1 Vacuum Consolidation Dewatering in Sediment Remediation Anatomy of contaminated sediment volume Vacuum Consolidation Dewatering (VCD) Underwater dewatering for volume reduction. VCD application modes and advantages Daekyoo Hwang, Ph.D., P.E
2 Nature of Contaminated Sediment Recent deposits Settled in water Contaminated Sediment (organic silt/clay) Very loose Solids vol << Water vol Remove water Volume reduction Key to sediment remediation (Not appreciated in current practice) 2
3 Anatomy of Sediment Volume Env l engineers - Solids content, 35% of total weight Solids = 35g (35%) Water = 65g (65%) Geotech engineers - Water content,186% of solids weight Solids = 35g (100%) Water = 65g (186%) Geologists - Porosity, 82% (for Gs = 2.5) S = 18%) Water = 82 % (Total vol = 79 ml) Porosity shows how much volume reduction is feasible for sediment remediation. 3
4 Vacuum Consolidation Dewatering Underwater sediment consolidation (dewatering) using horizontal drains and vacuum loading Settled sediment Horizontal drain Vacuum pump - Overconsolidation by vacuum - Used for 25 years in Japan and Europe 4
5 Horizontal Drains Wick Drain Detail Tube Drain Roll Wick Drain Roll 5
6 Horizontal Drain Installation Japanese Way from Chiba, et. al, 1990 To reduce sediment volume Belgian Way from Van Impe, et. al, 2001 To secure shipping channel 6
7 Magnitude of Vacuum Loading Vacuum loading = Atmospheric pressure 14.7 psi (2,117 psf) Field vacuum 70% effective = 2,117 x 0.7 = 1,482 psf Pressure from 1 foot of loose, moist sand = 100 psf Sediment application (submerged) ( ) = 37.6 psf Field vacuum is equivalent to 1,482/37.6 = 39 ft of submerged sand load! Compare with typical 2.5 ft of in-situ capping load. Other vacuum loading advantages No heavy truck traffic for fill loading/removal No extended time for fill loading/removal Inherent 100% overconsolidation 7
8 Magnitude of Settlement by VCD Solids content of organic silt/clay sediment 35% Porosity = 82% 18% solids + 82% water After VCD, water content of soft clay = 40% Porosity = 50% 50% solids + 50% water S = 18 ml Water = 82 ml S = 18 ml W = 18 ml Water = 64 ml removed Post-VCD sediment volume = 36% of the original volume Field performance may be 40 ~ 45% VCD Settlement ~ 50% of sediment thickness 8
9 Application 1 In-Situ Capping Replacing Off-Site Disposal Water depth In-situ capping is acceptable. In-situ capping No loss of water depth In-situ capping Loss of water depth is not acceptable. Dredging + off-site disposal + capping $$$$$ VCD + In-situ capping No dredging, no off-site disposal $ Plus, low disturbance, leachate removal, overconsolidation 9
10 Application 2 On-site Disposal without Land Space Dam Disposal cell Contaminated Sediment Area A, volume V Enhanced cap 0.05 ~ 0.08A Disposal vol 0.35 ~ 0.5V Buffer cover from cell excavation Makes the target sediment disappear (almost) No loss of water depth + small footprint Cost saving from no off-site disposal $$$$ $ 10
11 Application 3 High Cost Capping vs. VCD Large capping area VCD Problem - Performance questions multilayer cap high unit cost high total cost VCD solution Enhanced performance (vacuum OC) Small footprint (5~8% ), low cost Cost saving from small footprint 11
12 Application 4 - Waterfront Development Traditional Method Heavy retaining walls Long sequential activities Large settlement, large footprint Large surcharge fill and removal VCD Cost Saving Light retaining structures Parallel activities Smaller disposal area Smaller surcharge fill/removal Retaining structure Surcharge Sediment consolidation with wick drains and surcharge Sediment consolidation with horizontal drains and vacuum Cost saving from no import of surcharge 12
