PRODUCT MODELING OF BRIDGES

Similar documents
BIM-based falling prevention planning

SKANSKA S NEW HEADQUARTER IN HELSINKI, FINLAND. Tiina Koppinen Skanska Finland

Safe & Sound Bridge Terminology

Foreword. Version Parties to the COBIM project

Interoperability with Structural Disciplines

SOLUTIONS FROM VIANOVA SYSTEMS

Inframodel 3 (4-5) InfraFINBIM / buildingsmart Infra Seminar 19 November Juha Hyvärinen, Senior Scientist

InfraBIM Tiina Perttula

BRIDGES ARE relatively expensive but often are

REHABILITATION OF NOVOARBATSKY BRIDGE IN MOSCOW

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

Trimble, TILOS & The Future

Autodesk Revit LEARNING PATH BUILDING DESIGN SUITE

RoadBIM Seminar Tallinn

BIM BUILDING INFORMATION MODELLING. Understanding its functions in the future of the Architectural profession.

Building Information Modelling (BIM); How it Improves Building Performance. R.P. Kumanayake Lecturer, Department of Civil Engineering

Olilo's AEC Design Services. SrinSoft Inc, Partners of

The Real Service Life and Repair Costs for Bridge Edge Beams

SUPPLEMENTAL SPECIFICATIONS CROSS SLOPE VERIFICATION:

Lecturers: Per Kortegaard, Associate Professor, Arkitekt MAA Søren Sti Andersen, Arkitekt MAA, Aarhus Arkitekterne

5 ALTERNATIVE SOLUTIONS AND EVALUATION

BIM ACROSS THE DESIGN-BUILD-OPERATE LIFECYCLE

Turner Innovation Series BIM Conference Istanbul May Brian Krause, Dan Gramer, Turner Construction Company

Common InfraBIM requirements YIV2015

WORLD S TALLEST TIMBER BUILDING, BERGEN

Roadway Cost Per Centerline Mile Revised June 2014

WORK SCOPE. Domains in which we work:

USE OF MICROPILES IN TEXAS BRIDGES. by John G. Delphia, P.E. TxDOT Bridge Division Geotechnical Branch

Construction automation and productivity - Industry perspective

C9 - BIM implementation on Stockholm Bypass Project Using PowerCivil. Trafikplats Akalla och Häggvik, ÅF-URS.

BIM SOFTWARE EVALUATION MODEL FOR GENERAL CONTRACTORS

COBIM. Series 1. General part. Common BIM Requirements v 1.0

Model based quality assurance process in a infra construction. Case Riippa-Eskola RU2 double rail project

The unit costs are based on the trend line of the 3 low bids for the average quantity.

Design of Bridges. Introduction. 3 rd to 4 th July Lecture for SPIN Training at the University of Dar es Salaam

Rehabilitation of the Red Bank Road Bridge over Hoover Reservoir. Presented By: Doug Stachler, P.E.

Technical Analysis and High-End Structural Design

Elevated Roads for Sri Lanka

Tietomallintamisen läpimurto infra-alalla - tietomallintamisella automaatioon

Building Information Modeling (BIM) Requirements for PT Projects Today s Capabilities for a BIM based Design

Ch a p t e r 5. Bridges Decks and Boardwalks

ESI Consultants, Ltd. PROJECT EXPERIENCE

Colorado Off-System Bridge Program Description and Guidelines for Selecting Bridges for Rehabilitation or Replacement Funding

BIM in Finland today. TOMI HENTTINEN M.Sc. (Archit.) SAFA Gravicon Oy, CEO buildingsmart Finland, Chair FINLAND

CITY OF TRAIL MEMORANDUM

1,045 m length of the Deh Cho Bridge

- White Paper - Structural design with ArchiCAD, and its integration with structural software

TABLE OF CONTENTS. INTRODUCTION... 5 Advance Concrete... 5 Where to find information?... 6 INSTALLATION... 7 STARTING ADVANCE CONCRETE...

