1 2008 Total Dissolved Gas Management Plan 1.0 Introduction High total dissolved gas (TDG) saturation levels are observed in various parts of the Columbia and Snake River systems where spill occurs, sometimes creating conditions that may adversely affect fish survival. Therefore, a plan to control TDG is developed annually along with a water management plan based on the runoff and the resulting spill for that year. This document outlines the TDG management plan adopted by the Technical Management Team (TMT) for It includes a review of voluntary and involuntary spill, applicable management options, and a detailed TDG management plan with spill priority list and spill caps. This plan reflects relevant provisions of both the U.S. Fish and Wildlife Service and the National Marine Fisheries Service (NMFS) Federal Columbia River Power System (FCRPS) Biological Opinions (BiOps). 2.0 Voluntary and Involuntary Spill 2.1 Voluntary Spill Voluntary spill is defined as the passing of water through the spillway gates of a dam to facilitate passage of juvenile salmon past the project or passage of water to aid fish downstream. Spill at projects that pass juvenile salmonids is done to decrease the residence time of juvenile salmon in the forebay of dams, which increases their passage and survival in the FCRPS. Spill, as a fish passage strategy, has a higher survival rate than most other routes of passage at the dam. The amount of voluntary spill is adjusted so that the resulting TDG levels associated with spill are consistent with applicable State water quality criteria. These criteria specify that TDG levels are not to exceed 120% in the tailwaters and 115% in the forebays of downstream projects as measured as the average of the twelve highest hourly readings in any one day. They also specify that TDG levels are not to exceed 125% on a one-hour basis (State of Washington) or on a twohour basis (State of Oregon). These TDG levels are referred to as gas caps. The term spill cap is defined as the amount of spill necessary for TDG levels to reach the gas cap. Another reason for spill is for flow augmentation. The NMFS and USF&WS BiOps call for flow augmentation in the Columbia and Snake Rivers. There are instances where spill at some projects is required to obtain the flow objectives called for in these BiOps. 2.2 Involuntary Spill Involuntary spill is caused primarily by project and/or system operational limitations. There are two primary causes for involuntary spill: 1. When hydrologic conditions result in flows which exceed the hydraulic capacity of power generation facilities, and/or 2. When potential power generation from water moving through the reservoir exceeds the available market, especially during light load hours at night and on weekends. 1
2 Other causes for involuntary spill include management of reservoirs for flood control, scheduled or unscheduled turbine unit outages of various durations, passing debris, or any other operational and/or maintenance activities required to manage project facilities for safety and multiple uses. For example, in managing the project for flood control, the water supply forecast may underestimate the seasonal streamflows resulting in inadequate space available in the reservoirs to capture incoming water. In other instances, unusually high winter precipitation in January through March may force the operators to store water in the reservoirs above the flood control elevations during the month, causing involuntary spill to occur later in the month as the water is evacuated to get to end of the month reservoir flood control elevations. The anticipated frequency and extent of involuntary spill due to hydrologic conditions cannot be predicted until the 2008 (April Final) January through July forecast for the Columbia River at The Dalles is completed. Isolated instances of involuntary spill, prompted by scheduled or unscheduled turbine unit outages of various durations and/or other operational and maintenance activities, are expected to occur in Management Options Fish Operations Plan Spill Guidance: The 2008 Fish Operations Plan (FOP) describes actions by the U.S. Army Corps of Engineers (Corps) to implement project operations for fish passage (including spill) at its Federal Columbia River Power System (FCRPS) dams during the April August 2008 fish migration season. This plan adopts the project operations contained in the 2007 FOP, as incorporated in the Court s May 23, 2007 Opinion and Order, through August 31, and modified through consensus during the 2007 migration season. The 2008 FOP is included in this document as Appendix Spill Management to the TDG Gas Caps: Spill caps will be assigned to each project and will be adjusted in-season, based on actual TDG readings and a variety of other factors. TDG measurements will be reviewed on a daily basis and minor adjustments to the voluntary spill at each project will be made to the daily spill cap in order for TDG concentrations as close as possible, but not exceeding 120% in the tailraces and 115% in the forebays. The assignment of spill caps at each individual project