1 912 MW Supercritical Boiler for the next Coal Fired Plant Generation Konrad Ebert, Dr. Michael Kübel (1) Heinz Lorey, Wolfgang Michele (2) (1) EnBW Kraftwerke AG, Stuttgart/Germany (2) ALSTOM Boiler Deutschland GmbH, Stuttgart/Germany Abstract Coal-fired power plants continue to play an important role for the European energy supply, both in terms of securing this supply, as well as keeping the cost of electricity at an affordable level. The remarkable increase of the renewable energy sources contribution to the electricity supply over the last years has posed additional requirements in terms of flexible operation of coal-fired power plants. In order to cope with those economic, operational and environmental requirements today and in the future, advanced plant design and materials are essential. The new Karlsruhe RDK8 power plant, fired with bituminous coal, has an electrical output of 912 MW el. The overall plant efficiency is over 46 %, and the additional combined district heat production (max. 220 MW th ) leads up to 58 % of fuel utilization. The specific CO 2 -emissions are far below the European and global average. High boiler steam parameters (603 C / 285 bar, 621 C / 60 bar for the HP and RH section respectively), low emissions, a wide coal range, and the use of advanced materials are the main significant features of this steam generator. Erection started in spring The pressure tests were completed successfully in May and June Commissioning of the power plant started in This paper gives an overview of the RDK8 boiler design and the project realization with the focus on advanced boiler design. The steam turbine is also described briefly. 1

2 The RDK Power Plant The Rheinhafen Dampfkraftwerk (RDK) Power Plant is located in the City of Karlsruhe at the river Rhine (Figure 1). The history of the power plant goes back in the 1950s when the first bituminous coal-fired units started their operation. Today a capacity of 1208 MW is installed in total comprising of four power blocks: Unit 4 is a modern Combined Cycle Plant, units 5 and 6 are two oil/gas fired units, currently in cold reserve and unit 7 is a 550 MW bituminous coal fired unit. The Power Plant also supplies the city of Karlsruhe with district heating. In December 2006 EnBW decided to enlarge the site by a new 912 MW unit. The new unit, taking the name RDK8, is expected to be worldwide a milestone in terms of efficient power generation from bituminous coal, with a plant efficiency above 46 % and in terms of environmental performance with clearly lower emissions than the corresponding German and European limits. Figure 1: Overview RDK power plant (Source: EnBW) 2

3 Alstom was selected for supplying the boiler and the turbine island of RDK8 (Figure 2). This paper will mainly focus on the boiler with some reference also on the turbine. Figure 2: 3-D-Model of boiler and turbine house RDK8 Boiler design The boiler is designed for ultra-supercritical steam parameters with 292 bar and 603 C on the live steam side and 61 bar and 621 C on the reheat side at BMCR, representing the highest parameters used for such type of boiler (Figure 3). This is based on the once through technology which started commercially in the 1970s and gradually developed to higher steam parameters and to supercritical steam cycles while the main components remained but size and the pressure part material was further developed. [1] 3

4 Live Steam 312 bar (Design Pressure) 603 C 652 kg/s (2,347 t/h) Reheat Steam 77 bar (Design Pressure) 621 C 542 kg/s (1,951 t/h) Feedwater 305 C Fuel Bituminous Coal (Import) Figure 3: Side Elevation of boiler The boiler is of tower type design and the air and flue gas systems are designed as single train systems. The capacity of the boiler is optimized in order to take full advantage of the scale of economy for single flue gas train plants using the largest Regenerative Air Preheater build. The boiler is equipped with Alstom's Low NO X Tangential Firing System (LNTFS) with tilting burners. The tangential firing system is designed as a direct firing for imported coal with 4 bowl mills. The system comprises the coal bunkers, the fuel feeding system, the milling system, the burners and the corresponding air and flue gas system and is designed for a wide fuel range. Figure 4 gives a schematic overview of the coal range that includes bituminous coal with a heating value from 23.0 up to 29.3 MJ/kg. Additionally single coals outside of this coal range can also be burnt, or mixed with coals within the range shown below. This allows on the one side an operationally and economically important fuel flexibility, but requires on the other side a corresponding design of the firing system and the boiler. There are 2 bunkers for each mill so that the coal can be mixed by the feeding system from the bunkers to the mill. 4

5 Coal range Design coal 18 Ash content [%] raw Moisture content [%] raw Figure 4: Coal range diagram The grinding and drying of the coal takes place in 4 bowl mills of the type SM29/18 equipped with dynamic classifiers. Full load is achieved with all four mills in operation; there is no reserve mill foreseen. In order to achieve a good burnout of the coal within the specified range, while keeping a low primary NO X emission a fineness of approx. 10 % rest on the 0,09 mm sieve will be achieved. This value will be controlled by the speed of the dynamic classifier. The mills are arranged on one side of the boiler. Each mill has 4 dust outlets serving one level of the burner system in the four corners of the boiler (Figure 5). Each burner level has two coal burner nozzles and three air nozzles. The division of the coal dust pipe per burner takes place directly before the burner in order to maintain a good coal dust distribution. 5

6 The secondary air is supplied via separated nozzles as lower, intermediate and upper secondary air nozzle according to the following burner array: Combined upper secondary and wall offset air Upper coal and primary air Combined intermediate secondary air and oil burner for start up Lower coal and primary air Lower secondary air Figure 5: Mill arrangement This array is located at the corner cut end of the combustion chamber and each 2 burners are combined in 1 burner compartment integrated in the water walls. The whole burner array is connected to a tilting mechanism that allows the nozzles to tilt up- and downwards. Through this tilt the fireball in the furnace can be repositioned in order to automatically control reheat steam temperature in response to load changes and furnace wall blowing cycles, or to different coal qualities and the conditions of the combustion chamber, eliminating thus the need for reheat spray injection at steady state and avoiding the corresponding efficiency losses. Figure 6 gives a schematic of the tilting mechanism and an as built picture of one burner array. 6

7 Figure 6: Tilting Burner for Bituminous Coal Due to the high steam conditions, advanced materials are used which must be resistant to oxidation and corrosion in accordance with their application parameters. The materials concerned in detail are presented in Figure 7. Showing also the heating surface structure to the colours reflects the planned material selection. On the right-hand side of the picture the header materials are listed. The economizer is completely made of 16Mo3. Reheater 1 consists of the materials 16Mo3, 13CrMo4-5, 10CrM09-10, X10CrMoVNb9-1 and S304H. For the Superheater 2 supporting tube screen the material VM12 is utilized, which is a newly developed 12 % Cr-material with a creep rupture strength similar to T91. The last 2 Superheaters and Reheater 2 are made of austenitic alloys. For reasons of corrosion protection, the austenite material has a mean chromium content of at least 18 %; in the hot sections of the Reheater 2 of at least 25 %. Furthermore, wherever the 18 % Cr-material is used the shot peened variant with a higher steam oxidation resistance was selected. Due to the high steam temperatures and the high axial loads, the material 7CrMoVTiB (T24) is employed as a wall material at the end of the evaporator spiral and in the vertical tubing part of the membrane wall (Figure 8). The supporting tubes are also made of this material for the same reason. 7

