Integrated Regional Water Management: Kings Basin Water Authority

Similar documents
California s Groundwater

Presentation Program Outline

Pajaro River Watershed Integrated Regional Water Management Plan Update Project Solicitation Form

9.1. Adequacy of Available Data and Monitoring Efforts

January, Prepared By. Steve Haze, Program Director. Fresno, California

AN INITIATIVE TO IMPROVE

LR 314 Working Group 5 Final Report

How To Manage Water Resources In The Yakima Basin

CALIFORNIA AMERICAN WATER LOS ANGELES DISTRICT 2009 GENERAL RATE CASE CHAPTER: 1 INTRODUCTION AND SUMMARY OF APPLICATION

Overview of Proposition 1 TRACIE BILLINGTON, CHIEF FINANCIAL ASSISTANCE BRANCH DIVISION OF INTEGRATED REGIONAL WATER MANAGEMENT

Greater Los Angeles County Region

City of Inglewood Well No. 2 Rehabilitation. City of Inglewood Thomas Lee

Reference: CA Urban Streams Partnership s White Paper on Funding Urban Watershed Projects Recommendations for a 2014 Water Bond

COMPREHENSIVE PLAN SECTION B, ELEMENT 4 WATER RESOURCES. April 20, 2010 EXHIBIT 1

Peters Canyon Channel (OCFCD Facility No. F06) from Confluence with San Diego Creek Channel (F05) to downstream Barranca Parkway

Municipal Water District of Orange County. Regional Urban Water Management Plan

INFORMATION SHEET ORDER NO. R XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

APPENDIX E SOUTH ORANGE COUNTY IRWM PLAN LETTERS OF SUPPORT FROM NON-AGENCY ORGANIZATIONS, COMMUNITY GROUPS, AND OTHERS

Santa Barbara County IRWM

Building Resilient Infrastructure for the 21 st Century

San Diego Integrated Regional Water Management Implementation Grant Proposal Economic Analysis Flood Damage Reduction Costs and Benefits

Plan Groundwater Procurement, Implementation and Costs, prepared for the Brazos River Authority, July 2005.

As stewards of the land, farmers must protect the quality of our environment and conserve the natural resources that sustain it by implementing

Proposed General Plan Update Goals, Policies, and Implementation Actions

KAISER PERMANENTE NORTHERN CALIFORNIA REGION FRESNO SERVICE AREA 2014 GRANT AND SPONSORSHIP APPLICATION GUIDE

Research Brief. Storing Water in California: What Can $2.7 Billion Buy Us? Background. About Water in the West and the Authors OCTOBER 2014

ELMER AVENUE. Water Augmentation Study NEIGHBORHOOD RETROFIT DEMONSTRATION PROJECT

Flood Risk Management

Flood Risk Management

The Planning Process. 1 O WOW 1.0 Plan Moving Towards Sustainability

edms 5. THAILAND 5.1 Water Resources Management Policies and Actions

ECONOMIC ANALYSIS FLOOD DAMAGE REDUCTION. Lower Carmel River Floodplain Restoration and Enhancement Project

NAPA COUNTY WATERSHED SYMPOSIUM

East Niles Community Services District 2010 Urban Water Management Plan

Chehalis River Basin Flood Damage Reduction Capital Budget Approved by Legislature in June 2013

TESTIMONY OF RONNIE LUPE, TRIBAL CHAIRMAN THE WHITE MOUNTAIN APACHE TRIBE FORT APACHE INDIAN RESERVATION, ARIZONA SENATE COMMITTEE ON INDIAN AFFAIRS

Leading CEQA Cases on Water Supply Issues

Water Utility Financial Plan and Rates Study

Topic 9: Data Collection, Management, and Reporting

Final Report. Dixie Creek Restoration Project. Funded by Plumas Watershed Forum

Case Study: The History of the San Juan Headwaters Forest Health Partnership

Section 4 General Strategies and Tools

Section 5: Conserve to Enhance Program Goals What is Conserve to Enhance All About?

Creating the environment for business

The Budget: Effectively Implementing The 2014 Water Bond

Subject: North Coast Integrated Regional Water Management Plan, Phase III revisions

FY Springs Funding Projects

5. Environmental Analysis

ARIZONA DEPARTMENT OF WATER RESOURCES

5.14 Floodplains and Drainage/Hydrology

INNOVATION IN FLOW RESTORATION AND WATER BANKING CASE STUDY: DUNGENESS WATER EXCHANGE

WATER QUALITY, SUPPLY, AND INFRASTRUCTURE IMPROVEMENT ACT OF Funding Summary

DRAFT SOUTH FORK SKYKOMISH RIVER

Series 2016A-2 (Green Bonds) Final Proceeds Allocation April 2016

Tres Rios del Norte Feasibility Study

Water Quality and Water Usage Surveys

St. Vrain Watershed Master Plan Thursday, January 23 10:00 a.m. 12:15 p.m.