is dependent upon an array of variables. Factors that are evaluated in the determination of spill caps are as follows, 1. Physical Design and Operation of Projects: TDG levels that are generated in the tailwaters of each project depend upon many factors including the amount of spill passing through the spillway, the pattern of spill through the spillway, the amount of flow through the powerhouse, structure of the stilling basin, the presence (or absence) of flow deflectors, the presence (or absence) of divider walls, the presence (or absence) of fish screens (which can influence decisions regarding distribution of spill at specific projects), and river characteristics immediately below each project. These individual characteristics are taken into account when assigning spill caps. 2. Travel Time: The time it takes water to move from one project to the next depends upon the distance between projects and the flow rate in the river. Because of this, changes in spill at 2
3 an upstream project and the resulting change in TDG levels will not be seen in the forebays of the downstream project for several hours or days. 3. Water Temperature: Climatic conditions can cause increases in water temperatures, which in turn can cause increases in TDG levels. The rule of thumb for water temperature is that a 1 o C (1.8 o F) increase in water temperature can result in a 2 to 3% increase in TDG. Since the impact of changing climactic conditions on water temperature cannot be directly predicted, air temperature is used as a surrogate. If it is expected that significant increases air temperature are expected in a specific region, then it will be assumed that water temperatures would also be increasing and spill caps will be adjusted appropriately. 4. River Characteristics: Characteristics of the river channel can influence TDG levels. For example, the forebay of Lower Monumental Dam is shallow and therefore susceptible to heating by sunlight. Other projects have forebays that are deeper, and therefore less susceptible to heating effects. 5. Degassing: As waters flow from one project to another, degassing can occur. Experience has shown that winds above 10 mph enhance degassing. Therefore, wind conditions are used to predict levels of degassing. In addition, flows below 200 kcfs, significant degassing of TDG occurs in the river between the Bonneville dam and the Camas/Washougal FMS. However, when flows increase above 200 kcfs, little or no degassing has been observed. 6. Flow Variations: Spill decisions are often affected by forecasts of flows for the near future. For example, when high flows are anticipated, shifting of spill priorities at different projects may occur in order to develop an overall river-wide strategy to minimize TDG exceedances. Also, there are variations in flow on a weekly basis. On weekends, demand for power typically drops as compared to during the workweek. This results in decreases in flow through project powerhouses. As a result, the relative proportion of spilled water flow (which typically has higher TDG levels) to powerhouse flow (which typically has lower TDG levels) increases. If this condition is not taken into account, then tailwater TDG levels will be higher than what was predicted. The opposite occurs on Mondays where powerhouse flow generally increases over the flow on the weekends due to an increase in power demand as the workweek begins. 7. Maintenance and Repairs: Scheduled maintenance and repair activities can modify the amount of flow through a particular project. The type of maintenance and repair activity and how it will affect flows through the project need to be taken into account in order to assign appropriate spill caps. 8. Experimental Test Schedules: The scheduling of various investigative studies can result in alterations in the normal operation of a project. Examples of such alterations including modified spill pattern tests, Removable Spillway Weir tests, and modified spill operations (e.g. at Ice Harbor, 50% spill operations for 24 hours for two days and then BiOp spill operations for the next two days). 3
4 TDG Management Plan The 2008 TDG Management Plan is similar to previous years' plans. Storage reservoirs will be operated to flood control rule curves and are projected to provide some cushion that will minimize incidences of involuntary spill. No pre-emptive reservoir drafting below flood control elevation will be attempted, as the Salmon Managers are also concerned about reservoir refill. Flows will be regulated to maximize potential for voluntary spill. When project voluntary spill occurs, the projects will be operated to try to keep TDG at or below 115%/120%/125% criteria as long as possible without jeopardizing flood control objectives. When TDG cannot be managed to 115%/120%/125%, the river will be managed in the best interest of listed salmon stocks. It is recognized that measures designed to physically reduce TDG could have significant impact on migrating salmon. Therefore, input from Federal, State and Tribal salmon managers will be sought when attempting to use those TDG control measures. The