8 Separator and vessel are made of P92. For the superheaters and the reheaters, from the reheater 1 outlet onwards, also the martensitic 9 % chromium steel P92 is used as header materials. Heating Surfaces 16Mo3 13CrMo4-5 7CrMoVTiB CrMo9-10 X10CrMoVNb9-1 VM12 Super 304 H Shot blasted HR3C Eco RH 1 SH 3 RH 2 SH 4 SH 2 Header 15NiCuMoNb (Inlet/Outlet) 16Mo3 (Inlet) X10CrWMoVNb9-2 (Outlet) X10CrMoVNb9-1 (Inlet) X10CrWMoVNb9-2 (Outlet) X10CrWMoVNb9-2 (Outlet) X10CrWMoVNb9-2 (Inlet) X10CrWMoVNb9-2 (Outlet) X10CrWMoVNb9-2 (Inlet) X10CrMoVNb9-1 (Outlet) Figure 7: Material Concept Heating Surfaces T24 vertical walls (SH 1) T24 spiral walls 13CrMo4-5 spiral walls Figure 8: Material selection of waterwalls 8

9 Turbine Design The steam turbine generator used for the Karlsruhe RDK8 power plant is designed to achieve highest efficiency levels. The steam parameter at turbine inlet are 275 bar / 600 C on SH side and 58 bar / 620 C on RH side at TMCR. The five casing turbine consists of separate HP and IP turbine modules and three double flow LP turbine modules. These LP turbines are equipped with steel made last stage blades of 45 inch, taking maximum advantage of the low condenser pressure. In addition to the nine stage regenerative feed water heating system, steam can also be extracted from the LP turbines to feed the district heating system of the local municipal utility. The turbine is connected to a hydrogen/water cooled generator of 1,175 MVA (Figure 9). Figure 9: Turbine Island RDK8 9

10 Time schedule First activities on site started in March 2008 with excavation works followed by piling and civil work. The erection of the boiler started in March 2009 with the erection of the main steel structure. In January 2010 the generator stator was delivered to site. Subsequently the erection of the turbine started. After finalizing the erection of the pressure part, the pressure test was done successfully in May and June 2012 for the respective part. The next major step was the acid cleaning of the pipes and tubes in February First Fire is scheduled in April 2013 and start of trial run in January Experience from execution The permitting process started in April 2007 and in February 2008 the permitting authority, Regierungspräsidium Karlsruhe, has given approval for the start of first civil work, which could already start ahead of the other activities. Beside the careful preparation of the permitting documents, an extensive exchange of information with the public was a key for successfully passing the process. During this permitting process EnBW committed to lower emission levels for the new unit compared to the limits posed by legislation. Concerning NO X the emission level will be 100 mg/nm³ at boiler outlet and will be achieved by the combination of the low NO X firing system with a 2 layers SCR. The execution phase of this project fell within the construction peak of many new power plants in Europe. As a consequence the manufacturing of steel structure and pressure parts had to be split to different workshops, partly to workshops others than Alstom s. The coordination and control of time and quality was a demanding task. Furthermore the advanced materials used require a high degree of quality assurance, in order to avoid failures during commissioning, or service life of the unit. Especially the fulfillment of the specified welding quality requirements for the T24 material in the water walls proved to be very demanding. Extensive quality assurance effort in the workshops and on site from Alstom, EnBW and the involved Notified Body was done. In the course of this process parts of the waterwalls had to be reworked and partially waterwalls had to be produced again. The steel structure design, supply and manufacturing was split between European, Canadian and Asian sub-suppliers, while the design was performed according to EN-standards. This 10

11 split led to extensive interface management and required again a huge effort on co-ordination and monitoring in order to remain within time and fulfill the quality requirements. The main steel structure was manufactured in Europe and a new design was introduced: the main columns of the main steel structure are made in compound design with steel plates filled with concrete. An extensive program of testing had to be done to define the concrete mixture for filling up the main columns. Also the special way how to fill the sections of the column had to be worked out. Yet, the expected cost savings from such design did not materialize. Erection of the boiler house steel structure, the air and flue gas ducts, the main components like fans, RAPH, DeNO x casing and the vertical water walls was made with 3 tower cranes (Figure 10), one located at 47 m elevation on top of the bunker building which is located alongside the boiler building and designed as self standing structure. This crane set up proved to be very effective. Figure 10: Erection of steel structure and buckstays 11

12 At peak work load during pressure part erection up to 700 people worked in the boiler house and up to 9,000 welds were done per month in this period. A positive EHS result could be achieved in 2011 and 2012; there was no Lost Time Accident reported. The pressure tests of the high pressure and reheat system were done successfully in 2 steps. The testing pressure on the live steam side was defined according to the EN-standard and was 574 bar; the highest ever for an Alstom boiler. Chemical cleaning was performed for the entire water steam cycle except the spiral and vertical water walls of the boiler. These pressure parts were cleaned with high speed water flushing. In order to mitigate any potential risk of hydrogen induced stress corrosion on the T24 part of the boiler, a special procedure was followed during commissioning and start-up of the boiler, which was derived from the successful experience of commissioning the Neurath F and G units two years ago. During execution phase a further investigation was done by EnBW and Alstom in regard to the coal range and it was agreed that the coal range was enlarged compared to the original range as shown on page 5. Outlook The changing operational regime for bituminous coal fired units in Germany due to the increased supply of renewables and the need for more flexible operation of the conventional power plants [2] led EnBW and Alstom to work out further improvements to increase flexibility of RDK8. Those measures were decided during the execution phase and consisted mainly in: the reduction of the minimum once through load and the introduction of the one mill operation as a normal operation mode for the minimum load, which enables a minimum load of approx. 20 % of the nominal load Furthermore a concept on reducing the time for load changes is under investigation and is expected to be implemented also. Concerning the further schedule first firing of the boiler is planned for April 2013, followed by the first synchronization in July. After a further optimization period of the whole plant during commissioning, boiler and turbine will carry out their trial run operation in January

