Timber Frame. TFW-EW-01 Wall Junction. THERMAL PERFORMANCE OF JUNCTION AIR BARRIER CONTINUITY AIR BARRIER OPTIONS GENERAL NOTES VERSION 1.

Similar documents
Contents. APA Construction Details. Full fill cavity walls Partial fill cavity walls Solid externally insulated walls 26-37

Introduction & Principles Issued in support of Junction Details, Parts 1 to 5

NRG 75 CRF NRG GREENBOARD WALL SYSTEM

Multi-layer Insulation Blanket for Roofs

Rev Code of Practice. SIP Technology.

Section Timber Frame Walls. Single layer between studs. Single layer between studs with service void. Between studs with insulated lining

BUILDING CONTROL GUIDANCE SHEET USE OF BREATHABLE ROOFING FELTS.

CERTIFICATE NAME OF PRODUCT MANUFACTURER PRODUCT DESCRIPTION CERTIFICATION PROCEDURE. No VTT C Date of issue , Updated July 1, 2011

Energy Company Obligation (ECO): Technical Monitoring Questions

Rockwool Flexi Insulation Application Guide

Module 3.7. Thermal bridging

Fire 2This Technical Bulletin has been commissioned by the UK SIP Association in

Good Craftsmanship Guide. Carpentry and Joinery- Carcassing

IRISH BUILDING CONTROL INSTITUTE HOTEL COURT HOTEL BALLYCONNELL CO CAVAN. 26 th MARCH 2009 TIMBER FRAME CONSTRUCTION

Installation Details. D1 General D2 Walls D3 Ceilings D4 Reference. D Installation Details

!!!!!! !!! Decra Plus DPSW010 DPSTW011 DPSW012 DPSW013 DPSW014 DPSW015 DPSW016 DPSW020 DPSW021 DPSW024 DPSW030 DPSW031 DPSW035 DPSW030 DPSW031 DPSW035

Linea Weatherboard DIRECT FIX CONCRETE SLAB AND SOFFIT FIGURE 1

Building Regulations for the Conservation of Fuel and Power

TIMBER FRAME STANDARD DETAILS SEPTEMBER 09

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

DEFAULT HEAT LOSS COEFFICIENTS

Innovation - High performance roof, wall and floor insulation board. delivering better performance

Rochdale Building Control Guide. Approved Document C. Site preparation and resistance to contaminants and moisture

Including. Rubershield-Pro. Breather Membrane

Section 4.3. Separating Floors. Timber frame floor with I-Beams. Upgrading existing timber floor with new ceiling. Timber frame floor with

TGD L Limiting Thermal Bridging and Air Infiltration. Acceptable Construction Details. Introduction

The Pocket Guide To Insulation August 2013

BER Assessors Dwellings Technical Bulletin

Additions and Alterations

Building Control Guidance Note

fire separating walls #2

PB301 July Lightweight Building Solutions. Bushfire Protection.

2014 British Columbia Building Code Changes

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

How To Repair A Boat Landing Deck With A Boat Bed

Envelope INSULATION BATT (2) Avoid Using Batt Insulation With Metal Framing. Pressure or Friction Fit

Sample Drawing Package for One and Two Family Dwelling Applications

ROOFS, SNOW AND ICE DAMS

The formation of roof waterproofing details calls for

Roofers Guide to Underslating Membranes

Extension. for. Pretend Customer 123 A Road HA7 9BP. at: 123 A Road HA7 9BP

CI/SfB 2- Rj7 December 2010

Part 3 Ancillary technologies. Chapter 3.2. Mechanical ventilation with heat recovery

Ubiflex. Non-lead flashing system

Timber Frame Construction

ENVIRONMENTAL INFORMATION APR 1200 products are made from glass mineral wool, one of the most environmentally friendly insulants available.

This seminar covers the principles, design and installation of ground bearing and suspended insulated floors. You will discover

SOUND INSULATION FOR EXTERIOR WALLS AND FACADE SYSTEMS

POST AND FRAME STRUCTURES (Pole Barns)

Residential Inspection Guidelines

Mark Cramer Inspection Services, Inc.