essence of the 2008 TDG Management Plan is as follows: Implement spill for fish passage at all mainstem Federal dams as specified in the 2008 Fish Operations Plan (Appendix 6) up to the TDG waiver gas caps. The gas caps are defined as 120% TDG in mainstem project tailraces and 115% in the forebays of downstream dams as measured as the average of the twelve highest hourly TDG readings in a given day and 125% as measured on an hourly basis. (Note: The State of Washington has recently amended their water quality standard for TDG specifying that the daily TDG be calculated as the average of the twelve highest consecutive hourly readings in any one day, relative to atmospheric pressure. Since this years plan is to implement the same spill program as in 2007, the Corps will continue to set spill caps based on the twelve highest hourly TDG readings in a given day and not to the average of the highest 12 consecutive hourly readings. However, in the year-end report to the states, the Corps will report the average of the highest 12 consecutive hourly readings to the State of Washington. There has been no change to the State of Oregon s methodology for calculating the daily TDG levels). Since spill management at Bonneville dam in 2007 was based on TDG measurements taken at both the Cascades Island and Camas-Washougal TDG fixed monitoring stations, the Corps will continue to use TDG measurements from these two stations for spill management at Bonneville dam in Issues surrounding the use of TDG measurements from all fixed monitoring stations for spill management are currently being discussed by the Adaptive Management Team (sponsored by the Oregon Department of Environmental Quality (ODEQ) and the Washington Department of Ecology(WDOE) and various Regional Forum groups. Modification to the strategies for spill management may occur in the future. Adjust spill as needed, based on real-time TDG data, and fish movement and biological conditions in that order. Operate unit operation within 1% of peak efficiency. 4
5 Accommodate special spill requirements/restrictions for research, adult passage, etc. that have the full endorsement of all concerned parties. Also, continue to implement fish transportation program as agreed to and using calculation method endorsed by NMFS (or an equivalent method agreed to at TMT). If systemwide TDG exceed 120%, update and implement the spill priority outlined in Attachment 1, with incremental system TDG control objectives. Unless and until a different reach priority is recommended by the TMT, spill will start as specified in the Spill Priority List. Discontinue or postpone field research and non-critical unit service and maintenance schedules that create (or have potential for creating) high localized TDG levels, especially when and where high numbers of listed fish are present. If regionally coordinated and approved by the TMT, operate turbines outside their respective 1% peak efficiency flow range at projects where measurable reduction in TDG (at least 3%, given the accuracy range of the instrumentation) and no intolerable adverse fish impacts can be expected. If regionally coordinated and approved by the TMT, store water at lower Snake reservoirs above MOP, if this would result in a measurable (3% or more, based on instrumentation accuracy) reduction in TDG levels. Experiment with promising new spill patterns. Implement other operations or measures recommended by the TMT or the IT. This may include appropriate changes in transportation targets when TDG exceeds levels that are universally recognized as lethal (130% more for 1 week or longer, per NOAA Fisheries) or when obvious in-river lethal conditions exist. 5
6 TDG Monitoring Plan of Action In support of the spill management program, a TDG monitoring program has been established. Each year, this monitoring program is evaluated by the Regional Forum Water Quality Team (WQT). The draft plan for 2008 was presented to the WQT at the October 29, 2007 meeting and discussed at the December 13, 2008 meeting. Based on discussions at these meetings and submitted written comments, the final plan for 2008 was completed in February A copy of the 2008 plan can be obtained at the TMT/Water Quality Programs webpage at: TDG Modeling Total Dissolved Gas caused by large volumes of water spilled over dams can result in injury and mortality of juvenile salmonids. Development and continued refinement of a systemwide TDG model would assist with in-season management of involuntary spill. In response to RPA 133 of the NMFS 2000 Biological Opinion, the Corps began developing a TDG model to be used as a river operations management tool. During the 2004 spill season, this model (SYSTDG) was utilized on a trial basis to evaluate TDG in the Columbia River Basin and to assist in the setting of spill caps at each of the projects where voluntary spill occurred. At the conclusion of the spill season, a review of the performance of SYSTDG was completed and included in the 2004 Dissolved Gas and Water Temperature Monitoring Report. The same was done for the 2005 through 2007 spill seasons. These reports were included in the annual Total Dissolved Gas and Temperature Annual Report for each of those seasons and are available on the TMT/Water Quality Programs webpage at; SYSTDG will again be used as a TDG management tool in As the season progresses, modification of the model will occur as necessary due to modifications in project operations. 