13 Figure 11: View of boiler house References [1] Stamatelopoulos, G.-N.; Sadlon, E.: Advancement in coal-fired power plants: Higher Efficiency using advanced materials, Power-Gen Europe 2005, June 2005, Milan, Italy. [2] Heinzel, T.; Meiser, A.; Stamatelopoulos, G.-N.; Buck, P.: Einführung Einmühlenbetrieb im Kraftwerk Bexbach und im Kraftwerk Heilbronn Block 7, VGB Konferenz Brennstoff und Feuerungen, Mai 2012, Kassel. 13

NAWTEC18-3541 CONCEPTS AND EXPERIENCES FOR HIGHER PLANT EFFICIENCY WITH MODERN ADVANCED BOILER AND INCINERATION TECHNOLOGY

NAWTEC18-3541 CONCEPTS AND EXPERIENCES FOR HIGHER PLANT EFFICIENCY WITH MODERN ADVANCED BOILER AND INCINERATION TECHNOLOGY Proceedings of the 18th Annual North American Waste-to-Energy Conference NAWTEC18 May 11-13, 2010, Orlando, Florida, USA NAWTEC18-3541 CONCEPTS AND EXPERIENCES FOR HIGHER PLANT EFFICIENCY WITH MODERN ADVANCED

More information

A Review on Power Generation in Thermal Power Plant for Maximum Efficiency

A Review on Power Generation in Thermal Power Plant for Maximum Efficiency International Journal of Advanced Mechanical Engineering. ISSN 2250-3234 Volume 4, Number 1 (2014), pp. 1-8 Research India Publications http://www.ripublication.com/ijame.htm A Review on Power Generation

More information

Boiler Calculations. Helsinki University of Technology Department of Mechanical Engineering. Sebastian Teir, Antto Kulla

Boiler Calculations. Helsinki University of Technology Department of Mechanical Engineering. Sebastian Teir, Antto Kulla Helsinki University of Technology Department of Mechanical Engineering Energy Engineering and Environmental Protection Publications Steam Boiler Technology ebook Espoo 2002 Boiler Calculations Sebastian

More information

Committed to make a better world

Committed to make a better world Committed to make a better world 1. Higher Availability & Reliability 2. Highest Plant efficiency 3. Lower Heat Rate 4. Minimum Auxiliary Power Consumption 5. Minimum Emission of Pollutants Committed to

More information

Progress on High Efficiency Coal Power Plants

Progress on High Efficiency Coal Power Plants CoalFleet for Tomorrow Progress on High Efficiency Coal Power Plants Dr. Jeff Phillips Sr. Program Manager, Generation McIlvaine Webcast March 1, 2012 CoalFleet for Tomorrow is a registered service mark

More information

POLYCITY. Technical measures and experiences at a 6 MW cogeneration plant with wood chip furnace POLYCITY

POLYCITY. Technical measures and experiences at a 6 MW cogeneration plant with wood chip furnace POLYCITY Technical measures and experiences at a 6 MW cogeneration plant with wood chip furnace Content 1. Technical overview cogeneration plant and heating network 2. Investment of the facility 3. Experiences

More information

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district

Torino Nord. Cogeneration Plant. The gas turbine. The steam generator. The Torino Nord cogeneration plant produces electricity and heat for district PLANT TORINO NORD Iren Energia is the company in the Iren Group whose core businesses are the production and distribution of electricity, the production and distribution of thermal energy for district

More information

Skoda Supercritical Steam Turbine 660 MW

Skoda Supercritical Steam Turbine 660 MW Skoda Supercritical Steam Turbine 660 MW Jiri Fiala Head of Engineering Dept. Skoda Power s.r.o. 27th of October 2010 Vrnjacka Banja - Serbia ŠKODA History Establishment of the company in 1859 Mr. Emil

More information

Overview of Integrated Coal Gasification Combined-cycle Technology Using Low-rank Coal

Overview of Integrated Coal Gasification Combined-cycle Technology Using Low-rank Coal 19 Overview of Integrated Coal Gasification Combined-cycle Technology Using Low-rank Coal TAKAO HASHIMOTO *1 KOICHI SAKAMOTO *2 YOSHIKI YAMAGUCHI *3 KOJI OURA *4 KENICHI ARIMA *5 TAKESHI SUZUKI *6 Mitsubishi

More information

CONTENTS. ZVU Engineering a.s., Member of ZVU Group, WASTE HEAT BOILERS Page 2

CONTENTS. ZVU Engineering a.s., Member of ZVU Group, WASTE HEAT BOILERS Page 2 WASTE HEAT BOILERS CONTENTS 1 INTRODUCTION... 3 2 CONCEPTION OF WASTE HEAT BOILERS... 4 2.1 Complex Solution...4 2.2 Kind of Heat Exchange...5 2.3 Heat Recovery Units and Their Usage...5 2.4 Materials

More information

TRIAL CHEMICAL CLEANING OF FOULED APH BASKETS

TRIAL CHEMICAL CLEANING OF FOULED APH BASKETS TRIAL CHEMICAL CLEANING OF FOULED APH BASKETS Dr. Abhay Kumar Sahay, AGM(CC OS) Bijay Manjul, AGM( Operation) Kahalgaon Boiler has three inputs Steam generator 1. WATER 2. COAL 3. AIR Burner Air preheater

More information

Waste to Energy in Düsseldorf. for a clean city.

Waste to Energy in Düsseldorf. for a clean city. Waste to Energy in Düsseldorf for a clean city. Waste Management in Düsseldorf. Düsseldorf s public utilities company known as Stadtwerke Düsseldorf operates a waste to energy plant (WtE) that has been

More information

OROT RABIN POWER STATION UNITS 1-4. 4 x 350 MW

OROT RABIN POWER STATION UNITS 1-4. 4 x 350 MW ISRAEL ELECTRIC OROT RABIN POWER STATION UNITS 1-4 4 x 350 MW COAL BOILER CONVERSION TO LOW NO X NATURAL GAS AND COAL FIRING BY PRIMARY AND SECONDARY MEASURES INSTALLATION Replacing the Burner Management

More information

Drying of Woody Biomass. Process Engineering / GEA Barr-Rosin

Drying of Woody Biomass. Process Engineering / GEA Barr-Rosin Drying of Woody Biomass BioPro Expo & Marketplace / Atlanta, GA / March 14-16, 2011 Drying of Woody Biomass Conventional Direct Fired Dryer Technology Proprietary work of the Copyright Owner Issues with

More information

Best Choice BENSON BOILER. Excellent performance features make the Benson boiler the most widely used type of once-through boiler

Best Choice BENSON BOILER. Excellent performance features make the Benson boiler the most widely used type of once-through boiler BENSON BOILER Best Choice Excellent performance features make the Benson boiler the most widely used type of once-through boiler by JOACHIM FRANKE and RUDOLF KRAL Power for generations BENSON BOILER Best

More information

4 th EU Sout Africa Clean Coal Working Group Meeting

4 th EU Sout Africa Clean Coal Working Group Meeting 4 th EU Sout Africa Clean Coal Working Group Meeting Hybrid Concentrated Solar Power (CSP) Concept Case Study for the Medupi Power Stationy Falk Hoffmeister Head of Sales and Business Development. Dr.

