Understanding of OHDR and its repercussions on over all operation of super critical power plant

Similar documents
Performance of the Boiler and To Improving the Boiler Efficiency Using Cfd Modeling

OPPORTUNITIES FOR HEAT RATE REDUCTIONS IN EXISTING COAL- FIRED POWER PLANTS: A STRATEGY TO REDUCE CARBON CAPTURE COSTS

Boiler Calculations. Helsinki University of Technology Department of Mechanical Engineering. Sebastian Teir, Antto Kulla

APPLIED THERMODYNAMICS TUTORIAL 1 REVISION OF ISENTROPIC EFFICIENCY ADVANCED STEAM CYCLES

CONTENTS. ZVU Engineering a.s., Member of ZVU Group, WASTE HEAT BOILERS Page 2

A Review on Power Generation in Thermal Power Plant for Maximum Efficiency

Drying of Woody Biomass. Process Engineering / GEA Barr-Rosin

How To Reduce Coal Power Plant Emissions

Design and Operating Experience of the Latest 1,000-MW Coal-Fired Boiler

Progress on High Efficiency Coal Power Plants

Best Choice BENSON BOILER. Excellent performance features make the Benson boiler the most widely used type of once-through boiler

Thermodynamical aspects of the passage to hybrid nuclear power plants

Financing New Coal-Fired Power Plants

Overview of Integrated Coal Gasification Combined-cycle Technology Using Low-rank Coal

THE HUMIDITY/MOISTURE HANDBOOK

Webpage: Volume 3, Issue IV, April 2015 ISSN

1. A belt pulley is 3 ft. in diameter and rotates at 250 rpm. The belt which is 5 ins. wide makes an angle of contact of 190 over the pulley.

PERFORMANCE EVALUATION OF NGCC AND COAL-FIRED STEAM POWER PLANTS WITH INTEGRATED CCS AND ORC SYSTEMS

Carbon Dioxide Membrane Separation for Carbon Capture using Direct FuelCell Systems

Assessment of Solar-Coal Hybrid Electricity Power Generating Systems 13

Clean Coal Technology in Future Energy Supply

RELIABLE AND EFFICIENT STEAM GENERATION SYSTEMS FOR MODERN UTILITY SERVICE

Review of Potential Efficiency Improvements at Coal-Fired Power Plants

The Future of Coal-Based Power Generation With CCS UN CCS Summit James Katzer MIT Energy Initiative web.mit.edu/coal/

Babcock & Wilcox Company Supercritical (Once Through) Boiler Technology

Basics of Steam Generation

Improved Modern Control Station for High Pressure Bypass System in Thermal Power Plant

Natural Gas Conversions of Existing Coal-Fired Boilers

NAWTEC CONCEPTS AND EXPERIENCES FOR HIGHER PLANT EFFICIENCY WITH MODERN ADVANCED BOILER AND INCINERATION TECHNOLOGY

ENERGY EFFICIENCY IN POWER PLANTS

GENERATION TECHNOLOGY ASSESSMENT

Making Coal Use Compatible with Measures to Counter Global Warming

Study of a Supercritical CO2 Power Cycle Application in a Cogeneration Power Plant

HYBRID WAY EAF OFF GAS HEAT RECOVERY -ECORECS- MASANARI YAMAZAKI*1, YASUHIRO SATO*2, RYUTARO SEKI*3

COMBUSTION STUDIES OF NATURAL GAS AND SYN-GAS WITH HUMID AIR

Sixth Annual Conference on Carbon Capture & Sequestration

How To Calculate The Performance Of A Refrigerator And Heat Pump

Chapter 2.2: Boilers

An analysis of a thermal power plant working on a Rankine cycle: A theoretical investigation

High Efficiency Low Emissions: The first way forward for clean coal technology. Dr Andrew Minchener OBE General Manager IEA Clean Coal Centre

UNIT 2 REFRIGERATION CYCLE

OUTCOME 2 INTERNAL COMBUSTION ENGINE PERFORMANCE. TUTORIAL No. 5 PERFORMANCE CHARACTERISTICS

Investigating the Impact of Boiler Aging In Replacement Decisions

Evaluation Of Hybrid Air- Cooled Flash/Binary Power Cycle

DEGASSED CATION CONDUCTIVITY MEASUREMENT

Commercial refrigeration has been in the environmental. Refrigerant. as a. Basics Considerations PART 1:

Continuous flow direct water heating for potable hot water

Steam Generator Boilers Compact Steam Boilers. Rapid Start-Up Safe in Operation

Levelized Cost of New Electricity Generating Technologies

Energy Efficiency Improvement in Thermal Power Plants

Vorlesung WKA. Thermal Power Plant History and general survey

Pulverized Coal Pipe Testing and Balancing

New-generation Integrated Monitoring and Control System

Module 5: Combustion Technology. Lecture 34: Calculation of calorific value of fuels

Condensing Economizers Workshop Enbridge Gas, Toronto. MENEX Boiler Plant Heat Recovery Technologies. Prepared by: Jozo Martinovic, M A Sc, P Eng

Optimizing DRI production using natural gas

BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT. Jaroslav Lahoda Olaf Arndt Walter Hanstein. Siemens Power Generation (PG)

The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority

OROT RABIN POWER STATION UNITS x 350 MW

912 MW Supercritical Boiler for the next Coal Fired Plant Generation

MC (Multi-Circulation) f o r S A G D a n d I n d u s t r i a l A p p l i c a t i o n s

5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal.

Specific Volume of Liquid (Column 7). The volume per unit of mass in cubic feet per pound.

HYBRID COMBINED CYCLE POWER PLANT

How To Power A Power Plant With Waste Heat

ENGINEERING INFORMATION Hot water and steam service

Boiler Tune-up Guide

New Trends in the Field of Automobile Air Conditioning

IMPROVING COAL PLANT EFFICIENCY

PG Student (Heat Power Engg.), Mechanical Engineering Department Jabalpur Engineering College, India. Jabalpur Engineering College, India.

FUNDAMENTALS OF ENGINEERING THERMODYNAMICS

VAD. Variable Area Desuperheaters

Increasing Natural Gas Boiler Efficiency by Capturing Waste Energy from Flue Gas

Yu. F. Vasyuchkov*, M. Yu. Bykova* NEW TECHNOLOGY OF GAS EXTRACTION ON THE BASE OF A COAL TO A HYDROGEN TRANSFER

Module 5: Combustion Technology. Lecture 33: Combustion air calculation

NITROGEN OXIDES FORMATION in combustion processes COMBUSTION AND FUELS

10 Nuclear Power Reactors Figure 10.1

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district

Sheet 5:Chapter 5 5 1C Name four physical quantities that are conserved and two quantities that are not conserved during a process.

COKE PRODUCTION FOR BLAST FURNACE IRONMAKING

Committed to make a better world

Latest Low-NOx Combustion Technology for Pulverized-coal-fired Boilers

Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant:

EXPERIMENT NO. 3. Aim: To study the construction and working of 4- stroke petrol / diesel engine.

Supercritical Rankine Cycle

Optimization Design for Sulfur Dioxide Flow Monitoring Apparatus in Thermal Power Plants Hao-wei Hu 1, a, Xue Yang 1, b and Xiao-wei Song 1, c

Power Plants. BENSON Once-Through Heat Recovery Steam Generator. Power Generation

Hybrid Modeling and Control of a Power Plant using State Flow Technique with Application

Performance Analysis of Thermal Power Station: Case Study of Egbin Power Station, Nigeria

Lesson. 11 Vapour Compression Refrigeration Systems: Performance Aspects And Cycle Modifications. Version 1 ME, IIT Kharagpur 1

International Journal of Engineering Research and Development

How To Run A Power Plant In Celje

MHI s Energy Efficient Flue Gas CO 2 Capture Technology and Large Scale CCS Demonstration Test at Coal-fired Power Plants in USA


Efficiency Metrics for CHP Systems: Total System and Effective Electric Efficiencies

MCQ - ENERGY and CLIMATE

How To Prevent Corrosion In A Steam Electric Power Plant

SAMPLE CHAPTERS UNESCO EOLSS

Thermal efficiency of pulverized fuel boiler

QUESTIONS THERMODYNAMICS PRACTICE PROBLEMS FOR NON-TECHNICAL MAJORS. Thermodynamic Properties

Transcription:

Understanding of OHDR and its repercussions on over all operation of super critical power plant Rahul Pachouri M.Tech.Student (Thermal System & Design) SRCEM,MORENA (M.P) India Devendra Dandotiya Assistant Professor, Deptt.of M.E. SRCEM,MORENA (M.P.) India Surendra Kumar Agrawal Assistant Professor, Deptt.of M.E. SRCEM,MORENA (M.P.) India Abstract-The efficiency of coal-fired power generation is primarily dependent on when the steam generated from the boiler and the combustion of coal is at a more elevated temperature and pressure. However, the strength of the boiler decreases when used at high temperatures and pressure for long periods of time. In an effort to solve this problem, Hitachi has reviewed the design by focusing on strength and heat transmission, and developed high-strength steel. Hitachi has also established ultra-supercritical pressure power generation technology, which is able to withstand high temperatures in the (600 degrees) class and high pressure (25MPa, about 250 times greater than atmospheric pressure). This approach is resulting in the reduction of CO2 emissions by 7% in ultra-supercritical pressure power generation, compared with current sub-critical pressure power generation. The super critical thermal power plants are coming in India with size 660MW and above. The boiler plays a key role in availability of power plant, and at the same time is a key factor for optimum power generation. There are few different parameters in super critical boiler than conventional sub critical boiler operation. One among such parameters is OHDR i.e. Over Heat Degree of Super Heat in the evaporator. The OHDR is measured, monitored and controlled to maintain steady state or rated load conditions of boiler. The degree of super heat monitored is calculated as it is the difference between the temperature of evaporation of steam in evaporator zone and the pseudo critical temperature of water at any particular pressure. The OHDR gives the stability to super critical boiler in terms of water, coal and air at any operating condition. The water to coal ratio of boiler is maintained at OHDR 25 C at arch inlet manifold. Key words: - Super-critical, OHDR, Pseudocritical, Critical point, Sub-critical. I. INTRODUCTION The Thermal efficiency improvement in cost-effective way has been an important technological endeavor for over 250 years. The Newcomen steam engine appeared in 1750 and attained 0.5% efficiency [1]. James Watt patented improvements in 1769 and achieved 2.7% efficiency by 1775, launching the Industrial Revolution. Watt limited operating pressure to about 0.034 MPa. Richard Trevithick is credited with engine improvements that permitted increasing steam pressure to 1 MPa, to achieve 17% thermal efficiency by 1834. American Electric Power s (AEP) Philo Plant Unit 6 steam generator was the first commercial supercritical unit in service early in 1957 (Figure 1). Philo 6, a double reheat design, delivered 120 MW, operating at 85 kg/s, 31 MPa, 621C/565C/538C (675,000 lb/h, 4500 psi, 1150 F/1050 F/1000 F) and was supplied by The Babcock & Wilcox Company (B&W). In 1959, Philadelphia Electric Company s Eddystone steam generator, a dual reheat design supplied by Combustion Engineering, Inc., initially delivered 325 MW at 252 kg/s, 34.5 MPa, 649C/565C/565C (2,000,000 lb/h, 5000 psi, 1200F/1050F/1050F) and later operated at 32.4 MPa, 610C/554C/554C (4700 psi, 1130F/1030F/1030F) [2]. Once-through supercritical plants became valued to the U.S. market again in about 2000 and most new larger electric utility coal-fired plants have been supercritical with variable pressure operating mode. Two Babcock & Wilcox Power Generation Group, Inc. (B&W PGG) design efforts have been underway in this period. In one effort, the DOE and OCDO are sponsoring a materials development program by a consortium of boiler vendors that are seeking qualification of ASME Code Section I alloys suitable for 760C (1400F) turbine throttle steam temperatures [3, 4]. II. DESCRIPTION Research programs in word for Boiler Materials for supercritical Coal Power Plants have set a goal to improve thermal efficiency and reduce carbon dioxide emission through application of materials with higher temperature capability up to 760C (1400F) [4]

