1 Macro- and Micro-Hydropower: An Option for Socioeconomic Development. Case Study Agbokim Waterfalls, Cross River State, Nigeria. R. Uhunmwangho, Ph.D. and E.K. Okedu Department of Electrical/Electronic Engineering, University of Port Harcourt, Nigeria. ABSTRACT Over the last few decades, there has been a growing realization in developing countries that macro- and micro-hydro schemes have an important role to play in the economic development of remote rural areas, especially mountainous ones. The Agbokim Waterfalls located 23 km from Ikom Town is one of such macro-hydro schemes that can provide power for industrial, agricultural and domestic uses. The Agbokim waterfall is located in a hilly terrain cuts < flow rate of 7m 3 /sec that is perpetual, flowing all year round unto a head of approximately 40m producing approximately 2.2 mega watt power to 8 communities of about 4,000 persons. Land acquisition problems, difficult and inaccessible sites, geological surveys, and funding are of some of the constraints in developing the Agbokim hydro schemes. The key areas of interest were stream flow data, water quality, interconnection cost consideration and financing. A cash flow evaluation was used to determine the economic viability of the hydro scheme by looking at the overall revenues which includes the energy sales and the expenses on a year by year basis. (Keywords: hydropower, energy sales, electricity demand) INTRODUCTION Power is a critical infrastructure for economic development and for improving the quality of life. However, it is a matter of concern that the annual average per capita consumption of Nigeria is about 14.6kWh, which is among the lowest in the world. Further, people in a large number of urban and rural villages have no access to electricity. The end users of electricity like households, farmers, commercial establishments, and industries are confronted with frequent power cuts, both scheduled and unscheduled. Power cuts, erratic voltage, and low or high supply frequency have added to the power woes of the consumer. These problems emanate from: Inadequate power generation capacity; Lack of optimum utilization of the existing generation capacity; Inadequate inter regional transmission links; Inadequate and ageing sub transmission and distribution network leading to power cuts and local faults; Slow pace of rural electrification; Large scale theft and skewed tariff structure. In order to improve on the social economic wellbeing of Nigerians, there is need to provide affordable power. With increasing price of fuels and cost of installation, the cost of power generation has significantly increased. While attending to the task of improving the country s generation capacity, high priority is to be given to reduce the cost of power to enable different segments of the population and the economy to effectively utilize power as an input. As a result, adoption of best practice and choosing least cost options in capacity addition will be encouraged. One of these options will be the small or macro hydro power. Hydro power became an important resource for electricity generations at the beginning of the electricity era. The first hydropower scheme was installed in Wisconsin in September 1882 only few years after Thomas Edison invented the light bulb (Energizing Sustainable Development, 2002). Soon after, it became a popular option for electricity generation around the world. At present nearly 20% of the total electricity consumed worldwide comes from hydroelectric plants (Micro Hydropower Systems, 2006). In some countries The Pacific Journal of Science and Technology 529
2 hydroelectricity accounts for more than 80% of the total electricity consumed. For some years, interest in hydropower went down drastically due to a number of factors: fast growth in electricity demand globally; progress of other technologies, success of large generation schemes and large grids in bringing down cost; mass production of small diesel sets that are both portable and easily installed; and easy access to affordable diesel fuel. In the more recent past, the energy crisis, climate change, energy poverty in developing countries, and commitments for achieving the Millennium Development Goals (MDGs) has led to a rethink. Planners and policy makers are being urged to review all available energy options, especially those decentralized sources that could play a role supplying poor and isolated communities with energy for development. These sources include hydro power schemes as well as solar photovoltaic systems, biomass energy and wind generators. Hydroelectric power plants are an important and environmentally friendly tool for the achievement of the MDGs in the rural areas through the provision of sustainable electric power supply (Final synthesis report, for sustainable development of micro hydro power, 2000). It is economically and socially viable, when indigenous resources and appropriate technology are deployed in its implementations operations and management. Hydroelectric power is an option which can generate energy 24hours a day continuously at its full capacity (if needed) the marginal cost are negligible, and it can in turns promote creation and the productive user of energy for income generation and social development of communities. In spite of the existence of numerous reports and an apparent interest in the development of the micro hydro technology in the country, not many hydro plants have been constructed so far. In Nigeria, Preliminary Prospect of harnessing the hydro-electric potentials exist for Evboru II in Edo state with an estimated capacity of 20kW run off river, Ugonoba River along Benin/Asaba highway has a mathematical estimate of 600kW and other parts of the country. Marco-hydroelectricity development has significant potential for contributing to Nigeria s long term energy mix. Nigeria has developed some hydroelectric schemes over the last century; however there are many opportunities for small- or macro-hydro developments in many part of Nigeria, especially Cross River State. The climate and geography of Cross River State is ideal for hydroelectric development as identified in Agbiokim Waterfalls, in Etung Local Government Area with estimated capacity of 2.2MW (Income Electricity Limited, 2008). Also, Baqui stream located about 300m from Agbokim Waterfalls, is