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

WATERPROOFING OF REINFORCED CONCRETE FLAT ROOF 12

FOREST OF DEAN DISTRICT COUNCIL BUILDING CONTROL SERVICES. Building Control Guidance for. Loft Conversions

British Gypsum Guide to Timber Frame Construction. March 1998

Conventions for U-value calculations

Building Control Guidance Note

- Version 2 Total R-value calculations for typical building applications

8/18/14. Introduction to. Framing. Terminology and Concepts

H-Stud Area Separation Wall System

Chapter 2: Foundations

The Scottish Building Standards TECHNICAL HANDBOOK CONSERVATORIES

DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES

BUILDING CONTROL GUIDANCE FOR DOMESTIC LOFT CONVERSIONS

TR21. I n s u l a t i o n. Low Energy Low Carbon Buildings

MUNICODE SERVICES LTD.

Residential Refurbishment. September ThermoShell Internal Wall Insulation System Design Guide

State of Connecticut Department of Public Health RADON PROGRAM

Domestic Extensions. Monmouthshire County Council. Building control guidance document

Cavity Drain R20 is manufactured from1.0mm thick black high density polyethylene with studs approximately 20mm high.

GYPROCK PARTY WALL INTERTENANCY WALL SYSTEMS FOR CLASS 1 BUILDINGS

Low Energy Low Carbon Buildings

Footing and Temporary Power Inspection

Residential Foundations and Basements

House building is changing fast NHBC unveils new Standards Chapters on curtain walling and cladding, and light steel framed walls and floors

RESIDENTIAL ROOFING & RE-ROOFING, ROOF VENTILATION AND ROOF SHEATHING REQUIREMENTS MICHIGAN RESIDENTIAL CODE 2000

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

Part 7 Roofs. Chapter 7.2. Pitched roofs. Effective from 1 January 2012

GUIDANCE SHEET FOR CONSERVATORIES, SUNROOMS AND EXTENSIONS TO DWELLINGS.

BUILDING SAFETY UNIT

technology UICK progressive sustainable any design, any shape, any colour, anywhere you like!

Page & Turnbull imagining change in historic environments through design, research, and technology

Cupa Natural Slate Roofing design and fixing guide

Structure Survey Findings:

INSULATED PITCHED ROOFING

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

EXTERNAL WATERPROOFING MEMBRANES BEST PRACTICE GUIDELINES

CONSTRUCTION DETAILS & LOAD DESIGN CHARTS

FLASHCLAD VERTICAL WEATHERBOARD CAVITY SYSTEM. Product. Scope. Appraisal No. 829 [2013] Appraisal No. 829 (2013) Amended 05 February 2016

If stepping is required, step at 180mm as seen in this picture.

Fire Barrier Systems. For inhibiting the spread of fire and smoke in concealed spaces

Fig. 2 WALL-TO-WALL PANEL CONNECTIONS CORNER WALL CONNECTION

Leaky Homes Financial Assistance Package (FAP) Repair plan example

Custom 30 x 20-8 Garage Plan Plan #g233 By SDS-CAD Specialized Design Systems

Providing protection in construction

INTERIOR WALLS AND BASEMENTS CHOOSING THE RIGHT MEMBRANE FOR INTERIOR WALLS. Multi-Layer Technology provides increased strength.

ENERGY STAR Qualified New Homes Thermal Enclosure Checklist. Water Management Checklist. Eli Caudill

IECC Compliance Guide for Homes in Virginia

Transcription:

Ensure insulation is tucked into corners. AIR BARRIER S Accredited (Indicative) Detail Number: TFW-EW-0 TFW-EW-0 Wall Junction.

Floor insulation must tightly abut the inner face of the timber frame soleplate. Seal between the wall and floor air barrier OR seal the gap between the skirting board and the floor using a flexible sealant. AIR BARRIER S Accredited (Indicative) Detail Number: TFW-GF-0 If sole plates are packed to level ensure that any gaps are sealed. Ensure sole plate DPC turns up behind and laps with vertical vapour control layer/vapour control plasterboard to improve airtightness. TFW-GF-0 Ground Bearing Floor/ Raft Foundation/ In-situ Suspended Ground Floor Slab/ Pre-cast Suspended Ground Floor. Insulation above Slab with Timber Floor Finish.