13 Application 5 On-site Treatment In-situ treatment performance - Heterogeneous, thin, and large area - Questions of reagent delivery/contact - Problems of repeat treatment VCD solves all these problems - Homogenized sediment during dredging - Uniform delivery via horizontal drains - Extraction, injection and recirculation - Fully contained, long-term operation Extraction lines Injection lines Injection pump Extraction pump Cost saving from no off-site disposal by treatment 13
14 VCD Summary Only underwater dewatering and volume reduction method. Can eliminate most off-site disposal remedies by replacing with in-situ/on-site remedies. Enhances the performance of in-situ/on-site remedies. - Overconsolidation and minimal O/M - Leachate removal and low disturbance - Small footprints and minimal truck traffic Reduce the cost of in-situ/on-site remedies. Primary cost saving Secondary cost saving A New Sediment Solution Platform - Creative, versatile, and cost-effective. 14
Methods for Land Reclamation using Soft Soil and Waste
NTU-JTC I3C Seminar Methods for Land Reclamation using Soft Soil and Waste Chu Jian 2 August 2012 1 Outline Part 1. Overview of land reclamation methods Part 2. Methods for land reclamation using soft
Best Management Practices for Coal Ash Storage Facilities
2009 World of Coal Ash (WOCA) Conference - May 4-7, 2009 in Lexington, KY, USA http://www.flyash.info/ Best Management Practices for Coal Ash Storage Facilities Presented by: Christopher D. Hardin, PE
consulting engineers and scientists
consulting engineers and scientists Incorporating Sustainable Principles into Cleanups June 2014 Presented by: Rich Truax, PE GEI Consultants, 650 Personnel Nationwide Rich Truax, P.E. Sr. Program Manager
EXAMPLE 1 DESIGN OF CANTILEVERED WALL, GRANULAR SOIL
EXAMPLE DESIGN OF CANTILEVERED WALL, GRANULAR SOIL A sheet pile wall is required to support a 2 excavation. The soil is uniform as shown in the figure. To take into account the friction between the wall
TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL
TECHNICAL SPECIFICATIONS CEMENT-BENTONITE SLURRY TRENCH CUTOFF WALL SCOPE This section of the specifications includes requirements for the Slurry Trench Cutoff Wall and related work as indicated on the
Operations and Maintenance Guidelines for Coal Ash Landfills Coal Ash Landfills are NOT the Same as Subtitle D Solid Waste Landfills
Operations and Maintenance Guidelines for Coal Ash Landfills Coal Ash Landfills are NOT the Same as Subtitle D Solid Waste Landfills 1. INTRODUCTION: 2011 World of Coal Ash (WOCA) Conference May 9-12,
Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems
Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems The septic tank-absorption field sewage treatment system is composed of two major elements; the
FUNDAMENTALS OF CONSOLIDATION
FUNDAMENTALS OF CONSOLIDATION SAND (Vertical Stress Increase) CLAY CONSOLIDATION: Volume change in saturated soils caused by the expulsion of pore water from loading. Saturated Soils: causes u to increase
Potential Dredged Material Storage Facilities and Their Impact on Public Processing Facility Economic Modeling Summary Report
Port of New York and New Jersey Feasibility Analysis for a Dredged Material Public Processing Facility Potential Dredged Material Storage Facilities and Their Impact on Public Processing Facility Economic
SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT
SPECIFICATION FOR DYNAMIC CONSOLIDATION / DYNAMIC REPLACEMENT 1.0 SOIL IMPROVEMENT 1.1 General Soil Investigation Information are provided in Part B1 annex as a guide to the Contractor for his consideration
CREATING A GREEN FUTURE THROUGH WATER REMEDIATION
CREATING A GREEN FUTURE THROUGH WATER REMEDIATION Cornerstone Principles for Conducting Business Active Treatment Systems, Inc. goes to great lengths to instill in every employee the importance of ethical
Tremie Concrete CM 420 CM 420 CM 420 CM 420. Temporary Structures. Tremie Concrete
Tremie Concrete Underwater concrete plays an important role in the construction of offshore structures. It may be used to tie together various elements in composite action (i.e., to tie piling to the footing).
