Stramit sections; use the Stramit S3R design software to determine the most suitable Stramit member sizes, or ask your Stramit representative for assistance from Steel- MAX to offer a floor design solution for your project, including all necessary Steel-MAX companion products. 8. FIXINGS:- Refer to the Steel-MAX load capacity tables on page 10, (provided by the H.R. Group) and have your project engineer specify your individual job requirements. However; for uniformly loaded domestic applications, consider the following as a guide only :- Stump bases to stump tube = 6 / 14 g hex teks ( 3 in each face ) Stump tops to stump tube = 8 / 14 g teks up to 8 m2 of floor area carried by the stump, then 1 / screw per m2 or 1/M12 bolt per 5 m2 of area extra over the first 8 m2. Sleeves to tube = 8 / 14 g teks per sleeve. Bracing brackets = 4 / 14 g teks per brackets for 12mm rod and 1 / M16 bolt per bracket for 16mm rod. L & H connector brackets = 8 / 10 g teks for joist to bearer connections and 8 / 14 g teks for bearer to bearer connections. Joist connector brackets = use 6 / teks per brackets ( 3 in each member ) Use 10 g. teks for 200mm brackets and 14 g. teks for 295mm brackets. 9. AVAILABILITY:- All Steel-MAX products are available from Steel-MAX Distribution by calling (07) 3831 5444 or Mob: 0438 748 381 Fax: 07 3831 5666 email distribution@steelmax.com.au Steel-MAX Companion products to the Stramit Residential Flooring System are available from your participating Stramit Building Products supplier. 10. APPLICATION DETAILS:- The following diagrams are suggested methods of using Steel-MAX products with C channel sections and may act as Companion products to Stramit C channel sections for a restricted number of common construction applications. The information contained within this document or any other provided by Steel-MAX, does not represent, form or replace any other system requirements specified for any other floor framing system. All information shown, enclosed and contained within this and associated documents represent suggested methods of using Steel-MAX components in conjunction with C channel sections, such as Stramit C sections or similar and may not suit your particular job requirements and application. We offer design solutions as a suggestion, for the consideration of the customer and his project engineer. It is imperative that the customer's project engineer looks at the suggested details and either incorporates them into his whole job structural design, or alters them to suit his requirements. It is always possible that there could be influencing elements within the structure, that we are not aware of, which could effect and alter the following suggested details and information. Page 4

Steel - MAX Steel - MAX Bevel cut the base of the stump tube to suit the angle of the footing. Use Buildex Hiteks 14-20 x 22 metal thread tek screws for all stump fittings. Sloped footings Masonry anchors as specified. SMART Stump Coat with Supaprime to 100mm above footing. F.G level Refer to the Steel-MAX web site for installation details. Bored or pad footings ( as per AS 2870 ) Detail:- 1 Vertical section 150mm deep concrete base pad. ( to AS 2870 ) Vertical section Footing connections Note:- optional footing designs are also available from Steel-MAX for deep reactive soil conditions. C-Bearer Steel-MAX Bracing brackets Detail:- 2 Page 5

T-75 / 230 C- bearer Use 14-20x22 HiTek screws to fix stump tops and base fittings to stump tube and C-Bearers. Steel-MAX Smart Stumps provide web stability to C-Bearers and may eliminate the need for web stiffener brackets, in most cases. S-75 stump Steel-MAX Smart Stumps are telescopically height adjustable, up to ~ 75 mm. Detail:- 3 STUMP - BEARER connection High bearer High level bearer Cut low bearer to allow the web to sit on the stump top. Slice both bearer webs together & screw fix to stump fin plate. Low bearer Smart stump Detail:- 4 Low level bearer Bearer step-down at stump. Page 6

Fix 6 / 14g. Teks through stump cleat into bearer. Fix 6 / 12g. Series 500 Teks through bearer-stump-bearer connection. Joists Joists Back to back bearers CT-75 / 180 centre fin plate stumps, between back to back bearers. Detail:- 5 Centre-fin stump tops. ( for back to back bearers.) C-180, 235 or 280 bearers CT-75 / 180 centre fin plate stumps, between back to back bearers. "B" "A" Detail:- 6 Use Buildex Series 500 12-24x32 or 50 metal thread tek screws for all back to back bearer connections. Fix through web of bearer "A", the stump fin plate & through bearer "B". Centre-fin stump tops. ( for back to back bearers.) Page 7

Wall frame Decking Flooring Detail:- 7 Deck joists Steel-MAX stump tops. Screw deck bearer to main floor bearer with 2 / 14g teks @ 450 c/c. Stump tube Main floor joists Common deck to main floor connection. Joists in continuous spans over intermediate bearers can sometimes offer a quick and cost effective alternative in some applications. Joists Web side Steel-MAX angle shaped joist connector brackets help support joists laterally. Detail:- 8 Optional "Joist-on-bearer" system. Page 8

