Section 4: I.B.S. Intelligent Boiler Sequencing

Similar documents
Autoflame PC Software Guide

Boiler Preparation, Start-Up and Shutdown

Mk7 M.M. Installation and Commissioning Guide

PART 11: START-UP PROCEDURES FOR THE INSTALLER

OilonChooser Operating Instructions

TANKLESS WATER HEATER INSTALLATION DIAGRAMS

ABC-1000 Automatic Boiler Level Controller Operation and Installation Manual

! WARNING. McDonnell & Miller Installation & Maintenance Instructions MM-217(I) Series 150S and 157S (Snap Switch, All Models except 157S-RB-P)

CGC s Hybrid System Loop Control

USER MANUAL OPERATION AND USE OF CAR WITH. Diego G3 / NEVO SEQUENTIAL GAS INJECTION SYSTEM

OASIS SERVICE & TROUBLESHOOTING MANUAL (WITH DM10 OR DM12)

HEAT INTERFACE UNITS (Modular)

Luna 3 Comfort Troubleshooting Guide June 2008

UA-NJ Air Conditioning & Refrigeration Division Training Curriculum

O. Gas boiler. Gaz 6000 W WBN H-E-N/L-S2400. Operating instructions for the end customer (2014/07) en

For installation guide see reverse of book

prestige Condensing Water Boiler SERVICE TECHNICIAN S TROUBLE SHOOTING GUIDE TSG-PRESTIGE Date revised: 12/6/10

Aerona Air Source Heat Pumps

TRANSMITTER RECEIVER THESE INSTRUCTIONS APPLY IN THE UK ONLY THESE INSTRUCTIONS ARE TO BE LEFT WITH THE USER OR AT THE APPLIANCE. Digistat Optimiser

FIELD TESTS OF FUEL EFFICIENCY MAGNETS J A CRABB JULY 1997 SWEEG REPORT 80

C. Burner management system to follow requirements of Industrial Risk Insurers (IRI).

USERS GUIDE. LOGIC Heat 12, 15, 18, 24, 30. For installation guide see reverse of book

USERS GUIDE. LOGIC Combi 24, 30, 35. For installation guide see reverse of book

Printing and Publishing Energy Savings Guide

Flame Conductivity VS Flame Rectification Systems

Product Description Digital Solid State Starting Electric Fire Pump Controllers FTA1930

Operating instructions

ABB i-bus KNX Fan Coil Controller FC/S 1.1

Indoor coil is too warm in cooling mode or too cold in heating mode. Reversing valve or coil thermistor is faulty

CoolTop. A unique water cooled air-conditioning unit for server room cooling from the top AC-TOPx-CW-240/60

Tips for burner modulation, air/fuel cross-limiting, excess-air regulation, oxygen trim and total heat control

INSTALLATION & SERVICE MANUAL. Display Panel

TECHNICAL SERVICE DEPARTMENT Technical Service Bulletin Inch PowerVent LED Indicator Explanations & Troubleshooting Table

Introduction. In this Self-study Programme we will explain to you the design and function of the CAN data bus. SSP 186/01

Frequently Asked Questions. Air Top Diesel Heaters. 2000STC, Evo 40 & Evo 55

Points Position Indicator (PPI1) for Points Motors with Common Ground

OZW30. Central Unit SYNERGYR

TC-9102 Series Surface Mount Temperature Controllers

Energy Saving Fact Sheet Boilers

Preventing Overheated Boiler Incidents

RF 1. Contents: Connecting diagram. Detailed information:

User's Instructions. Alpha HE CB25/33 and HE SY25

Laddomat Charging unit

Baxi Combi 130 HE. User s Operating Instructions. Gas Fired Wall Mounted Condensing Combination Boiler

Programmable Room Thermostat 7 Day (5-2 Day) Models: / Power Supply: Battery / Mains

Appliance Diagnostic Modes Microwave. GE Consumer & Industrial Technical Training