Micropiles Reduce Costs and Schedule for Merchant RR Bridge Rehabilitation

How To Write An Analysis System For Bridge Test

MASTER CLASS INTEGRATED PROJECT MANAGEMENT SOFTWARE REPORT Timo Hartmann

Ross River Suspension Bridge Ross River, Yukon. Life Cycle Cost Analysis

Advancements in GPR for a Sustainable Tomorrow

Collaborative Engineering with IFC: common practice in the Netherlands

Numerical modelling of shear connection between concrete slab and sheeting deck

NETLIPSE NETWORK MEETING Seppo Mäkinen Finnish Transport Agency

COBIM. Series 8. Use of models for visualization. Common BIM Requirements v 1.0

BIM-based Safety Management and Communication for Building Construction

1 Introduction. Kari I. Leväinen

REHABILITATION OF CONCRETE BEAM BRIDGES IN CROATIAN STATE ROAD NETWORK

48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

BIM and API Extensions

CAPPELEN MEMORIAL BRIDGE REHABILITATION

Vico Office R3.0 Help

INITIAL SITE INSPECTION OF MOTORCYCLE COLLISIONS WITH ROADSIDE OBJECTS IN NEW JERSEY

LOAD TESTING OF SOME NEW BRIDGES IN LATVIA

Civil Engineering and Architecture (CEA) Detailed Outline

3.1 Historical Considerations

Tekla Structures More than a detailing tool. Precast concrete

~iffiui ~ Bridge Condition Survey. Inspection Date: 21 May 2003 District: San Angelo County: Tom Green Highway:

SharePoint for Engineering Document Management & Control

Civil. 2. City of Seattle Supplement to the Specification for Road, Bridge and Municipal Construction, most current addition.

Maintenance and Management of JR East Civil Engineering Structures

Exterior Elevated Elements Inspection Guidelines

CIVIL ENGINEERING ASSOCIATE, 7246

Introduction to Structural Drafting

reality Revit check Autodesk have long Identify possible Utilize structural Tool Works Building bcg.com

Granger Bay Boulevard and Green Point Roundabout

Paving Capitalization Work Categories and Treatments

ODOT Major Construction, Bikeways and Enhancements Report for Lucas County. (State Fiscal Years 2007 to 2010)

COBIM. Series 3. Architectural design. Common BIM Requirements v 1.0

3 Tappan Zee Bridge Rehabilitation Options

Autodesk Robot Structural Analysis Professional Break it down before you build it up.

IH-635 MANAGED LANES PROJECT, SEG. 3.2

Slab Track Austria. System ÖBB-PORR elastically supported slab

The rail engineering service provider. Consulting, planning, project management

New construction Repairing failed or old foundations Retrofit foundations Permanent battered piers Machinery/equipment foundations

BIM: FOR PROJECT MANAGERS CSI Southwest Region Conference Program 1B 8:45am 11:00am

REFOR-tec REPAIR AND STRENGTHENING OF STRUCTURES WITH U.H.P.F.R.C.C. Ultra High Performance Fiber Reinforced Cementitious Composites

How To Understand Building Information Modeling

How To Study The Use Of Information Technology In Road Construction

BRIDGE RESTORATION AND LANDSLIDE CORRECTION USING STRUCTURAL PIER AND GRADE BEAM

Road Asset Management

New Business Models in Construction

Fall protection systems and practices Duty to have fall protection Protection at or above 6' level.

Built Environment Process Reengineering (PRE): Infra FINBIM

Mari Karttunen, NCC Housing Property Development Manager, Architecture NCC-yhtiöt 1

Preliminary steel concrete composite bridge design charts for Eurocodes

Design of an Orphanage, Learning and Community Center in Ethiopia Abstract

Transcription:

PRODUCT MODELING OF BRIDGES RING ROAD III UPGRADE Minna Salonsaari, Development Engineer (BIM)

Content A-Insinöörit Oy Ring Road III Upgrade Lentoasemantie contract Lahdenväylä Porvoonväylä contract Conclusions

A-Insinöörit Oy

50 40 30 20 10 0 25,8 28,0 33,7 36,5 40,0 Turnover, EUR million 2009 2010 2011 2012 2013 A respected and versatile expert in information modelling 450 350 250 150 50-50 297 350 370 400 436 Personnel 2009 2010 2011 2012 2013 Structural engineering A-INSINÖÖRIT Construction management Founded 1959 Branches Infrastructure design From our customers standpoint, we have a comprehensive service supply, strong professional expertise, and the ability to manage project entities. Our service is personalized to meet each customer s specific needs.