another site capable of yielding up to 204kW of electricity. This brings the total energy yield of this area to about 2.4 mega watt. The estimated energy demand of this area is 1.0MW (Income Electric Limited, 2008). THE AGBOKIM COMMUNITY The Agbokim community is 23km from Ikom Town and a boarder community between Nigeria and Cameroon. Agbokim Waterfalls is in Etung Local Government area of Cross River State. Agbokim community and the neighboring communities are connected to the national grid. The small hydro scheme can be a Grid-tie or Off-grid. The main income of the people is from Agriculture. The crops are cassava, cocoa, and chewing sticks production is also a major source of income. The total population of the Agbokim community and other neighboring communities is about 4,000 (National Population Commission, 2007). The proposed installed capacity of the major stream is 57 x 40 x 7.83 = kW while the minor stream is 1x25x7.8 = 200kW. The annual energy generation on the major stream = x8780 = 19,205,424kWh, while the minor stream is 200x8760 = 1,752,000kwh (Income Elecrtriy Limited, 2008). The river drops on the Agbokim Falls is one cascade of about 40m. The upper part is the normal River course which will be used as the dam section, and the lower part of the valley is used for the generator house. The Agbokim Waterfalls is technically the most flexible for the construction of a medium head plant filled with a Kaplan turbine. The maximum power that can be derived from the major is kw (Agbokim Waterfalls), while the minor is 200kw (Baqui steram). It should be taken into in consideration The Pacific Journal of Science and Technology 530
3 that the Agbokim Falls are extra ordinary natural beauty and the location has been declared a tourist area. Actual stream flow measurements should also be undertaken and as much data as possible collected prior to a final commitment to go ahead; as this will give actual values with which the power derivable from that stream may be accurately determined. The development and operation of a hydropower plant can be adversely affected by suspended sediment in the water like silt and fine sand, bed load (including the sand, gravel and rocks that move along the stream bed), flowing debris, dissolved chemicals, and ice these things must be determined before selecting the actual intake site and specifying equipment that would come into the contact with the water. MACRO AND MICRO - HYDRO SCHEMES CASE OF CROSS RIVER STATE The case for sustainable energy development in Cross River state is as follows: The Baqui stream development and Agbokim Waterfalls Baqui Stream Micro Hydropower The key components of micro-hydro development are plan development, site selections, costs of financing, permitting process, grid interconnection energy sales, construction and operation, maintenance and surveillance (OMS). Plan Development: A preliminary survey of the Baqui stream near Agbokim reveals that the basic requirement for the sitting of a micro-hydroelectric power station exist as shown in Figure 1, for example the stream flows all year round and is located in a hilly terrain. The available power P at this site can be determined from the relation: P = Q x H x kw (1) Figure 1: Baqui Stream. (Sources: Income Electrix, 2008) Site Selection: The stream has a flow rate of 1m 3 /sec and it flows all year round. The head of this stream is approximately 26m (Income Electrix Limited, 2008). From Equation 1 above, the estimated power at this site is: P = 1 x 26 x 7.83Kw = kW, approximately 204kW. Cost of Financing: From the estimated average cost of building a micro- and macro-hydroelectric power station at $2,000.0 (240,000 naira) per kw, the cost of this hydro scheme will be as follows: $2, x 204 = $408, or N48,960,000.00, at the rate of N to $1.00. The environmental impact assessment (EIA) and all necessary permits in line with the EIA reports and recommendation result will be met as this is one of the necessary conditions in setting up a hydro scheme. where Q = flow rate of the river in m 3 /sec and H = height of the river head in meters. Grid Interconnection and Energy Sales: The 204kW to be generated from this unit will supply the community and surrounding settlements, this The Pacific Journal of Science and Technology 531
4 power could be sold to the consumers at N5/kwh. For a 204kW plant, this will yield 204 x 5x 24 = N24, per day or N8, 935, per annum. This revenue can be used to provide operations and maintenance service for the plant, as well as contribute to offset the cost of replacing the unit after the expiration of its useful life. The average useful life of a hydroelectric power plant is 20 years, given adequate maintenance. Hence, after the initial expenditure on the project, further investments in the project becomes unnecessary as the project would begin to generate enough revenue to take care of itself and even replace itself hen its useful life has expired. Macro-Hydroelectric Power Plant at Agbokim Waterfalls A preliminary survey of the Agbokim Waterfalls reveals that the basic requirement for the sitting of a hydroelectric power station exist, like the river flows which is all year round located in a hilly terrain. The available power P at this site can be determined from the relation in equation (1). The Agbokim River has a flow rate of 7m 3 /sec and is a perpetual river (flowing all year round). The head of this river is approximately 40m (income Electrix Limited, 2008), a shown in Figure 2. Figure 2: Agbokim Waterfall. (Source: Income Electrix Limited, 2008) Also, from Equation (1), the available power at the Agbokim is: P = 7 x 40 x 7.83kW = kW which is approximately 2.2 megawatts. Cost of Financing: It is estimated that the average cost of building a hydroelectric power station of about 125kW to 32MW is $2, per kw (240,000 naira), since the Agbokim plants falls within this range, the value can be use as a rough guide. This means that for a 2.2 megawatt plant, the total capital cost of construction could be estimated as: $2, x 2,200 = $4,400,000 or N528, 000,000 at the rate of N to $1.00. Grid Interconnection and Energy Sales: The 2.2 megawatt to be generated from this unit will supply the village and surrounding settlements. This power could be sold to the consumers at 5kWh. For a 2.2 megawatt plant this will yield: 2, 200 x 5 x 24 = N264, per day or N96, 360, per annum. This revenue can be used to provide operations as maintenance service for the plant as well as contribute to offset the cost of replacing the unit after the expiration of its useful life, as the average useful life of a hydroelectric power plant in 20 years, given adequate maintenance. COST AND FINANCING Developing a micro-hydro project can be an expensive undertaking. Total project costs should be estimated early in the project to provide a good understanding of the total investment required. Planning of project expenditures allows for the development of a financial plan, identifying how much money is needed at each stage of the project. This information is required when approaching potential project fenders. Cost for developing a micro project development; construction cost incurred in the day-to-day running of the project. Annual cost includes operation, maintenance and surveillance expanses as well as applicable taxes and rental payments. The initial cost of a micro hydroelectric power plant include the cost of the preliminary survey, the cost of a detailed project survey or feasibility studies, and the cost of the project development. The preliminary survey costs includes the cost of initially visiting the site to determine whether the basic requirements for sitting a small or micro hydroelectric power plants exists (such as availability of a suitable head, The Pacific Journal of Science and Technology 532
5 sufficient flow rate, whether the stream is seasonal or constant, etc.). The detailed survey or feasibility studies include the cost of hydrologic assessment EIA, preliminary designs, and drawing and detailed cost estimates. The cost for the studies is calculated based on an estimate of the time required by experts to complete the necessary work. For the project at Agbokim, about N5,000,000 (five million naira) is required for detail project report. Engineering costs vary depending on whether one is designing the micro hydro project on ones own or hiring engineers and contractors to carry out the work. Engineering cost is calculated based on an estimate of the time required by experts to complete the necessary work. A micro hydro project requires various pieces of electrochemical equipment including turbinegenerators, controls, electrical protection (including electrical equipment for the power house and possibly a remote monitoring system), pumps and gates. The cost of this equipment varies depending on the size and gross head of the project. Typically, the generating equipment for projects with higher head and lower flow are less expensive than that for lower head, higher flow projects. In addition to equipment supply cost, there is also need to counter cost for transporting and installing the equipment. These costs are dependent on the size of equipment, as larger equipment will need to be transported in sections and assembled on site. BALANCE OF PLANT The balance of a plant for a micro hydro like the Agbokim type typically includes items such as access roads, transmission lines, substations, and costs for civil works such as down or weir construction, decorating, spill nary and intake construction and pipelines. The cost associated with each are specific to each project and vary according to the materials used and complexity of construction. If the hydro project is located on leased land, an annual lease payment is required. These costs are site specific and will depend on the value of land that is leased. Applicable property taxes (provincial or municipal) have to be estimated on a site by-site basis and will depend on the are and value of land and fixed structures (except equipment) used and/or the revenue generated by the hydro development. OPERATION, MAINTENANCE AND SURVEILLANCE The maintenance of transmission line associated with a micro hydro project involves periodic clearing of tress and replacement of parts of that becomes damaged as a result of lighting, impact or other events. Annual general administrative costs include the costs of bookkeeping, preparation of annual statements, bank charges and communication. If legal services are required they generally fall under this category. There will be a cost for maintaining cooking capital, which is needed to absorb the sometimes-uneven flow of project reviews. CONCLUSION Macro- and micro-hydro systems are designed to operate for a maximum of twenty years, if they are properly looked after. By making a small charge for use, communities can accumulate energy money to pay for the replacement of the unit at the end of its useful life. Once schemes are set up, they should continue to function indefinitely without any more external funding. The calculation done above are enough proof that the Agbokim Waterfall project is the cost effective means of providing sustainable electric power supply in Cross Rives State. The saying prevention is better than cure holds true for motivation of environmental and human impacts of hydroelectric projects. It would be with while to abandon project when the environmental and social cost to be paid are high. The main criteria for choice of a project should be its sustainability. It is possible that the alternatives of hydroelectric projects might be worse. Therefore all options should be considered together to arrive at a choice. Big and small project have advantages and disadvantages. But a small project like the Agbokim would often be preferable owing to lower risk factors. No conventional alternatives would take time to arrive on the scene in a big way. There is The Pacific Journal of Science and Technology 533