7.0 Temperature Management The 2004 NOAA Fisheries Biological Opinion calls for cold-water releases from Dworshak reservoir. These releases serve the dual purpose of providing additional flows of water to assist passage of juvenile salmonids past the lower Snake River projects and to help moderate water temperatures of that water. The management of the temperatures of these release waters is possible due to the presence of selector gates at Dworshak Dam which can move vertically and draw water from varying elevations in the reservoir. The management of the flows and water temperatures from Dworshak reservoir is coordinated with TMT. The Water Quality Unit (WQU) of the Corps Reservoir Control Center will provide TMT with water temperature stratification data from the Dworshak reservoir as well as temperatures of release water derived from the Dworshak tailwater fixed monitoring station (DWQI). The WQU will also provide TMT with recommendations concerning the amount of 6
7 storage of cool waters in the reservoir to ensure that these sufficient quantities will be maintained through mid-september and what outflow water temperatures will be expected when the operation concludes and the projects returns to minimum flows. 7
8 Attachment SPILL PRIORITY LIST and SPILL CAPS (April 20 - August 31) This attachment provides project priority for spill and allowable spill levels to be used in an attempt to control total dissolved gas (TDG) to 120%, 125%, 130% and 135%. When systemwide TDG is at or below 120%, provide spill for fish passage on the Lower Columbia and Lower Snake rivers up to the 120% TDG tailwater and 115% TDG in the forebays of downstream projects as stipulated in the NOAA Fisheries 2004 Biological Opinion. The states of Oregon and Washington have provided TDG waivers for generating TDG at the levels specified in the BiOp during fish passage season. When systemwide TDG exceeds 120% TDG, then try to control systemwide TDG to 125%, then to 130%, and so on by spilling up to the spill caps indicated for those TDG levels at lower Columbia, Snake, mid-columbia, HGH, and Willamette projects in the specified order. The listing order of the projects on the Spill Priority List depends upon specific river conditions, locations of juvenile and adult salmonids, specific configurations of the projects, and any special operational conditions (e.g. research studies, maintenance outages, etc.). The listing order and the specific spill quantities to achieve the various TDG levels will be updated as necessary to account for changing conditions in the rivers. Project Table A-1. Initial Spill Priority List for 2008 Spill Cap to Generate Specific Percentage of Total Dissolved Gas (TDG) 110% 115% 120% 125% 130% 135% LWG LGS LMN BON JDA TDA WAN WEL (1) -- RRH (1) -- RIS (1) -- PRD MCN IHR GCL CHJ (1) Limit daytime spill to 100 kcfs. 8
DraftNovember 2007. Lower Granite Dam
Lower Granite Dam 1. Fish Passage Information. The locations of fish passage facilities at Lower Granite Lock and Dam are shown in Figure LWG-1. Dates of project operations for fish purposes and special
Case 3:01-cv-00640-RE Document 1757 Filed 04/19/2010 Page 1 of 9
Case 3:01-cv-00640-RE Document 1757 Filed 04/19/2010 Page 1 of 9 DWIGHT C. HOLTON Acting United States Attorney STEPHEN J. ODELL, OSB #90353 Assistant United States Attorney District of Oregon 600 United
STREAMFLOW RESTORATION PRIORITY AREAS
STREAMFLOW RESTORATION PRIORITY AREAS Synopsis The Water Resources Department and the Department of Fish and Wildlife jointly identified priority areas for streamflow restoration in basins throughout the
ENVIRONMENTAL MITIGATION AT HYDROELECTRIC PROJECTS Volume 1. Current Practices for Instream Flow Needs, Dissolved Oxygen, and Fish Passage
DOEIID-10360 Distribution Category: UC-22S ENVIRONMENTAL MITIGATION AT HYDROELECTRIC PROJECTS Volume 1. Current Practices for Instream Flow Needs, Dissolved Oxygen, and Fish Passage M. J. Sale G. F. Cada
Flood mitigation program for Gatun lake. Programa de mitigación de inundaciones del lago Gatún
Flood mitigation program for Gatun lake Programa de mitigación de inundaciones del lago Gatún Moffatt & Nichol Engineers 10 de febrero de 2005 Contrato No. 126161 Introducción y Recomendaciones 1 INTRODUCTION
UTILITIZATION OF ECOHYDROLOGIC MODELS IN FLOODPLAIN FISH PASSAGE AND HABITAT RESTORATION EVALUATION
UTILITIZATION OF ECOHYDROLOGIC MODELS IN FLOODPLAIN FISH PASSAGE AND HABITAT RESTORATION EVALUATION Joshua A. Israel, Fish Biologist, U.S Bureau of Reclamation, Sacramento, CA. [email protected]; Paul
WATER STORAGE, TRANSPORT, AND DISTRIBUTION Multi-Dam Systems and their Operation - J.J. Cassidy MULTI-DAM SYSTEMS AND THEIR OPERATION
