New Hydropower Development in Madagascar

Similar documents
APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P Turbidity Monitoring Plan

Frequently Asked Questions (FAQs) on Hydropower

MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed

Assessment of hydropower resources

A Green Sector Overview

Micro-Hydro. Module Introduction. Tokyo Electric Power Co. (TEPCO)

What are the Benefits?

A CASE-STUDY OF CUA_DAT CFRD IN VIETNAM

Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes

RENEWABLE ENERGY TECHNOLOGY: MICRO HYDRO POWER GENERATION FOR ELECTRIFICATION

Project Layout & Design Features of the Project

Small Dam Repair The Stone Lake Dam Story. Joe Barron, P.E. SynTerra formerly the Fletcher Group, Inc. 148 River St. Suite 220 Greenville, S.C.

Búrfell. hydropower station

How To Build A Road Into A Lake In The North Of The Korean Island Of Hongkoon

WATER STORAGE, TRANSPORT, AND DISTRIBUTION Multi-Dam Systems and their Operation - J.J. Cassidy MULTI-DAM SYSTEMS AND THEIR OPERATION

HYDROELECTRICITY and DAMS

Sample Micro Hydro Initial Report

How To Check For Scour At A Bridge

XAYABURI HYDRO POWER PLANT, LAO PDR

NOTE. Note on the pumped storage potential of the Onslow-Manorburn depression, New Zealand

AN ECONOMICAL AND TECHNICAL CASE STUDY FOR A SMALL HYDROPOWER SYSTEM

Welcome to our open house. Thanks for coming. Please sign in and help yourself to refreshments. Energizing your community.

SMALL HYDRO PROJECT ANALYSIS

USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS. October 2013

Glossary of Energy Terms. Know Your Power. Towards a Participatory Approach for Sustainable Power Development in the Mekong Region

Yukon Development Corporation. Next Generation Hydro Summary of the Hydroelectric Power Planning Directive Work Plan

Clean Development Mechanism Project Opportunities in Indonesia

FACT SHEET 6: HYDRO ELECTRICITY

HYDROMATRIX Jebel Aulia - Sudan

Case Study 5 Use of Wind Turbine Technology

Executive Summary: PA No. 12 Micro-hydro at Graham Hill Water Treatment Plant

CHAPTER 3 RESEARCH DESIGN

ESBI Carbon Solutions. Partnering with Countries to Achieve their Full Carbon Credit Potential

Black Canyon Hydroelectric Project FERC Project No. P Proposed Fish Passage Study Plan September 2012

Workshop on Rehabilitation of Hydropower

Re: Preliminary Permit Application for the Rose Creek Pumped Storage Project

Tunnelling and underground works in PPC hydro projects: Contracting practices & construction management Ioannis Thanopoulos Dr.

COMPUTATIONAL FLUID DYNAMICS: DIVERSE APPLICATIONS IN HYDROPOWER PROJECT s DESIGN AND ANALYSIS

Hydropower. Corps Hydro Plants Non-Federal Plants

Techno - socio - economic Assessment of Pico Hydropower Installations in the Northern Region of Thailand

Flood Risk Management

Flood Risk Management

Stream Rehabilitation Concepts, Guidelines and Examples. Objectives. Pierre Y. Julien. Three Laws of Stream Restoration

Hydro Power Projections Report. Jennifer Palmer

Asian Journal on Energy and Environment

Manage water resources for on site hydro-electricity generation

Indonesian Microhydro Power Development

2008 Total Dissolved Gas Management Plan

D 4.4 Report on the feasibility analysis for most technically acceptable locations

Outlet stabilization structure

Integrated Water and Sediment Management of Yellow River

Financing hydropower Introduction to the Specifics of Small Hydro Power Plants

Electricity Generation from Renewable Energy in Sri Lanka: Future Directions

CLIFTY CREEK PLANT MADISON, INDIANA

Feasibility Study Report. India Muerta Small Hydro Power Plant. In Uruguay

CORUH RIVER DEVELOPMENT PLAN

Commonly asked Question about Green Power, and Kit Carson Renewable Energy Program.