More information

1. A belt pulley is 3 ft. in diameter and rotates at 250 rpm. The belt which is 5 ins. wide makes an angle of contact of 190 over the pulley.

1. A belt pulley is 3 ft. in diameter and rotates at 250 rpm. The belt which is 5 ins. wide makes an angle of contact of 190 over the pulley. Sample Questions REVISED FIRST CLASS PARTS A1, A2, AND A3 (NOTE: these questions are intended as representations of the style of questions that may appear on examinations. They are not intended as study

More information

INSTRUCTION MANUAL. Boil-Out TABLE OF CONTENTS SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9

INSTRUCTION MANUAL. Boil-Out TABLE OF CONTENTS SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9 TABLE OF CONTENTS Description Page Number SAFETY WARNINGS 2-3 RESPONSIBILITY 3 INTRODUCTION 3 PRE-BOIL OUT PROCEDURES 3-5 BOIL OUT PROCESS 5-9 Indeck Keystone Energy, LLC. 5451 Merwin Lane, Suite 100 Erie,

More information

The soot and scale problems

The soot and scale problems Dr. Albrecht Kaupp Page 1 The soot and scale problems Issue Soot and scale do not only increase energy consumption but are as well a major cause of tube failure. Learning Objectives Understanding the implications

More information

OPPORTUNITIES FOR HEAT RATE REDUCTIONS IN EXISTING COAL- FIRED POWER PLANTS: A STRATEGY TO REDUCE CARBON CAPTURE COSTS

OPPORTUNITIES FOR HEAT RATE REDUCTIONS IN EXISTING COAL- FIRED POWER PLANTS: A STRATEGY TO REDUCE CARBON CAPTURE COSTS CONFERENCE PROCEEDINGS OPPORTUNITIES FOR HEAT RATE REDUCTIONS IN EXISTING COAL- FIRED POWER PLANTS: A STRATEGY TO REDUCE CARBON CAPTURE COSTS by Edward K. Levy, Nenad Sarunac, and Carlos Romero Energy

More information

Performance of the Boiler and To Improving the Boiler Efficiency Using Cfd Modeling

Performance of the Boiler and To Improving the Boiler Efficiency Using Cfd Modeling IOSR Journal of Mechanical and Civil Engineering (IOSR-JMCE) e-issn: 2278-1684,p-ISSN: 2320-334X, Volume 8, Issue 6 (Sep. - Oct. 2013), PP 25-29 Performance of the Boiler and To Improving the Boiler Efficiency

More information

SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA. Matthias Fränkle Siemens Power Generation (PG), Germany

SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA. Matthias Fränkle Siemens Power Generation (PG), Germany SRS: THE STANDARDIZED REPOWERING SOLUTION FOR 300MW STEAM POWER PLANTS IN RUSSIA Matthias Fränkle Siemens Power Generation (PG), Germany Page 1 of 11 1 Introduction Deregulation and competition are further

More information

EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ

EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ Parallel session Producing more with less: Efficiency in Power Generation EFFICIENT ENERGY SUPPLY (ELECTRICITY AND DISTRICT HEAT) FOR THE CITY OF LINZ Johann Gimmelsberger Linz Strom GmbH EFFICIENT ENERGY

More information

Stora Enso Fors Ltd Sweden

Stora Enso Fors Ltd Sweden THE ANALYSIS REPORT OF PLANT NO. 3 Cofiring of biomass - evaluation of fuel procurement and handling in selected existing plants and exchange of information (COFIRING) - Part 2 Stora Enso Fors Ltd Sweden

More information

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard

Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard Sulfur Tail Gas Thermal Oxidizer Systems By Peter Pickard Introduction SRU s (Sulfur Recovery Units) are critical pieces of equipment in refineries and gas plants. SRUs remove sulfur compounds from certain

More information

Design and Operating Experience of the Latest 1,000-MW Coal-Fired Boiler

Design and Operating Experience of the Latest 1,000-MW Coal-Fired Boiler Hitachi Review Vol. 47 (1998), No. 5 183 Design and Operating Experience of the Latest 1,000-MW Coal-Fired Boiler Kazuhito Sakai Shigeki Morita Tsutomu Yamamoto Toshikazu Tsumura ABSTRACT: The Matsuura

More information

BIOPOWER 5 CEX. 1 Wärtsilä 10 January 2012 Presentation name / Author

BIOPOWER 5 CEX. 1 Wärtsilä 10 January 2012 Presentation name / Author BIOPOWER 5 CEX 1 Wärtsilä 10 January 2012 Presentation name / Author GENERAL INFORMATION ELECTRICAL OUTPUT 4.3 5.5 MWe HEAT OUTPUT Up to 10 MWth (16 t/h steam 1,3 bara) FUEL TYPE Wood chips, bark, saw

More information

Steam and hot water boiler systems for industrial and municipal power generation Dr.-Ing. Wolfgang Sobbe VKK Standardkessel Köthen GmbH

Steam and hot water boiler systems for industrial and municipal power generation Dr.-Ing. Wolfgang Sobbe VKK Standardkessel Köthen GmbH Steam and hot water boiler systems for industrial and municipal power generation Dr.-Ing. Wolfgang Sobbe VKK Standardkessel Köthen GmbH German-Vietnamese Bio Energy Day Ho Chi Minh City, 16. September

More information

Supercritical boiler technology for future market conditions

Supercritical boiler technology for future market conditions Supercritical boiler technology for future market conditions Joachim Franke and Rudolf Kral Siemens Power Generation Presented at Parsons Conference 2003 Oct. 2003 H30-K0018-X-X-7600 Textseite, engl. 2001-09

More information

Modern boiler design. by Flemming Skovgaard Nielsen, BWE Paolo Danesi, BWE M.V.Radhakrishnan, BWE Energy India

