COBIM. Series 1. General part. Common BIM Requirements v 1.0
|
|
|
- Winfred Wade
- 9 years ago
- Views:
Transcription
1 COBIM v 1.0 Common BIM Requirements 2012 Series 1 General part
2 Foreword The publication series Common BIM Requirements 2012 is the result of a broad-based development project entitled COBIM. The need for these requirements arises from the rapidly growing use of building information modeling in the construction industry. During all phases of a construction project, the involved parties have an increasing need to define more precisely what is being modeled and how the modeling is done. Common BIM Requirements 2012 is based on the previous instructions of the owner organizations and the user experiences derived from them, along with the thorough experience the writers of the instructions possess with model-based operations. The parties involved in the project are: Funding providers: Aitta Oy, Larkas & Laine Architects Ltd, buildingsmart Finland, City of Espoo Technical and Environment Services, Future CAD Oy, City of Helsinki Housing Production Office, City of Helsinki Premises Centre, University of Helsinki, Helsingin Yliopistokiinteistöt Oy, HUS Kiinteistöt Oy, HUS Premises Centre, ISS Palvelut Oy, City of Kuopio Premises Centre, Lemminkäinen Talo Oy, Micro Aided Design Ltd. (M.A.D.), NCC companies, Sebicon Oy, Senate Properties, Skanska Oy, SRV Group Plc, Sweco PM Oy, City of Tampere, City of Vantaa Premises Centre, Ministry of the Environment. Written by: Finnmap Consulting Oy, Gravicon Oy, Olof Granlund Oy, Lemminkäinen Talo Oy, NCC companies, Pöyry CM Oy, Skanska Oyj/VTT Technical Research Centre of Finland, Solibri, Inc., SRV Rakennus Oy, Tietoa Finland Oy. Management: The Building Information Foundation RTS. The requirements were approved by an executive group consisting of members from the project parties. The executive group acted as committee TK 320 of the Building Information Foundation RTS, and as such, participated actively in developing the content of the requirements and asking for comments from the members of the executive group and from interest groups. Parties to the COBIM project.
3 Series 1 Author Gravicon Oy Tomi Henttinen Contents 1 Main Objectives of Building Information Modeling 5 2 Introduction 7 3 General Technical Requirements for BIM Software Release of the BIM Coordinates and Units BIM Accuracy Modeling Tools The Buildings, Floor Levels and Divisions Naming and Archiving of the BIM BIM Specification Role of the BIM Coordinator Publishing of Models Working Models Quality Assurance of BIMs 12 4 Generation and Utilization of Models at Different Project Stages Needs and Objectives Area and volume, main activities, site requirements Space program, total budget, selected site Requirement BIM Identification of Spaces Laws, Regulations and Instructions Tasks for the BIM Coordinator Design of Alternatives Interface between modeling and the decision-making process BIM of the Site and Existing Buildings Alternative Spatial Group Models and Spatial Models Structural Design HVAC Design Cost Estimatation based on Areas and Volumes Energy Consumption Simulation and Calculation of Lifecycle Costs Visualizations Comparison and Decisions BIM Coordinator Early Design Architectural Models Structural Models HVAC Models Electrical Models Visualizations Model Merging and Checking Early Design Cost Estimation Energy Consumption Simulation and Calculation of Lifecycle Costs BIM Coordinator Detailed Design Impact of the BIM on Process and Decision-making Architectural Models Structural Models HVAC Models 19
4 Series 1 Author Gravicon Oy Tomi Henttinen Electrical Models Visualizations Model Merging and Checking Cost Estimation and Bills of Quantities Energy Consumption Simulation and Calculation of Lifecycle Costs BIM Coordinator Contract Tendering Stage Analysis and Planning Construction Using BIM in Construction Commissioning Using BIMs in Maintenance As-built Models 21
5 Page 5 / 22 1 Main Objectives of Building Information Modeling Property and construction modeling aims to support a design and construction lifecycle process that is of high quality, efficient, safe and in compliance with sustainable development. Building information models are utilized throughout the building s lifecycle, starting from initial design and continuing even during use and facility management (FM) after the construction project has concluded. Building information models enable the following, for example: Provision of support for investment decisions by comparing the functionality, scope and costs of the solutions. Energy, environment and lifecycle analyses for the purpose of comparing solutions, design and objectives of facility management follow-up. Design visualization and analysis of construction feasibility. Enhancement of quality-assurance and data exchange and making the design process more effective and efficient. Utilization of building project data during building operations and facility management activities. To make modeling successful, project-specific priorities and objectives must be set for models and model utilization. Project-specific requirements should be defined and documented on the basis of the objectives and general requirements set in this publication series. General objectives of building information modeling include, for example, the following: To provide support for the project s decision-making processes. To have the parties commit to the project objectives by means of using the building information model. To visualize design solutions. To assist in design and the coordination of designs To increase and secure the quality of the building process and the final product. To make the processes during construction more effective. To improve safety during construction and throughout the building s lifecycle. To support the cost and lifecycle analyses of the project. To support the transfer of project data into data management during operation. Common BIM Requirements 2012 covers targets for new construction and renovation, as well as the use and facility management of buildings. The minimum requirements for modeling and the information content of models are included in the modeling requirements. The minimum requirements are intended to be observed in all construction projects wherein the use of these requirements is advantageous. Besides the minimum requirements, additional requirements can be presented on a case-specific basis. Modeling requirements and content must be presented in all design contracts in a binding and consistent manner.