6 resistance to adopting some of these technologies owing to vested interest of those working in the field. It is up to the planner, policy makers and the Government to see that the decisions are proper when public money is involved. To determined if the Agbokim project is economically viable a cash flow evaluation of the project is necessary. Cash-flow analysis looks at overall project revenues and expenses on a year by year basis over the life of the project. The cash flow analysis demonstrates the viability of the project. It also highlights variation in yearto-year profit or loss. However, it should be remembered that this analysis is based only on average revenue and expenses. Actual project revenue varies from projected revenue due to variations in annual stream flow. Expenses can also vary due to unforeseen circumstances. REFERENCES 1. Ofosu Ahemkorah, A.K. and Seven Dern-edde Mini Hydro Power in Ghana: Prospect and Challenges. Energy Foundation: Accra, Ghana. 2. Energizing Sustainable Development Concepts and Projects. Partner for the Future Worldwide. 3. Final Synthesis Report Best Practices for Sustainable Development of Micro hydro power in Developing Countries. 4. Income Electrix Limited. 2007, Report on Preliminary Survey for the Construction of Small Hydroelectric Power Plant in Agbokim. IEL: Lagos, Nigeria. 5. London Economics and Delucia Associates For the Department of International Development UK. Cambridge, MA. 6. Quest Enterprise Micro-Hydroelectric System Design Manual Quest Enterprise: Russellville. 9. National Population Commission Report Smail Khennas and Andrew Barneth ITDG Practical Answers to Poverty. Department for International Development: London, UK. 11. The British Hydropower Association A Guide for UK Mini Hydropower. BHA: London, UK. ABOUT THE AUTHORS Roland Uhunmwangho was born at Benin, Nigeria on March 10th, He received a B.Sc. Electrical Engineering at the Technical University of Iasi, Romania in 1983, an M.Tech., and a Ph.D. from the Rivers State University of Science and Technology, Port Harcourt, Nigeria in 1988 and 2003 respectively. He lectured with the Bendel State University Ekpoma, Nigeria from 1994 till date he is with University of Port Harcourt, Port Harcourt, Nigeria. He is currently on leave of Absence with an engineering company (Income Electrix Limited) Electrical Power. The company is involved in the Construction of Electrical Transmission and Distribution lines. E.K. Okedu is a researcher in the Department of Electrical/Electronic Engineering, University of Port Harcourt, Nigeria with research interests in hydropower and energy systems. SUGGESTED CITATION Uhunmwangho, R. and E.K. Okedu Macro- and Micro-Hydropower: An Option for Socioeconomic Development. Case Study Agbokim Waterfalls, Cross River State, Nigeria. Pacific Journal of Science and Technology. 10(2): Pacific Journal of Science and Technology 7. Micro-Hydropower System A Buyer s Guide. Natural Resources Canada: Ontario. 8. National Development and Reform Commission Beijing Declaration on Renewable Energy for Sustainable Development. The Pacific Journal of Science and Technology 534
MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT. By: Payman Hassan Rashed
MICRO-HYDROPOWER NEED FOR ENERGY FOR RURAL DEVELOPMENT Significant water resources are found in many developing countries. In areas where adequate water resources are present, harnessing the power of falling
Electricity Generation from Renewable Energy in Sri Lanka: Future Directions
Electricity Generation from Renewable Energy in Sri Lanka: Future Directions Presented by M.M.C. Ferdinando, Secretary, Ministry of Power and Energy R.J. Gunawardana, Additional General Manager (Transmission),
Pico Power: A Boon for Rural Electrification
Advance in Electronic and Electric Engineering. ISSN 2231-1297, Volume 3, Number 7 (2013), pp. 865-872 Research India Publications http://www.ripublication.com/aeee.htm Pico Power: A Boon for Rural Electrification
Handbook for Developing MICRO HYDRO In British Columbia
Handbook for Developing MICRO HYDRO In British Columbia March 23, 2004 Issued: March 23, 2004 Disclaimer This Handbook has been prepared for the purpose of outlining the conditions affecting the development
A Green Sector Overview
A Green Sector Overview Micro Hydro Electric Power Ontario's Waterpower Resources: Past and Present The first hydroelectric generator in Canada was installed near Ottawa, which was the first city in North
Glossary of Energy Terms. Know Your Power. Towards a Participatory Approach for Sustainable Power Development in the Mekong Region
Glossary of Energy Terms Know Your Power 2012 Towards a Participatory Approach for Sustainable Power Development in the Mekong Region List of terms Terms Page Terms Page Avoided cost 10 Installed capacity
Clean Development Mechanism Project Opportunities in Indonesia
Clean Development Mechanism Project Opportunities in Indonesia Pre-feasibility Report on a Micro Hydro Power CDM Project Center for Research on Material and Energy Institut Teknologi Bandung October 2002
What are the Benefits?
Micro hydro power system introduction Not everyone is lucky enough to have a source of running water near their homes. But for those with river-side homes or live-on boats, small water generators (micro-hydro
Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is
Technology Fact Sheet for Mitigation B. Small Hydropower Technology i 1. Introduction 1.1. Historical - All over the World, hydropower sector is playing a great role in economic development since the last
Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes
Analytical Approach for Cost Estimation of Low Head Small Hydro Power Schemes S.K. Singal and R.P. Saini Alternate Hydro Energy Centre, Indian Institute of Technology, Roorkee, India Email : [email protected]
Frequently Asked Questions (FAQs) on Hydropower
Frequently Asked Questions (FAQs) on Hydropower What are the advantages of Hydropower? A renewable source of energy - saves scarce fuel reserves. Non-polluting and hence environment friendly. Long life
Micro-Hydro. Module 4.1. 4.1.1 Introduction. Tokyo Electric Power Co. (TEPCO)
Module 4.1 Micro-Hydro 4.1.1 Introduction Tokyo Electric Power Co. (TEPCO) Workshop on Renewable Energies November 14-25, 2005 Nadi, Republic of the Fiji Islands Subjects to be Covered in Workshop Potential
SECTOR ASSESSMENT (SUMMARY): ENERGY
Provincial Renewable Energy Project (RRP SOL 46014) SECTOR ASSESSMENT (SUMMARY): ENERGY Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Grid-connected electricity is generated and
S.1 Introduction to the Case Study on Micro-Hydro Power Plants
S.1 Introduction to the Case Study on Micro-Hydro Power Plants Micro-Hydro power is an alternative technology for power generation. This section provides a case study on the design and development of a
Sample Micro Hydro Initial Report
Sample Micro Hydro Initial Report Sample Micro Hydro Initial Report Introduction The Hydro Burn at Glen Water was visited by Richard Haworth of Glen Hydro to assess its suitability for a micro hydro installation.
