Landfill Thickness (m) CALCULATED RANGE OF TOTAL SETTLEMENT TOTAL SETTLEMENT VERSUS LANDFILL THICKNESS YEARS

Similar documents
VOLUME III GEOLOGY, HYDROGEOLOGY & GEOTECHNICAL REPORT CAPITAL REGION RESOURCE RECOVERY CENTRE

Information Request 14

Principles of groundwater flow

Matt Harris, Golder Associates (NZ) Ltd. The value of geophysics as a non-intrusive method for site characterisation

Preliminary Assessment

COVER SYSTEMS FOR MINE CLOSURE AND REHABILITATION TWO CASE STUDIES

4. Environmental Impacts Assessment and Remediation Targets

Vulnerability Assessment

EXPLAINING GROUNDWATER AND WATER WELLS

1200 United Boulevard

Flood Risk Assessment. For Application at: Brick House Farm Brick House Lane Hambleton Lancashire FY6 9BG

EPSG. Coordinate Reference System Definition - Recommended Practice. Guidance Note Number 5

STORMWATER MANAGEMENT CHECKLIST

ources of Drinking Water

Frequently Asked Questions on the Alberta Tier 1 and Tier 2 Soil and Groundwater Remediation Guidelines. February 2008

STATE OF VERMONT AGENCY OF NATURAL RESOURCES DEPARTMENT OF ENVIRONMENTAL CONSERVATION WASTE MANAGEMENT DIVISION SOLID WASTE MANAGEMENT PROGRAM

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS

How To Model Soil On Gri

BLACK/HARMONY/FAREWELL CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

Embankment Consolidation

Guidelines For Sealing Groundwater Wells

Floodplain Development Land Use Review

ALL GROUND-WATER HYDROLOGY WORK IS MODELING. A Model is a representation of a system.

Boundary Conditions of the First Kind (Dirichlet Condition)

INFORMATION SHEET ORDER NO. R XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY

CHAPTER 9 CONCLUSIONS AND RECOMMENDED MITIGATION

CIVL451. Soil Exploration and Characterization

DEPARTMENT OF THE ARMY ETL U.S. Army Corps of Engineers CECW-EG Washington, DC

Stormwater Management Design Brief. Proposed Commercial Redevelopment 5830 Hazeldean Road Ottawa (Stittsville), Ontario.

APPENDIX B CHARACTERIZATION OF SOILS AT TEST SITES

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

TOPOGRAPHICAL SURVEY REPORT - PART OF L.R No. 7413/11 Done on February 2015 at International Union for Conservation of Nature (IUCN) Eastern African

Development of the National Water Resources Model for Jutland

Chapter 5: Working with contours

IMPACT ASSESSMENT OF SOLUTION MINING ON GROUNDWATER RESOURCES IN KAZAN TRONA FIELD, ANKARA-TURKEY

Operations and Maintenance Guidelines for Coal Ash Landfills Coal Ash Landfills are NOT the Same as Subtitle D Solid Waste Landfills

ENVIRONMENTAL CODE OF PRACTICE FOR CONCRETE BATCH PLANT & ROCK WASHING OPERATIONS

Landfill ER Revenues versus Landfill Costs

3D-Groundwater Modeling with PMWIN

Assessment of Groundwater Vulnerability to Landfill Leachate Induced Arsenic Contamination in Maine, US - Intro GIS Term Project Final Report

Earth Coordinates & Grid Coordinate Systems

BALLANTRAE-MUSSELMAN LAKE SERVICING REPORT. Submitted to: The Town of Whitchurch-Stouffville. Submitted by:

Module 7 (Lecture 24 to 28) RETAINING WALLS

PREDICTIVE MODELLING AND MONITORING NATURAL ATTENUATION TO SAVE REMEDIAL COSTS

FLOOD INFORMATION SERVICE EXPLANATORY NOTES

APPENDIX G SETTLEMENT

FINAL PLAN OF REMEDIAL ACTION

1.34 WASTE CONTAINMENT AND SITE REMEDIATION TECHNOLOGY TAKE-HOME FINAL EXAM DUE FRIDAY MAY 7, 2004 AT 9:30 AM

The Role of Groundwater in Alberta s Tight Water Supply Environment. Ken Baxter, M.Sc., P.Geol. Dan R. Brown, M.Sc., P.Geol.

