1. TITLE OF THE PROJECT HYDROPOWER SYSTEM UPPER HORIZONS. 2. SECTOR Energy

Similar documents
US Army Corps of Engineers BUILDING STRONG

XAYABURI HYDRO POWER PLANT, LAO PDR

USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS. October 2013

CORUH RIVER DEVELOPMENT PLAN

Feasibility Study Mzimvubu Water Project

Micro-Hydro. Module Introduction. Tokyo Electric Power Co. (TEPCO)

NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand

A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM

Búrfell. hydropower station

Track II Project level analyses. Robert Lempert, RAND

Foster care development in Bosnia &Herzegovina

APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P Turbidity Monitoring Plan

Contents. Responsibility for the financial statements 1. Independent auditor's report 2. Statement of comprehensive income 3

Chattichai WAISURASINGHA 1*, Prinya CHINDAPRASIRT 1, Winai SRI-AMPORN 1 and Sinee CHUANGCHAM 2

Dr. Lidija Globevnik Luka Snoj, Neven Verdnik, Peter Muck. Meta Povž

The River Devoll Project

HYDROPOWER POTENTIAL OF NEUQUÉN PROVINCE

Ways toward Food Security -Lessons Learned from Fish Passages in the Paraná River-

INTRODUCING PUMPED STORAGE IN LEBANON: TOWARDS A PROSPECTIVE NATIONAL MASTER PLAN

Frequently Asked Questions (FAQs) on Hydropower

INDONESIA - LAW ON WATER RESOURCES,

Institut für Energietechnik Department of Energy Systems. Hydroelectric power. Elias Bartos 2/7 2010

BOSNIA AND HERZEGOVINA (Entity, REPUBLIKA SRPSKA)

Preliminary damage survey report on 2015 Nepal Gorkha Earthquake

Pöyry renewable energy. Energy through small hydropower

Hydropower in Rwanda: Ongoing Initiatives & New Investment Opportunities. Yves Muyange Director General Energy Water & Sanitation Authority

Hydroelectric Power Plant - Los Cóndores. Santiago, April 2014

Financing hydropower Introduction to the Specifics of Small Hydro Power Plants

CHAPTER 3 RESEARCH DESIGN

TOSHKA PROJECT POWER OPERATION (Mubarak Pump Station)

Tanzania: Lower Kihansi Hydropower Station / Hydropower plants

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún

CALCULATION OF AVERAGE WEIGHTED COST OF CAPITAL FOR INDIVIDUAL SHARES OF SARAJEVO AND BANJA LUKA STOCK EXCHANGE

German-Lebanese Technical Cooperation Project. Public Awareness Campaign for Schools

EXHIBIT A SCOPE OF WORK Montgomery Reservoir Improvements

CTI-Investors Forum 2007 CDM/ JI Project Porfolio

River Basin Management in Croatia

MokeWISE Program Scope of Work: Project 8b: Rehabilitation of Transmission Main

Eagle Mountain Pumped Storage Project No Final License Application Volume 6 of 6. Exhibit G Project Boundary PUBLIC. Palm Desert, California

PPC s Involvement in the Application of the WFD

PRC: Zhanghewan Pumped Storage Power Station Project

STATE JOINT-STOCK COMPANY UZBEKENERGO. Electric power industry of the Republic of Uzbekistan: a current situation and development prospects

How To Fix A Flood Control System In South Lakewood

Project Finance Structuring: Case Study - Nam Theun 2

Exploring the potential of energy recovery using micro hydropower systems in water supply systems

Clean Development Mechanism Project Opportunities in Indonesia

HOW TO FUND BASIN MANAGEMENT PLANS? Invest in IWRM - it pays back!

What are the Benefits?

Business Analysis - A Guide to Energy Projects in Serbia

Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr.

4 Water supply description

Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is

Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes

The Flow Regulator. Flow regulation

* 765 million tons of recoverable reserves as of 1970; W.E. Edmonds, Pennsylvania Geologic Survey

Kyrgyzstan: Power Generation & Transmission

STAKEHOLDER ENGAGEMENT PLAN BANJA LUKA TO DOBOJ MOTORWAY: SECTION 1: BANJA LUKA TO PRNJAVOR

LAW ON FREE ZONES Official Gazette of Republika Srpska, 65/03

Performance Improvement of Pump-turbine for Large Capacity Pumped Storage Power Plant in USA

China s Small Hydropower in Rural Energy Development

IUCN Guidelines to Avoid Impacts of Water Resources Projects on Dams and Other Water Infrastructure

WATER STORAGE, TRANSPORT, AND DISTRIBUTION Multi-Dam Systems and their Operation - J.J. Cassidy MULTI-DAM SYSTEMS AND THEIR OPERATION

Design Considerations for Addressing Climate Change Vulnerabilities of Dams and Reservoirs

D5.2 MANUAL ADDRESSED TO STAKEHOLDERS

Meşrutiyet Cad. No. 98 D. 10 Beyoğlu, Istanbul / Turkey Tel: Fax: A REGULATORY UPDATE. New Electricity Market Law

Hydropower Projects Portfolio

Experience in Wetlands restoration and conservation concerning natural water retention measures. Ministry of Environment and Water, Bulgaria

Protecting your private water supplies. The possible causes of contamination and their remediation to prevent this risk.