4 Floor slab perimeter must have minimum R-Value value of 0.75m²K/W. Floor insulation must tightly abut the inner face of the concrete block. Seal between the wall and floor air barrier OR seal the gap between the skirting board and the floor using a flexible sealant. AIR BARRIER S Accredited (Indicative) Detail Number: TFW-GF-0 If sole plates are packed to level ensure that any gaps are sealed. Ensure sole plate DPC turns up behind and laps with vertical vapour control layer/vapour control plasterboard to improve airtightness. TFW-GF-0 Ground Bearing Floor/ Raft Foundation/ In-situ Suspended Ground Floor Slab/ Pre-cast Suspended Ground Floor/Concrete and Screed. Insulation Below Slab

Ensure insulation is in contact with the underside of the timber flooring. 4 Seal between the wall and floor air barrier OR seal the gap between the skirting board and the floor using a flexible sealant. Seal joints in the timber floor with a suitable glue. Support and fix any square edge joints in the decking to the joists. AIR BARRIER S Accredited (Indicative) Detail Number: TFW-GF-0 Ventilate sub-floor (vents not shown). If compressible insulation is installed, ensure that full insulation depth is achieved between floor joists by fixing netting to sides of joists with battens. TFW-GF-0 Timber Suspended Ground Floor.

Install insulation with a minimum R-value of 0.75m²K/W around floor perimeter. Seal the gap between the skirting board and the floor using a flexible sealant. The dotted blue line depicts the continuity of the air barrier through the floor zone e.g solid nogging or header joist. AIR BARRIER S Accredited (Indicative) Detail Number: TFW-IF-0 TFW-IF-0 Timber Intermediate Floor.

Pack between external wall studs with suitable insulation. Ensure wall insulation is tucked into the corners studs. Ensure air barrier continuity between internal linings at the corner. AIR BARRIER S Accredited (Indicative) Detail Number: TFW-IW-0 Refer to Approved Document B for fire safety requirements and to Approved Document E for sound insulation requirements. This detail to be read in conjunction with detail No: TFW-IW-0. TFW-IW-0 Separating Wall/ External Wall Abutment.

Pack compressible insulation between last truss/ joist and separating wall. Pack compressible insulation between wall head members. Ensure that the full depth of insulation between, over (or below) the joists extends to the face of the wall. Ensure air barrier continuity between the ceiling and the wall linings. AIR BARRIER S Accredited (Indicative) Detail Number: TFW-IW-0 Refer to Approved Document B for fire safety requirements and to Approved Document E for sound insulation requirements. This detail to be read in conjunction with detail No: TFW-IW-0. TFW-IW-0 Separating Wall Head.

Ensure that insulation is tucked into the corner. The dotted blue line depicts the continuity of the air barrier through the partition zone e.g. timber stud. AIR BARRIER S Accredited (Indicative) Detail Number: TFW-IW-0 This detail to be read in conjunction with detail No: TFW-IW-04. TFW-IW-0 Timber Stud Partition Wall/ External Wall Abutment.

Ensure that the full depth of insulation between and over the joists extends over the head of the wall. The dotted blue line depicts the continuity of the air barrier through the partition zone e.g through top timber rail. AIR BARRIER S Ceiling lining (e.g. plasterboard) Accredited (Indicative) Detail Number: TFW-IW-04 This detail to be read in conjunction with detail No: TFW-IW-0. TFW-IW-04 Timber Stud Partition Wall Head.

Ensure the gap between the wall plate and the proprietary eaves ventilator is completely filled with insulation having a min. R-value across the thickness of the insulation of. m.k/w. Ensure continuity of the insulation throughout the junction. Ensure that the full depth of insulation between and over the joists abuts the eaves insulation. Ensure air barrier continuity between the ceiling and the wall linings Complying with all of the above checklist items will help achieve the design air Accredited (Indicative) Detail Number: TFW-RE-0 AIR BARRIER S The use of over joist insulation is considered best practice as it eliminates the cold bridge caused by the joist. Use a proprietary eaves ventilator to ensure ventilation in accordance with BS550. The installation of the eaves ventilator must not prevent free water drainage below the tiling battens. This detail to be read in conjunction with detail No: TFW-RG-0. TFW-RE-0 Pitched Roof. Ventilated Loft. Eaves.

Ensure the gap between the wall plate and the proprietary eaves guard is completely filled with insulation having a min. R-value across the thickness of the insulation of. m.k/w. Ensure continuity of the insulation throughout the junction. Ensure that the full depth of insulation between and over the joists abuts the eaves insulation. Ensure air barrier continuity between the ceiling and the wall linings. Accredited (Indicative) Detail Number: TFW-RE-0 AIR BARRIER S The use of over joist insulation is considered best practice as it eliminates the cold bridge caused by the joist. Vapour permeable roof underlay to be used in strict accordance with approved third party certification. The installation of the eaves insulation must not prevent free water drainage below the tiling battens. This detail to be read in conjunction with detail No: TFW-RG-0. TFW-RE-0 Pitched Roof. Unventilated Loft. Eaves.