Potential of Solarhomesystems, Biogas-plants and Micro-hydro in Nepal and Opportunities for MFI
Potential of Solarhomesystems, Biogas-plants and Micro-hydro in Nepal and Opportunities for MFI A Paper prepared for the MicroFinanceSummit 2010 in Kathmandu, Nepal. Prepared by Michael Wegstein, Financial
Asian Journal on Energy and Environment
As. J. Energy Env. 2005, 6(02), 139-144 Asian Journal on Energy and Environment ISSN 1513-4121 Available online at www.asian-energy-journal.info The Small Hydropower Project as the Important Renewable
NATIONAL POLICY FOR OFF-GRID HYDRO POWER GENERATION
NATIONAL POLICY FOR OFF-GRID HYDRO POWER GENERATION PUBLIC UTILITIES COMMISSION OF SRI LANKA November 2011 Summary Small and mini hydel potential can provide a solution for the energy problems in remote
Empowering Rural India: Expanding Electricity Access by Mobilizing Local Resources
The World Bank Group Empowering Rural India: Expanding Electricity Access by Mobilizing Local Resources Analysis of Models for Improving Rural Electricity Services in India through Distributed Generation
Micro-hydro Power. Introduction. What is hydropower? System types. Power the entire farm Generate power to sell back to the national grid
Cronfa Amaethyddol Ewrop ar gyfer Datblygu Gwledig: Ewrop yn Buddsoddi mewn Ardaloedd Gwledig The European Agricultural Fund for Rural Development: Europe Investing in Rural Areas Micro-hydro Power Introduction
Ministry of Power & Energy
Ministry of Power & Energy Institutional Frame work Power sector overview Renewable energy policy Major issues and barriers Institutional Framework Sustainable Energy Authority The Sri Lanka Sustainable
Hon. Jemma Nunu Kumba Minister Ministry of Electricity and Water Resources Republic of South Sudan
Hon. Jemma Nunu Kumba Minister Ministry of Electricity and Water Resources Republic of South Sudan South Sudan Electricity Sector Investment Opportunities Introduction Status of electricity supply in South
Uganda s Experience on the Role of Private Operators in Decentralized Electricity Services
Uganda s Experience on the Role of Private Operators in Decentralized Electricity Services Benon Bena Manager, Off-Grid Renewable Energy Development Rural Electrification Agency-Uganda Outline of the Presentation
3.0 Results and Discussions
Estimating the cost of electrification technology options to aid electricity access scale up: The case of Ghana F. Kemausuor * 1, I. Adu-Poku 1, E. Adkins 2, A. Brew-Hammond 1 1.0 Introduction 1 The Energy
Techno - socio - economic Assessment of Pico Hydropower Installations in the Northern Region of Thailand
2012 International Conference on Environment Science and Engieering IPCBEE vol.3 2(2012) (2012)IACSIT Press, Singapoore Techno - socio - economic Assessment of Pico Hydropower Installations in the Northern
AN ECONOMICAL AND TECHNICAL CASE STUDY FOR A SMALL HYDROPOWER SYSTEM
AN ECONOMICAL AND TECHNICAL CASE STUDY FOR A SMALL HYDROPOWER SYSTEM Dumitru Dan POP 1, Vasile Simion CRĂCIUN, Liviu Neamţ, Radu Tîrnovan, Teodor VAIDA Technical University of Cluj Napoca, [email protected]
MICRO-GRIDS FOR RURAL ELECTRIFICATION Case Study from Zambia on the Zengamina Micro-Hydro Power Grid
MICRO-GRIDS FOR RURAL ELECTRIFICATION Case Study from Zambia on the Zengamina Micro-Hydro Power Grid Presentation by Energy Regulation Board, Zambia 79 th IEC General Assembly Workshop for Industrialising
Assessment of hydropower resources
Assessment of hydropower resources Oliver Froend Assessment of hydropower resources Relevance of surveys, data assessment and analyses to the success of the project. Required data and field survey. Key
B. ENERGY Government Focal Point Ministry of Works and Energy Responding Ministry/Office Department of Energy. 1.0. Progress made in implementation
B. ENERGY Government Focal Point Ministry of Works and Energy Responding Ministry/Office Department of Energy 1.0. Progress made in implementation 1.1. The Department of Energy is responsible for overall
An Introduction to. Micro- Hydropower. Systems. Natural Resources Canada. Ressources naturelles Canada
An Introduction to Micro- Hydropower Systems Natural Resources Canada Ressources naturelles Canada Introduction Hydropower technology has been around for more than a century. Hydropower comes from converting
CHAPTER 3 RESEARCH DESIGN
CHAPTER 3 RESEARCH DESIGN 3.1 Introduction In general, micro-hydropower systems operate as Run-of-River type which means that neither a large dam or water storage reservoir is built nor is land flooded.
Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency
Renewable Energy Strategy for 2020 and Regulatory Framework Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency Objectives of the Agency Regulate, supervise, and control all matters
FIXED CHARGE: This is a cost that goes towards making the service available, including
ELECTRICITY BILL COMPONENTS FIXED CHARGE: This is a cost that goes towards making the service available, including installation and maintenance of poles, power lines and equipment, and 24-hour customer
Sustainability of Micro-hydropower in Nepal: A case study of Rukum District
Sustainability of Micro-hydropower in Nepal: A case study of Rukum District Shashiram Dahal, Rajendra Shrestha Department of Mechanical Engineering, Central Campus, Pulchowk, Institute of Engineering,
The business model of MICRO POWER ECONOMY DIRECTORY. INENSUS GmbH 2011. The business model
INENSUS GmbH TITEL 2011 DIRECTORY 01 The business model of 01 The business model of Micro Power Economy is a strategic tool to establish a market for economically and ecologically viable electrification
Energy Technology. Marco Ordonez
Energy Technology Marco Ordonez Solar Power Solar Power The conversion of sunlight into electricity. Solar Power can be done directly using photovoltaic's, or indirectly using concentrated power. Concentrated
Hydro Power Projections Report. Jennifer Palmer