MULTI-DAM SYSTEMS AND THEIR OPERATION J.J. Cassidy Consulting Hydraulic and Hydrologic Engineer, Concord, California, USA Keywords: Dams, reservoirs, rivers, water storage, dam safety, floods, environment,
STIPULATED SETTLEMENT AGREEMENT AND ORDER OF DISMISSAL - 1-
STEPHANIE M. PARENT (OSB #92590) Pacific Environmental Advocacy Center 100 15 SW Terwilliger Blvd. Portland, OR 972 1 9 Phone (503) 768-6736 Fax (503) 768-6642 parentalclark. edu Attorney for Plaintiffs
2016 Outlook and Management -Pre-season outlook / expectations and early indications - General overview of in-season management approach
Salmon Briefing 2016 Outlook and Management -Pre-season outlook / expectations and early indications - General overview of in-season management approach Pacific Salmon Species Size and age at return varies
Oregon Administrative Rules Oregon Department of Fish and Wildlife
DIVISION 023 COLUMBIA RIVER ZONE AND SNAKE RIVER ZONE 635-023-0080 Purpose and Scope (1) The purpose of Division 023 is to provide for management of sport fisheries in the Columbia River Zone and in the
Columbia River Project Water Use Plan. Monitoring Program Terms of Reference
Columbia River Project Water Use Plan Revelstoke Flow Management Plan Monitoring Program Terms of Reference CLBMON-15a Middle Columbia River Physical Habitat Monitoring Revision January 29, 2015 Monitoring
Post-Flood Assessment
Page 1 of 7 Post-Flood Assessment CHAPTER 4 AGENCY COORDINATION Agency coordination is an essential element for the operation of the flood management systems in the Central Valley. Due to the nature of
Columbia River Project Water Use Plan. Monitoring Program Terms of Reference LOWER COLUMBIA RIVER FISH MANAGEMENT PLAN
Columbia River Project Water Use Plan LOWER COLUMBIA RIVER FISH MANAGEMENT PLAN CLBMON-45 Lower Columbia River Fish Indexing Surveys 31 August 2007 1.0 OVERVIEW LOWER COLUMBIA RIVER FISH MANAGEMENT PLAN
Fisheries Research Services Report No 04/00. H E Forbes, G W Smith, A D F Johnstone and A B Stephen
Not to be quoted without prior reference to the authors Fisheries Research Services Report No 04/00 AN ASSESSMENT OF THE EFFECTIVENESS OF A BORLAND LIFT FISH PASS IN PERMITTING THE PASSAGE OF ADULT ATLANTIC
APPENDIX F. Baker County. Mason Dam Hydroelectric Project FERC No. P-12686. Turbidity Monitoring Plan
APPENDIX F Baker County Mason Dam Hydroelectric Project FERC No. P-12686 Turbidity Monitoring Plan April 2011 857 Table of Contents 1.0 Introduction 1 2.0 Purpose and Scope 2 3.0 Turbidity Monitoring and
NID statement Agreement Disagreement Auburn Ravine: During irrigation and nonirrigation
NID statement Agreement Disagreement Auburn Ravine: 1. NID will not divert the natural flow during times when the flow as measured at NID s Highway 65 gage is less than 8 cfs provided that during those
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Every year floods sweep through communities across the United States taking lives, destroying property, shutting down businesses, harming the environment
Flood Risk Management
Flood Risk Management Value of Flood Risk Management Value to Individuals and Communities Every year floods sweep through communities across the United States taking lives, destroying property, shutting
CHAPTER 2 HYDRAULICS OF SEWERS
CHAPTER 2 HYDRAULICS OF SEWERS SANITARY SEWERS The hydraulic design procedure for sewers requires: 1. Determination of Sewer System Type 2. Determination of Design Flow 3. Selection of Pipe Size 4. Determination
US Department of Energy, Bonneville Power Administration US Army Corps of Engineers, North Pacific Division
United States Entity US Department of Energy, Bonneville Power Administration US Army Corps of Engineers, North Pacific Division Columbia River System Operation Review Final Environmental Impact Statement
Distribution Restriction Statement Approved for public release; distribution is unlimited.
CEMP-CP Regulation No. 415-1-15 Department of the Army U.S. Army Corps of Engineers Washington, DC 20314-1000 Construction CONSTRUCTION TIME EXTENSIONS FOR WEATHER ER 415-1-15 Distribution Restriction
Burnt River Black River and Gull River Flood Contingency Plan
Burnt River Black River and Gull River Flood Contingency Plan Objective: The objective of this plan is to preplan and prepare for flooding events in the Burnt River, Black River and Gull River area of
Hydropower. Corps Hydro Plants Non-Federal Plants
Hydropower Corps Hydro Plants Non-Federal Plants at Corps Dams The U.S. Army Corps of Engineers is the largest owner/operator of hydroelectric powerplants in the United States and one of the largest in
Hydrologic Engineering Techniques for Regional Water Resources Planning
US Army Corps of Engineers Hydrologic Engineering Center Hydrologic Engineering Techniques for Regional Water Resources Planning October 1969 Approved for Public Release. Distribution Unlimited. TP-17
Section 2. Mono Basin Operations
Section 2 Mono Basin Chapter 2 Mono Basin Compliance with State Water Resources Control Board Decision 1631 and Order Nos. 98-05 and 98-07 May 2008 Los Angeles Department of Water and Power Table of Contents
Methodology for Merit Order Dispatch. Version 1.0
Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...