IEA ETSAP - Technology Brief E12 - May Hydropower

Sensitivity Analysis for Small Hydropower Plant (SHP)

SECTOR ASSESSMENT (SUMMARY): ENERGY. 1. Sector Performance, Problems, and Opportunities

China s Small Hydropower in Rural Energy Development

Sewerage Management System for Reduction of River Pollution

Mini & Micro Hydro Power Generation. EBARA Hatakeyama Memorial Fund Tokyo, Japan

A Resource Guide to In State Hydropower Production

The Mississippi River & Tributaries Project

An Introduction to. Micro- Hydropower. Systems. Natural Resources Canada. Ressources naturelles Canada

Altoona Water Authority. Infrastructure Overview

HYDROVEX. CSO, SSO and Stormwater Management Specialist Products and Services for North America

1. Purpose and scope. 2. SEPA's role in hydropower and planning

Pico Power: A Boon for Rural Electrification

SEFEC. With Open Coast Defence of Steel and Concrete built Barrier towards Total Energy Transition 2050 by Combining Water-, Wind- and Sun-Power

Micro-hydro Power. Introduction. What is hydropower? System types. Power the entire farm Generate power to sell back to the national grid

Chattichai WAISURASINGHA 1*, Prinya CHINDAPRASIRT 1, Winai SRI-AMPORN 1 and Sinee CHUANGCHAM 2

SIMULATION OF SEDIMENT TRANSPORT AND CHANNEL MORPHOLOGY CHANGE IN LARGE RIVER SYSTEMS. Stephen H. Scott 1 and Yafei Jia 2

Is a community based micro-hydro ELEctrification SCHEME. suitable for your village?

The Alternatives of Flood Mitigation in The Downstream Area of Mun River Basin

INTRODUCING PUMPED STORAGE IN LEBANON: TOWARDS A PROSPECTIVE NATIONAL MASTER PLAN

PROPOSAL FOR CONTRACTORS ALL RISKS

Energy Situation in Egypt

Hydrologic Engineering Techniques for Regional Water Resources Planning

Macro- and Micro-Hydropower: An Option for Socioeconomic Development. Case Study Agbokim Waterfalls, Cross River State, Nigeria.

QUESTIONNAIRE AND PROPOSAL FOR CONTRACTORS ALL RISK INSURANCE

Report Tidal Power Generation Systems

Lockport Pool Chicago Sanitary & Ship Canal Illinois Waterway

Electric Power Systems An Overview. Y. Baghzouz Professor of Electrical Engineering University of Nevada, Las Vegas

Lecture 6. Jump as energy dissipation Control of jump.

ICOLD POSITION PAPER ON DAM SAFETY AND EARTHQUAKES

EE 1452 ELECTRIC ENERGY GENERATION, UTILIZATION & CONSERVATION KINGS COLLEGE OF ENGINEERING

Basics. this is a form of solar energy, as the sun drives water evaporation from the ocean and winds carry the moisture overland

Exploring the Possibilities of Small Hydropower Development Utilizing NRCS-Assisted Flood Control Dams

By Gene Kitts, Senior Vice President-Mining Services, International Coal Group, Inc.

Conduit hydropower: An alternative sustainable renewable energy source

Executive Director, Engineering & Construction Services Director, Purchasing & Materials Management Division

Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún

Discussion about the practicability of implementing flood risk. management and urban flood insurance in China. Longhua Gao, Xiaoqing Zhou

Transcription:

New Hydropower Development in Madagascar Michael Edwards Project Engineer Paul C. Rizzo Associates, Inc. Monroeville, Pennsylvania, USA Melvin Koleber P.E. Project Manager Paul C. Rizzo Associates, Inc. Monroeville, Pennsylvania, USA INTRODUCTION Paul C. Rizzo Associates, Inc. is currently working with the Madagascar Ministry of Energy and Mines to complete the planning and conceptual design for the Volobe Amont Project in Madagascar. The Volobe Amont (Upstream Volobe) Hydroelectric Project is currently conceptualized as a 60 MW run-of-river project owned and operated by the Government of Madagascar. Paul C. Rizzo Associates helped to develop the concept for the Project, and is undertaking a Feasibility Study that is being partially-funded by the United States Trade & Development Agency, and also cost-shared between the Madagascar Ministry of Energy and Mines and Paul C. Rizzo Associates. In cooperation with the project owner, three Malagasy engineers worked in the RIZZO offices in Pittsburgh, Pennsylvania to assist in the completion of the required studies and analysis, and to benefit from technology transfer and training while in the United States for four months. The unique aspects of the project and the development process will be summarized in the paper, as well as a report on the experience of the Malagasy engineers working in the USA. PROJECT DESCRIPTION The Volobe Amont (Upstream Volobe) Hydroelectric Project site is located 30 kilometers west-northwest of Toamasina, the second largest city in Madagascar, and the largest shipping port on the Island.

PROJECT LOCATION The Project is currently conceptualized as a 60 MW run-of-river project owned and operated by the Government of Madagascar. Located on the Ivondro River, this project has the potential to increase the installed hydropower capacity in the country by more than 50 percent1. Paul C. Rizzo Associates helped to develop the concept for the Project, and is undertaking a Feasibility Study that is being partially-funded by the United States Trade & Development Agency, and also cost-shared between the Madagascar Ministry of Energy and Mines and Paul C. Rizzo Associates. 1 The Energy Information Administration s International Energy Tables indicate that Madagascar had 105 megawatts of installed capacity in 2004.

The current conception of the Project is to capture the Ivondro s flow at a location approximately 11 kilometers upstream of the proposed powerhouse. A small dike, less than 10 meters in height, will be constructed across the river to allow adequate water depth for intake during seasons of low flow. This dike will not serve to create a reservoir, as it will be overtopped by the River s flow during most times of the year. The water collected at the intake will be transported through a large-diameter tunnel, constructed by drill and blast methods, through rock strata between the intake and powerhouse sites. The primary initial load for the hydropower development will be a proposed privately developed processing facility for the products of local mining operations. The processing facility will have a peak power demand of approximately 81 megawatts, currently planned to be provided by fossil fuel fired power plants. The Volobe Amont hydropower plant will offset a significant portion of the need for additional fossil capacity with clean, economical hydro-generated energy. In addition to the processing facilities, the Volobe plant will serve the increasing electrical loads of Toamasina, as well as some local rural electrification needs. PROJECT SITE