Vietnam hydropower current situation and development plan

Small-Micro Hydro Facilitation & Innovative Technologies in Japan

Techno - socio - economic Assessment of Pico Hydropower Installations in the Northern Region of Thailand

Hydroelectric power and development in Argentina

Project Layout & Design Features of the Project

: Promoters Contribution : Term Loan Total Profitability at optimum level. : Optimum Utilization(3 rd Year)

Projekty Inženýring Konzultace

DECISION. Single Registry of Legal Entities Transaction Accounts in. Bosnia and Herzegovina. Article 1

Prof. dr Branko Glavonjić. Wood energy market and subsidies for using woody biomass in production of electricity and heat in Serbia

Overview of the biomass market in Bosnia and Herzegovina

Assessment of hydropower resources

HOW TO ESTABLISH A BUSINESS IN BOSNIA AND HERZEGOVINA

PROPOSED REHABILITATION SAN CARLOS IRRIGATION PROJECT FACILITIES. Pinal County, Arizona. Scoping Information and Opportunity to Comment

How To Build A River Restoration Project In North Korea

Flood risk reduction strategy along the river Loire

Hydropower Case Studies and Good Practice Examples

WaReg The Flow Regulator

CHARACTERISTIC EQUATIONS FOR HYDROPOWER STATIONS OF MAIN BARRAGES IN EGYPT

Assessment of Impact of Hydropower Dams Reservoir Outflow on the Downstream River Flood Regime Nigeria s Experience

3E MODEL FOR A SMALL HEPP DESIGN

The Isar Experience River Restoration in Middle Isar Reaches Uwe Kleber-Lerchbaumer Bavarian Environment Agency

Standard Operating Procedures for Flood Preparation and Response

PPI 1 in IDA Countries, 2009 to 2014

The Bathtub Ring. Shrinking Lake Mead: Impacts on Water Supply, Hydropower, Recreation and the Environment

POWER AFRICA GEOTHERMAL ROADSHOW. Presented by Mekuria Lemma Ethiopian Electric Power Strategy & Investment Head SEP 28 Oct 3, 2014

Water Quality Contingency Planning Standard EPB 540B

FRESHWATER COUNTRY PROFILE NORWAY

How To Build A Road Into A Lake In The North Of The Korean Island Of Hongkoon

Subsurface storage And artificial recharge for sustainability

THE FOUR RIVERS RESTORATION PROJECT AND ITS IMPLICATIONS TO THE CHAO PHRAYA RIVER

Título do trabalho. Diálogo Latinoamericano sobre as Melhores Práticas no Desenvolvimento de Grandes Centrais Hidroelétricas

Pump Storage Technology

Transcription:

1. TITLE OF THE PROJECT HYDROPOWER SYSTEM UPPER HORIZONS 2. SECTOR Energy 3. LOCATION The term Upper Horizons means the undeveloped part of the hydropower system Trebišnjica, which is located above the existing Bileća reservoir (elevation 400 masl) encompassing the basins of the rivers Zalomka, Bregave and partly Trebišnjica or karst fields Gacko, Nevesinje, Dabar and Fatničko. The buildings of HPP Dabar are spread over 32 km and are located in the municipalities of Nevesinje, Berkovići and Bileća. HPP Bileća is located in the municipality of Bileća, about 5 km from the city, while HPP Nevesinje is located in the municipality of Nevesinje. The total estimated investment for HPS Upper Horizons amounts to EUR 325.56 million. 4. BRIEF DESCRIPTION OF THE PROJECT The current conception of hydropower water use of Upper Horizons was defined in the preliminary design of Upper Horizons from 1976, which envisages the construction of three hydropower plants upstream of the Bileća reservoir as follows: HPP Dabar, HPP Bileća and HPP Nevesinje (all of which are in the Republic of Srpska). The main elements of the hydropower system Upper Horizons given in this design are based on the concept for which the water management permits are obtained. 1