U.S. Fish and Wildlife Service Icicle Creek Fish Passage Evaluation for The Leavenworth National Fish Hatchery
U.S. Fish and Wildlife Service Icicle Creek Fish Passage Evaluation for The Leavenworth National Fish Hatchery U.S. Fish and Wildlife Service Columbia River Fisheries Program Office Vancouver, Washington
Estimating Potential Reduction Flood Benefits of Restored Wetlands
Estimating Potential Reduction Flood Benefits of Restored Wetlands Kenneth W. Potter University of Wisconsin Introduction Throughout the summer of 1993 a recurring question was the impact of wetland drainage
Oregon. Climate Change Adaptation Framework
Oregon Climate Change Adaptation Framework Oregon Environmental Quality Commission Climate Change Adaptation Framework Presentation at a glance: Purposes of the framework Participating agencies Climate
Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs
US Army Corps of Engineers Hydrologic Engineering Center Methods for Determination of Safe Yield and Compensation Water from Storage Reservoirs October 1966 Approved for Public Release. Distribution Unlimited.
National Dam Safety Program Technical Seminar #22. When is Flood Inundation Mapping Not Applicable for Forecasting
National Dam Safety Program Technical Seminar #22 Thursday February 19 th 2015 Emmittsburg, MD When is Flood Inundation Mapping Not Applicable for Forecasting Victor Hom Hydrologic Services Division National
How To Decide If A Dam Removal Is Safe For Water Quality
Report Issue Paper: Water Quality Certification Procedures for Klamath River Restoration Project By: Steve Kirk and Debra Sturdevant March 2012 Last Updated: 3/14/12 DEQ 11-WQ-047 This report prepared
Hydrologic Modeling System HEC-HMS
Hydrologic Engineering Center Hydrologic Modeling System HEC-HMS Release Notes Version 4.0 December 2013 Approved for Public Release Distribution Unlimited Hydrologic Modeling System HEC-HMS, Release Notes
Flash Flood Science. Chapter 2. What Is in This Chapter? Flash Flood Processes
Chapter 2 Flash Flood Science A flash flood is generally defined as a rapid onset flood of short duration with a relatively high peak discharge (World Meteorological Organization). The American Meteorological
AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA
AZ EGER-PATAK HIDROLÓGIAI VIZSGÁLATA, A FELSZÍNI VÍZKÉSZLETEK VÁRHATÓ VÁLTOZÁSÁBÓL ADÓDÓ MÓDOSULÁSOK AZ ÉGHAJLATVÁLTOZÁS HATÁSÁRA GÁBOR KEVE 1, GÉZA HAJNAL 2, KATALIN BENE 3, PÉTER TORMA 4 EXTRAPOLATING
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013
Chehalis River Basin Flood Damage Reduction 2013-2015 Capital Budget Approved by Legislature in June 2013 1. Design alternatives for large capital flood projects (basinlevel water retention and Interstate
GLOBAL CIRCULATION OF WATER
Global Circulation of Water MODULE - 8A 27 GLOBAL CIRCULATION OF WATER More than three-fourths of the earth s surface is covered by water. Water is an odorless, tasteless, substance than can naturally
Walla Walla Bi state Stream Flow Enhancement Study Interim Progress Report. Department of Ecology Grant No. G1400656.
Walla Walla Bi state Stream Flow Enhancement Study Interim Progress Report Department of Ecology Grant No. G1400656 Submitted by: Walla Walla Watershed Management Partnership Walla Walla, WA Walla Walla
MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed
MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT Significant water resources are found in many developing countries. In areas where adequate water resources are present, harnessing the power of falling
121 FERC 62,167 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION. Public Utility District No. 1 of Project No. 637-044 Chelan County
121 FERC 62,167 UNITED STATES OF AMERICA FEDERAL ENERGY REGULATORY COMMISSION Public Utility District No. 1 of Project No. 637-044 Chelan County ORDER MODIFYING AND APPROVING LAKE CHELAN FISHERY PLAN,
PRESENTATION TITLE. Corps of Engineers Agreement with. Columbia Riverkeeper Regarding Hydropower Plant Discharges
Corps of Engineers Agreement with PRESENTATION TITLE Columbia Riverkeeper Regarding Hydropower Plant Discharges 2015 Southwestern Federal Hydropower Meeting June 18, 2015 Wayne Todd Sr. Hydropower Program
Chelan County PUD. Rock Island Rehabilitation Powerhouse One Units B5 to B8
Chelan County PUD Rock Island Rehabilitation Powerhouse One Units B5 to B8 Follow-up from October 19 th, 2015 Use of New Turbines vs. Refurbishment of Existing December 7, 2015 From Oct. 19 - Next Steps
Rules and Regulations for Dam Safety
STATE OF RHODE ISLAND AND PROVIDENCE PLANTATIONS DEPARTMENT OF ENVIRONMENTAL MANAGEMENT OFFICE OF COMPLIANCE AND INSPECTION Rules and Regulations for Dam Safety December 2007 AUTHORITY: These regulations
Black Canyon Hydroelectric Project FERC Project No. P-14110 Proposed Fish Passage Study Plan September 2012
Black Canyon Hydroelectric Project FERC Project No. P-14110 Proposed Fish Passage Study Plan September 2012 Prepared for Black Canyon Hydro, LLC 3633 Alderwood Avenue Bellingham, WA 98225 Table of Contents
Howsham fish passage Consultation document
Howsham fish passage Consultation document Report ENVIMNE000903 Final version 30 June 2016 We are the Environment Agency. We protect and improve the environment. Acting to reduce the impacts of a changing
Earth Science. River Systems and Landforms GEOGRAPHY 1710. The Hydrologic Cycle. Introduction. Running Water. Chapter 14.