Page 1. Description

Industrial Steam System Process Control Schemes

Name Description Model Number. Parameters Min. Typ. Max. Note. Vaux Voltage 9.8 V 12 V 13.2 V Auxiliary Supply Voltage

GAS HEATING IN COMMERCIAL PREMISES

Series GM. Peerless Boilers. Residential/Commercial Gas Boilers

PD 100A. Printing data system

User Guide and Important Warranty Information. Suprima 30L - 100L. Wall Mounted Fan Assisted Balanced Flue Gas Boiler

Oil - kerosene burners


Workshop 7 PC Software - Tracker

Product Description Primary Resistance Starting Electric Fire Pump Controllers FTA1500

FIREDEX Conventional Fire Panels

SET1E. Installation & User Instructions. Electronic timeswitch for heating & hot water. Certification Mark

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)

Procidia Control Solutions Dedicated Backup in a Single Variable Control Loop

PLC Based Liquid Filling and Mixing

Commercial Semi-Instantaneous Water Heaters

Certified HVAC - Refrigeration Training Program

igadgitz Bluetooth Audio Transmitter & Receiver (BTT009 / U3442) User Guide

Fuel Monitoring & Remote Diagnostic System: The Complete Story

SELECTION, APPLICATION AND MAINTENANCE

Mechanical Engineering Technician- Plant Technician

POINTS POSITION INDICATOR PPI4

ROC Protocol Specifications Manual

LMS The modular management system for condensing boilers. Control Products & Systems OEM. Answers for infrastructure.

Installation & User Instructions

How to connect your Victron to a computer with VE Bus Quick Configure

Operating Instructions DT, PRT, PRT/HW PRT-R, PRT-R2


User Manual. Air-conditioner Controller SB-DN-HVAC (MAC01.331)

R&D Electronics 8440 N. Waukegan Rd., Morton Grove, IL (847) Issue 12/08/06 om_207f.doc --

RVL470. Heating Controller. Building Technologies HVAC Products. Series B

PRORAE REMOTE HOST CONTROLLER: COMMUNICATION TROUBLESHOOTING GUIDE

Description of functions

Install the DeviceNet Module using the following procedure:

SPROG II User Guide 1. SPROG II DCC Decoder Programmer User Guide

Multi-Range Programmable DC Power Supplies 9115 Series

UNIFIED FACILITIES GUIDE SPECIFICATIONS

Frequently Asked Questions

Transmitter Interface Program

Operating instructions

Product Description Full Voltage Starting Electric Fire Pump Controllers FTA1000

PHASED OUT. Digital dimmable ballasts for fluorescent lamps EXCEL one4all series. PCA TCL EXCEL one4all, W Compact and T5c fluorescent lamps

The Piping System Model a New Life Cycle Document. Elements of the Piping System Model

BARCODE TICKET SOLUTION RF CARD SOLUTION MAGNETIC TICKET SOLUTION

PRESSURE AND TEMPERATURE SENSORS for use with the BURNERLOGIX Burner Management System and PPC4000 Series Fuel/Air Ratio Controller

7800 SERIES Relay Modules

Operating instructions

GENERATOR START CONTROL MODULE - MINI (2 Wire to 3 Wire)

PANASONIC TROUBLE SHOOTING GUIDE

General Information. Do programmable thermostats really save energy?

DTW Works Master Specification Version 2006

Heating and Hot Water Services Controls General Technical Specification

Transcription:

Section 4: I.B.S. Intelligent Boiler Sequencing 4.1 Overview - Features & Benefits of I.B.S. control 4.2 Commissioning and Setting Up Procedure 4.2.1 Guide to Commissioning Sequencing 4.4 Electrical Schematics Showing all Terminal Interconnections 4.4.1 Sequencing Connection Diagram 4.4.2 DTI/Sequencing Connection Diagram 4.5 Other Information and Illustrations. 4.5.1 Sequencing Operation 4.5.2 Sequencing Combinations 4.5.3 Diagram showing Data Transmission/Reception 4.5.4 Mini Mk5 Sequencing Status Information Issue: 1.1.2007 Autoflame Technical Manual Section 4: Index