HPP DABAR Installed capacity: 159,15 MW Average annual generation 251,8 GWh with additional energy effects of 265 GWh/annualy downstream hydropower plants. Estimated total investment: 179,9 million euro HPP Dabar is planned to be built as the first hydropower plant in the Upper Horizons of Trebišnjica River, because it provides the highest energy and water management effects. HPP Dabar is a typical diversion hydropower plant. HPP Dabar is located on the northern edge of Dabar field. HPP Dabar would use treated water from HPP Nevesinje (water transferred from Gacko field and its own water of the Zalomka River) and own water of Nevesinjsko field. RS Government has granted a concession to the company HPP Dabar for the construction of HPP Dabar. The buildings of HPP Dabar are as follows: - dam Pošćenje with reservoir, - supply tunnel with intake house, - surge tank, - pipeline under pressure, - power house with accompanying facilities, - regulation of the Ponikve abyss. The buildings located downstream from the power plant, and necessary for its operation are: - channel and balancing reservoir in the Dabar field, - channel through Fatničko field, - Dabarsko field - Fatničko field tunnel, - Fatničko field Bileća reservoir tunnel. Under the first phase of construction of the multipurpose system Upper Horizons, the construction of the Dabar - Fatnica tunnel of total length of 3235m and Fatničko field - Bileća reservoir tunnel of total length of 15 650 m is completed. Basic features of HPP Dabar are: - natural flow 2.11 m 3 /s - elevation of Nevesinje reservoir 836.0 masl - storage capacity of Nevesinje reservoir 52.8 x 106 m 3 - structural net head 330.70 m - installed flow 55.0 m 3 /s - installed capacity 159.15 MW - average annual generation 251.80 GWh/yr. Having in mind the value of the investment there is open an opportunity for cooperation in the sphere of finding an adequate model for financing projects. 2

HPP NEVESINJE Installed capacity: 60 MW Average annual generation 100,6 GWh Estimated total investment: 97,4 million euro Hydropower plant Nevesinje is a diversion plant, which consists of: - Zalomka reservoir, - embankment dam Rilje with clay core, - embankment dam Nadinići with clay core, - inlet tunnel from the intake house, - surge tank, - pipeline under pressure, - power house, - outlet tunnel with an intake house and connecting channel. HPP Nevesinje uses water from the reservoir, created by construction of the Rilje dam on the Zalomka River and embarkment dam Nadinići which closes the reservior at the upstream side, given the backflow elevation is higher than ground elevation. Basic features and parameters of HPP Nevesinje (according to technical documentation drafted in the period from 1980 to 1986 by Energoinvest Sarajevo): - natural flow 4.7 m 3 /s - volume of the basin for the maintenance of the backflow level 185.5 mil. m 3 - elevation of maximum backflow 970 m asl - elevation of normal backflow of HPP operation 970 m asl - installed flow through turbines 55 m 3 /s - installed capacity of the hydropower plant - number of generators - max./min. level of tail water - constructive head 60 МW 2 836/828 m asl 127.10 m - average annual generation 100.6 GWh HPP BILEĆA Installed capacity: 33 MW Average annual generation 116,4 GWh Estimated total investment: 48,26 million euro Hydropower plant Bileća is a diversion plant designed at the end of the existing hydropower tunnel, which connects Fatničko field with Bileća reservoir. The tunnel is currently being used only for transporting water from Fatničko field to Bileća reservoir. The construction of the power house and accompanying facilities next to the site of the current discharge made tunnel station an inlet tunnel of the hydropower plant. 3

According to the current technical solution (preliminary design with feasibility study drafted by the Intitute for Water Management Jaroslav Cerni in 2007), HPP Bileća is run-off-river consisting of: - basin in front of the intake house, - intake house (in function as of the construction of the tunnel in 2005), - inlet tunnel (Fatničko field Bileća reservoir tunnel, completed and partially coated), - surge tank, - gallery of the closures and pipelines under pressure, - discharge with chute (in function as of the tunnel construction), - power house, - outlet water ways. Basic data and parameters of HPP Bileća with usage of the Dabar water: - natural flow (without losses) 46.67 m 3 /s - volume of the basin for the maintenance of the backflow level 40 000 m 3 - elevation of maximum backflow 470.00 m asl - elevation of normal backflow of HPP operation 465.66 m asl - installed flow through turbines 60 m 3 /s - installed capacity of the hydropower plant 33 МW - number of generators 2 - max./min. level of tail water 400/395 masl - nominal net head 63.10 m - average annual generation 116.4 GWh In principle, HPP Bileća is related to the construction of the whole system of Upper Horizons, but it can be build separately and independently from the other two hydropower plants in the system (HPP Nevesinje and HPP Dabar). 5. PROJECT DETAILS PROJECT STATUS HPP Dabar: In order to implement Dabar project, a series of activities have been conducted in order to obtain construction permits: the property issues have been completely resolved, location conditions were provided and environmental permit obtained. Research works have been performed, access roads built and the preparation of the Detailed Design is in progress. HPP Nevesinje: Preliminary Design has been drafted in the period from 1980 to 1986 by Energoinvest Sarajevo. For the purposes of actualization of this Preliminary Design, the activities are underway in carrying out detailed geological research. HPP Bileća: For the purposes of MH ERS, MP Trebinje, Institute Jaroslav Cerni from Belgrade in 2007 drafted new Preliminary Design with Feasibility Study for HPP Bileća. 4