Earth Science GEOGRAPHY 1710 River Systems and Landforms DAVID R. SALLEE Robert W. Christopherson Charlie Thomsen Chapter 14 Introduction Rivers and streams are dynamic systems that continually adjust
Initial Assessment of Potential Flood Mitigation for Communities Downstream of Googong Dam
Initial Assessment of Potential Flood Mitigation for Communities Downstream of Googong Dam ICON WATER AND QUEANBEYAN CITY COUNCIL Summary Report 8006314 25 June 2015 Initial Asssessment of Potential Flood
Resolving complex issues with large scale river restoration; a case study: the San Joaquin River in California
IWA Publishing 2011 Water Practice & Technology Vol 6 No 4 doi:10.2166/wpt.2011.074 Resolving complex issues with large scale river restoration; a case study: the San Joaquin River in California William
National Weather Service River Forecast System (NWSRFS) Reservoir Tools Enhancement
NATIONAL WEATHER SERVICE OFFICE of HYDROLOGIC DEVELOPMENT CONCEPT OF OPERATIONS And REQUIREMENTS DOCUMENT National Weather Service River Forecast System (NWSRFS) Reservoir Tools Enhancement Revision History
Gold Ray Dam Interagency Technical Team Meeting
Gold Ray Dam Interagency Technical Team Meeting Agenda Public Outreach, Funding, Monitoring EA/BA/Permit Updates Deconstruction Plans Fish Passage & Salvage Plan Hydraulic Modeling Next Steps Public Outreach,
Frequently Asked Questions (FAQs) on Hydropower
Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life
Addressing Declining Elevations in Lake Mead
Integrated Resource Planning Advisory Committee July 23, 2014 Addressing Declining Elevations in Lake Mead 1 Meeting Topics Drought update Attribute finalization Interbasin Cooperation Intake Pumping Station
WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE
WETLAND RESTORATION PROGRAM WATER ACT APPROVAL ADMINISTRATIVE GUIDE May 24, 2005 Table of Contents Introduction...3 Definitions...3 Types of Wetland Restorations...4 Re-Contouring...4 Engineered...4 Water
Year 2 7-15-10 Post Restoration Monitoring Summary Rock Creek Project Monitoring and Analysis conducted by Bio-Surveys,LLC. Contact: strask@casco.
Year 2 7-15-10 Post Restoration Monitoring Summary Rock Creek Project Monitoring and Analysis conducted by Bio-Surveys,LLC. Contact: [email protected] Project Sponsors include: The City of Corvallis Oregon
COMMUNITY CERTIFICATIONS
National Flood Insurance Program Community Rating System COMMUNITY CERTIFICATIONS Public reporting burden for this form is estimated to average 4 hours for annual recertification, per response. The burden
COMPLIANCE REPORT MUDDY HOLLOW CULVERT REMOVAL FILE NUMBER 25358N
COMPLIANCE REPORT MUDDY HOLLOW CULVERT REMOVAL FILE NUMBER 25358N Submitted by the National Park Service Point Reyes National Seashore Point Reyes Station, California, 94956 Project Description: Muddy
UNITED STATES DISTRICT COURT DISTRICT OF OREGON ) ) ) ) ) ) ) ) ) ) ) ) ) ) ) )
Case 3:09-cv-00729-HA Document 20 Filed 07/09/10 Page 1 of 10 Page ID#: 86 IGNACIA S. MORENO, Assistant Attorney General SETH M. BARSKY, Acting Section Chief BRADLEY H. OLIPHANT, Trial Attorney (Cal. Bar
Federal Emergency Management Agency (FEMA) Preliminary Flood Insurance Rate Maps (FIRMs) and Preliminary Flood Insurance Study (FIS) for New York City
March 10, 2014 Submitted electronically via http://www.nyc.gov Mayor s Office of Long Term Planning and Sustainability c/o Flood Map Comments 253 Broadway, 10th Floor New York, NY 10007 Federal Emergency
Manage water resources for on site hydro-electricity generation
Manage water resources for on site hydro-electricity generation 18279 version 4 Page 1 of 6 Level 4 Credits 8 Purpose People credited with this unit standard are able to: demonstrate knowledge of water