Estimation of Compression Properties of Clayey Soils Salt Lake Valley, Utah
Estimation of Compression Properties of Clayey Soils Salt Lake Valley, Utah Report Prepared for the Utah Department of Transportation Research Division by Steven F. Bartlett, PhD. P.E. Assistant Professor
State of Rhode Island Department of Environmental Management Division of Site Remediation. Policy Memo 95-01
State of Rhode Island Department of Environmental Management Division of Site Remediation Policy Memo 95-01 Guidelines for the Management of Investigation Derived Wastes 1.0 Purpose The purpose of this
Liner system design for tailings impoundments and heap leach pads
Liner system design for tailings impoundments and heap leach pads John F. Lupo, Ph.D., P.E. AMEC E&E TAILINGS & MINE WASTE 08, VAIL Liner Systems Liner systems Environmental containment of process solutions
PVC PIPE PERFORMANCE FACTORS
PVC PIPE PERFORMANCE FACTORS PVC pipe, like all flexible pipe products, is very dependent on the surrounding soil for its structural capacity, in addition, the pipe material must have sufficient inherent
Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation
Ultraviolet (UV) Light Cured Fiberglass Reinforced Cured-In-Place Pipe (CIPP) It is not just for sanitary sewer rehabilitation Dan Broderick Director of Pipeline Rehabilitation ACHEN-GARDNER ENGINEERING,
APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY
ALAMEDA POINT MASTER INFRASTRUCTURE PLAN March 31, 2014 APPENDICES G) DETAILED BACKBONE INFRASTRUCTURE CONSTRUCTION COST ESTIMATE SUMMARY Carlson, Barbee & Gibson, Inc. Backbone Infrastructure Engineer
Strength Determination of "Tooth-Paste" Like Sand and Gravel Washing Fines Using DMT
Strength Determination of "Tooth-Paste" Like Sand and Gravel Washing Fines Using DMT David L. Knott, P.E. and James M. Sheahan, P.E. HDR Engineering, Inc. 3 Gateway Center Pittsburgh, PA 15222-1074 Phone:
CCR Fugitive Dust Control Plan CPS Energy Calaveras Power Station San Antonio, Texas
CCR Fugitive Dust Control Plan CPS Energy Calaveras Power Station San Antonio, Texas October 15, 2015 The world's leading sustainability consultancy CPS Energy CCR Fugitive Dust Control Plan Calaveras
GEOTECHNICAL ENGINEERING FORMULAS. A handy reference for use in geotechnical analysis and design
GEOTECHNICAL ENGINEERING FORMULAS A handy reference for use in geotechnical analysis and design TABLE OF CONTENTS Page 1. SOIL CLASSIFICATION...3 1.1 USCS: Unified Soil Classification System...3 1.1.1
SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING
812-1 SCOPE OF WORK: SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING a. The Contractor shall provide all labor, materials, equipment, and incidentals necessary to perform the cleaning of sewer lines,
Embankment Consolidation
Embankment Consolidation 36-1 Embankment Consolidation In this tutorial, RS2 is used for a coupled analysis of a road embankment subject to loading from typical daily traffic. Model Start the RS2 9.0 Model
SMALL SCALE DREDGING AN INTRODUCTION IT S IN OUR NATURE
SMALL SCALE DREDGING AN INTRODUCTION IT S IN OUR NATURE TABLE OF CONTENTS 1. INTRODUCTION: SMALL-SCALE DREDGING.. 2 2. CRITERIA FOR SELECTING DREDGING TECHNIQUE.. 3 3. DREDGING TECHNIQUES 5 4. TRANSPORT
STORM DRAIN PIPE MAINTENANCE. a. Develop standard operating procedures for maintaining storm drain pipes.
STORM DRAIN PIPE MAINTENANCE a. Develop standard operating procedures for maintaining storm drain pipes. 2. PROCESS Storm drain pipes are to be maintained per the Storm Water System Maintenance Plan schedule.