UNIQUE INTERAGENCY COOPERATION As the project team sought funding on behalf of the Madagascar Ministry of Energy and Mines for a Feasibility Study of their 60-megawatt Volobe Amont Hydroelectric Project, some creative and innovative means were employed. The U.S. Trade and Development Agency (USTDA) agreed to fund most of the Study if the remaining costs were shared between the Ministry and RIZZO. Since the Ministry could not afford a significant monetary contribution, the project team suggested that they send three engineers to work in the Paul C. Rizzo Associates Monroeville, Pennsylvania headquarters for a period of four months. From the USTDA perspective, this proposed knowledge transfer presented an unprecedented and intriguing approach to solving a common problem. All parties agreed to this unique cost-sharing idea, and the appropriate agreements were reached. In late October of 2005, a team from Paul C. Rizzo Associates traveled to Madagascar to begin the Feasibility Study for the Volobe Amont Hydroelectric Project. The team met with the Ministry of Energy and Mines and various other agencies in Antananarivo, then spent several days at the project site, located in a remote region of jungle, about 30 kilometers inland from Toamasina. The site visit included exploration of all relevant project features, GPS data collection, geologic interpretation, and hydrologic assessment. This initial reconnaissance indicated that Volobe Amont is a very attractive construction site from a geologic perspective. After the initial field reconnaissance, the three nominated engineers from the Ministry of Energy and Mines were scheduled to spend four months working on the Project in Pittsburgh, PA, at the headquarters of Rizzo Associates. Vololonirina Ratsiranto is a hydraulic/civil engineer who consulted on several international hydroelectric projects. Augustin Randrianarivony is an environmental engineer, and Chief of the Environmental Unit of the Ministry of Energy and Mines. Francois-Xavier Rakotozafy is an electrical engineer who is the Chief of Transmission and Distribution of JIRAMA, the state-run utility in Madagascar. These three engineers brought important knowledge to the Feasibility Study team. Vololona, Augustin, and Xavier arrived at the Pittsburgh International Airport on January 5, 2006. Their stay in Pittsburgh proved to be even more valuable to us than anticipated. Xavier evaluated several schemes for interconnection with the existing electrical grid, and provided a conceptual design for his recommended system. Augustin spent his time in the U.S. defining all the potential environmental and social impacts of the Project. Vololona brought an incredible knowledge of local engineering practices, making her the most important critical reviewer during conceptual design of the civil works. This arrangement was also a success from their perspective. The Malagasy engineers had never been exposed to such a structured engineering environment, where research publications and computing power were so readily available. They had also typically focused on intense technical details, rather than on the big picture when approaching

engineering challenges, which proved to be the biggest difference between the two engineering cultures. In addition, since it was their first time in the United States, they were able to visit Washington, D.C.; Niagara Falls; the Saluda Dam in Columbia, SC; Gettysburg; the Chesapeake Bay Bridge-Tunnel; as well as everything that Pittsburgh had to offer, including a Steelers Super Bowl championship! It would have been difficult to bridge the information gap that exists between the United States and a remote region in Madagascar, in order to conduct a relevant and accurate Feasibility Study. But by sharing thoughts and ideas with three talented local engineers, both sides were able to gain a much better understanding of the subtleties that will contribute to the overall success of the project. CIVIL PROJECT LAYOUT AND ENGINEERING CONCEPT Several alternative intake locations were investigated as a result of the site visit. The advantages and disadvantages were discussed at length with the project team, and the project concept will be based on an overflow spillway structure to be located upstream of the previously envisioned intake sites. The intake structure will include an ogee-type spillway, with its length designed as such to sufficiently pass a 6,000 m 3 /s flood flow without prohibitive backwater effects. The intake system will also consist of a gated tunnel entrance to be located upstream of the spillway. The ecological flow (3 m 3 /s) will be released through a gate in the spillway, at an elevation such that the water is adequately oxygenated. This intake design was the most technically challenging aspect of the Project. Our three consultants indicated that debris and sedimentation are a major design challenge in their region. The Volobe Hydro Power Station, which exists downstream of the proposed site, requires hydromachinery rehabilitation every five years due to erosion. With this in mind, debris and sedimentation became a significant issue. After deliberation, our project team determined that floating debris will be handled by diversion over the spillway. Settled debris will be flushed through a sluice gate to be located through the bottom of the spillway. Suspended solids will be given adequate time to settle, likely in sedimentation basins to be located between the river and the tunnel intake. From the gated intake, a tunnel will extend approximately 4,900 meters to the powerhouse site. Significant groundcover for this tunnel alignment will allow the tunnel to extend directly to the powerhouse, reducing hydraulic losses associated with any bends. An Economic Diameter Analysis indicates that the horseshoe-shaped tunnel will be 6.4 meters in height and 3.4 meters in width. A surge tank will also be necessary. It is envisioned to be located approximately 450 meters from the discharge site. A shaft will be drilled into rock, and a surge chamber,