REASONS TO INVEST IN THE PROJECT Electricity is a good like any other good, and consequently has its market price. The demand for energy worldwide, including this region, is growing rapidly. In the liberalized market, "satisfying own needs" is certainly not the only criterion for the construction of new plants. The HES Upper Horizons project seems particularly attractive, because, in addition to the electricity generation in new plants, the electricity generation in the downstream, existing power stations in the Trebišnjica basin, would be increased. Previous analysis showed that the planned hydropower plants of HES Upper Horizons have extremely favorable technical and economic parameters. Further, since the planning and construction of hydropower plants requires many years from preliminary planning phase to the start of work, and this project has been prepared for a number of years, and is coming to an end, it makes it very interesting for investment. It should be added that it has been already invested a lot in this project, many facilities and supporting infrastructure have been built, particularly for HPP Dabar (access roads, power lines, construction settlements, etc.). The following important facts should be taken into account when it comes to evaluation of the Upper Horizons project, especially when considering the integration of this system in the ecological and social environment. At stake is not only the hydropower project, but it is a large integrated development project of public importance, with very complex target structure. The project must be treated as a development project of planning, utilization and protection of catchment areas of Upper Horizons, whose realization should initiate a complex mechanism of reconstruction and development of Eastern Herzegovina, which is now threatened by unfavorable tendencies in social, economic and development terms. 6. PROJECT FINANCING TOTAL ESTIMATED INVESTMENT According to the current estimates, the total investment for the construction of the hydropower plants amounts to: HPP Dabar: HPP Nevesinje: HPP Bileća: EUR 179.9 million EUR 97.4 million EUR 48.26 million The total estimated investment for HPS Upper Horizons amounts to EUR 325.56 million. Note: The significant funds have already been invested in the realization of HPS Upper Horizons project, since all property issues for HPP Dabar have been resolved, access roads to the site have been built and certain part of the preparatory work for HPP Dabar and HPP Bileća have been completed. PLANNED SOURCES OF FINANCING Energy Development Strategy of the Republic of Srpska envisages different models of financing in the energy sector: public financing, mixed financing (public-private partnership) and private financing. 5

- RS Government has granted a concession to the company HPP Dabar for the construction of HPP Dabar. The model of public financing is envisaged, which would be about 25% of the funds provided from equity by MH ERS ZP HPP on Trebišnjica and about 75% by loans. - The Government shall make a final decision on modalities of implementation and financing of HPP Nevesinje and HPP Bileća. 7. LOCATION FOR THE PROJECT IMPLEMENTATION The buildings of HPP Dabar with accompanying facilities is planned to be built in the municipalities of Nevesinje, Berkovići and Bileća and the plant itself is located on the river in the Dabar field. The buildings of HPP Nevesinje are located in the municipality of Nevesinje, and power plant is located on the Zalomka River, on the eastern edge of Nevesinjsko field. HPP Bileća is located in the municipality Bileća, in the Čepelica village, the exit part of the tunnel Fatničko field- Bileća reservoir. 8. HAVE THE ACTIVITIES IN PROJECT IMPLEMENTATION BEEN ALREADY INITIATED? On April 2011, the Government of the Republic of Srpska adopted the Decision on the Implementation of HPP Dabar. By its decision, the Government of the Republic of Srpska granted a concession for the construction and operation of HPP Dabar to the concession company HPP Dabar. Seventy percent of the share capital for HPP Dabar is provided by ZP HPP Trebišnjica and thirty percent by MH ERS Holding Company. The preparatory activities in the implementation of HPP Dabar project have been initiated after the establishment of the company HPP Dabar. 9. APPLICANT AND CONTACT DETAILS MINISTRY OF INDUSTRY, ENERGY AND MINING Trg Republike Srpske 1, 78 000 Banja Luka Tel: +387 51 339 581 Fax: +387 51 339 651 E-mail: mier@mier.vladars.net 6