Only fonts from the standard AutoCAD and Windows installation may be used.

Similar documents
CAD Standards Guideline For Facility Documentation and Construction Projects

CAD Standards. Design Guidelines and Standards. June Office of the University Architect

UNIVERSITY OF WASHINGTON Facilities Services Design Guide. Civil. Topographical Survey. Design Evaluation. Construction Submittals

CAD Standards Guideline For Facility Documentation and Construction Projects

University of Northern Iowa Design Documents Standards. October 2014

5.2 Drawing Information Consultants Procedure Manual. 5.2 Drawing Information: Large Format Document Standards: Page 1 of 5

Company Profile. Introduction. Contents. Orbitcad.com since 2009 Providing AutoCAD & Revit Support to Clients Globally

2012 BIM Guidelines and Standards (Rev. 00) University at Albany

0 - Initial Services

THIS PAGE INTENTIONALLY LEFT BLANK

BIM: FOR PROJECT MANAGERS CSI Southwest Region Conference Program 1B 8:45am 11:00am

Olilo's AEC Design Services. SrinSoft Inc, Partners of

Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series

Coordinating and Sharing Information with Revit Architecture and Revit Structure Best Practices!

Practice Note

Autodesk Revit LEARNING PATH BUILDING DESIGN SUITE

Effective Collaboration using Revit Structure and AutoCAD MEP

Guidelines to create Building Information Modelling (BIM) models for AAP, P1, SOM & SPC

Requirements for Building Application Submission

Revised Work Scope Dated April 23 rd, 2015

2D and 3D Framing and Detailing in Chief Architect X4 Dan Baumann, ChiefExperts.com

PROJECT COST ESTIMATES & FEASIBILITIES

Exhibit C: Scope of Work and Schedule of Deliverables

TABLE OF CONTENTS. INTRODUCTION... 5 Advance Concrete... 5 Where to find information?... 6 INSTALLATION... 7 STARTING ADVANCE CONCRETE...

Design Development Quality Management Phase Checklist Project Phase Checklist Series

Practical Strategy and Workflow for Large Projects: A Realistic Solution

Design Consultant (Electrical Services) Design Deliverables and Responsibilities Allocation (Stage E+)

ALABAMA STATE DEPARTMENT OF EDUCATION

SECTION 5 DRAFTING STANDARDS

The use of BIM in plumbing projects creates deeper project knowledge, delivers a more robust product, and can reduce total project costs.

Envisioneer Technical Note

Applicant. User Guide.

Software for Producing Rack Layouts and Purchase Orders

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

Architectural Drafting

BUILDING OR RENOVATING

OPEN BIM Collaboration Pilot: The Faith Lutheran College Secondary School

Certified Instructors & Curriculum

Importing and exporting content

Scope: Communications and Electronic Systems addressed in this section include:

Segreti Design Scope of Interior Design Services

SYDNEY COLLEGE OF THE ARTS GRADUATE SCHOOL MASTER OF FINE ARTS RESEARCH PAPER/THESIS GUIDELINES LENGTH OF RESEARCH PAPER

Mechanical Engineer. Process Engineer. Civil Engineer. PFD Inlet works and screening PFD Membrane Bioreactor 34.

PROJECT BRIEF Version (insert number)

Execution Plan Template Design Modeling

BETTER BY 3D DESIGN AND COORDINATION IN BUILDING SERVICES INDUSTRY

BIM. Building Intelligent Models For Better Information Management. By: Sean Arbic

Lincoln Public Schools. 15 Attachments (separately bound) Schematic Design Schematic Design Project Manual

C r e a t i n g S u s t a i n a b l e D e s i g n s

Sample Drawing Package for One and Two Family Dwelling Applications

Australian Standard. Emergency control organization and procedures for buildings, structures and workplaces AS

Menu of Architecture Services 2009

2880 International Circle Colorado Springs, CO Telephone Executive Summary Pikes Peak Regional Building Code Revisions

Regional Council of Goyder

BMIC S APPETITE GUIDE EFFECTIVE JUNE 2013

PREPARATION OF ELECTRICAL ENGINEERING DRAWINGS STS904

Building Permit Application

THE PROVISIONAL CENTRAL PRODUCT CLASSIFICATION

How To Understand The Development Of Bim Technology

Australian Standard. General conditions of contract for design and construct. AS (Incorporating Amendment No. 1)

APPLICATION FORM 4M & 4MA

The Shorten AutoCAD the road solution for mechanical, electrical, to done. and plumbing engineering. AutoCAD AutoCAD.

Development Variance Permit Application Package

BIM Management Plan Template

FUNDAMENTALS OF LANDSCAPE TECHNOLOGY GSD Harvard University Graduate School of Design Department of Landscape Architecture Fall 2006

Health Chapter ALABAMA STATE BOARD OF HEALTH ALABAMA DEPARTMENT OF PUBLIC HEALTH ADMINISTRATIVE CODE

THE CORPORATION OF DELTA ENGINEERING CONSULTANT PROJECT PROCEDURAL MANUAL

CPIx on Line. Post Contract-Award Building Information Modelling (BIM) Execution Plan (BEP) Supporting the HMG Construction Strategy.