SUBDIVISION AND DEVELOPMENT REGULATION

WHAT YOU NEED TO KNOW ABOUT LIVING NEAR INDIANA COAL MINES

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska

3D MAGNETIC INVERSION OF A VTEM SURVEY. (Nicol Block) Submitted to: NORTHSTAR GOLD CORP. PRESENTED BY

Assessment of groundwater inflow into a metro tunnel (Ankara)

Modelling the Discharge Rate and the Ground Settlement produced by the Tunnel Boring

Water-Table Elevation and Depth to Water Table

Utah State General Records Retention Schedule SCHEDULE 1 GEOSPATIAL DATA SETS

Vacuum Consolidation Dewatering in Sediment Remediation

December 29, 2014 Reference No

CONSOLIDATION

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file

Soil Strength. Performance Evaluation of Constructed Facilities Fall Prof. Mesut Pervizpour Office: KH #203 Ph: x4046

USING DETAILED 2D URBAN FLOODPLAIN MODELLING TO INFORM DEVELOPMENT PLANNING IN MISSISSAUGA, ON

Groundwater Management. Discussion Paper for the Milk River Integrated Watershed Management Plan. Compiled by: Sandi Riemersma.

FAULT SEAL ANALYSIS: Mapping & modelling. EARS5136 slide 1

EM Oct US Army Corps of Engineers ENGINEERING AND DESIGN. Slope Stability ENGINEER MANUAL

Engineering Specifications February, 2004 Schedule H to Bylaw 7452, Subdivision Bylaw Page 18

4. Right click grid ( ) and select New MODFLOW, then select Packages, enabling both the optional Well and Recharge option.

Proposed Construction of Basement Flood Risk Assessment. 35 Edwardes Square London W8 6HH

MAC-ENC-PRO-062 GROUNDWATER MONITORING PROGRAM

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND TELECOMMUNICATION CABLES IN THE VICINITY OF TRANSPORTATION FACILITIES

APPENDIX I WORLEYPARSONS GPR REPORT (ISSUED IN ELECTRONIC FORM)

FLOOD RISK AND SURFACE WATER DRAINAGE ASSESSMENT HILLHOUSE RESTORATION SITE, OFF JAMESON ROAD, THORNTON CLEVELEYS ON BEHALF OF NPL ESTATES

Chapter 4 Atmospheric Pressure and Wind

SUMMARY REPORT ON COMPARISON OF THE QUARRY SLOPE ANGLES ADJACENT TO THREE KINGS RESERVE

DESIGNING STRUCTURES IN EXPANSIVE CLAY

Best Management Practices for Coal Ash Storage Facilities

Post Construction Stormwater Management Checklist Program

PUBLIC WORKS DESIGN, SPECIFICATIONS & PROCEDURES MANUAL LINEAR INFRASTRUCTURE

The Homeowner s Building Application Checklist for Constructing a Residential Sundeck

ATTACHMENT 8: Quality Assurance Hydrogeologic Characterization of the Eastern Turlock Subbasin

TEXAS: SAN ANTONIO San Antonio Protects Edwards Aquifer

D R A F T. Best Management Practices Plan (Surface Water, Sediment & Erosion Control) West Carleton Environmental Centre. May 2014

BEACH NOURISHMENT COMBINED WITH SIC VERTICAL DRAIN IN MALAYSIA.

Ground-Water-Level Monitoring and the Importance of Long-Term Water-Level Data U.S. Geological Survey Circular 1217

720 Contour Grading. General. References. Resources. Definitions

Applying a circular load. Immediate and consolidation settlement. Deformed contours. Query points and query lines. Graph query.