Steel-MAX 40x40x200 connector bracket. Steel-MAX "L" or "H" bracket at corner. Main perimeter bearer End bearer/joist sits on stump first, with main bearer on top of flanges. Top of end bearer/joist is level with main floor joists. End bearer/joist. Main floor joist Steel-MAX stump. Detail:- 9 End bearer section, instead of double joists, below load bearing wall. Bearer & joist connections Steel-MAX stump tops can also carry verandah beams. Bearer Bearer Steel-MAX Post sleeves connect to posts or stumps, to carry bearers at lower levels. Sleeves have 2 / carry lugs to take single or intersecting bearers. Detail:- 10 Post sleeves Page 9

Structural Load capacities for "Smart stumps" and connections. Steel stump tube: ( Minimum grade C350 ) SHS Max. height 75x2.0 = 1.8m 75x2.5 = 2.5m 75x4.0 = 3.4m Stump tops to steel stump tube: ( Minimum stump topand post Yield Stress fy = 300 MPa; Minimum bolt Yield Stress fy = 400MPa ) Connection Shear capacity Vu 2x14-20 Teks 14.7kN 4x14-20 Teks 29.4kN 8x14-20 Teks 58.8kN 16x14-20 Teks 117.6kN 20x14-20 Teks 147.0kN 1 / M12 bolt 24.2kN 2 / M12 bolts 48.4kN Notes:- 1. All shear capacities are governed by the screw/bolt shear capacity. 2. Calculations based on a minimum post wall thickness of 2.0mm. 3. Tek screws to be installed in accordance with the manufacturer's specifications 4. Screws and bolts may be combined to achieve reduced shear capacities, using the appropriate reduction factors for each connection type. Stump top to Stramit bearer connection ( Minimum stump top, fin plate Yield Stress fy = 300 MPa; Minimum bolt Yield Stress fy = 400MPa ) Connection Shear capacity Vu 2x14-20 Teks 9.2kN 4x14-20 Teks 18.4kN 6x14-20 Teks 27.6kN 1 / M12 bolt 10.2kN 2 / M12 bolts 20.4kN Notes:- 1. All shear capacities are governed by the hole capacity of the channel's web and not the screw/bolt shear capacity. 2. Calculations based on a minimum web thickness of 1.5mm, minimum Tensile Strength (fu) = 490MPa and minimum Yield Stress (fy) = 380MPa. 3. Tek screws to be installed in accordance with the manufacturer's specifications 4. Stramit channel members to be fully restrained against lateral displacement of both flanges and twisting about the longitudinal axis. Bracing brackets Connection Bracing capacity Moment base plates 4x14-20 Teks 15kN ( 12mm rod ) M16 bolt 22kN ( 16mm rod ) Notes:- 100x100x4.0 Moment Base Plates have an ultimate bending moment capacity of 5.2kNm, subject to the following:- 1. Must be fixed to a footing or slab with a minumum compressive strength of 25MPa with 4 / M12 chemset anchors, fixed with a minimun distance between the centre of the bolt and the edge of slab of 50mm. 2. The supporting structure should be assessed by the project engineer to ensure that it is structurally capable of withstanding both the moment and vertical loads expected. 3. The Moment sleeve must be fixed to the supported post with a No.10 Tek screw in each of the four faces of the sleeve. 4. The gap between the sleeve and the supported post must be adequately sealed to prevent moisture ingress between the two members. Page 10

Mezzanine floors "C" joists "C" bearer Detail:- 11 Mezzanine flooring system using in-plane channel panels, supported on Steel-MAX 89mm "Smart stumps" with Moment Base plates. Refer to Detail:- 9 for Steel-MAX connector brackets used in heavily loaded applications. Page 11

HR Design Group Pty Ltd ABN: 14 015 519 720 23 July 2008 File: 08-0406 Ref: Combined documentation for Steel-MAX and Stramit brochure Dated: 12 June, 2008 This is a certification letter for the above-mentioned brochure, which I have inspected and checked, in conjunction with the original Steel-MAX documentation and designs carried out by our engineering staff. We are satisfied that all the details listed below, are adequate, and conform to all requirements of structural mechanics. The design parameters for this project are: - Building type - Residential dwelling, commercial or industrial buildings. Standards used in the design - AS1170.1 & 2, AS1720.1, AS1684, AS4100, AS4600 NOTES: 1. All capacities listed are subject to review of final product specifications and drawings. 2. Some limitations may apply to commercial or industrial projects for timber sections using screws or bolts see notes below the applicable tables Yours faithfully, HR DESIGN GROUP Pty Ltd Directors: Stephen Hunt Janette Hunt Engineering: Craig Doherty Matthew Crow Benjamin Winning James Sweet Jacob Kerswill Stephen Hunt BEng (Civil), CPEng (MIEAust #368737), (RPEQ #3731), NPER Building Design: Brad Hunt Software: Luke Harpin Administration: Carolyn Foot Sharyn Crawford Reply to: - PO Box 103, Buddina, Q, 4575. Office at: - 4/40 Technology Dr, Warana, Q, 4575. Telephone: 07) 5493 2677 Facsimile: 07) 5493 1816 Email: - engineers@ hrdesigngroup.com.au Web site: - www.hrdesigngroup.com.au Bringing people, ideas and engineering together