IES <Virtual Environment> Tutorial. ModelIT (Version 6.0)

PivotLoc Ladder Systems

SECTION PERMITTED USE OF STANDARDS

HATFIELD TOWNSHIP DRY CLEANING PLANT PERMIT APPLICATION PROCEDURES

5047P Architectural and Engineering Services for the Cambie Fire Hall and Ambulance Station Project- Addendum #2

Effective Collaboration

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

In the Link Point Cloud window, locate the desired point cloud file

Introduction Building project management

POSITION: PROJECTS MANAGEMENT OFFICER

Collaborating Across Disciplines with Revit Architecture, MEP, and Structure

Geberit ProPlanner Geberit ProPlanner Installation and Basic Functions Training Manual. Training Manual. Installation and Basic Functions

IDP 150: INTRODUCTION TO AUTOCAD JANUARY TERM 2014 INSTRUCTOR: Keith A. Zaltzberg

Transbay Transit Center Program. CADD Standards Manual. Revision 2. November 2010

Facilities Management

3. QUALITY ASSURANCE REQUIREMENTS

AutoCAD Structural Detailing Getting Started with AutoCAD Structural Detailing, Reinforcement module

TENDER DOCUMENT PROCEDURE FOR MAJOR WORKS CONTRACTS USING AS GENERAL CONDITIONS OF CONTRACT

Civil Engineering Design

Capital Project Closeout. Construction Documentation Requirements

The need for CAD Standards

Residential Building Permit Process

RELOCATION OF BUILDINGS

RECOMMENDED MODEL AGREEMENTS BETWEEN HOUSING CONSUMERS AND HOME BUILDERS FOR THE CONSTRUCTION OF A HOME

CONTE NT DESIGN PROCESS. Appendix. 01 First Issue. 02 Revision A. 03 Revision B. 04 Co-ordination. 05 Panel Thicknesses. 06 Panel Surface Quality

CHAPTER 12 Revised January 1, 2013 SIGNING AND SEALIN OF PROFESSIONAL SURVEY DELIVERABLES

YOUR GUIDE TO THE UK S LEADING CONSTRUCTION SOFTWARE ESTIMATING DESIGNS HEALTH & SAFETY LEGAL CONTRACTS PROJECT MANAGEMENT. your partner in success

Introduction to AutoCAD 2010

CE6014: COMPUTER MEDIATED CONSTRUCTION

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003

aaca NCSA 01 The National Competency Standards in Architecture aaca Architects Accreditation Council of Australia PO Box 236 Civic Square ACT 2608

Minor Accommodation Planning Review Application

Transcription:

The Building Management division in the Department of Planning, Transport and Infrastructure (DPTI) has developed guidelines outlining the technical requirements for electronic documents including drawings and specifications. The information provided in this guide note should be understood and adhered to by professional service contractor (PSC) and subcontractor employees. Drawings Technical Requirements DPTI Drawing Title Blocks AutoCAD and Revit Drawing Title blocks must be used for all contract drawings. The folder CAD Drawing Titleblocks (D03) can be downloaded from the Building Project Information Management System (BPIMS) Project Library or from the DPTI Building Management website at http://www.infrastructure.sa.gov.au/buildingmanagement/information_for_contractors/plan_servi ces. The preferred size for drawings is A1 (A0, B1, A2, A3 and A4 are also available). Refer to Attachment 1 for an example of the DPTI title block. Title Block Information All PSC logos and contact details must be clearly shown in the space provided above the revision column. This must be in CAD format as images will not bind to the drawing. The size of the revision column should be reduced to suit. All relevant information within the title block must be completed. The DPTI logo and copyright information is to be included on all drawings in the title block. DPTI Drawing Registration All contract drawings must be registered with the Plan Officer before tender call. A DPTI drawing number and contract number will be supplied by the Plan Officer which must be entered in the title block. The Plan Officer must be informed of any changes to DPTI drawing numbers or drawing titles after initial registration. Extra drawing numbers will be issued on request however if any drawing numbers allocated are not used, the Plan Officer should be advised. Fonts Only fonts from the standard AutoCAD and Windows installation may be used. Xrefs AutoCAD If used, all xrefs are to be bound. This is done in AutoCAD via Insert Xref Manager. Select all xrefs and then Bind with the Insert option. (Note that when inserting xrefs ensure that the Overlay option is used as the Attach option can cause problems when binding.) electronic document requirements g65 v2-5.docx Updated in October 2013