Tampere Finland

Corporate structure A-Insinöörit Oy CEO Jyrki Keinänen Structural engineering Business Area Director Seppo Raiski Espoo Tampere Turku Pori Construction management Business Area Director Antti Varpe Espoo Tampere Turku Pori Infrastructure design Business Area Director Vesa Järvinen (1.10.2014) Espoo Tampere

BIM&VDC Unit and ICT support BIM & VDC Softwares, Design Process and Technology 12 persons ICT Workstations, Servers, Phones, Network 5 persons

Wide-ranging international experience

Ring Road III Upgrade

RING ROAD III Ring Road III is part of the national E18 highway.

RING ROAD III UPGRADE

70 000 vehicles each working day Estimated to grow by 50% in 2030 47 M 50 M RING ROAD III UPGRADE

Modeling in projects Decision together with the customer Pilot projects Accuracy of models is exact Goal was: No drawings produced IFC and native model delivered to site Additional orders have been made for drawings 1 bridge to be constructed spring 2015 No drawings?

Softwares >350 softwares Structural design Tekla Structures, AutoCAD, AutoCAD LT BIMSight, Solibri Archicad Infrastructure design Tekla Civil (roads&streets) Tekla Structures (bridges) Novapoint (traffic) Infraworks (VDC) Autocad, Autocad LT (general) (Microstation &Terrasolid) FEM-softwares RFEM (concrete and wood) Staad.Pro (steel) Lusas (bridges) Ansys, Comsol Etc.

Lentoasemantie

17 New Bridges 3 Retaining Walls

Modelled structures Steel truss bridge Staircases Ramps 2 Retaining walls Rail decoration

STEEL TRUSS BRIDGE, KARHUMÄKI OVERPASS

STEEL TRUSS BRIDGE, KARHUMÄKI OVERPASS

STEEL TRUSS BRIDGE, KARHUMÄKI OVERPASS

STEEL TRUSS BRIDGE, KARHUMÄKI OVERPASS

STEEL TRUSS BRIDGE, KARHUMÄKI OVERPASS

STEEL TRUSS BRIDGE, KARHUMÄKI OVERPASS

STEEL TRUSS BRIDGE, KARHUMÄKI OVERPASS

RETAINING WALLS

RETAINING WALLS

RETAINING WALLS

RAIL DECORATION

RAIL DECORATION

Lahdenväylä - Porvoonväylä

12 New Bridges 5 Bridge Repair 2 Retainig Walls 2 km Noise Barriers Geotechnical Structures 26 Pile Slabs

Modelled structures 2 Bridges Västersundom Interchange A Västersundom Interchange B Retaining Wall 4 Pile Slabs

LAHDENVÄYLÄ - PORVOONVÄYLÄ

LAHDENVÄYLÄ - PORVOONVÄYLÄ

PILE SLABS

PILE SLABS

VÄSTERSUNDOM INTERCHANGE B

VÄSTERSUNDOM INTERCHANGE B

VÄSTERSUNDOM INTERCHANGE A

VÄSTERSUNDOM INTERCHANGE A

VÄSTERSUNDOM INTERCHANGE A

VÄSTERSUNDOM INTERCHANGE A

VÄSTERSUNDOM INTERCHANGE A

VÄSTERSUNDOM INTERCHANGE A

VÄSTERSUNDOM INTERCHANGE A

VÄSTERSUNDOM INTERCHANGE A

Conclusions

Challenges Modeling of concrete No curved shapes available for deck Cut edges harder to handle Modeling of reinforcment Different shapes Shape catalog Quantity take-off Steel structures 2 shapes: final and manufactured shape Models in use at site Framework?

Benefits Integration of all structures Existing structures Road structures / surfaces Bed-rock top surface Geometry Structure is the same for everyone Geometry of tendor easy to see Quantity take-off Concrete Reinforcement Etc. Site requirements

Future Västersundom interchange B to be constructed using only model Spring 2015 Västersundom interchange A was only practice No more perfect drawings Models to be used in sites Surveying Framework Softwares / Applications Customers will demand models Also during construction

Thank you A-Insinöörit solves the customer s most challenging problems with 500 skilled professionals