4.1 INTELLIGENT BOILER SEQUENCING (I.B.S.) Overview of System Operation: Features and Benefits The Intelligent Boiler Sequencing software, which is included in every M.M. E.G.A. module, further extends the application possibilities of the system. The objective of this control form is to ensure that the minimum number of boiler/burner units are in operation at any one time to satisfy the heat requirement imposed upon the boiler plant, particularly in the case of multi boiler installations. There are two variations of I.B.S. software that can be selected by the user via the Options procedure. The first variation relates to heating boilers and the second variation to steam boilers. Heating Boilers Sequential Control: A maximum of ten M.M. E.G.A. modules may be interconnected by a two wire screened data cable: (See interconnection drawing). Any string of modules interconnected as detailed can have one of it s number designated No. 1 or lead boiler. This identifying of lead boiler is achieved by either of the following methods: a) Connecting a mains voltage onto terminal No. 41. b) Instructing the modules via the D.T.I. module (Data Transfer Interface) by software. Once a lead boiler has been selected the system works in the following way: Typically every five minutes the sequencing software in the lead boiler identifies it s own firing rate by looking at the position of the fuel valve in the load index and also the maximum heating capacity of the No 1. lead boiler. This information would normally be entered when this boiler/burner unit is commissioned. Having established percentage firing rate, and maximum heating capacity, the I.B.S. software calculates the amount of heat being contributed to the system by this boiler. The I.B.S. software in the lead M.M. E.G.A. module then contacts in turn each of the modules connected to this loop and gathers similar information from each. The lead module s I.B.S. software then calculates the minimum number of boiler/burner units that need to be operational to satisfy the building load, imposed upon the plant at that time, and switches the remainder off. There is a terminal connection on the M.M. E.G.A. module for controlling a two port valve that would normally be installed in the boiler s return pipe connection to the common return header. This facility ensures that boilers that are switched off line do not contribute return temperature water to the flow header thereby diluting the flow temperature to the building: (See relevant data sheets and drawings showing the control sequence detailed above). Example: There are four boilers interconnected as above, each with a heating capacity of 586kw (2 Mbtu.) In the event of each boiler firing 440kW (1.5 Mbtu) (3/4 of it s maximum rate), the No. 1 lead boiler would instruct the No. 4 boiler to shut down and boilers No.s 1, 2 and 3 would adjust their firing rate to maximum. In both cases the boilers are contributing 1758kW (6 Mbtu) to the system but, after intervention of the I.B.S. sequencing software, three boilers only are carrying the load which is a more fuel efficient method of operation. If the building load continued to decrease the three boilers would reach a point where they were each firing 390kW (1.33 Mbtu) each. Issue: 1.1.2007 Autoflame Technical Manual Section 4.1.1

At this point the I.B.S. software would switch off the No. 3 boiler as two boilers would be capable of generating the 1172kW (4 Mbtu) required. When the load on the system increases, the reverse procedure applies, i.e. when, for example, two boilers are firing at near 100% load and the setpoint temperature on either of the modules is not being achieved, the I.B.S. software would switch on a third boiler to assist with the generation of the heat requirement. Any boiler can be nominated lead boiler by the connection of an input to the appropriate terminal or by a software instruction via the D.T.I. Steam Boiler Sequential Control: When the I.B.S. software control package is applied to steam boilers, it s operation is exactly the same as above but with the additional features and enhancements as explained in the following. In the case of heating boilers only two states in the control form exist, either on or off. When steam boiler variation of I.B.S. is optioned there are three states which are controlled sequentially. The first is on-line, this is when the boiler is operating purely under the control of the M.M. E.G.A. module's internal P.I.D. load controller. The second state is Standby Warming : In this case the boiler is operated at a reduced pressure setpoint, and runs for a number of minutes each hour: e.g. if the on-line boiler or boilers are set at a setpoint of 7 bar (100 p.s.i.) the standby warming boiler controls at a setpoint of 5 bar (72 p.s.i.). In this way if the load increases the standby warming boiler can begin to contribute steam quickly. The reduced setpoint is a user variable option in the same way as the normal control pressure setpoint. The number of minutes run time is also adjustable. The third state is off-line, this is with the burner shut down and the boiler cold. If the load on the boiler house increases, this boiler would move into a warming condition. Apart from the variations detailed above, the steam sequencing works in precisely the same way as the heating boiler sequencing: The sequencing software package ensures that at all times the minimum number of boilers are operational to satisfy the load imposed on the boiler house. Note: It should be appreciated that all data and control variables can be shown on a screen via the addition of the D.T.I. module to the data loop. The screen and keyboard can be sited locally in the boiler house or the whole system can be addressed remotely via the normal telecommunications network. In the software in the D.T.I. there is a histogram facility which shows the firing rate and state of each boiler in the boiler house. Issue: 1.1.2007 Autoflame Technical Manual Section 4.1.2