4 Ensure the gap between the wall plate and the proprietary eaves guard is completely filled with insulation having a min. R-value across the thickness of the insulation of. m.k/w. Ensure continuity of the insulation throughout the junction. Ensure that the full depth of insulation between and over the joists abuts the eaves insulation. Ensure that the insulation is installed tightly between the rafters and is in contact with the under rafter insulation. Accredited (Indicative) Detail Number: TFW-RE-0 If required by BS550 use a vapour control plasterboard or a separate vapour control layer behind the lining. Vapour permeable roof underlay to be used in strict accordance with approved third party certification. The use of over joist and under rafter insulation is considered best practice as it eliminates the cold bridge caused by the joist/rafter. Ensure air barrier continuity between the ceiling and the wall linings. Install a full depth timber nogging between the floor joists. The dotted blue line depicts the continuity of the air barrier e.g. through the noggings. AIR BARRIER S The installation of the eaves insulation must not prevent free water drainage below the tiling battens. This detail to be read in conjunction with detail No: TFW-RG-0. The above indicative guidance illustrates good practice for the design and construction of interfaces only in respect to ensuring thermal performance and air barrier continuity. The above guidance must be implemented with due regard to TFW-RE-0 Pitched Roof. Between & Under Rafter Insulation. Unventilated Rafter Void. Eaves.

Ensure the gap between the wall plate and the proprietary eaves guard is completely filled with insulation having a min. R-value across the thickness of the insulation of. m.k/w. Ensure continuity of the insulation throughout the junction. Ensure that the full depth of insulation between and under the rafters abuts the eaves insulation. Ensure that the insulation is installed tightly between the rafters and is in contact with the under rafter insulation. Ensure air barrier continuity between the ceiling and the wall linings. Accredited (Indicative) Detail Number: TFW-RE-04 If required by BS550 use a vapour control plasterboard or a separate vapour control layer behind the lining. Vapour permeable roof underlay to be used in strict accordance with approved third party certification. The use of over joist and under rafter insulation is considered best practice as it eliminates the cold bridge caused by the joist/rafter. AIR BARRIER S The installation of the eaves insulation must not prevent free water drainage below the tiling battens. This detail to be read in conjunction with detail No: TFW-RG-0. The above indicative guidance illustrates good practice for the design and construction of interfaces only in respect to ensuring thermal performance and air barrier continuity. The above guidance must be implemented with due regard to TFW-RE-04 Pitched Roof. Between & Under Rafter Insulation. Unventilated Rafter Void. Storey and a Half.

Ensure the gap between the wall plate and the proprietary eaves ventilator is completely filled with insulation having a min. R-value across the thickness of the insulation of. m.k/w. Ensure continuity of the insulation throughout the junction. 4 Ensure that the full depth of insulation between and over the joists abuts the eaves insulation. Ensure that the insulation is installed tightly between the rafters and is in contact with the under rafter insulation. Accredited (Indicative) Detail Number: TFW-RE-05 Use a proprietary eaves ventilator to ensure ventilation in accordance with BS550. If required by BS550 use a vapour control plasterboard or a separate vapour control layer behind the lining. The use of over joist and under rafter insulation is considered best practice as it eliminates the cold bridge caused by the joist/rafter. Ensure air barrier continuity between the ceiling and the wall linings. Install a full depth timber nogging between the floor joists. The dotted blue line depicts the continuity of the air barrier e.g. through the noggings. AIR BARRIER S The installation of the eaves insulation must not prevent free water drainage below the tiling battens. This detail to be read in conjunction with detail No: TFW-RG-0. The above indicative guidance illustrates good practice for the design and construction of interfaces only in respect to ensuring thermal performance and air barrier continuity. The above guidance must be implemented with due regard to TFW-RE-05 Pitched Roof. Between & Under Rafter Insulation. Ventilated Rafter Void. Eaves.