International Commission On Large Dams Environment August A Viewpoint from the International Commission on Large Dams

March Prepared by: Irvine Ranch Water District Sand Canyon Avenue. Irvine, CA Contact: Natalie Likens (949)

PHOTO: Jon Waterman THE COLORADO RIVER DELTA, CIRCA NOW OPEN BOOKLET TO SEE CHANGE

Flood Plain Reclamation to Enhance Resiliency Conserving Land in Urban New Jersey

GROUNDWATER CONDITIONS

Walla Walla Bi state Stream Flow Enhancement Study Interim Progress Report. Department of Ecology Grant No. G

Addressing Declining Elevations in Lake Mead

North Branch Chicago River Watershed-Based Plan

3.4 DRAINAGE PLAN Characteristics of Existing Drainages Master Drainage System. Section 3: Development Plan BUTTERFIELD SPECIFIC PLAN

River Restoration Activities in the Rio Grande Canalization Flood Control Project. Upper Rio Grande Citizens Forum Elizabeth Verdecchia July 19, 2012

Chapter 9. Selected Watershed Initiatives in the Great Basin Region

STAFF REPORT TO COMMITTEE OF THE WHOLE

CHAPTER I: INTRODUCTION. Background

4. Environmental Impacts Assessment and Remediation Targets

Delaware River Basin Commission

North San Jose Neighborhoods Planning Taskforce

Foothill Municipal Water District Recycled Water Project

Results of the Conference

State Stormwater Flood Management Grant Funding

Water Conservation Measurement in California - A Guide

2010 Salida Community Priorities Survey Summary Results

STATE WATER RESOURCES CONTROL BOARD REGIONAL WATER QUALITY CONTROL BOARDS

DIRECT POTABLE REUSE: A PATH FORWARD:

C alifornia needs a statewide water policy that gives all Californians

San Joaquin River Settlement Water Supply Impacts And Water Management Goal. By Ronald D. Jacobsma General Manager Friant Water Authority

The North State: Implementing the California Water Action Plan February 24, 2014

Restoring Anadromous Fish Habitat in Big Canyon Creek Watershed. Summary Report 2002

Climate Change Adaptation Strategy

BASIN MANAGEMENT OBJECTIVES CHEROKEE SUBINVENTORY UNIT

FLOOD PROTECTION AND ECOSYSTEM SERVICES IN THE CHEHALIS RIVER BASIN. May Prepared by. for the by Earth Economics

G3 GRANT LID RETROFIT FOR THE ASHLAND MUNICIPAL PARKING LOT

Attachment 6: Monitoring, Assessment, and Performance Measures

DRAFT Tahoe-Sierra Integrated Regional Water Management Plan SECTION 8: IMPLEMENTATION FRAMEWORK. South Tahoe Public Utility District

Local Steps Toward California s Watershed Program

Iowa Smart Planning. Legislative Guide March 2011

Roosevelt Water Conservation District ROOSEVELT WATER CONSERVATION DISTRICT

Water LA. capture conserve reuse. California Adaptation Forum 2014 From Watershed to Coast: Adapting to Rising Seas & Prolonged Drought

LEAGUE NOTES ON APPROVED COMMUNITY WATER SUPPLY PLAN

State Center Community College District. Dual Enrollment 101

ARIZONA HISTORICAL SOCIETY 949 East Second Street Library and Archives Tucson, AZ (520) Fax: (520)

3. The submittal shall include a proposed scope of work to confirm the provided project description;

Early SNMP Case Studies Salt and Nutrient Management Plans and Related Issues at Camp Pendleton MCB. Rob Beggs, Brown and Caldwell

How To Improve Water Resources Information And Analysis For Integrated Water Management

Transcription:

Integrated Regional Water Management: Kings Basin Water Authority By Cristel Tufenkjian Introduction State of California policy (California Senate Bill 672, passed in 2002) encourages local land and water use planning entities to work collaboratively within a region, to establish common water resource management goals and objectives, and to develop a regional planning framework that integrates land, water and habitat projects called Integrated Regional Water Management (IRWM). In California s 2009 Water Plan Update, the first of thirteen objectives is to expand integrated regional water management. (Bulletin 60-09). The State believes that regional partnerships can efficiently solve water management problems and has offered special grant funding to support IRWM efforts, including $500 million from Proposition 50, the Water Security, Clean Drinking Water, Coastal and Beach Protection Act of 2002, to fund competitive grants for projects consistent with an adopted IRWM plan; $ billion from Proposition 84, the Safe Drinking Water, Water Quality, and Supply, Flood Control, River and Coastal Protection Bond Act of 2006, for IRWM Planning and Implementation, and $300 million from Proposition E, the Disaster Preparedness and Flood Prevention Bond Act of 2006, for IRWM stormwater flood management. In response, a number of agencies and organizations in the Central San Joaquin Valley have been working together over the last several years to create a coalition of water agencies, cities, counties, and environmental interests in the Kings Basin to deal with the most pressing water issues in the region, namely groundwater depletion, water supply reliability, and water quality. Background Historically, management of the Kings Basin water resources has been limited to independent operations by overlying local water agencies and individual users. The basin encompasses nearly two dozen local public agencies (water districts, cities, and counties etc.) and private mutual water companies, which were each managing their shared groundwater resources separately. This approach exacerbated groundwater overdraft and constrained the scope of potential solutions, as each water supplier only managed within its district boundaries and with its individual resources. In 200, four water agencies in the Basin, the Kings River Conservation District, Alta Irrigation District, Consolidated Irrigation District and Fresno Irrigation District, formed a Basin Advisory Panel with the purpose of working together to manage existing supplies and developing new supplies. In 2004, the Basin Advisory Panel solicited wider stakeholder participation. Outreach was initiated to the cities, counties, and environmental groups. To create a better understanding of why stakeholder participation was important, water district representatives shared data and groundwater contour maps to explain that the movement of groundwater throughout the Basin

made it a shared resource. This data made it visible that actions of one district potentially affected other water suppliers of other districts within the basin. Through these outreach efforts, the group expanded and formed the Upper Kings Basin Water Forum (Water Forum). The Water Forum s purpose was to increase communication and collaboration to create regional solutions for water resources management. This marked the first time that all of the various stakeholders in the region had come together to work on developing a long-term, regional plan to address water issues for the Kings Basin. Water district representatives were able to leverage established relationships with local fishing groups and communities to initiate a foundation of trust amongst the newly formed group. Figure. Kings Basin Water Authority Boundary Map The Water Forum began to meet on a regular basis with facilitation support by the Department of Water Resources. Trust was expanded through open and transparent discussions and the sharing of resources. The Water Forum continued to gain momentum as their joint efforts in grant funding were successful. In 2009, the Water Forum members strengthened their relationship by forming the Upper Kings Basin Integrated Regional Water Management Authority (Kings Basin Water Authority). Establishing the new governance structure was a challenge due to the multiple and diverse stakeholders. Not all of the participants had funding to contribute to a budget, but all of the participants wanted to be involved in the decision making process. It was determined that a group formed under the California Joint Powers Act provide the best legal structure to protect the 2

public agencies from risk and liability. To provide for full participation, the Authority Board created an Advisory Committee within the Joint Powers Agreement to allow non-public organizations a place at the table. Advisory Committee meetings are held prior to each meeting of the full Authority Board to discuss items and provide recommendations regarding virtually all actions to be considered by the Board. On September 0, 2009, the Kings Basin Water Authority held its formation meeting with full participation by the members that overlay the California Department of Water Resources Bulletin 8 Kings groundwater sub-basin (Figure ). The Kings Basin Water Authority currently consists of 49 entities that have come together (Table Kings Basin Water Authority Participating Members) to engage in the planning effort. These entities are diverse, but have one common vision: A sustainable supply of the Kings River Basin's finite surface and groundwater resources through regional planning that is balanced and beneficial for environmental stewardship, overall quality of life, a sustainable economy and adequate resources for future generations. The Kings Basin Water Authority is governed by a board of directors, which is composed of one representative from each of the 8 member agencies. Directors and alternates are appointed by each member's governing board. An advisory committee functions as the technical/working group of the Kings Basin Water Authority. Membership is made up of voting members and interested parties (Table ). The Committee oversees the implementation of the Kings Basin Integrated Regional Water Management Plan (IRWMP) and provides recommendations to the board of directors. 3