14.330 SOIL MECHANICS Assignment #4: Soil Permeability.
Geotechnical Engineering Research Laboratory One University Avenue Lowell, Massachusetts 01854 Edward L. Hajduk, D.Eng, PE Lecturer PA105D Tel: (978) 94 2621 Fax: (978) 94 052 e mail: [email protected]
Type of Sewer Systems. Solomon Seyoum
Type of Sewer Systems Solomon Seyoum 0 Learning objectives Upon completion of this lecture, the participants will be able to differentiate between types of sewer systems and discuss different aspects of
Interim Summary Report for the Treatment Facility D Helipad In-Situ Bioremediation Treatability Test
Interim Summary Report for the Treatment Facility D Helipad In-Situ Bioremediation Treatability Test June 15, 2012 Environmental Restoration Department This work was performed under the auspices of the
SECTION 1 GENERAL REQUIREMENTS
Page 1 of 6 SECTION 1 GENERAL REQUIREMENTS 1. SCOPE OF WORK: The work to be performed under the provisions of these documents and the contract based thereon includes furnishing all labor, equipment, materials,
Period #16: Soil Compressibility and Consolidation (II)
Period #16: Soil Compressibility and Consolidation (II) A. Review and Motivation (1) Review: In most soils, changes in total volume are associated with reductions in void volume. The volume change of the
REDUCING INK AND SOLVENT USE IN ENCLOSED FLEXOGRAPHIC INKING SYSTEMS
1 REDUCING INK AND SOLVENT USE IN ENCLOSED FLEXOGRAPHIC INKING SYSTEMS Introduction The objective of the flexographic printing process is to transfer solid color, or pigment, while suspended in a volatile
U. S. Army Corps of Engineers Ground Water Extraction System Subsurface Performance Checklist
U. S. Army Corps of Engineers Ground Water Extraction System Subsurface Performance Checklist Installation Name Site Name / I.D. Evaluation Team Site Visit Date This checklist is meant to aid in evaluating
Environmental Remediation Examples and Remediation Strategic Planning
Environmental Remediation Examples and Remediation Strategic Planning Yasuo Onishi ([email protected]) October 16, 2011 Pacific Northwest National Laboratory, and Washington State University, Civil
Sediment Management Standards Cleanup Action Decision: Duwamish/Diagonal CSO/SD
FINAL Sediment Management Standards Cleanup Action Decision: Duwamish/Diagonal CSO/SD July 25, 2002 Prepared by Washington State Department of Ecology Northwest Regional Office, Toxics Cleanup Program
oil liquid water water liquid Answer, Key Homework 2 David McIntyre 1
Answer, Key Homework 2 David McIntyre 1 This print-out should have 14 questions, check that it is complete. Multiple-choice questions may continue on the next column or page: find all choices before making
AGREGADOS RECICLADOS MITOS Y REALIDADES
The Production and Use of Recycled Concrete in the USA Thomas Van Dam, Ph.D., P.E., FACI Principal Engineer CTL Group Introduction In the United States, concrete is the most commonly used recycled material
Earth Pressure and Retaining Wall Basics for Non-Geotechnical Engineers
PDHonline Course C155 (2 PDH) Earth Pressure and Retaining Wall Basics for Non-Geotechnical Engineers Instructor: Richard P. Weber, P.E. 2012 PDH Online PDH Center 5272 Meadow Estates Drive Fairfax, VA
Index. protection. excavated drop inlet protection (Temporary) 6.50.1 6.51.1. Block and gravel inlet Protection (Temporary) 6.52.1
6 Index inlet protection excavated drop inlet protection (Temporary) 6.50.1 HARDWARE CLOTH AND GRAVEL INLET PROTECTION Block and gravel inlet Protection (Temporary) sod drop inlet protection ROCK DOUGHNUT
Specification Guidelines: Allan Block Modular Retaining Wall Systems
Specification Guidelines: Allan Block Modular Retaining Wall Systems The following specifications provide Allan Block Corporation's typical requirements and recommendations. At the engineer of record's
INTRODUCTION TO SOIL MODULI. Jean-Louis BRIAUD 1
INTRODUCTION TO SOIL MODULI By Jean-Louis BRIAUD 1 The modulus of a soil is one of the most difficult soil parameters to estimate because it depends on so many factors. Therefore when one says for example:
PILE FOUNDATIONS FM 5-134
C H A P T E R 6 PILE FOUNDATIONS Section I. GROUP BEHAVIOR 6-1. Group action. Piles are most effective when combined in groups or clusters. Combining piles in a group complicates analysis since the characteristics
Use and Application of Piezocone Penetration Testing in Presumpscot Formation
Use and Application of Piezocone Penetration Testing in Presumpscot Formation Craig W. Coolidge, P.E. Summit Geoengineering Services, Rockland, Maine ABSTRACT: This paper examines the advantages and limitations
SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section 02250.
02150-1 of 6 SECTION 02150 REMOVAL OR ABANDONMENT OF EXISTING 02150.01 GENERAL A. Description Removal or abandonment of existing utilities and underground structures shall include, but not necessarily
THE COMPETENT PERSON & SOIL TESTING. This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation.