Hydro Power Projections Report Jennifer Palmer Abstract- The purpose of this report is to assess the current and future role of hydro power in the UK energy supply market. The historical trends and barriers
A-B-C model for Off-grid Energy Solutions
A-B-C model for Off-grid Energy Solutions Monali Ranade World Bank Institute Climate Change Practice, as part of Incubating Innovation for Rural Electrification: The Telecom-Energy Initiative September
Status of Renewable Energy in Liberia
Status of Renewable Energy in Liberia Augustus V. Goanue Principal Officer Prototype Rural and Renewable Energy Agency of Liberia Email: [email protected] Mobile: +231 655 9266 Presentation Outline Background
A Resource Guide to In State Hydropower Production
A Resource Guide to In State Hydropower Production Thursday, October 11, 2007 Fairfax, VT Hydro Facility Owned & Operated by CVPS Published by: Winooski, VT Winooski One Hydro Electric Facility Introduction
Telefónica South America Feasibility Studies
1 Telefónica South America Feasibility Studies The GSMA conducted a six country study for Telefónica in South America. The countries covered by this study were Argentina, Chile, Colombia, Mexico, Nicaragua,
Hybrid Renewable Energy Systems for North-Eastern Poland
Hybrid Renewable Energy Systems for North-Eastern Poland * Janusz PIECHOCKI, Piotr SOLOWIEJ, Maciej NEUGEBAUER Department of Electrical, Power, Electronic and Control Engineering, University of Warmia
Investment Brief for the Electricity Sector in Liberia
Investment Brief for the Electricity Sector in Liberia Overview Liberia s economic growth is severely constrained by an insufficient supply of reliable and affordable electricity. The only on- grid electricity
Chattichai WAISURASINGHA 1*, Prinya CHINDAPRASIRT 1, Winai SRI-AMPORN 1 and Sinee CHUANGCHAM 2
The Utilization of Geographic Information Systems and Multi-Criteria Decision Making with Local Community Participation for Selection of Site for Micro Hydropower Project: A Case Study of Chi River Basin,
Regulation for Renewable Energy Development: Lessons from Sri Lanka Experience
Regulation for Renewable Energy Development: Lessons from Sri Lanka Experience Priyantha D C Wijayatunga Asian Development Bank, Manila, Philippines * Corresponding author. Tel: +6326326131, Fax: +6326362338,
Republic of Zambia OPPORTUNITIES IN THE ENERGY SECTOR IN ZAMBIA
Republic of Zambia OPPORTUNITIES IN THE ENERGY SECTOR IN ZAMBIA Presentation Outline COUNTRY PROFILE KEY POWER SECTOR PLAYERS OVERVIEW OF THE ENERGY SECTOR IN ZAMBIA ZAMBIA ENERGY SITUATION PRESENTLY RESULT
Perspectives on Renewable Energy Investment in Ghana
Perspectives on Renewable Energy Investment in Ghana Seminar on Sustainable Energy Investment in Africa b UN City, Copenhagen, 24-25 June 2014 By Wisdom Ahiataku-Togobo Director, Renewable & Alternate
Mpeketoni Electricity Project
Session 4.1 Mpeketoni Electricity Project Mr Danson Mwangi Kinyanjui & Mr Paul Mutinda Kituku Rural Electrification Workshop March 1-3, 2006 Nairobi Mpeketoni Electricity Project Community Based Electricity
OFF-GRID SOLAR CASE STUDY AND OPPORTUNITIES IN KENYA J.M.P. MBITHI Deputy Director, Renewable Energy MINISTRY OF ENERGY AND PETROLEUM
OFF-GRID SOLAR CASE STUDY AND OPPORTUNITIES IN KENYA J.M.P. MBITHI Deputy Director, Renewable Energy MINISTRY OF ENERGY AND PETROLEUM PRESENTATION SUMMARY Introduction-Power situation in Kenya Off-grid
RENEWABLE ENERGY TECHNOLOGY: MICRO HYDRO POWER GENERATION FOR ELECTRIFICATION
RENEWABLE ENERGY TECHNOLOGY: MICRO HYDRO POWER GENERATION FOR ELECTRIFICATION Dr. S. K. Dave 1, Ashokkumar A. Parmar 2, Nikhil M. Vyas 3, P. S.Chadhari 4 Lecturer & I/C Head Civil Eng, Applied Mechanics.,
RENEWABLE ENERGY DEVELOPMENT STATE TAX POLICIES AND INCENTIVES IMPACTING
RENEWABLE ENERGY DEVELOPMENT STATE TAX POLICIES AND INCENTIVES IMPACTING RENEWABLE ENERGY DEVELOPMENT PREPARED BY THE NATIONAL CONFERENCE OF STATE LEGISLATURES MARCH 2012 OREGON Contents State Taxes that
Executive Summary: PA No. 12 Micro-hydro at Graham Hill Water Treatment Plant
Executive Summary: PA No. 12 Micro-hydro at Graham Hill Water Treatment Plant Description A micro-hydro project at SCWD s Graham Hill Water Treatment Plant (WTP) would replace an exisiting non-operational
Is a community based micro-hydro ELEctrification SCHEME. suitable for your village?
Is a community based micro-hydro ELEctrification SCHEME suitable for your village? published by Practical Action Is a community based micro-hydro ELEctrification scheme suitable for your village? ISBN
Energy Engineering Program. Mission. Vision. Today s 3 Critical Challenges 5/24/2012
Engineering Energy Program of the University of the Philippines & the Renewable Energy Act of 2008 Energy Engineering Program It was instituted in 1983 with the objective of training specialists who will:
C5 :106. The Alleviation of Prices Impact on Electricity Tariff caused by Renewable Energy Adders in Thailand
2012 Paris Session http : //www.cigre.org C5 :106 The Alleviation of Prices Impact on Electricity Tariff caused by Renewable Energy Adders in Thailand SIRIWAN WORADEJ Metropolitan Electricity Authority
Photovoltaic in Mexico Recent Developments and Future
Photovoltaic in Mexico Recent Developments and Future Rodolfo Martínez Strevel Berlin, Germany May 23th, 2013 Bufete de Tecnología Solar, S.A. (BUTECSA) Production of Primary Energy in Mexico, 2011 % 7,0
Electricity Rates Forecasting:
Electricity Rates Forecasting: Muskrat Falls Will Options: Stabilize Rates for Consumers Legal S92A, Good Faith and Regulatory Proceedings in Quebec Department of Natural Resources October 2012 Department
Solar Energy in Africa Experiences from Ghana
Solar Energy in Africa Experiences from Ghana AfricaSolar Conference 2015, 25 27 June 2015, Ouagadougou David A. Quansah Kwame Nkrumah University of Science and Technology (KNUST) Kumasi Ghana 26 June
Table 2.1: Component construction costs of some representative MHPs Present Value (10%) Unit cost, $ Project Civil Gen. Equip.