approximately 18.5 meters deep and 18.5 meters wide, will be placed atop a local mountain peak above the tunnel. It has been determined that the axis of our hydroelectric turbines must be located 4.5 meters below the minimum elevation of discharge in order to prevent cavitation problems. The powerhouse will house two Francis-type turbines, in addition to the generating and electrical equipment. The powerhouse will be contained mostly belowground, and will be designed with hatch-type entrances on the top of the building only, so that it can be submerged under water during flooding. POWER GENERATION CAPACITY Analysis of flow data taken at the nearby Ringaringa gauging station indicates a flow duration curve as seen on Figure 1. FIGURE 1 FLOW DURATION CURVE FOR PROPOSED INTAKE Generation optimization analyses indicate that the Project should contain two (2) 30- megawatt Francis turbines. These 2 x 30MW units will provide average annual generation of 452 gigawatt-hours.

TRANSMISSION INTERCONNECTION / RURAL ELECTRIFICATION In addition to evaluating several alternatives for transmission line routing, as well as implementing the interconnections to the various substations that are concerned, Mr. Rakotozafy has recommended a rural electrification component for the Project. The recommended scheme, shown on Figure 2, envisions 250KWA electrical power that will serve more than twenty villages and 5,000 people. FIGURE 2 RECOMMENDED RURAL ELECTRIFICATION SCHEME PRELIMINARY ENVIRONMENTAL AND SOCIAL IMPACT ASSESSMENT Mr. Randrianarivony completed a Project Idea Note (PIN) and the Clean Development Mechanism (CDM) memo, for issuance to the Ministry of Environment, as stipulated by the Project s Terms of Reference. Mr. Randrianarivony addressed many aspects of potential environmental impacts, including ongoing use of the Ivondro River, the impact of backing up a part of the River by constructing a spillway, excavation and tunneling considerations, emissions, various impacts to the populations, and many other items. Also, an environmental flow release was calculated (3 m 3 /s) and used to size the discharge gate through the spillway.

COST ESTIMATE AND FINANCIAL ANALYSIS The cost estimate and financial analysis are currently being completed. Much input was provided by the three consultants related to the unit costs of certain construction activities. Additionally, the project team visited a large international hydropower machinery manufacturer, based in Pennsylvania. The input from this supplier will be used for estimating the machinery. The financial analysis is being completed by members of the project team, who have also met with officials from the Inter-American Development Bank in Washington, DC, to discuss the Project and endeavor to establish the economic parameters and boundary conditions. CONCLUSIONS In conclusion, Volobe Amont appears to be a technically feasible and attractive project. Our Feasibility Study was met with several challenges, most notably the debris and sedimentation issues at the intake, and the natural difficulties that would arise in working in a remote, underdeveloped region of the world. A unique approach was adopted to bridge the information and cultural gaps between our engineering consulting firm located in the United States, and the project owner located nearly 15,000 kilometers away in Madagascar. When the Ministry of Energy and Mines provided us with three highly-qualified Malagasy engineers who were dedicated to the success of the project, we were able to share knowledge and experience with each other. This transfer proved to be a significant benefit for two main reasons: first, it allowed for a much more efficient Study, where ideas and concerns were voiced between client and consultant in real-time; and second, we formed good relationships with each other that will be of great importance as we work together for the duration of this Project. Author Profiles Mike Edwards is a Project Engineer with Paul C. Rizzo Associates, Inc. in Monroeville Pennsylvania, USA. Mr. Edwards received a B.S. degree from Carnegie Mellon University in Civil Engineering in 2002. Mr. Edwards works primarily on hydropower projects and dams worldwide, with specialized expertise in the development of pumpedstorage schemes. Mr. Edwards served as the Project Manager for the Volobe Amont Study. Melvin Koleber, P.E. is a Project Manager and Director of Sales and Marketing for Paul C. Rizzo Associates, Inc. Mr. Koleber received a B.S. degree in Civil Engineering from the University of Colorado in 1980. Mr. Koleber has extensive experience with hydropower development, primarily in North and South America, including planning and design of new hydropower plants and dams, and rehabilitation of existing plants.