The supercritical boiler operated in once through cycle of operation where in all the water fed to boiler gets converted in to steam instantaneously. The conversion takes place in evaporator zone of the boiler. The Rankine cycle followed by once through boiler is different than the sub critical one. In subcritical boiler operation the water passes through sensible heat, latent heat and super heat while in super critical boiler it passes through only sensible heat and super heat. The water saturation line and dry steam line at different pressure and temperature points is shown below in figure 1. As the result of a B&W PGG economic study applying B&W PGG/Air Liquide (AL) technology and starting with references [5, 6], the relative efficiency and levelized cost of electricity for A-USC with oxy-combustion CCS are shown to be lower in comparison to other technologies In super critical boiler the water undergoes heating at pressure above the critical pressure and therefore requires zero latent heat for evaporation. As the super critical boiler operates above critical point pressure and temperature which affects the boiler metallurgy, the operator needs to be cautious while operating the plant. Fig. 1: Temperature entropy diagram of water There are many important parameters of boiler which need continuous monitoring. Some of the important parameters are given below [7,8] (i) Over heating i.e. degree of super heat in evaporator. (ii) Water-coal ratio. (iii) Total feed water flow. (iv) Temperature and pressure in main steam and reheat steam. (v) Total load in MW. (vi) Limits of operation for above all One of the important parameter in above list is Over Heat Degree (OHDR) of Superheat in evaporator zone of boiler. The degree of super heat in super critical boiler is necessary to maintain the stability of steady state operation of boiler. It also gives the operator the balancing of water and coal in the boiler which otherwise is necessary to maintain. The manufacturer s specification of super critical boiler defines the water to coal ratio as 7:1. The stable water coal ratio at rated conditions gives stability of the Over Heat Degree (OHDR) of Steam in the evaporator zone of the boiler [9]. The OHDR is the difference between the pseudo critical temperature and the actual temperature at which water is getting evaporated at any particular pressure above critical point. In 660MW super critical boiler at rated load, pressure is 25MPa and the evaporation temperature is maintained 410 C at Arch Inlet Manifold in evaporator. The pseudo critical temperature is 385 C as given in the graph below. The 25 C is the difference between pseudo critical temperature at 25MPa and Ach Inlet manifold temperature which has to be maintained by the operator for safe operation of once through boiler. As per boiler

manufacturer for stable operation, the OHDR need to be maintained around 25 C when boiler is working in once through mode [10] Fig. 2: Super critical boiler Initially when boiler is in wet state or subcritical mode of operation, the evaporator is in saturation phase where in the steam water separation takes place by density difference as well as through cyclonic motion of mixture inside the Separator. The degree of super heat in evaporator matters only when the boiler is in once through mode. During boiler operation in once through mode if the OHDR is less, the water quantity is likely to be more than coal proportion. This will lead saturated steam to go to super heaters, due to lesser heat transfer. If the OHDR is more, the coal flow to boiler is likely to be more with respect to water flow which can cause higher temperature of superheated steam [11]. The advantage of superheated steam is the absence of residual moisture in the steam pipes. The thermal conductivity of super heated steam i.e. its ability to deliver heat to surrounding bodies is much lower than that of saturated steam. Hence, it will not transmit heat as rapidly to the walls of pipes compared to when it is flowing in saturation phase. In short, it is important that super heated steam delivers heat to the prime movers and not the pipes in which it is carried[13,14]. As mentioned in the graph below, the pressure and temperature relation of water and steam is given by the saturation line up to critical point at which the pressure is 22.06 MPa and temperature is 373.99 C. Above this, water doesn t absorb latent heat and it directly evaporates with certain degree of super heat. The temperature of saturation can be calculated by characteristic curve like in the graph given below which is pseudo critical line of water. The evaporation temperature is measured in evaporator zone at Arch Inlet Manifold and the difference between evaporator temperature and characteristic critical temperature is calculated by software at any instant which is referred as OHDR. Above critical pressure i.e. 22.064MPa the pseudo relationship between pressure and temperature is given in the table below; Pressure, MPa Pseudo critical pressure, C Peak value of specific heat, kj/kg 23 377.5 284.3 24 381.2 121.9 25 384.9 76.4 26 388.5 55.7 27 392.0 43.9 28 395.4 36.3 29 398.7 30.9

30 401.9 27.0 31 405.0 24.1 32 408.1 21.7 33 411.0 19.9 34 413.9 18.4 35 416.7 17.2 Table 1: Pseudo critical pressure and temperature values The pseudo saturation temperature of water at various pressures above critical point pressure is given in graph.1; Graph 1: Pseudo critical pressure Vs temperature relationship Practical view point: In 660MW super critical thermal unit, the steady state performance of the unit with respect to OHDR and watercoal ratio is shown in the graph 2. The parameters above indicate the operating condition at 500MW load condition when the water coal ratio is 5.82 and OHDR is 30 C. The data collected is for 24 hours.