Ensure the gap between the wall plate and the proprietary eaves ventilator is completely filled with insulation having a min. R-value across the thickness of the insulation of. m.k/w. Ensure continuity of the insulation throughout the junction. Ensure that the full depth of insulation between and under the rafters abuts the eaves insulation. Ensure that the insulation is installed tightly between the rafters and is in contact with the under rafter insulation. Ensure air barrier continuity between the ceiling and the wall linings. Accredited (Indicative) Detail Number: TFW-RE-06 If required by BS550 use a vapour control plasterboard or a separate vapour control layer behind the lining. Use a proprietary eaves ventilator to ensure ventilation in accordance with BS550. The use of over joist and under rafter insulation is considered best practice as it eliminates the cold bridge caused by the joist/rafter. AIR BARRIER S The installation of the eaves ventilator must not prevent free water drainage below the tiling battens. This detail to be read in conjunction with detail No: TFW-RG-0. The above indicative guidance illustrates good practice for the design and construction of interfaces only in respect to ensuring thermal performance and air barrier continuity. The above guidance must be implemented with due regard to TFW-RE-06 Pitched Roof. Between & Under Rafter Insulation. Ventilated Rafter Void. Storey and a Half.

Ensure the gap between the wall plate and the proprietary eaves guard is completely filled with insulation having a min. R-value across the thickness of the insulation of. m.k/w. Ensure continuity of the insulation throughout the junction. VERSION.0 Ensure that the full depth of insulation between and over the rafters abuts the eaves insulation. 4 Ensure that the insulation is installed tightly between the rafters and is in contact with the over rafter insulation. Accredited (Indicative) Detail Number: TFW-RE-07 If required by BS550 use a vapour control plasterboard or a separate vapour control layer behind the linings. Vapour permeable roof underlay to be used in strict accordance with approved third party certification. The use of over rafter insulation is considered best practice as it eliminates the cold bridge caused by the rafter. Ensure air barrier continuity between the ceiling and the wall plasterboard.. Install a full depth timber nogging between the floor joists. The dotted blue line depicts the continuity of the air barrier e.g. through the noggings. AIR BARRIER S This detail to be read in conjunction with detail No: TFW-RG-04. The above indicative guidance illustrates good practice for the design and construction of interfaces only in respect to ensuring thermal performance and air barrier continuity. The above guidance must be implemented with due regard to TFW-RE-07 Pitched Roof. Between & Over Rafter Insulation. Eaves

Ensure the gap between the wall plate and the proprietary eaves guard is completely filled with insulation having a min. R-value across the thickness of the insulation of. m.k/w. Ensure continuity of the insulation throughout the junction. Ensure that the full depth of insulation between and over the rafters abuts the eaves insulation. Ensure that the insulation is installed tightly between the rafters and is in contact with the under rafter insulation. Ensure air barrier continuity between the ceiling and the wall linings. Accredited (Indicative) Detail Number: TFW-RE-08 If required by BS550 use a vapour control plasterboard or a separate vapour control layer behind the linings. Vapour permeable roof underlay to be used in strict accordance with approved third party certification. The use of over rafter/joist insulation is considered best practice as it eliminates the cold bridge caused by the rafter/joist. AIR BARRIER S This detail to be read in conjunction with detail No: TFW-RG-04. The above indicative guidance illustrates good practice for the design and construction of interfaces only in respect to ensuring thermal performance and air barrier continuity. The above guidance must be implemented with due regard to TFW-RE-08 Pitched Roof. Between & Over Rafter Insulation. Storey and a Half.

4 Ensure that the wall insulation is installed level with or above the top of the roof insulation. Ensure that the roof insulation tightly abuts the inner face of the parapet wall. Ensure air barrier continuity between the ceiling and the wall linings. AIR BARRIER S Accredited (Indicative) Detail Number: TFW-RF-0 BS550 requires a vapour control layer to be installed between the deck and insulation. Turn up vapour control layer at edge of roof insulation, lap with roof waterproofing layer, and seal. TFW-RF-0 Timber Flat Roof with Parapet.

Continue loft insulation over head of main wall panel to sheathing board. Ensure that the full depth of insulation between and over the joists extends to the inner edge of the wall. Ensure air barrier continuity between the ceiling and the wall lining. Complying with all of the above checklist items will help achieve the design air AIR BARRIER S Accredited (Indicative) Detail Number: TFW-RG-0 The use of over joist insulation is considered best practice as it eliminates the cold bridge caused by the joist. This detail to be read in conjunction with detail Nos: TFW-RE-0 or TFW-RE-0. TFW-RG-0 Pitched Roof. Ventilated & Unventilated Loft. Gable.