Modern boiler design. by Flemming Skovgaard Nielsen, BWE Paolo Danesi, BWE M.V.Radhakrishnan, BWE Energy India Modern boiler design by Flemming Skovgaard Nielsen, BWE Paolo Danesi, BWE M.V.Radhakrishnan, BWE Energy India January 2012 Contents Modern boiler design 2012 1. Abstract... 3 2. Introduction... 4 3. Tower

More information

Steam Generator Boilers Compact Steam Boilers. Rapid Start-Up Safe in Operation

Steam Generator Boilers Compact Steam Boilers. Rapid Start-Up Safe in Operation Steam Generator Boilers Compact Steam Boilers Rapid Start-Up Safe in Operation AB&CO TT BOILERS The boiler maker AB&CO TT BOILERS LTD. have since the middle sixties produced industrial boilers and heaters

More information

Natural Gas Conversions of Existing Coal-Fired Boilers

Natural Gas Conversions of Existing Coal-Fired Boilers White Paper MS-14 Natural Gas Conversions of Existing Coal-Fired s Authors: F.J. Binkiewicz Jr., P.E. R.J. Kleisley B.E. McMahon J.E. Monacelli D.A. Roth D.K. Wong Babcock & Wilcox Power Generation Group,

More information

A - 2564 Weissenbach AUSTRIA Tel. +43/2672/890-0, Fax: 890-13 Internet: www.polytechnik.com E-Mail: office@polytechnik.at

A - 2564 Weissenbach AUSTRIA Tel. +43/2672/890-0, Fax: 890-13 Internet: www.polytechnik.com E-Mail: office@polytechnik.at A - 2564 Weissenbach AUSTRIA Tel. +43/2672/890-0, Fax: 890-13 Internet: www.polytechnik.com E-Mail: office@polytechnik.at 1 Biomass heat and energy production Ing. Herbert Brenner Polytechnik Luft-und

More information

ARP Food Industry, Portugal

ARP Food Industry, Portugal Food Industry, Portugal In a Portuguese food company colibri will install a twostage ammonia-water-absorption refrigeration system. The 1st refrigeration stage provides the customer with liquid ammonia

More information

How To Run A Power Plant In Celje

How To Run A Power Plant In Celje VRANSKO, May 2009 Waste Management Strategy Waste management strategy in accordance with European directive 91/156/EEC: 1. Reduction at source 2. Reuse 3. Recycle 4. Energy recovery 5.Disposal Celje Regional

More information

BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT. Jaroslav Lahoda Olaf Arndt Walter Hanstein. Siemens Power Generation (PG)

BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT. Jaroslav Lahoda Olaf Arndt Walter Hanstein. Siemens Power Generation (PG) BIOMASS LOOKING FOR EFFICIENT UTILIZATION THE REHEAT CONCEPT Jaroslav Lahoda Olaf Arndt Walter Hanstein Siemens Power Generation (PG) Brno, Czech Republic & Görlitz, Germany BIOMASS LOOKING FOR EFFICIENT

More information

Steam Turbine Concepts for the Future Volatile Power Market

Steam Turbine Concepts for the Future Volatile Power Market Steam Turbine Concepts for the Future Volatile Power Market Power-Gen Europe June 12 14, 2012 Michael Wechsung Thomas Loeper Radim Znajda Siemens AG - Energy Sector Fossil Power Generation Agenda Situation

More information

Increasing Natural Gas Boiler Efficiency by Capturing Waste Energy from Flue Gas

Increasing Natural Gas Boiler Efficiency by Capturing Waste Energy from Flue Gas Increasing Natural Gas Boiler Efficiency by Capturing Waste Energy from Flue Gas Mark Schiffhauer, ATSI Engineering Services Cameron Veitch, Combustion and Energy Systems Scott Larsen, New York State Energy

More information

Alstom Development of Oxyfuel PC and CFB Power Plants

Alstom Development of Oxyfuel PC and CFB Power Plants Alstom Development of Oxyfuel PC and CFB Power Plants Frank Kluger & John Marion 3 rd Oxy-Combustion Workshop Yokohama, Japan March 06, 2008 Improvement Measures for Fossil Power Plants Regarding CO2 Mitigation

More information

R&D on Oil-Burning, Environment-Friendly, High-Efficiency Boiler

R&D on Oil-Burning, Environment-Friendly, High-Efficiency Boiler [N.2.1.1] R&D on Oil-Burning, Environment-Friendly, High-Efficiency Boiler (Environment-Friendly, High-Efficiency Boiler Group) Takashi Murakawa, Yasuhiro Kotani, Kazuhiro Kamijo, Koichi Tsujimoto, Hiroshi

More information

OilonChooser Operating Instructions

OilonChooser Operating Instructions OilonChooser Operating Instructions 1. Menu display and structure OilonChooser s menu display shows the data input field in the central area. The navigation bar is located in the left column. It shows

More information

Enhanced power and heat generation from biomass and municipal waste. Torsten Strand. Siemens Power Generation Industrial Applications

Enhanced power and heat generation from biomass and municipal waste. Torsten Strand. Siemens Power Generation Industrial Applications Enhanced power and heat generation from biomass and municipal waste Torsten Strand Siemens Power Generation Industrial Applications Enhanced power and heat generation from biomass and municipal waste Torsten

More information

RELIABLE AND EFFICIENT STEAM GENERATION SYSTEMS FOR MODERN UTILITY SERVICE

RELIABLE AND EFFICIENT STEAM GENERATION SYSTEMS FOR MODERN UTILITY SERVICE RELIABLE AND EFFICIENT STEAM GENERATION SYSTEMS FOR MODERN UTILITY SERVICE The safe, reliable and efficient generation of steam has challenged boiler designers since steam was first harnessed for power.

More information

Power Plants. BENSON Once-Through Heat Recovery Steam Generator. Power Generation

Power Plants. BENSON Once-Through Heat Recovery Steam Generator. Power Generation Power Plants BENSON Once-Through Heat Recovery Steam Generator Power Generation BENSON Once-Through technology for Heat Recovery Steam Generators New application of proven technology Siemens development

More information

Efficiency on a large scale CFB Steam Boilers

Efficiency on a large scale CFB Steam Boilers Efficiency on a large scale CFB Steam Boilers Circulating Fluidized Bed Steam Boiler The Circulating Fluidized Bed Steam Boiler is an offering from Bosch Thermotechnology a member of the worldwide Bosch

More information

University of Iowa Power Plant

University of Iowa Power Plant University of Iowa Power Plant Contents Purpose... 2 History... 3 Cogeneration... 6 Boilers... 7 Environmental Impact... 10 Steam Turbine Generators... 12 Modernization... 14 Biomass Fuel Initiative...