Climate Change and Infrastructure Planning Ahead
Climate Change and Infrastructure Planning Ahead Climate Change and Infrastructure Planning Ahead Infrastructure the physical facilities that support our society, such as buildings, roads, railways, ports
2016 ERCOT System Planning Long-Term Hourly Peak Demand and Energy Forecast December 31, 2015
2016 ERCOT System Planning Long-Term Hourly Peak Demand and Energy Forecast December 31, 2015 2015 Electric Reliability Council of Texas, Inc. All rights reserved. Long-Term Hourly Peak Demand and Energy
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002
Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed Summary Report 2002 DOE/BP-00005268-5 November 2002 This Document should be cited as follows: "Restoring Anadromous Fish Habitat in Big Canyon
Solar PV panels fitted to roofs. Solar PV panels produce electricity from energy provided by sunlight. 3.5 MWh per system
Solar PV panels fitted to roofs Yearly cost of production Cost per kwh 12.5p Solar PV panels produce electricity from energy provided by sunlight. 3.5 MWh per system 430 per system Solar energy can be
LR 314 Working Group 5 Final Report
LR 314 Working Group 5 Final Report I. Nebraska Department of Natural Resources Table 1. NDNR and NATURAL RESOURCES COMMISSION WATER/INTEGRATED MANAGEMENT PLANNING RELATED RESEARCH, STUDIES AND RELATED
FLOOD FORECASTING PRACTICE IN NORTHERN CALIFORNIA
FLOOD FORECASTING PRACTICE IN NORTHERN CALIFORNIA California Department of Water Resources Post Office Box 219000, Sacramento, California 95821 9000 USA By Maurice Roos, Chief Hydrologist ABSTRACT Although
Adoption of an Interim 602(a) Storage Guideline. Final Environmental Assessment
Adoption of an Interim 602(a) Storage Guideline Final Environmental Assessment U.S. Department of the Interior Bureau of Reclamation March 2004 The mission of the Department of the Interior is to protect
The IPCC Special Report on Managing the Risks of Extreme Events and Disasters to Advance Climate Change Adaptation
The IPCC Special Report on Managing the Risks of Extreme Events and Disasters to Advance Climate Change Adaptation A changing climate leads to changes in extreme weather and climate events 2 How do changes
RECOGNIZING THE VALUE OF WATER QUALITY MONITORING
CHAPTER 15: CREATING A NATIONAL WATER QUALITY MONITORING NETWORK Ongoing monitoring is essential to assess the health of ocean and coastal ecosystems and detect changes over time. More than any other measure,
Emergency Spillways (Sediment basins)
Emergency Spillways (Sediment basins) DRAINAGE CONTROL TECHNIQUE Low Gradient Velocity Control Short-Term Steep Gradient Channel Lining Medium-Long Term Outlet Control Soil Treatment Permanent [1] [1]
Reservoir Simulations for the Delaware River Basin Flood of June, 2006
Reservoir Simulations for the Delaware River Basin Flood of June, 2006 Middle Atlantic River Forecast Center State College, PA August 2007 (Revised 9/13/07) Introduction: In the late spring of 2005, the
NOTICE TO STATE WATER PROJECT CONTRACTORS
State of California DEPARTMENT OF WATER RESOURCES CALIFORNIA STATE WATER PROJECT California Natural Resources Agency NOTICE TO STATE WATER PROJECT CONTRACTORS Date: FEB 0 4 2016 Number: 16-02 Subject:
OVERLAND PIPELINE OPTIONS
Working Document of the NPC Study: Arctic Potential: Realizing the Promise of U.S. Arctic Oil and Gas Resources Made Available March 27, 2015 Paper #7-9 OVERLAND PIPELINE OPTIONS Prepared for the Technology
JOCASSEE FOREBAY AND TAILWATER WATER QUALITY REPORT KEOWEE-TOXAWAY PROJECT (FERC PROJECT NO. 2503)
JOCASSEE FOREBAY AND TAILWATER WATER QUALITY REPORT KEOWEE-TOXAWAY PROJECT (FERC PROJECT NO. 2503) Prepared for: Prepared by: DUKE ENERGY CAROLINAS, LLC CHARLOTTE, NC RESERVOIR ENVIRONMENTAL MANAGEMENT,