THE COMPETENT PERSON & SOIL TESTING This easy-to-use Leader s Guide is provided to assist in conducting a successful presentation. Featured are: INTRODUCTION: A brief description of the program and the
INFORMATION SHEET ORDER NO. R5-2011-XXXX TRIANGLE ROCK PRODUCTS, INC. FLORIN ROAD AGGREGATE PLANT SACRAMENTO COUNTY
ORDER NO. R5-2011-XXXX INFORMATION SHEET Background Triangle Rock, Inc. (Discharger) submitted a Report of Waste Discharge (RWD) on 23 August 2010. The Discharger is expanding the mining operations at
MANURE COLLECTION AND TRANSFER SYSTEMS IN LIVESTOCK OPERATIONS WITH DIGESTERS. A. C. Lenkaitis GEA Farm Technologies Inc. (Houle USA), Naperville, IL
MANURE COLLECTION AND TRANSFER SYSTEMS IN LIVESTOCK OPERATIONS WITH DIGESTERS A. C. Lenkaitis GEA Farm Technologies Inc. (Houle USA), Naperville, IL INTRODUCTION Manure collection systems are influenced
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements
City of Paso Robles Community Development Department Construction Site Storm Water Quality Requirements Overview of the City s Construction Storm Water Program The City of Paso Robles is committed to protecting
PNWS-AWWA PRESENTATION May 9, 2013 Spokane, Washington. Water Operations Stormwater Best Management Practices
PNWS-AWWA PRESENTATION May 9, 2013 Spokane, Washington Water Operations Stormwater Best Management Practices Presenters David Owens- Senior Water Pipe Worker; Certified Erosion and Sediment Control Lead
812-3 LIMITATIONS: b. No fire hydrant shall be obstructed or used when there is a fire in the area.
812-1 SCOPE OF WORK: SECTION 812 SEWER LINE, MANHOLE AND WET WELL CLEANING a. The Contractor shall provide all labor, materials, equipment, and incidentals necessary to perform the cleaning of sewer lines,
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION
STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION Design Criteria Drainage Area The drainage area for storm drain inlets shall not exceed one acre. The crest elevations of these practices shall
Section 402. STORM SEWERS
402.02 Section 402. STORM SEWERS 402.01. Description. This work consists of constructing storm sewers of the size and class required, including excavation, bedding, and backfill. 402.02. Materials. Provide
Table 4.9 Storm Drain Inlet Protetion Applicable for
BMP C220: Storm Drain Inlet Protection Purpose To prevent coarse sediment from entering drainage systems prior to permanent stabilization of the disturbed area. Conditions of Use Type of Inlet Protection
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can
Construction Site Inspection Checklist for OHC000004 By making use of some simple Best Management Practices (BMPs) a construction site operator can do his or her share to protect Ohio's water resources
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS
State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS While its use is not required, this checklist has been prepared to provide the field inspector a summary
The Most Advanced Name in Drainage Systems. Geotextile Products
The Most Advanced Name in Drainage Systems Geotextile Products ADS MEETs YOUR Geotextile NEEDS Advanced Drainage Systems, Inc. (ADS) single wall and N12 dual wall pipe have become the industry standard
San Mateo County Environmental Health Characterization and Reuse of Petroleum Hydrocarbon Impacted Soil
INTRODUCTION San Mateo County Environmental Health Characterization and Reuse of Petroleum Hydrocarbon Impacted Soil This guidance relates to the on-site reuse of non-hazardous petroleum hydrocarbon impacted
Design and Construction of Auger Cast Piles
Design and Construction of Auger Cast Piles 101 th Annual Road School 2015 3/11/2015 Malek Smadi, Ph.D., P.E. Principal Engineer - GEOTILL - Fishers, IN [email protected] - www.geotill.com CONTENTS 1.
Well gauging results LNAPL in Benzol Processing Area
Well gauging results LNAPL in Benzol Processing Area 3.59 ft 0.62 ft 4.64 ft Context Scope & Methods Onshore Results Offshore Results Summary & Conclusions 13 Page 1 of 4 Underground Storage Tanks Last
Dredging in the Port of Antwerp: Ing. Agnes Heylen Environment Manager Antwerp Port Authority
Dredging in the Port of Antwerp: Ing. Agnes Heylen Environment Manager Antwerp Port Authority Port of Antwerp - intro North west Europe Distance to the sea: approximately 100 km Port of Antwerp - intro
Risk Management Procedure For The Derivation and Use Of Soil Exposure Point Concentrations For Unrestricted Use Determinations
Risk Management Procedure For The Derivation and Use Of Soil Exposure Point Concentrations For Unrestricted Use Determinations Hazardous Materials and Waste Management Division (303) 692-3300 First Edition
load on the soil. For this article s examples, load bearing values given by the following table will be assumed.