Cost and Revenue Structures for Micro-Hydro Projects in Nepal Paper prepared by Dr. Vaidya, micro-hydro specialist under contract with AEPC Cost Structure of Micro Hydropower Plant The cost of the MHP
MINISTRY OF ENERGY FEED-IN-TARIFFS POLICY ON WIND, BIOMASS, SMALL-HYDRO, GEOTHERMAL, BIOGAS AND SOLAR RESOURCE GENERATED ELECTRICITY
MINISTRY OF ENERGY FEED-IN-TARIFFS POLICY ON WIND, BIOMASS, SMALL-HYDRO, GEOTHERMAL, BIOGAS AND SOLAR RESOURCE GENERATED ELECTRICITY Initial Issue: March 2008 1 st Revision: January 2010 2 nd Revision:
SOLAR PV-WIND HYBRID POWER GENERATION SYSTEM
SOLAR PV-WIND HYBRID POWER GENERATION SYSTEM J.Godson 1,M.Karthick 2,T.Muthukrishnan 3,M.S.Sivagamasundari 4 Final year UG students, Department of EEE,V V College of Engineering,Tisaiyanvilai, Tirunelveli,
Tufts Consulting Group: Macedonian Energy
March 2010 CENTER FOR EMERGING MARKETS ENTERPRISES STUDENT RESEARCH SERIES Tufts Consulting Group: Macedonian Energy An Executive Summary Opportunity In the more than 18 years since its independence from
SECTOR ASSESSMENT (SUMMARY): ENERGY 1. 1. Sector Performance, Problems, and Opportunities
Country Partnership Strategy: Bangladesh, 2011 SECTOR ASSESSMENT (SUMMARY): ENERGY 1 Sector Road Map 1. Sector Performance, Problems, and Opportunities 1. Power generation gap. Bangladesh endures long
MICRO HYDRO FOR THE FARM AND HOME
MICRO HYDRO FOR THE FARM AND HOME How much can I expect to save? This depends entirely on the available flow, available head (fall) and the duration that the flow is available. Some farms struggle to maintain
FEED-IN OF EXCESS ENERGY AND SELF CONSUMPTION: NEW REGULATIONS IN GHANA S ENERGY SECTOR JULIUS NKANSAH-NYARKO ENERGY COMMISSION
FEED-IN OF EXCESS ENERGY AND SELF CONSUMPTION: NEW REGULATIONS IN GHANA S ENERGY SECTOR JULIUS NKANSAH-NYARKO ENERGY COMMISSION NOVEMBER 20, 2014 PRESENTATION OUTLINE Overview of Ghana s Energy Situation
FACT SHEET 6: HYDRO ELECTRICITY
FACT SHEET 6: HYDRO ELECTRICITY Hydro comes from the Greek word hydra, meaning water. Hydro electricity is electricity produced from the energy contained in the downhill flow of water from rivers and lakes.
Canada A Global Leader in Renewable Energy Enhancing Collaboration on Renewable Energy Technologies
Canada A Global Leader in Renewable Energy Enhancing Collaboration on Renewable Energy Technologies Energy and Mines Ministers Conference Yellowknife, Northwest Territories August 2013 Canada A Global
China s Small Hydropower in Rural Energy Development
China s Small Hydropower in Rural Energy Development Li Zhiwu National Research Institute for Rural Electrification, China Hangzhou regional (Asia & Pacific) Center for Small Hydropower 2012.8.1 As one
Energy Sector Afghanistan
دافغانستان اسلامی جمهوريت جمهوری اسلامی افغانستان Islamic Republic of Afghanistan Office of Senior Adviser for Mining & Energy Energy Sector Afghanistan Importance of Renewable Energy for Afghanistan Renewable
CHALLENGES OF SOLAR PV FOR REMOTE ELECTRIFICATION IN GHANA
CHALLENGES OF SOLAR PV FOR REMOTE ELECTRIFICATION IN GHANA WISDOM AHIATAKU-TOGOBO RENEWABLE ENERGY UNIT MINISTRY OF ENERGY ACCRA - GHANA. Email:[email protected] Electricity 10% Energy Consumption GHANA
Cost Reflective Tariffs: Balancing Commercial and Socio-economic Imperatives The MYTO Perspective
14th 15th May 2013 Cape Town, South Africa Cost Reflective Tariffs: Balancing Commercial and Socio-economic Imperatives The MYTO Perspective Sam Amadi, Ph.D Chairman/Chief Executive Officer Nigerian Electricity
Solar PV panels fitted to roofs. Solar PV panels produce electricity from energy provided by sunlight. 3.5 MWh per system
Solar PV panels fitted to roofs Yearly cost of production Cost per kwh 12.5p Solar PV panels produce electricity from energy provided by sunlight. 3.5 MWh per system 430 per system Solar energy can be
Solar systems provide a range of flexible heating
f a c t s h e e t 7 Solar Power Production photo by Alex Nikada Why solar? Solar systems provide a range of flexible heating and electricity options and are particularly wellsuited to remote or off-grid
The Leader in Wind Energy
The Leader in Wind Energy About the Cover: The 102-megawatt Red Mesa Wind Energy Center in New Mexico is capable of generating enough electricity to power more than 30,000 homes. NextEra Energy Resources
Exploring the potential of energy recovery using micro hydropower systems in water supply systems
Water Utility Journal 7: 25-33, 2014. 2014 E.W. Publications Exploring the potential of energy recovery using micro hydropower systems in water supply systems I. Kougias *, T. Patsialis, A. Zafirakou and
Energy Access in Brazil
Taller Latinoamericano y del Caribe: Pobreza y el Acceso a la Energía Energy Access in Brazil Prof. Suani Coelho CENBIO Brazilian Reference Center on Biomass University of São Paulo Santiago, October,
National Electricity Policy 03-Feb-2005
National Electricity Policy 03-Feb-2005 Under the provisions of section 3(1) of the Electricity Act, 2003, the Central Government is required to prepare the National Electricity Policy for development
Climate Parliament Climate Change & Energy Access for the Poor March 26-28, 2010, Limbe, Cameroun
Climate Parliament Climate Change & Energy Access for the Poor March 26-28, 2010, Limbe, Cameroun SHEP Ghana s Self-help Electrification Programme By Henry Vanderpuye Energy Consultant, Ministry of Energy
The Prospects for Small Hydropower in Mexico
The Prospects for Small Hydropower in Mexico Jorge M Huacuz Non-Conventional Energy Unit Electrical Research Institute Cuernavaca, Mexico Who can produce electricity in Mexico? Export 2.2 CFE, the National
Solar and Hydroelectric Power. Abbie Thill Becca Mattson Grace Nordquist Keira Jacobs Miyabi Goedert
Solar and Hydroelectric Power Abbie Thill Becca Mattson Grace Nordquist Keira Jacobs Miyabi Goedert Photovoltaic Cell vs Solar Heating Panel Photovoltaic cells power things such as calculators and satellites.