Map Patterns and Finding the Strike and Dip from a Mapped Outcrop of a Planar Surface

Vapor Phase Transport as a Groundwater Contamination Process at Arid Landfill Sites

CHAPTER: 6 FLOW OF WATER THROUGH SOILS

Flood risk assessment through a detailed 1D/2D coupled model

GROUNDWATER FLOW NETS Graphical Solutions to the Flow Equations. One family of curves are flow lines Another family of curves are equipotential lines

GROUNDWATER FLOW AND CONTAMINANT TRANSPORT MODELING NIAGARA FALLS STORAGE SITE LEWISTON, NEW YORK

GUIDE TO SETTLEMENT OF CANTERBURY FLAT LAND CLAIMS

SLOPE AND TOPOGRAPHY

EARS 5 Problem Set #3 Should I invest in flood insurance? Handed out Friday 1 August Due Friday 8 August

LYNDE CREEK WATERSHED EXISTING CONDITIONS REPORT CHAPTER 12 - STORMWATER MANAGEMENT

1 Mobilisation and demobilisation 1 Deep boring sum 2 Cone penetration tests sum 3 Miscellenous tests sum

Appendix B. Kensington Project Tailings Storage Facility Consolidation Testing & Modeling

Transcription:

12000 10000 Total Settlement (mm) 8000 6000 4000 2000 0 0 5 10 15 20 25 30 Landfill Thickness (m) CALCULATED RANGE OF TOTAL SETTLEMENT TOTAL SETTLEMENT VERSUS LANDFILL THICKNESS - 100 YEARS Project No. 12-1125-0045 Drawn: CK Date: Nov. 2013 Checked: PLE Review: PAS Figure 11-6

HYDRAULIC HEAD PROFILES GENERATED BASED ON SETTLE-3D MODEL RESULTS AND OBSERVED VERTICAL GRADIENTS SETTLE-3D MODEL ACCOUNTS FOR LEACHATE COLLECTION SYSTEM AT 0.3 METRES DEPTH AND ALLOWS DRAINAGE OF THE UPPER CLAY THROUGH THE SILTY LAYER Hydraulic Head Development During Consolidation No. 12-1125-0045 DESIGN GIS MIB -- CHECK PLE REVIEW PAS Nov. 2013 -- PHASE No. 4500 SCALE AS SHOWN REV.0 FIGURE 12-1

BEARBROOK CREEK BEAR RIVER MUNICIPAL DRAIN BEDROCK RIDGE CASTOR RIVER MODEL DOMAIN GOLDER ASSOCIATES LTD. REPORT LAND INFORMATION ONTARIO (LIO) DATA PRODUCED BY GOLDER ASSOCIATES LTD. UNDER LICENSE FROM ONTARIO MINISTRY OF NATURAL RESOURCES, QUEENS PRINTER 2011. ION: TRANSVERSE MERCATOR DATUM: NAD 83 COORDINATE SYSTEM: UTM ZONE 18 3-D Numerical Groundwater Model Domain No. 12-1125-0045 DESIGN MIB Nov. 2013 GIS -- -- CHECK PLE REVIEW PAS PHASE No. 4500 SCALE AS SHOWN REV.0 FIGURE 12-2

BEARBROOK CREEK REGIMBALD MUNICIPAL DRAIN BEAR RIVER MUNICIPAL DRAIN SIMPSON MUNICIPAL DRAIN DD2 BEDROCK RIDGE CASTOR RIVER MODEL DOMAIN SPECIFIED HEAD OR SEEPAGE BOUNDARY NO FLOW BOUNDARY GOLDER ASSOCIATES LTD. REPORT LAND INFORMATION ONTARIO (LIO) DATA PRODUCED BY GOLDER ASSOCIATES LTD. UNDER LICENSE FROM ONTARIO MINISTRY OF NATURAL RESOURCES, QUEENS PRINTER 2011. ION: TRANSVERSE MERCATOR DATUM: NAD 83 COORDINATE SYSTEM: UTM ZONE 18 Boundary Conditions 3-D Numerical Groundwater Model No. 12-1125-0045 DESIGN MIB Nov. 2013 GIS -- -- CHECK PLE REVIEW PAS PHASE No. 4500 SCALE AS SHOWN REV.0 FIGURE 12-3