Table. Kings Basin Water Authority Participating Members Voting Members Alta Irrigation District City of Clovis City of Dinuba City of Fresno City of Kerman City of Kingsburg City of Parlier City of Reedley City of Sanger City of Selma County of Fresno County of Tulare Consolidated Irrigation District Fresno Irrigation District Fresno Metropolitan Flood Control District Kings County Water District Kings River Conservation District Raisin City Water District Interested Parties Bakman Water Company Biola Community Services District California Native Plant Society, Sequoia Chapter City of San Joaquin Community Water Center County of Kings Crescent Canal Company Cutler Public Utilities District East Orosi Community Services District El Rio Reyes Conservation Trust Hardwick Water Company James Irrigation District Kings River Conservancy Kings River Water Association Laguna Irrigation District Laton Community Service District Liberty Canal Company Liberty Water District London Community Services District Mid-Valley Water District Orange Cove Irrigation District Orosi Public Utilities District Reed Ditch Company Riverdale Irrigation District Riverdale Public Utility District Self-Help Enterprises Sierra Club, Tehipite Chapter Sierra Resource Conservation District Sultana Community Services District Terranova Ranch, Inc. Tulare Basin Wildlife Partners Success of the Kings Basin Water Authority has been built around strong stakeholder participation. Several work groups have been constituted by the Advisory Committee to deal with specific issues and tasks. Work Groups provide an additional opportunity for stakeholder involvement. Work groups report back to the Advisory Committee with recommendations and updates on activities. The Advisory Committee has the following work groups:. Groundwater Monitoring Work Group 2. Projects Work Group 3. Model Work Group 4. IRWMP Update Work Group 5. Disadvantaged Communities Work Group 6. Outreach Work Group The Kings Basin Water Authority provides for a wide array of input and support so that regional benefits are achieved and priority issues are addressed. Water Authority participants realize that water, land use, and environmental resource issues are interrelated and of regional scope, and that both local and regional solutions are required. This ensures that responses to one issue do not result in unintended, adverse impacts on other issues or areas. 4

The Integrated Regional Water Management Plan Prior to formation of the Kings Basin Water Authority, the regional stakeholders had been meeting together as a group for several years developing the IRWM Plan (IRWMP), a long-term, basin-wide, water resources management plan. Projects proposed for development in the basinwide plan had been identified through an integrated hydrologic model of the Kings Basin. The model, developed by WRIME Inc. under contract with the Department of Water Resources, has provided a common source of information for the Kings Basin area. It is an analytical tool that represents regional groundwater and surface water flow systems and their interactions; and quantitative information on groundwater and surface water system characteristics and to evaluate alternative water management strategies. As identified in the IRWMP, overdraft of the groundwater resource is the primary issue to be addressed in the Kings Basin. Over the past 40 years, groundwater levels in the Fresno area have dropped by 40 feet. In the Raisin City area, southwest of Fresno, they have dropped by 50 feet. This is a result of water demand exceeding the available surface and groundwater supplies as they are currently developed and managed. The continued groundwater overdraft is not sustainable and the urban growth pressure in the region, coupled with the need to sustain the agricultural economy, call for improved water resource management in the Kings Basin. Over the last several decades, regional irrigation districts have built groundwater recharge basins to capture flood waters. Nevertheless, much more are needed. More than 0.8 million acre-feet of water has left the Kings River service area in the form of flood releases since the 950s (Kings River Water Association flood flows data as of September 30, 20), enough water to fill the Kings River s primary storage facility, Pine Flat Reservoir, over ten times. The Kings Basin region needs more water projects that can utilize this water for urban areas, agriculture and the environment. The consequences of groundwater overdraft, in terms of declining water levels, increased pumping costs, and subsidence and migration of poor-quality water, are experienced to different degrees depending on the location. In the long term, groundwater overdraft could also impact economic development opportunities, cause conflicts between overlying users and result in litigation to define rights and entitlements, possibly leading to legal adjudication. The IRWMP seeks to develop regional, tangible, and economically feasible solutions to groundwater overdraft that are fair and equitable, and which anticipate and avoid potential conflicts. Projects The objectives of the IRWMP have been specifically crafted so that projects will achieve multiple benefits. The process for defining priorities and configuring alternatives is also intended to demonstrate preference for projects that provide regional, as compared to strictly local benefits. The objectives integrate groundwater recharge, stormwater capture, ecosystems enhancement and wastewater reclamation into the overall planning strategy. Since the early 2000s, the Water Authority has received nearly $29 million in state financial support for use towards planning activities and to construct projects which address groundwater, water conservation and efficiency, water quality, riparian habitat, flood corridors, and disadvantaged communities (Table 2). The projects are located throughout the basin. (Figure 2 Project Location Map). 5