Solar Irrigation in Bangladesh
Solar Irrigation in Bangladesh Country Context Bangladesh is the one of the most densely populated countries in the world Land Area (~144,000 sq km) slightly smaller than the State of Iowa Population (156
Methodology for Merit Order Dispatch. Version 1.0
Methodology for Merit Order Dispatch Version 1.0 25 th April 2011 TABLE OF CONTENTS 1. OBJECTIVES... 1 2. ROADMAP FOR IMPLEMENTATION... 1 3. DEFINITIONS... 3 4. OPERATIONS PLANNING... 3 4.1. General Considerations...
The Rural Electrification in China and The Impact of Renewable Energies
Student Research Projects/Outputs No.042 The Rural Electrification in China and The Impact of Renewable Energies Tomás Hevia MBA 2009 China Europe International Business School 699, Hong Feng Road Pudong,
4.2 Option 1 Expand Existing Lagoon System
4. WASTEWATER TREATMENT SYSTEM 4.1 of Existing Lagoons The of existing lagoon system is evaluated for future demand based on the following requirements. Existing Lagoons Anaerobic cells - Four Cells, of
Sustainable Schools 2009. Renewable Energy Technologies. Andrew Lyle RD Energy Solutions
Sustainable Schools 2009 Renewable Energy Technologies Andrew Lyle RD Energy Solutions RD Energy Solutions Energy efficiency and renewable energy consultancy Project management of installations Maintenance
USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS. October 2013
USAID ENERGY POLICY PROGRAM SITE VISIT REPORT STATUS OF 4 RUN OF RIVER HYDROPOWER PROJECTS October 2013 This program is made possible by the support of the American people through the United States Agency
Micro-hydro applications in rural areas
OASYS South Asia: Dundee Workshop 20 Micro-hydro applications in rural areas Dr Arthur Williams Dept. of Electrical & Electronic Engineering University of Nottingham, UK Types of hydropower Conventional
The Water, Energy, Food Nexus: Lebanese Policy and Institutional Analysis
The Water, Energy, Food Nexus: Lebanese Policy and Institutional Analysis Nadim Farajalla, Patricia Haydamous, Charbel Rizk, Silva Kerkezian and Rana El Hajj-Mitri Climate Change and the Environment in
Crisis of Electrical Energy in Pakistan and Future guideline for Policy makers
International Journal of Basic & Applied Sciences IJBAS-IJENS Vol:09 No:09 11 Crisis of Electrical Energy in Pakistan and Future guideline for Policy makers Sifat Shah, M.K. L. Bhatti COMSATS Institute
Comparison of Electricity Supply and Tariff Rates in South Asian Countries
Comparison of Electricity Supply and Tariff Rates in South Asian Countries By Faisal Jamil, Energy Specialist (Economics) Introduction A reliable, accessible and affordable supply of energy produced in
4th Basic Plan Targets of Renewable Energy Deployment
Yeonji Kim 4th Basic Plan Targets of Renewable Energy Deployment Changes in 2035 RE Share Target ratio of waste has decreased largely PV Generation Capacity Target : 17.5GW by 2035 Expected Share of RE
Uttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014
Uttar Pradesh Rooftop Solar Photovoltaic Power Plant Policy, 2014 Table of Contents 1- PREAMBLE - 1 2- OBJECTIVES - 1 3- OPERATIVE PERIOD - 1 4- IMPLEMENTATION PLAN - 2 5- ELIGIBLE ENTITIES - 2 6- TARGETS
Investment Brief for the Electricity Sector in Ghana
Investment Brief for the Electricity Sector in Ghana Overview Ghana s economy growth decelerated sharply to an estimated 4.2% in 2014, down from 7.4 % in 2013. Manufacturing and oil production from the
Glossary of Terms Avoided Cost - Backfeed - Backup Generator - Backup Power - Base Rate or Fixed Charge Baseload Generation (Baseload Plant) -
Glossary of Terms Avoided Cost - The incremental cost Flint Energies would pay for the next kilowatt-hour of power in the open marketplace for energy. Flint Energies Board of Directors sets this Avoided
The Contribution of Renewable Energy Resources on the Electrification and Development at The Guantanamo Province
The Contribution of Renewable Energy Resources on the Electrification and Development at The Guantanamo Province Sotolongo Pérez Jose Angel 3 Conrado Moreno Figueredo 1 Alejandro Montesinos Larrosa 2 Centro
Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems
Residential Solar Service Agreement (RSSA) Customer Sited Solar Photovoltaic Systems This Agreement is made and entered into this day of, 20, ( Effective Date ) by and between the Orlando Utilities Commission