Graph 2: Relationship between OHDR, water- coal ratio and load for 660MW Super critical power plant. At steady state, the water coal ratio appears to be quite normal while the OHDR is changing from 28 C up to 30 C depending on local operating conditions. The lesser ratio of water to coal is because of low calorific value of coal. Hence, though the coal water ratio is specified by the boiler manufacturer, it depends upon calorific value of coal. In short we need to refer the OHDR which is the ultimate indication of balance of water and coal in the boiler at any operating condition. The OHDR gives the overall stability to once through super critical boiler. For better clarity let s understand two different cases below; Case#1: At 660MW, 25MPa pressure if the OHDR is 40 C The pseudo critical temperature at 25MPa is 385 C. The evaporator temperature at Arch Inlet Manifold- 385 C+40 C=425 C. The evaporator temperature is higher than the design value 25 C. The water is getting evaporated before it is reaching to evaporator zone. The heat absorption by water is more than desired. The coal proportion in boiler is more than required or water may be less. This can over heat water walls, steam tubes as well as flue gas zone of the boiler which can cause water or steam tube failures.

The resultant temperature of main steam and reheat steam will also increase. Case#2: At 660MW, 25MPa pressure if the OHDR is 10 C The pseudo critical temperature at 25MPa is same i.e. 385 C. The evaporator temperature at Arch Inlet Manifold- 385 C+10 C=395 C. Evaporator temperature is lesser than design value i.e. 25 C. The water is getting evaporated after evaporation zone i.e. near Separator The heat absorption by water walls in the boiler is less than desired. The coal proportion is either less or water is more than required value. This will lead to less main steam temperature. Eventually, Load will start reducing. III. CONCLUSION Keeping above two conditions in view, we need to maintain the OHDR value at 25 C as far as possible with water coal ratio defined as per specifications which will lead to stable operating conditions of super critical boiler. At once through operating conditions, the operator need to monitor OHDR regularly and take corrective measures to keep water to coal proportion in order to operate boiler as per specific load conditions. In emergency, the OHDR value becomes more critical. In such cases the boiler operator needs to prepare action plan to have minimum possible deviations in OHDR value. REFERENCES [1] Burstall, A.F., A History of Mechanical Engineering, MIT Press, The Massachusetts Institute of Technology, Cambridge, MA, 1965. [2] Silvestri, G.J., et.al., Optimization of Advanced Steam Condition Power Plants, Diaz-Tous, I.A., (ed.), Steam Turbines in Power Generation PWR-Vol. 3, Book No. H00442, ASME, 1992 [3] Bennett, A.J., Weitzel P.S., Boiler Materials for Ultrasupercritical Coal Power Plants Task 1B, Conceptual Design, Babcock & Wilcox Approach, USC T-3, Topical Report, DOE DE-FG26-01NT41175 & OCDO D-0020, February 2003 [4] Viswanathan, R., Shingledecker, J., Phillips, J., In Pursuit of Efficiency in Coal Power Plants, (ed. Sakrestad, BA) 35th International Technical Conference on Clean Coal and Fuel Systems 2010, Clearwater, FL, June 2010. [5] DOE/NETL 2007-1281 Cost and Baseline for Fossil Energy Plants, Rev. 1. [6] DOE/NETL 2007 1291 Pulverized coal Oxycombustion Power Plants, Rev. 2. [7] Silvestri, G.J., Eddystone Station, 325 MW Generating Unit 1-A Brief History, ASME, March 2003. [8] Viswanathan, R., U.S. Program on Materials Technology for Ultrasupercritical Coal Power Plants, Electric Power Research Institute, Palo Alto, CA, March 2006. [9] Viswanathan, R., et.al., U.S. Program on Materials Technology for Ultra supercritical Coal-Fired Boilers, in Proceedings of the 5th International Conference on Advances in Materials Technology for Fossil Power Plants, ASM International, 2008. [10] Sarver, J.M., Tanzosh, J.M., Characterization of Steam-Formed Oxides on Candidate Materials for USC Boilers, Sixth International Conference on Advanced Materials for Power Plants, Sante Fe, NM, September 2010. [11] Thermophysical properties at critical and super critical conditions by Igor Piro and Sarah Mokry Super critical technology, NTPC [12] Wheeldon, J., Engineering and Economic Evaluation of 1300 F Series Ultra-Supercritical Pulverized Coal Powe Plants: Phase 1. EPRI, Palo Alto, CA: 2008. 1015699