Ensure that the wall insulation is taken up level with top of wall. Ensure that the full depth of insulation between and under the rafters extends to the wall. Ensure that the insulation is installed tightly between the rafters and is in contact with the under rafter insulation. Ensure air barrier continuity between the ceiling and the wall linings. AIR BARRIER S Accredited (Indicative) Detail Number: TFW-RG-0 If required by BS550 use a vapour control plasterboard or a separate vapour control layer behind the lining. Vapour permeable roof underlay to be used in strict accordance with approved third party certification. This detail to be read in conjunction with detail No: TFW-RE-0 or TFW-RE-04. TFW-RG-0 Pitched Roof. Between & Under Rafter Insulation. Unventilated Rafter Void. Gable.

Ensure that the wall insulation is taken up level with top of wall. Ensure continuity of the insulation throughout the junction. Ensure that the full depth of insulation between and under the rafters extends to the wall. Ensure that the insulation is installed tightly between the rafters and is in contact with the under rafter insulation. Ensure air barrier continuity between the ceiling and the wall linings. AIR BARRIER S Accredited (Indicative) Detail Number: TFW-RG-0 If required by BS550 use a vapour control plasterboard or a separate vapour control layer behind the lining. The use of under rafter insulation is considered best practice as it eliminates the cold bridge caused by the rafter. This detail to be read in conjunction with detail No: TFW-RE-05 and TFW-RE-06. TFW-RG-0 Pitched Roof. Between & Under Rafter Insulation. Ventilated Rafter Void. Gable.

Ensure that the wall insulation is taken up level with top of wall. Ensure that the full depth of insulation between and over the rafters extends to the wall. Ensure that the insulation is installed tightly between the rafters and is in contact with the over rafter insulation. Ensure air barrier continuity between the ceiling and the wall lining AIR BARRIER S Accredited (Indicative) Detail Number: TFW-RG-04 If required by BS550 use a vapour control plasterboard or a separate vapour control layer behind the linings. Vapour permeable roof underlay to be used in strict accordance with approved third party certification. The use of over rafter insulation is considered best practice as it eliminates the cold bridge caused by the rafter. This detail to be read in conjunction with detail No: TFW-RE-07 or TFW-RE-08. The above indicative guidance illustrates good practice for the design and construction of interfaces only in respect to ensuring thermal performance and air barrier continuity. The above guidance must be implemented with due regard to TFW-RG-04 Pitched Roof. Between & Over Rafter Insulation. Gable.

0mm Install a proprietary cavity closer having a path of minimum thermal resistance path through the closer of not less than 0.45 m²k/w (manufacturers certified data) OR a treated timber batten. Minimum frame overlap to be 0mm Flexible sealant should be applied to the junction between the plasterboard and the window/ door frame members. Apply external flexible seal around frame. Accredited (Indicative) Detail Number: TFW-WD-0 AIR BARRIER S Ensure that vapour control layer or vapour control plasterboard is returned into reveal. TFW-WD-0 Windows and Doors. Independent Lintels.

Install a proprietary cavity closer having a path of minimum thermal resistance path through the closer of not less than 0.45 m²k/w (manufacturers certified data) OR a treated timber batten. Minimum frame overlap to be 0mm 0mm Ensure air barrier continuity between the window and the wall lining. Flexible sealant should be applied to the junction between the lining and cill board and between the cill board and window frame member. Apply external flexible seal around frame. Accredited (Indicative) Detail Number: TFW-WD-0 Ensure that vapour control layer or vapour control plasterboard is returned into reveal. AIR BARRIER S TFW-WD-0 Windows Cills.

Install a proprietary cavity closer having a path of minimum thermal resistance path through the closer of not less than 0.45 m²k/w (manufacturers certified data). Minimum frame overlap to be 0mm 0mm Flexible sealant should be applied to the junction between the lining and the window/ door frame members. Apply external flexible seal around frame. Accredited (Indicative) Detail Number: TFW-WD-0 AIR BARRIER S Ensure that vapour control layer or vapour control plasterboard is returned into reveal. TFW-WD-0 Windows and Doors. Jambs.

Install a proprietary cavity closer having a path of minimum thermal resistance path through the closer of not less than 0.45 m²k/w (manufacturers certified data). Flexible sealant should be applied to the junction between the lining and the window/ door frame members. Apply external flexible seal around frame. AIR BARRIER S Accredited (Indicative) Detail Number: TFW-WD-04 Ensure that vapour control layer or vapour control plasterboard is returned into reveal. TFW-WD-04 Windows and Doors. Checked Reveals.