Guide to Commissioning Sequencing 4.2.1 GUIDE TO COMMISSIONING SEQUENCING Before any attempt is made to implement Sequencing operation, it is necessary that the fuel/air positions and load index are already entered. Refer to Sections 2 or 3 for Commissioning fuel/air positions. The load index is implemented using the same ten point load index entry method used for the Flow Metering as detailed in Sections 2 and 3 of the manual. If the Flow Metering has already been optioned and the ten point load index entered then it is not necessary to enter this again. However if it is not entered, proceed as detailed below. 1. Set Option 57 to Value 1 (Refer to Section 2.2.4 - Setting Options). 2. Press ENTER whilst 57 and 1 are being displayed in the Air and Required windows MEMORY respectively. 3. Next time the burner starts the M.M. will automatically go into the ten point load index entry mode. The firing range is automatically divided into ten equal parts. Each of the ten divisions from high to low has a fuel flow value in whatever unit of flow measurement the user requires allocated to it. (All extrapolated fuel flow values between the ten points are calculated from a best fit mathematical formula). Fuel 4. In this mode the window will show fuel value in degrees angular. Air The window will be blank. Position Position The window and its associated buttons will be used to enter the fuel flow in the chosen fuel flow unit per minute value. Note: Required a) The Actual window confirms to the commissioning engineer which of the 10 points are currently being measured. When the positioning motors are moving from one calibrated point to another the Actual display flashes. When it reaches the next point to be calibrated, with a flow value, the display remains steady. b) The minimum numerical value for fuel flow that can be entered into memory is 0.01. The maximum numerical value for fuel flow that can be entered into memory is 999. c) The values are entered in descending order, i.e. Point No.1 is maximum flame and Point No.10 is at minimum flame. Issue: 1.1.2007 Autoflame Technical Manual Section 4.2.1.1

Guide to Commissioning Sequencing The 10 sequential points on the load index are allocated automatically by the M.M. 5. When fuel flow has been calculated or read off of a commissioning fuel flow meter the value is entered as detailed in Point No.4. The ENTER button is then pressed and the flow value is passed into the M.M. memory. MEMORY 6. The above detailed data entry routine is repeated until all 10 points have flow values allocated to them. 7. When the last (10th) point has been entered the M.M. stops the burner and implements the calculations necessary to enable the Load Index to be actioned. Whilst the calculations are being carried out a rolling decimal point is displayed. 8. If it is not required to subsequently display the Flow Metering values, set Option 57 back to value 0. 9. If implementing "hot water" Sequencing set Options as follows ON EACH M.M.: Set Option 16 to Value 1 or 3. Set Option 33 to identification number accordingly. Set Option 34 to the rating of burner. Set Option 35 to time between Sequence scans. ENSURE OPTION 53 IS SET TO 0. 10. If implementing "steam" Sequencing set Options as follows ON EACH M.M.: Set Option 16 to Value 1 or 3. Set Option 33 to identification number accordingly. Set Option 34 to the rating of burner. Set Option 35 to time between Sequence scans. Set Option 53 to the time required for the boiler to be off. Set Option 54 to the time required for the boiler to be on. Note: Options 53 and 54 are relevant to the "Stand-by Warming" state. Option 53 is the indication to this M.M. that the Sequencing being done is either hot water or steam (i.e. 0 - Hot water, non zero value - Steam). Issue: 1.1.2007 Autoflame Technical Manual Section 4.2.1.2