How Many Piers? By Gary Collins, P.E. A clear-cut guide to helical pier spacing Introduction Helical pier spacing is not an exact science. How many does it take to support a structure adequately or repair
Standard Operating Procedures 4ft Muscle Wall
Standard Operating Procedures 4ft Muscle Wall Primary Containment Standard Operating Procedures Page 2 of 11 Table of Contents Page 4 Page 3 Page 7 Page 5 Page 10 Specifications Items Needed Stage 1: Liner
COST AND PERFORMANCE REPORT
COST AND PERFORMANCE REPORT Pump and Treat of Contaminated Groundwater at the United Chrome Superfund Site Corvallis, Oregon September 1998 Prepared by: SITE INFORMATION Identifying Information: United
Treatment and longevity in Norwegian soil treatment units
Treatment and longevity in Norwegian soil treatment units Nordisk konferens Små avlopp Malmø 8-9 feb 2011 Gro Bioforsk Jord og miljø Avdeling for Miljøteknologi og renseprosesser Outline: Wastewater soil
Geofoam A Light Weight Fill Alternative
Geofoam A Light Weight Fill Alternative Insulfoam A wholly owned subsidiary of Carlisle Construction Materials Headquarters in Puyallup, WA Producer of expanded polystyrene (EPS) for more than 45 years
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation
Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation Jeff R. Hill, P.E. Hayward Baker Inc. 111 W. Port Plaza Drive Suite 600 St. Louis, MO 63146 314-542-3040 [email protected]
Preliminary Foundation Evaluation Oakland Army Base Reuse Study
Preliminary Foundation Evaluation Oakland Army Base Reuse Study Oakland, California Prepared for: Kimely-Horn and Associates 555 12 th Street, Suite 1230 Oakland, California February 2006 Project No. 10991
Module 7: Hydraulic Design of Sewers and Storm Water Drains. Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains
1 P age Module 7: Hydraulic Design of Sewers and Storm Water Drains Lecture 7 : Hydraulic Design of Sewers and Storm Water Drains 2 P age 7.1 General Consideration Generally, sewers are laid at steeper
REHABILITATION METHOD FOR INCREASING FLOW VELOCITY AND REDUCING SEDIMENTATION
.asu/ North American Society for Trenchless Technology (NASTT) NO-DIG 2005 Orlando, Florida April 24-27, 2005 REHABILITATION METHOD FOR INCREASING FLOW VELOCITY AND REDUCING SEDIMENTATION Hwan-Kook Hwang
AWWA Small Systems Pipe Repair Checklist, as published in July 2008 Opflow Question of the Month
, as published in July 2008 Opflow Question of the Month Thanks to: Mike Grahek, Los Angeles Department of Water, Los Angeles, California Ahmad Havivian, Black & Veatch, Gaithersburg, Maryland David Kroon,
Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective
Value of Instrumentation Systems and Real-Time Monitoring: An Owner s Perspective FHWA NATIONAL GEOTECHNICAL PROGRAM www.fhwa.dot.gov/engineering/geotech Why Geotechnical Instrumentation? Provide warning
Emerging Technologies in Wastewater Collection Systems
Keville Enterprises Emerging Technologies in Wastewater Collection Systems Douglas McCutchen, CCM Brian Karmasin, P.E., BCEE CMAA Annual Conference Oct 2008 San Francisco, California Today s s Presentation
Basements and Deep Building Construction Policy 2014
Basements and Deep Building Construction Policy 2014 APPROVAL Council / CEO 27 October 2014 VERSION NO: Version 1.0 TRIM REF: 14/67838 REVIEW 30/10/2019 RESPONSIBLE EXECUTIVE General Manager City Assets
Remediation of Water-Based Drilling Fluids and Cleaning of Cuttings
OVERVIEW Water-Based Drilling Fluids are environmentally friendly compared with oil-based drilling fluids; however their safe disposal can still be a challenge. There are normally no hydrocarbons present,
CONSTRUCTION EQUIPMENT
Equipment is a critical resource in the execution of most construction projects. The equipment fleet may represent the largest long-term capital investment in many construction companies. Consequently,
Preventing Storm Water Pollution: What We Can Do
Preventing Storm Water Pollution: What We Can Do ~Employee Training Series~ Streets and Drainage Maintenance PREPARED IN COOPERATION WITH THE Texas Commission on Environmental Quality AND U.S. ENVIRONMENTAL
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION
COLORADO DEPARTMENT OF TRANSPORTATION STORMWATER FIELD INSPECTION REPORT - ACTIVE CONSTRUCTION (1) Project Name: (2) Project Contractor: (3) Erosion Control Supervisor/SWMP Administrator: (4) CDOT Project
Application Form - Contracting Firm
Application Form - Contracting Firm This form is for civil construction and general contracting companies to apply for membership of Civil Contractors New Zealand Company s details CCNZ Branch you want
BIOREMEDIATION: A General Outline www.idem.in.gov Mitchell E. Daniels, Jr.