More information

ADVANCED BOILER DESIGN

ADVANCED BOILER DESIGN ADVANCED BOILER DESIGN Flemming Skovgaard Nielsen Carsten Søgaard October 2014 TABLE OF CONTENTS 1 Abstract... 4 2 Introduction... 5 3 Tower Type or Two Pass Type... 5 3.1 Advantages & Disadvantages...

More information

Outlook on Integrated Gasification Combined Cycle (IGCC) Technology

Outlook on Integrated Gasification Combined Cycle (IGCC) Technology The IGCC Process: From Coal To Clean Electric Power Outlook on Integrated Gasification Combined Cycle (IGCC) Technology Testimony of Edward Lowe Gas Turbine-Combined Cycle Product Line Manager General

More information

ELECTRODE BOILERS VAPOR POWER INTERNATIONAL

ELECTRODE BOILERS VAPOR POWER INTERNATIONAL ELECTRODE BOILERS WITH JET-FLO Technology VAPOR POWER INTERNATIONAL ELECTRODE boilers The Electrode Steam Boiler with Jet-Flo technology consists of an insulated pressure vessel and is fully enclosed in

More information

APPLIED THERMODYNAMICS TUTORIAL 1 REVISION OF ISENTROPIC EFFICIENCY ADVANCED STEAM CYCLES

APPLIED THERMODYNAMICS TUTORIAL 1 REVISION OF ISENTROPIC EFFICIENCY ADVANCED STEAM CYCLES APPLIED THERMODYNAMICS TUTORIAL 1 REVISION OF ISENTROPIC EFFICIENCY ADVANCED STEAM CYCLES INTRODUCTION This tutorial is designed for students wishing to extend their knowledge of thermodynamics to a more

More information

GAS COOLING SYSTEMS FOR STEAM REFORMING PLANTS

GAS COOLING SYSTEMS FOR STEAM REFORMING PLANTS GAS COOLING SYSTEMS FOR STEAM REFORMING PLANTS 1 1.1 INTRODUCTION is a leading and highly regarded supplier of components and systems for the petrochemical, chemical, refining & metallurgical industries.

More information

Boiler Preparation, Start-Up and Shutdown

Boiler Preparation, Start-Up and Shutdown Boiler Preparation, Start-Up and Shutdown Learning Outcome When you complete this module you will be able to: Describe the basic preparation of a boiler for start-up, and the start-up and shutdown procedures.

More information

GENERAL PROPERTIES //////////////////////////////////////////////////////

GENERAL PROPERTIES ////////////////////////////////////////////////////// ALLOY 625 DATA SHEET //// Alloy 625 (UNS designation N06625) is a nickel-chromium-molybdenum alloy possessing excellent resistance to oxidation and corrosion over a broad range of corrosive conditions,

More information

High-efficient gas boiler CompactGas

High-efficient gas boiler CompactGas High-efficient gas boiler CompactGas Patented alufer for a high efficiency and low emission. 1 CompactGas (1000-2800). Advantages at a glance. The Hoval CompactGas fulfils all expectations with regard

More information

Investigating the Impact of Boiler Aging In Replacement Decisions

Investigating the Impact of Boiler Aging In Replacement Decisions Investigating the Impact of Boiler Aging In Replacement Decisions Siddika Pasi and Michael R. Muller, Rutgers University - Center for Advanced Energy Systems ABSTRACT Traditionally boilers were believed

More information

Basics of Steam Generation

Basics of Steam Generation Helsinki University of Technology Department of Mechanical Engineering Energy Engineering and Environmental Protection Publications Steam Boiler Technology ebook Espoo 2002 Basics of Steam Generation Sebastian

More information

New-generation Integrated Monitoring and Control System

New-generation Integrated Monitoring and Control System Hitachi Review Vol. 54 (05), No. 3 145 New-generation Integrated Monitoring and Control System Shigeru Takahashi Satoru Shimizu Takaaki Sekiai OVERVIEW: Hitachi delivered a new-generation integrated monitoring

More information

5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal.

5. State the function of pulveriser. The pulverisers are the equipments which are used to powdered coal. 413 POWER PLANT ENGINEERING PART-A 1. Define Power. Power is the rate at which energy is used (or) Energy/time. 2. What are the types of fuels? Solid fuel Liquid fuel Gaseous fuel (Any one among the above

More information

Layout Planning of Waste-to-Energy Plants

Layout Planning of Waste-to-Energy Plants Layout Planning of Waste-to-Energy Plants Layout Planning of Waste-to-Energy Plants Falko Weber The layout planning of waste incineration and solid recovered fuel power plants is subject to certain local

More information

Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant:

Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant: 31 Design and Test Operation Performance of 1,500 C Class Gas Turbine Combined-Cycle Power Plant: Construction of Group 1 of the Tokyo Electric Power Company s Kawasaki Thermal Power Station KIYOSHI KAWAKAMI

More information

Feasibility Study on Carbonate Looping Process for Post Combustion CO 2 -Capture from Coal fired Power Plants

Feasibility Study on Carbonate Looping Process for Post Combustion CO 2 -Capture from Coal fired Power Plants Feasibility Study on Carbonate Looping Process for Post Combustion CO 2 -Capture from Coal fired Power Plants B. Epple und J. Ströhle Removal London, 7-9 July 2008 www.est.tu-darmstadt.de Technische Universität

More information

Basics of Kraft Pulping & Recovery Process. Art J. Ragauskas Institute of Paper Science and Technology Georgia Institute of Technology

Basics of Kraft Pulping & Recovery Process. Art J. Ragauskas Institute of Paper Science and Technology Georgia Institute of Technology Basics of Kraft Pulping & Recovery Process Art J. Ragauskas Institute of Paper Science and Technology Georgia Institute of Technology Outline History Goals Process Overview Kraft Pulping Process Kraft

More information

Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance

Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance Phoenix Process Engineering, Inc. Project Experience Helping Clients Achieve MACT Compliance The Boiler MACT, 40 CFR 63, Subpart DDDDD, was vacated in 2007 by the U.S Court of Appeals and the 2004 rule

More information

The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority

The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority The Technology and Business of Power Andrew Valencia, P.E. Lower Colorado River Authority 1 2 What is Efficiency? Efficiency: What you get divided by what you pay for Heatrate is a measure of plant efficiency

More information

High Efficiency Low Emissions: The first way forward for clean coal technology. Dr Andrew Minchener OBE General Manager IEA Clean Coal Centre

High Efficiency Low Emissions: The first way forward for clean coal technology. Dr Andrew Minchener OBE General Manager IEA Clean Coal Centre High Efficiency Low Emissions: The first way forward for clean coal technology Dr Andrew Minchener OBE General Manager IEA Clean Coal Centre IEA Clean Coal Centre mission statement The IEA CCC will disseminate