A A PROPERTY BOUNDARIES WEATHERED CLAY SILTY LAYER 10 X Vertical Exaggeration CROSS-SECTION A-A Scale as Shown Unit SUMMARY OF HYDRAULIC PARAMETERS Horizontal Hydraulic Conductivity (m/sec) Anisotropy (K H :K V ) Specific Storage (m -1 ) Specific Yield (-) Surficial Silty Sand 2.0 x 10-5 1:1 2.0 x 10-4 0.2 Weathered Clay 1.0 x 10-7 10:1 2.0 x 10-3 0.05 Unweathered Clay 1.0 x 10-8 10:1 2.0 x 10-3 0.05 8.0 x 10-7 1:1 2.0 x 10-4 0.1 Glacial Till 1.5 x 10-6 1:1 2.0 x 10-4 0.1 Queenston Shale Bedrock Formation 5.5 x 10-7 1:1 3.0 x 10-6 0.01 Carlsbad Bedrock Formation 7.0 x 10-7 1:1 3.0 x 10-6 0.01 MODEL DOMAIN SURFICIAL SILTY SAND SILTY CLAY GLACIAL TILL CARLSBAD BEDROCK FORMATION LAND INFORMATION ONTARIO (LIO) DATA PRODUCED BY GOLDER ASSOCIATES LTD. UNDER LICENSE FROM ONTARIO MINISTRY OF NATURAL RESOURCES, QUEENS PRINTER 2011. ION: TRANSVERSE MERCATOR DATUM: NAD 83 COORDINATE SYSTEM: UTM ZONE 18 PLAN VIEW (SLICE 1) Scale as Shown Hydraulic Conductivity Distribution 3-D Numerical Groundwater Model Ottawa, Ontario No. 12-1125-0045 SCALE AS SHOWN REV.0 DESIGN GIS MIB Nov. 2013 CHECK REVIEW PLE PAS FIGURE 12-4

CALIBRATION STATISTICS Abs. Mean Error (m) 2.16 Normalized RMS 12.0 % Residual Mean Error (m) 3.11 CALIBRATION DATA MODEL DOMAIN CALIBRATION DATA CRRRC SITE ONLY 75 GROUNDWATER ELEVATION (metres ABOVE SEA LEVEL) (2 metre contour interval) INTERPRETED GROUNDWATER FLOW DIRECTION MONITORING LOCATION (CURRENT STUDY) WATER WELL LOCATION LAND INFORMATION ONTARIO (LIO) DATA PRODUCED BY GOLDER ASSOCIATES LTD. UNDER LICENSE FROM ONTARIO MINISTRY OF NATURAL RESOURCES, QUEENS PRINTER 2011. ION: TRANSVERSE MERCATOR DATUM: NAD 83 COORDINATE SYSTEM: UTM ZONE 18 Comparison of Simulated and Measured Groundwater Elevations Ottawa, Ontario No. 12-1125-0045 SCALE AS SHOWN REV.0 DESIGN GIS MIB Nov. 2013 CHECK REVIEW PLE PAS FIGURE 12-5

A A WEATHERED CLAY SILTY LAYER 5 X Vertical Exaggeration CROSS-SECTION A-A Scale as Shown SURFICIAL SILTY SAND SILTY CLAY GLACIAL TILL CARLSBAD BEDROCK FORMATION SUMMARY OF HYDRAULIC PARAMETERS WASTE Unit Horizontal Hydraulic Conductivity (m/sec) Anisotropy (K H :K V ) DRAINAGE LAYER GCL LAND INFORMATION ONTARIO (LIO) DATA PRODUCED BY GOLDER ASSOCIATES LTD. UNDER LICENSE FROM ONTARIO MINISTRY OF NATURAL RESOURCES, QUEENS PRINTER 2011. ION: TRANSVERSE MERCATOR DATUM: NAD 83 COORDINATE SYSTEM: UTM ZONE 18 Simulated Post-Development Cross-Section No. 12-1125-0045 SCALE AS SHOWN REV.0 DESIGN MIB Nov. 2013 GIS KEY MAP CHECK PLE FIGURE 12-6 Scale as Shown Ottawa, Ontario REVIEW PAS Specific Storage (m -1 ) Specific Yield (-) Surficial Silty Sand 2.0 x 10-5 1:1 2.0 x 10-4 0.2 Weathered Clay 1.0 x 10-7 10:1 2.0 x 10-3 0.05 Unweathered Clay 1.0 x 10-8 10:1 2.0 x 10-3 0.05 8.0 x 10-7 1:1 2.0 x 10-4 0.1 Glacial Till 1.5 x 10-6 1:1 2.0 x 10-4 0.1 Queenston Shale Bedrock Formation 5.5 x 10-7 1:1 3.0 x 10-6 0.01 Carlsbad Bedrock Formation 7.0 x 10-7 1:1 3.0 x 10-6 0.01 Waste (Operations) 1.0 x 10-5 1:1 2.0 x 10-3 0.1 Waste (Closure) 1.2 x 10-5 1:1 2.0 x 10-3 0.1 Drainage Layer 1.0 x 10-4 1:1 2.0 x 10-4 0.3 GCL 3.0 x 10-10 1:1 2.0 x 10-3 0.0001 Berm 1.0 x 10-7 1:1 2.0 x 10-3 0.05