TECHNICAL GUIDANCE DOCUMENT INDIANA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT BIOREMEDIATION: A General Outline www.idem.in.gov Mitchell E. Daniels, Jr. Thomas W. Easterly Governor Commissioner 100 N. Senate
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND.
SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION 623.10 CONCRETE BONDING COMPOUND. 623.10.1 Description. This work shall consist of preparing the surface,
Concrete Repair. Applications and Procedures
Concrete Repair Applications and Procedures Objectives Identify what surface preparation is needed Identify typical modes of failure and testing methods How to choose the correct material for the repair
Background. 179 million gallons saved for make-up water
Essential Expertise for Water, Energy and Air Gallatin Steel Achieves Significant eroi Savings Through the Use of Nalco Innovative Technologies Background Gallatin Steel is a mini-mill that produces steel
Trench Rescue by Buddy Martinette
Trench Rescue by Buddy Martinette SOIL TYPE AND TESTING It is imperative that rescue personnel understand soil types and testing procedures if the want to be competent at trench rescue operations. Determining
March 2006 DIVISION 3 - CW 2140-R3 TABLE OF CONTENTS
March 2006 CW 2140 - SEWER AND MANHOLE CLEANING TABLE OF CONTENTS 1. DESCRIPTION... 1 1.1 General... 1 1.2 Definitions... 1 1.3 Referenced Standard Constructions... 1 3. CONSTRUCTION METHODS... 1 3.1 High
Force Main Condition Assessment: New Technologies & Case Studies
Force Main Condition Assessment: New Technologies & Case Studies Andy Dettmer, Ph.D., P.E. CMOM Workshop August 19, 2014 2 1 Three takeaways 1. Most of your force mains are good 2. We can pinpoint the
Damage to a plant caused by construction-induced settlement
Sustain Environ Res, 22(5), 7-4 (2012) 7 Damage to a plant caused by construction-induced settlement 1, 1 2 1,3 Gordon Tung-Chin Kung, * Chih-Ta Tsai, Yu-Geng Tang and Juu-En Chang 1 Sustainable Environment
Formwork for Concrete
UNIVERSITY OF WASHINGTON DEPARTMENT OF CONSTRUCTION MANAGEMENT CM 420 TEMPORARY STRUCTURES Winter Quarter 2007 Professor Kamran M. Nemati Formwork for Concrete Horizontal Formwork Design and Formwork Design
A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.
BMP: SUBSURFACE DRAIN Definition A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. PurRoses 1. To prevent sloping soils from becoming
Settlement of Foundations on Expansive Clays Due to Moisture Demand of Trees CIGMAT 2008
Settlement of Foundations on Expansive Clays Due to Moisture Demand of Trees CIGMAT 2008 Kenneth E. Tand, P.E. Practicing Geotechnical Engineer FRIEND OR FOE Trees are our friends. They extract carbon
DEWATERING AND WATER TREATMENT OPERATIONS OF THE OTTAWA RIVER SEDIMENT REMEDIATION PROJECT
DEWATERING AND WATER TREATMENT OPERATIONS OF THE OTTAWA RIVER SEDIMENT REMEDIATION PROJECT William J. Cretens 1 ABSTRACT The Ottawa River Sediment Remediation Project, performed in Toledo, Ohio in 2010,
SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS
SECTION 33 31 00.13 ABANDONMENT OF SEWER MAINS PART 1: GENERAL 1.01 SECTION INCLUDES A. Abandonment in place, by cutting and capping, of existing sewers, junction structures, manholes, service lines, and
DIRT DWELLING. and your. www.pinfoundations.com. Pin Foundations Inc., 2008
DIRT and your DWELLING 2008 Pin Foundations Inc., 2008 If we accept that preserving soil in its native condition is necessary, then how do we build? Utilities? Roads? Foundations? Typical Strip, Transfer,