4.4 ELECTRICAL SCHEMATICS Sequencing Connection Diagram MINI Mk.6 M.M./E.G.A. System Pt. No. MMM60016 Combustion Management Systems ENTER MEMORY INTER HIGH START FUEL METERING OPEN IBS SEQUENCING CLOSE FLAME SCANNER RESET LOCKOUT COM DISPLAY STATUS RUN E.G.A. M.M. MINI Mk.5 M.M./E.G.A. System Pt. No.MMM50016 Issue: 1.1.2007 Autoflame Technical Manual Section 4.4.1

DTI/Sequencing Connection Diagram If a voltage on terminal 88 is used to select lead boiler, it will take priority over a lead boiler set via the DTI. Combustion Management Systems MINI Mk.6 M.M./E.G.A. System Pt. No. MMM60016 ENTER MEMORY INTER HIGH START FUEL METERING OPEN IBS SEQUENCING CLOSE FLAME SCANNER RESET LOCKOUT COM DISPLAY STATUS RUN E.G.A. M.M. MINI Mk.5 M.M./E.G.A. System Pt. No.MMM50016 Issue: 1.1.2007 Autoflame Technical Manual Section 4.4.2

Issue: 1.1.2007 Autoflame Technical Manual Section 4.5.1

Issue: 1.1.2007 Autoflame Technical Manual Section 4.5.2

Diagram showing Example of Data Communications with Reference to Flickering L.E.D.s This is the M.M. that is working communications: Eg.: - M.M. No. 1. Open A0 A0 A2 A0 A3 A0 A4 A0 Close R0 R1 A1 R0 R2 R0 R3 R0 R4 R0 This is an M.M. that is not working communications. Eg.: M.M. No. 3. Same waveforms apply to M.M. No.s 5 to 10. Open R0 A0 R1 A1 R0 A0 R2 A2 R0 A0 R3 R0 A0 R4 A4 R0 A0 Close A3 Note:- Only 1 M.M. works the communications. R0 - Request to D.T.I. R1 - Request to M.M. 1 R2 - Request to M.M. 2 R3 - Request to M.M. 3 R4 - Request to M.M. 4 R5 - Request to M.M. 5 R6 - Request to M.M. 6 R7 - Request to M.M. 7 R8 - Request to M.M. 8 R9 - Request to M.M. 9 R10 - Request to M.M. 10 A0 - Answer from D.T.I. A1 - Answer from M.M. 1 A2 - Answer from M.M. 2 A3 - Answer from M.M. 3 A4 - Answer from M.M. 4 A5 - Answer from M.M. 5 A6 - Answer from M.M. 6 A7 - Answer from M.M. 7 A8 - Answer from M.M. 8 A9 - Answer from M.M. 9 A10 - Answer from M.M. 10 > > > > Issue: 1.1.2007 Autoflame Technical Manual Section 4.5.3

4.5.4 Mini Mk5 Sequencing Status Information If parameter 32 = 1 then the information below is displayed instead of the Flow Metering Grand Total. (Totalising still continues to work in the background). *1 *2 *3 *4 Sequencing Status Information Sequence Code: Steam 0 On 1 Standby/Warming 2 Off 3 Off Sequence Code: Hot Water On Off Off Off *1 Receiving Sequencing Information 0 = No 1 = Yes CR1 Relay Status 0 = Off 1 = On Working Communications/ Sequencing 0 = No 1 = Yes *2 Status of Input 41 Disabled Status Unused 0 = 0V AC 1 = 230V AC (110V AC) 0 = Enabled 1 = Disabled *3 Lead Boiler 0 = No Lead Boiler Selected 1 to 10 = Number of Lead Boiler *4 Issue: 1.1.2007 Autoflame Technical Manual Section 4.5.4