A A WEATHERED CLAY SILTY LAYER 5 X Vertical Exaggeration CROSS-SECTION A-A Scale as Shown SURFICIAL SILTY SAND SILTY CLAY GLACIAL TILL CARLSBAD BEDROCK FORMATION KEY MAP Scale as Shown Unit SUMMARY OF HYDRAULIC PARAMETERS Horizontal Hydraulic Conductivity (m/sec) Anisotropy (K H :K V ) Specific Storage (m -1 ) Specific Yield (-) Surficial Silty Sand 2.0 x 10-5 1:1 2.0 x 10-4 0.2 Weathered Clay 1.0 x 10-7 100:1 (1) 2.0 x 10-3 0.05 Unweathered Clay 1.0 x 10-8 100:1 (1) 2.0 x 10-3 0.05 8.0 x 10-7 1:1 2.0 x 10-4 0.1 Glacial Till 1.5 x 10-6 1:1 2.0 x 10-4 0.1 Queenston Shale Bedrock Formation 5.5 x 10-7 1:1 3.0 x 10-6 0.01 Carlsbad Bedrock Formation 7.0 x 10-7 1:1 3.0 x 10-6 0.01 Waste (Operations) 1.0 x 10-5 1:1 2.0 x 10-3 0.1 Waste (Closure) 1.2 x 10-5 1:1 2.0 x 10-3 0.1 Drainage Layer 1.0 x 10-4 1:1 2.0 x 10-4 0.3 GCL 3.0 x 10-10 1:1 2.0 x 10-3 0.0001 Berm 1.0 x 10-7 1:1 2.0 x 10-3 0.05 1: 100:1 Anisotropy applied to consolidated clay, 10:1 Anisotropy applied to unconsolidated clay WASTE DRAINAGE LAYER GCL LAND INFORMATION ONTARIO (LIO) DATA PRODUCED BY GOLDER ASSOCIATES LTD. UNDER LICENSE FROM ONTARIO MINISTRY OF NATURAL RESOURCES, QUEENS PRINTER 2011. ION: TRANSVERSE MERCATOR DATUM: NAD 83 COORDINATE SYSTEM: UTM ZONE 18 Simulated Post-Development Post-Settlement Cross-Section Ottawa, Ontario No. 12-1125-0045 SCALE AS SHOWN REV.0 DESIGN GIS MIB Nov. 2013 CHECK REVIEW PLE PAS FIGURE 12-7

MODEL DOMAIN GOLDER ASSOCIATES LTD. REPORT LAND INFORMATION ONTARIO (LIO) DATA PRODUCED BY GOLDER ASSOCIATES LTD. UNDER LICENSE FROM ONTARIO MINISTRY OF NATURAL RESOURCES, QUEENS PRINTER 2011. ION: TRANSVERSE MERCATOR DATUM: NAD 83 COORDINATE SYSTEM: UTM ZONE 18 Simulated Pre-Failure Groundwater Drawdown (PS1: pre-settlement) No. 12-1125-0045 DESIGN MIB Nov. 2013 GIS -- -- CHECK PLE REVIEW PAS PHASE No. 4500 SCALE AS SHOWN REV.0 FIGURE 12-8