More information

Heat Exchangers in Boilers

Heat Exchangers in Boilers Helsinki University of Technology Department of Mechanical Engineering Energy Engineering and Environmental Protection Publications Steam Boiler Technology ebook Espoo 2002 Heat Exchangers in Boilers Sebastian

More information

Steam Power Plants as Partners for Renewable Energy Systems

Steam Power Plants as Partners for Renewable Energy Systems Steam Power Plants as Partners for Renewable Energy Systems Hans-Joachim Meier Head of VGB Competence Centre 4 Environmental Technology, Chemistry, Safety and Health VGB PowerTech e.v., Essen, Germany

More information

Coal ash utilisation over the world and in Europe

Coal ash utilisation over the world and in Europe Workshop on Environmental and Health Aspects of Coal Ash Utilization International workshop 23 rd 24 th November 2005 Tel-Aviv, Israel Coal ash utilisation over the world and in Europe Hans-Joachim Feuerborn

More information

PERFORMANCE EVALUATION OF NGCC AND COAL-FIRED STEAM POWER PLANTS WITH INTEGRATED CCS AND ORC SYSTEMS

PERFORMANCE EVALUATION OF NGCC AND COAL-FIRED STEAM POWER PLANTS WITH INTEGRATED CCS AND ORC SYSTEMS ASME ORC 2015 3rd International Seminar on ORC Power Systems 12-14 October 2015, Brussels, Belgium PERFORMANCE EVALUATION OF NGCC AND COAL-FIRED STEAM POWER PLANTS WITH INTEGRATED CCS AND ORC SYSTEMS Vittorio

More information

Biomass Boiler House Best Practices. Irene Coyle & Fernando Preto CanmetENERGY

Biomass Boiler House Best Practices. Irene Coyle & Fernando Preto CanmetENERGY Biomass Boiler House Best Practices Irene Coyle & Fernando Preto CanmetENERGY Growing the Margins London, Ontario March 2010 The Biomass & Renewables Group of Industrial Innovation Group (IIG) of CanmetENERGY

More information

Factory owners must ensure the boiler is:

Factory owners must ensure the boiler is: Factory owners must ensure the boiler is: * Registered with the Boilers and Pressure Vessels Division, Labour Department * Examined by an appointed examiner and has a valid certificate of fitness * Supervised

More information

USC Steam Turbine technology for maximum efficiency and operational flexibility. Dr. Rainer Quinkertz Andreas Ulma Edwin Gobrecht Michael Wechsung

USC Steam Turbine technology for maximum efficiency and operational flexibility. Dr. Rainer Quinkertz Andreas Ulma Edwin Gobrecht Michael Wechsung USC Steam Turbine technology for maximum efficiency and operational flexibility Dr. Rainer Quinkertz Andreas Ulma Edwin Gobrecht Michael Wechsung Siemens AG POWER-GEN Asia 2008 Kuala Lumpur, Malaysia October

More information

Operational Flexibility Enhancements of Combined Cycle Power Plants. Dr. Norbert Henkel, Erich Schmid and Edwin Gobrecht

Operational Flexibility Enhancements of Combined Cycle Power Plants. Dr. Norbert Henkel, Erich Schmid and Edwin Gobrecht Operational Flexibility Enhancements of Combined Cycle Power Plants Dr. Norbert Henkel, Erich Schmid and Edwin Gobrecht Siemens AG, Energy Sector Germany POWER-GEN Asia 2008 Kuala Lumpur, Malaysia October

More information

HYBRID WAY EAF OFF GAS HEAT RECOVERY -ECORECS- MASANARI YAMAZAKI*1, YASUHIRO SATO*2, RYUTARO SEKI*3

HYBRID WAY EAF OFF GAS HEAT RECOVERY -ECORECS- MASANARI YAMAZAKI*1, YASUHIRO SATO*2, RYUTARO SEKI*3 HYBRID WAY EAF OFF GAS HEAT RECOVERY -ECORECS- BY MASANARI YAMAZAKI*1, YASUHIRO SATO*2, RYUTARO SEKI*3 SYNOPSIS JP Steel Plantech Co. has developed Hybrid system for EAF off-gas heat recovery, with EAF

More information

INTEC Engineering GmbH Heating Solutions for the Marine Industry

INTEC Engineering GmbH Heating Solutions for the Marine Industry INTEC Engineering GmbH Heating Solutions for the Marine Industry Thermal Oil Heaters Heating Solutions for the Marine Industry Compared to conventional plants using hot water or steam, thermal oil as a

More information

Improving Energy Efficiency through Biomass Drying

Improving Energy Efficiency through Biomass Drying Improving Energy Efficiency through Biomass Drying Gilbert McCoy, Senior Energy Systems Engineer Northwest CHP Technical Assistance Partnership International District Energy Association Woody Biomass CHP

More information

IMPROVING COAL PLANT EFFICIENCY

IMPROVING COAL PLANT EFFICIENCY IMPROVING COAL PLANT EFFICIENCY Some ideas to consider for existing coal units to Work Toward Compliance with the EPA Clean Power Plan, Rule 111d Coal Plant Efficiency Improvements Presentation by: Dick

More information

Steam turbines for solar thermal power plants. Industrial steam turbines. Answers for energy.

Steam turbines for solar thermal power plants. Industrial steam turbines. Answers for energy. Steam turbines for solar thermal power plants Industrial steam turbines Answers for energy. Power without carbon dioxide The advantage of solar energy is that the fuel is free, abundant and inexhaustible.