Layouts Revit When exporting sheets to.dwg format, ensure views are not Xref, i.e. export as a single file. The.dwg files submitted should only contain a single layout e.g. one DPTI registered drawing per.dwg file. The files should be saved in the layout view (paperspace) showing a preview of the entire drawing sheet. If multiple layouts have been used, each layout view must be saved as an individual.dwg and.pdf file with its correct registration number as the file name e.g. 2889-AR- 2006.dwg. Purge At completion, drawings must be purged. File Name Ensure that the file is saved with the DPTI Registration Number as the file name e.g. 2889-AR- 2006.dwg. Tender Documents Drawing.dwg ( and.rvt if used) and.pdf files (@scale 1:1) are required on CD or DVD for all registered drawings that form part of the contract documents. Documentation to be provided to DPTI in AutoCAD format for tender and construction. If.rvt model has been produced, it can be provided for information only. Complete all cross referencing to other drawings and specifications. Do not include notes such as for tender or for construction on the drawings. Any drawings that contain this notation will be returned for removal of the notation prior to tender call. Remove all references to drawing revisions and amendments made prior to tender except for managing contractor projects. Delete all references to work by others unless the Principal is undertaking such works outside of the contract. Ensure that the scale(s) nominated on the drawings correspond to the scale(s) of the drawing. DPTI standard drawings are to be used. Ensure that the latest version of relevant DPTI standard drawings are downloaded from BPIMS or obtained from the Drawing Files Officer. When requesting drawing numbers it is important to specify the design discipline associated with each drawing. The disciplines available for assignment are listed below. Discipline Code Description Architectural AR Floor plan, room layout, elevations, sections, building dimensions, furniture layout, floor coverings, room functions, wet areas, ceiling layout. Electrical Engineering EE Lighting layout, line diagrams, switchboards, schematic line diagrams, power and emergency lighting, communication Page 2 of 5

Drawing Discipline Code Description layout, security and fire detection, photo voltaic system. Mechanical Engineering ME Water, gas, hydraulics, air-conditioning ventilation, airconditioning ducts layout and fire sprinkler layout. Site Development Civil Engineering SD Site layout, paving, landscaping, stormwater layout, planting guide. Structural Engineering SE Footings, columns and beams, roof structure, suspended floors, steel layout. Survey SU Cadastral data, contours, topographical information, site services, location of sumps, sewer IP s, grid levels (height markers), datum and temporary benchmarks. It is a requirement that if the design discipline associated with the drawing number issued is changed, the Plan Room Services group must be notified. As Built Drawings Within four weeks after the Date of Practical Completion (or the equivalent) of the construction contract, the lead PSC is to supply to the DPTI Project Risk Manager.dwg (and.rvt if used) and.pdf files of all as built drawings for architectural and civil engineering disciplines. The lead PSC shall ensure that the construction contractor supplies.dwg (and.rvt if used) and.pdf files of all as built drawings for the building services engineering that formed part of the construction contract. Electronic copies of as built drawings must also be sent to the Drawing Files Officer. Specification Technical Requirements All specifications and associated documents shall be prepared in Microsoft Office 2007 (or compatible). Specifications must be prepared using current Natspec texts supplemented where required with Natspec Services texts and including current DPTI Amended Worksections. The file NATSPEC - DPTI Amendments (227) can be downloaded from the BPIMS Project Library or obtained from the DPTI Project Risk Manager or the Natspec Officer. Reference is to be made only to the Principal, Superintendent, Superintendent s Representative and the Contractor. No reference should be made to the Architect, Engineer, Builder, Electrical Contractor, Proprietor, Building Owner etc. Page Numbering Page numbering shall be consecutive for the document including discipline and trade sections. They must have the correct page layout, be identified correctly in the contents and be of the format page x of y. Appendices can be separately numbered however they must be identified correctly in the contents. Layout of Page Project title to appear in the bottom left corner. Name of trade section to appear in top right corner. Page number to appear in bottom centre. Page 3 of 5

Contract number to appear in bottom of page. Title Page A title page is to be provided at the front of the specification document and is to contain the correct project name, the correct contract number and the type of tender e.g. General Building Contractor. Table of Contents A table of contents is to be provided listing all trade sections contained in the specification. Preliminaries Preliminaries and the general requirements are to be prepared based on NATSPEC - DPTI Amendments (227) and are required to include the specific DPTI clauses un-amended except for project specific information. Drawing List DPTI drawing numbers are to be listed in the specification. Drawing titles in the specification are to be consistent with the actual drawing titles. Delivery Deliver to: Project Risk Manager Building Management Project Services Department of Planning, Transport and Infrastructure Level 2, 211 Victoria Square, Adelaide SA 5000 GPO Box 967, Adelaide SA 5001 Contact For further information contact: Plan Officer Natspec Officer Drawing Registration, PDF/TIFF, Contract No s DPTI Amended Natspec Worksections Phone: 08 8226 5636 Phone: 08 8226 5183 Email: plan.officer@sa.gov.au Email: natspec.officer@sa.gov.au Drawing Files Officer AutoCAD DWG Files, DPTI Standard Drawings Phone: 08 8226 5344 Email: drawing.officer@sa.gov.au Page 4 of 5

Attachment 1 Professional Service Contractor (PSC) logo/contact details to be inserted at top of page reduce revision column to suit Revision Letter, Date, Revision Description and Initials Government of South Australia logo (Do not move or edit) DPTI Use Only to be completed at Contract execution Official Project Name must be used Full site address is required Description of drawings on the sheet Contract No., initial and check by signed PSC job/ref no, scale and page size Asset no. and PSC sheet no. DPTI dwg no. and revision letter Page 5 of 5