MODEL DOMAIN GOLDER ASSOCIATES LTD. REPORT LAND INFORMATION ONTARIO (LIO) DATA PRODUCED BY GOLDER ASSOCIATES LTD. UNDER LICENSE FROM ONTARIO MINISTRY OF NATURAL RESOURCES, QUEENS PRINTER 2011. ION: TRANSVERSE MERCATOR DATUM: NAD 83 COORDINATE SYSTEM: UTM ZONE 18 Simulated Pre-Failure Groundwater Drawdown (PS2: post-settlement) No. 12-1125-0045 DESIGN MIB Nov. 2013 GIS -- -- CHECK PLE REVIEW PAS PHASE No. 4500 SCALE AS SHOWN REV.0 FIGURE 12-9

CALIBRATED PRE-DEVELOPMENT CONDITIONS SLICE 3: SURFICIAL SILTY SAND AND CLAY STEADY-STATE POST-FAILURE CONDITIONS SLICE 3: SURFICIAL SILTY SAND AND CLAY LAND INFORMATION ONTARIO (LIO) DATA PRODUCED BY GOLDER ASSOCIATES LTD. UNDER LICENSE FROM ONTARIO MINISTRY OF NATURAL RESOURCES, QUEENS PRINTER 2011. ION: TRANSVERSE MERCATOR DATUM: NAD 83 COORDINATE SYSTEM: UTM ZONE 18 75 GROUNDWATER ELEVATION (metres ABOVE SEA LEVEL) (1 metre contour interval) INTERPRETED GROUNDWATER FLOW DIRECTION Simulated Post-Failure Groundwater Elevation (PS3: post-settlement) Ottawa, Ontario No. 12-1125-0045 SCALE AS SHOWN REV.0 DESIGN GIS MIB Nov. 2013 CHECK REVIEW PLE PAS FIGURE 12-10

SLICE 11: SILTY LAYER SLICE 16: GLACIAL TILL / BEDROCK CONTACT LAND INFORMATION ONTARIO (LIO) DATA PRODUCED BY GOLDER ASSOCIATES LTD. UNDER LICENSE FROM ONTARIO MINISTRY OF NATURAL RESOURCES, QUEENS PRINTER 2011. ION: TRANSVERSE MERCATOR DATUM: NAD 83 COORDINATE SYSTEM: UTM ZONE 18 75 SIMULATED HYDRAULIC HEAD (metres) (one metre contour interval) INTERPRETED GROUNDWATER FLOW DIRECTION Simulated Post-Failure Hydraulic Head (PS3: post-settlement) Ottawa, Ontario No. 12-1125-0045 SCALE AS SHOWN REV.0 DESIGN GIS MIB Nov. 2013 CHECK REVIEW PLE PAS FIGURE 12-11

18 16 14 12 10 8 6 4 2 Boron 1600 1400 1200 1000 800 600 400 200 Chloride Background ODWQS 6.E-02 5.E-02 4.E-02 3.E-02 2.E-02 1.E-02 Cadmium 0 0 0.E+00 0 1000 2000 3000 4000 5000 6000 7000 7.E-01 6.E-01 5.E-01 4.E-01 3.E-01 2.E-01 1.E-01 Lead 3.E-02 2.E-02 2.E-02 1.E-02 5.E-03 Benzene 1.E-02 1.E-02 8.E-03 6.E-03 4.E-03 2.E-03 1,4 - Dichlorobenzene 0.E+00 0.E+00 0.E+00 3.5 3 2.5 2 1.5 1 0.5 0 Dichloromethane 1.E+00 1.E+00 8.E-01 6.E-01 4.E-01 2.E-01 0.E+00 Toluene 4.E-02 3.E-02 3.E-02 2.E-02 2.E-02 1.E-02 5.E-03 0.E+00 Vinyl Chloride Results of Contaminant Transport Model Ottawa, Ontario No. 12-1125-0045 SCALE AS SHOWN REV.0 DESIGN GIS MKF MKF Nov. 23/2013 Nov. 23/2013 CHECK REVIEW PLE MKF FIGURE 12-13