More information

How To Reduce Coal Power Plant Emissions

How To Reduce Coal Power Plant Emissions Emissions from coal fired power Generation Workshop on IEA High Efficiency, Low Emissions Coal Technology Roadmap Date: 29 November 2011 Location: New Delhi Osamu Ito Energy Technology Policy Division

More information

Technology comparison of CFB versus pulverized-fuel firing for utility power generation

Technology comparison of CFB versus pulverized-fuel firing for utility power generation IFSA 2011, Industrial Fluidization South Africa: 91 99. Edited by A. Luckos & P. den Hoed Johannesburg: Southern African Institute of Mining and Metallurgy, 2011 Technology comparison of CFB versus pulverized-fuel

More information

High-performance steam boiler and hot water boiler plants for industry

High-performance steam boiler and hot water boiler plants for industry High-performance steam boiler and hot water boiler plants for industry Information 2/3 HKB leading manufacturer of industrial boiler plants in Europe and Asia Steam boilers with outputs up to 120 t/h and

More information

Review of Potential Efficiency Improvements at Coal-Fired Power Plants

Review of Potential Efficiency Improvements at Coal-Fired Power Plants Review of Potential Efficiency Improvements at Coal-Fired Power Plants Introduction The Clean Air Markets Division, U.S. Environmental Protection Agency requested that Perrin Quarles Associates, Inc.,

More information

COMBUSTION. In order to operate a heat engine we need a hot source together with a cold sink

COMBUSTION. In order to operate a heat engine we need a hot source together with a cold sink COMBUSTION In order to operate a heat engine we need a hot source together with a cold sink Occasionally these occur together in nature eg:- geothermal sites or solar powered engines, but usually the heat

More information

By K.K.Parthiban / Boiler specialist / Venus Energy Audit System

By K.K.Parthiban / Boiler specialist / Venus Energy Audit System FINE TUNING EXPERIENCE OF A CFBC BOILER By K.K.Parthiban / Boiler specialist / Venus Energy Audit System Introduction The Industrial boilers have been seeing a growth in capacity in the recent years. Current

More information

Thermal efficiency of pulverized fuel boiler

Thermal efficiency of pulverized fuel boiler Thermal efficiency of pulverized fuel boiler V.VARA LAKSHMI 1, P.S.KISHORE 2 M.E student, Heat Transfer studies in Energy Systems, Dept. of Mechanical Engineering, Andhra University, Visakhapatnam, A.P,

More information

Heat-Pipe Heat Exchanger

Heat-Pipe Heat Exchanger Heat-Pipe Heat Exchanger Heat Pipe Heat Exchanger For air-air 1 Heat Pipe Heat Exchanger Heat exchanger, which transfers the heat from one medium to another, is the most common thermal equipment in various

More information

48 No Change to Content of Form Permitted

48 No Change to Content of Form Permitted 13. FORM 2A BREAKDOWN OF FIXED CONSTRUCTION PRICE All prices are in Canadian dollars as at the Closing Time. 1. Design, Permits, and Construction Management including project development expenses, mobilization,

More information

www.optimumheat.co.uk

www.optimumheat.co.uk The modern wood pellet boiler with built-in flexibility and remote fingertip control Up to 98% efficient Wide output range Simple touch-panel control Remote control & maintenance Extremly low emissions

More information

Low grade thermal energy sources and uses from the process industry in the UK

Low grade thermal energy sources and uses from the process industry in the UK Low grade thermal energy sources and uses from the process industry in the UK Yasmine Ammar, Sharon Joyce, Rose Norman, Yaodong Wang, Anthony P. Roskilly Sustainable Thermal Energy Management in the Process

More information

ANCILLARY SERVICES SUPPLIED TO THE GRID: THE CASE OF THISVI CCGT POWER PLANT (GREECE)

ANCILLARY SERVICES SUPPLIED TO THE GRID: THE CASE OF THISVI CCGT POWER PLANT (GREECE) Claudio Cavandoli, Alessandro Crippa EDISON S.p.A., Engineering Department ANCILLARY SERVICES SUPPLIED TO THE GRID: THE CASE OF THISVI CCGT POWER PLANT (GREECE) 1 ANCILLARY SERVICES SUPPLIED TO THE GRID:

More information

Advanced Steam Parameters in a Large Scale CFB Application Operating on REF and Biofuels background and experiences

Advanced Steam Parameters in a Large Scale CFB Application Operating on REF and Biofuels background and experiences Advanced Steam Parameters in a Large Scale CFB Application Operating on REF and Biofuels background and experiences Matts Strömberg Soderenergi AB, Sweden Presented at Power Gen Europe 2011 Milan, Italy

More information

COAL GASIFICATION AND CO 2 CAPTURE

COAL GASIFICATION AND CO 2 CAPTURE COAL GASIFICATION AND CO 2 CAPTURE an overview of some process options and their consequences Use this area for cover image (height 6.5cm, width 8cm) Evert Wesker Shell Global Solutions International B.V.

More information

Boiler efficiency measurement. Department of Energy Engineering

Boiler efficiency measurement. Department of Energy Engineering Boiler efficiency measurement Department of Energy Engineering Contents Heat balance on boilers Efficiency determination Loss categories Fluegas condensation principals Seasonal efficiency Emission evaluation

More information

Evaluating the way that cez makes technology decisions thorough insight into their latest decision making process

Evaluating the way that cez makes technology decisions thorough insight into their latest decision making process Evaluating the way that cez makes technology decisions thorough insight into their latest decision making process international power summit forum, Munich, germany 20 February 2014 Jan Žižka Head of Coal

More information

How To Power A Power Plant With Waste Heat

How To Power A Power Plant With Waste Heat Power Generation Siemens Organic Rankine Cycle Waste Heat Recovery with ORC Answers for energy. Table of Contents Requirements of the Future Power Supply without extra Fuel Siemens ORC-Module Typical Applications

More information

HYBRID COMBINED CYCLE POWER PLANT

HYBRID COMBINED CYCLE POWER PLANT International Conference Nuclear Energy for New Europe 2002 Kranjska Gora, Slovenia, September 9-12, 2002 www.drustvo-js.si/gora2002 HYBRID COMBINED CYCLE POWER PLANT KÁROLY VESZELY Szmolnyica sétány 14/5,

More information

Hot Water Boilers and Controls Why Condensing Boilers are Different. Presented Oct. 14, 2008 Long Island Chapter, ASHRAE

Hot Water Boilers and Controls Why Condensing Boilers are Different. Presented Oct. 14, 2008 Long Island Chapter, ASHRAE Hot Water Boilers and Controls Why Condensing Boilers are Different Presented Oct. 14, 2008 Long Island Chapter, ASHRAE H.W. Boilers and Controls Major types of boilers Advantages and disadvantages Resistance

More information

Siemens Steam Turbine SST-600

Siemens Steam Turbine SST-600 Power and Gas Siemens Steam Turbine SST-600 This PDF offers an advanced interactive experience. This symbol indicates interactive content. For the best viewing experience, please use Acrobat Reader X or

More information

Process Integration of Chemical Looping Combustion with Oxygen Uncoupling in a Coal-Fired Power Plant

Process Integration of Chemical Looping Combustion with Oxygen Uncoupling in a Coal-Fired Power Plant Process Integration of Chemical Looping Combustion with Oxygen Uncoupling in a Coal-Fired Power Plant Petteri Peltola 1, Maurizio Spinelli 2, Aldo Bischi 2, Michele Villani 2, Matteo C. Romano 2, Jouni

More information