Table 2. Kings Basin Water Authority projects titles, descriptions, and costs Project Title Alta Irrigation District Coordinated Groundwater Storage Fresno Irrigation District Waldron Pond Banking Facility Expansion Upper Kings Basin IRWMP Plan Kings Basin Integrated Groundwater Surface Water Model Upper Kings Basin Water Forum Project The Fresno Irrigation District Jameson Pond Expansion Phase II The City of Fresno Residential Water Meter Phase II Kings River Conservancy KRCD UKBIRWMA UKBIRWMA Disadvantaged Communities (DAC) Outreach & Planning Pilot UKBIRWMA Groundwater Overdraft Reduction and Disadvantaged Community Water Supply Reliability Projects UKBIRWMA IRWMP Update Fancher Creek Flood Control Improvement Project No. of Projects 2 Project Description Dinuba project is a 28 acre,3-cell stormwater retention and recharge basin located within the City of Dinuba. AID s Traver Pond project is the enlargement of an existing 5-acre recharge basin to a size of 6 acres. The Waldron Pond Banking Facility is a groundwater recharge and recovery project that provides water to urban suppliers, agriculture suppliers, and facilitates the environmental benefits of improving the Kings River fishery. The project constructed 8 recovery wells, 5 monitoring wells, and 3 new recharge basins expanding the existing facility to 270 aggregate acres of recharge area. Project Cost $3,200,00 $0,544,787 Initial development of the Upper Kings Basin IRWMP. $,000,000 3 2 5 The Kings IGSM was developed to support the planning analysis required for the Upper Kings Basin IRWMP project. It provides an analytical tool for the region that can represent the groundwater and surface water flow systems and their interactions; and can provide quantitative information on a comparative basis to help evaluate alternative conjunctive water management strategies. AID Traver Pond Project provides dry year supply and is a component of a surface water exchange agreement w/ Cutler & Orosi PUDs. City s project installs 0k of a planned 0k residential water meters. FID Jameson Pond Expansion adds 60 additional acres to an existing 40-acre recharge facility. Fresno ID s Jameson Pond Phase II Expansion enhances water supply capacity by constructing an addition recovery well. The City s Phase II meter project installs an additional 5k meters (of planned 0k) complete with AMR devices and software. Construction of a /2 mile ADA trail, ADA bathroom and parking area, and rehabilitation of a -mile rugged foot path along the Kings River below Pine Flat Dam. Project seeks to map DACs and their water needs; develop mechanisms to effectively engage and integrate DACs into the IRWM planning process; develop conceptual project descriptions and cost estimates to include in the IRWMP project list; and identify/facilitate partnerships between member agencies and DACs. Bakman WC s project entails installation of 2,453 residential water meters. Consolidated ID s project develops a 75-acre groundwater banking facility. County of Fresno Drummond Jensen project removes an unincorporated neighborhood from septic by connecting to City of Fresno. City of Clovis project entails expansion of its surface water treatment facility to reduce groundwater pumping. City of Fresno s project would install an additional 0k residential water meters. East Orosi CSD s project rehabilitates two existing muni wells in a DAC to extract from a higher quality zone of the aquifer. The objective of the update the 2007 Upper Kings Basin IRWMP is to: ) Satisfy new State guidelines; 2) to include recent information; 3) Expand the focus on Disadvantaged Communities; 4) Document successes and lessons learned since the original plan was drafted; 5) Document governance and policy improvements since the original plan was drafted; 6) Improve the overall regional planning process. The Fancher Creek Detention Basin removes 682 acres from the 00-year floodplain, redirects runoff that may contain pollutants into stormwater management basins, and result in approximately 740 acre feet of additional surface water recharge per year. Once complete, the basin will have sufficient capacity to provide the 00-year control of the Fancher Creek flows. $800,000 $4,764,375 $965,000 $298,374 $500,000 $5,948,090 $336,850 $4,462,73 6

Figure 2. Kings Basin Water Authority Project Location Map Conclusions Integrated regional water management is a paradigm shift for water agencies in the Kings Basin region. Solutions to water issues can happen, and it starts with collaboration. Instead of water discussions focused on the conflicts of the varying interests that are vying for water for cities, farms, and fish, and the resulting stalemate, the Kings Basin Water Authority is producing results in managing the area s water resources. In addition, integrated regional planning can benefit from developing a common source of knowledge, in this case the regional hydrologic model, which not only provides important information about the current state of shared groundwater resources but also allows the authority to consider the impacts of different water management strategies. Integrated regional water management is the future for California. It will help regions identify their particular issues and develop specific strategies to address those issues enabling them to implement actions with multiple benefits and helping them become more self-sufficient. Common goals and guiding policies are necessary to maintain unity. Through integrated regional water management, regions can access local, state, and federal resources and funding. IRWMPs can provide efficient solutions, consider other resource issues, and enjoy broad support. 7