6 Page 6 / 22 The publication series Common BIM Requirements 2012 consists of the following documents: 1. General BIM Requirements 2. Modeling of the Starting Situation 3. Architectural Design 4. MEP Design 5. Structural Design 6. Quality Assurance 7. Quantity Take-off 8. Use of Models for Visualization 9. Use of Models in MEP Analyses 10. Energy Analysis 11. Management of a BIM Project 12. Use of Models in Facility Management 13. Use of Models in Construction 14. Use of Models in Building Supervision In addition to the requirements of individual fields, each participant in a building information modeling project must be acquainted at a minimum with the General BIM Requirements (Series 1) and the principles of Quality Assurance (Series 6). The person in charge of the project or the project's data management must have comprehensive command of the principles of building information modeling requirements.
7 2 Introduction Page 7 / 22 This document describes the basic requirements and concepts of the use of Building Information Modeling (BIM) in architectural projects. Modeling is part of the design process parallel to other methods such as detail drawings, schedules and building descriptions. These requirements address only those processes associated with the BIM. All other documents must be created and shared according to appropriate instructions. Some instructions, such as CAD Layering, may also be followed in the modeling. However, since the BIM design applications handle the detail levels, projections, documents etc. based on objects, the use of layering may be different than the traditional CAD drafting. The layering guidelines must therefore be adjusted accordingly. The tender documents should define how the BIM is going to be used in the project, the respective responsibilities of different parties and the verification methods. Additional information can be found in Series 11 Management of a BIM Project. It is recommended that the geometry and information content requirements of the models be clear before the selection of AECs. Otherwise, the technical modeling and data management can compromise in BIM quality and how effectively the model can be used. General requirements for BIMs are represented in Appendix 1. More detailed information can be found in the other series of these requirements. This document deals with same issues as discipline-specific documents, but on a more general level. Discipline-specific documents have always a higher priority in interpretations. 3 General Technical Requirements for BIM 3.1 Software In public projects, all software that has a minimum of IFC 2x3 certification may be used for modeling. This requirement can be overridden with project requirements. Designers need to specify all the BIM software and their versions, and what version of IFC they support in the tender documents. The project participants shall mutually agree on all version or software changes during the project. A testing phase must be carried out before the final decision of adaption to new versions. The use of non- IFC-certified file formats at the official decision points of the project must be accepted by the project management. Simultaneously all mutually agreed data exchange methods and formats may be used in the daily work. In some cases, the Client can specify the software used in the project. For example, construction companies are developing their own BIM processes around specific design software solutions and they may require the use of these design tools. Moreover, the Client may have specific software demands if the project has exceptional modeling requirements or there is for example process development in parallel to the project. 3.2 Release of the BIM All models are released during the project in the IFC format. In addition, a native file format model may be required simultaneously. Methods of distribution will be agreed upon for each project. At the end of the project all the designs and electronic documents including IFC and native format BIMs will be delivered to the Client as described in the contracts. The Client is entitled to use the models according to the same terms as traditional project documents. Prior to release of the BIM and sharing it to other disciplines at official release points, all parts and modeling components that are not relevant to the design must be removed from the model. This also includes all referenced models from other disciplines. Each model must contain modeling elements that are created or added only by the releasing discipline. The Inventory Model makes an exception to this requirement. In renovation projects, the Inventory Model should be used a base model for the Architectural BIM. However, the initial Inventory Model has to be archived separately in order to be used for checking or historical documentation. The IFC files should be compressed (e.g. zipped) when they are shared within the project. This operation can reduce the file size by up to 80%. Even smaller file sizes can be achieved by using
8 Page 8 / 22 an IFC file optimization program in addition to the file compression utility. This is recommended in especially large projects. Native format model files may be compressed as well, but in most cases the effect is less pronounced. 3.3 Coordinates and Units It is recommended that the coordination base of the project is determined such that the entire modeling area is on the positive side of the XY-axis and the origin of coordinates is located near the drawing area. The coordinates are typically determined by the architect. It is not recommended to use the municipality or state coordinate system since a base point that is located far away from the modeling area causes problems for most design software. Negative coordinates are no longer a technical problem. Nevertheless, in order to avoid human errors, it is recommended to avoid them. Negative coordinates in particular, may also cause unnecessary difficulties on the construction site. Another option to define the XY-origin point is to set it at a certain distance from building gridlines. This option is justified in cases when the building's location may change during the design. Even in this case, it is important to document the position of the origin and the x-axis direction with respect to the map coordinates. The base location of the project coordinate system is documented by using at least two known points. The X and Y coordinates for each documented point is presented in both source and target systems. Another option is to identify a single-point and the rotation angle. However, it is noted that especially at larger distances the rotation angle will always lead to inaccuracies, which may have an effect in the construction phase. When needed, the transformation from the source to target coordinate system can be made using the Helmert transformation process. The Z position of the BIM is the same as the actual elevation of building. The unit of measurement used in BIM is millimeters. Rotation angles are always documented with at least two decimal places. Each building on the plot is modeled into same XY coordinate system. Building elevations are determined in absolute elevations in the source coordinate system, but it is possible to agree otherwise if it better serves the project needs. The coordinate system will be agreed upon and documented at the beginning of the project and cannot be modified during the project without a sufficient reason. Any changes must be approved by all parties as well as the project manager. The site model is created using the same coordinate system as the buildings. The site model includes the site environment, vegetation, traffic areas and site structures. This requirement may, however, differ in projects that involve large-scale infrastructure. Once the coordination system has been agreed, the Inventory Model(s) and reference material (for example, laser scanning) must be changed into the same coordinate system. It is possible and reasonable to agree that the coordinate system used in the inventory BIM will be used for the design models as well. After the definition of the coordinate system, it is mandatory to test the compatibility between the disciplines. For this test, one can use a simple doghouse-type model in which all the design disciplines create a couple of buildings or mechanical system parts, so that it can be clearly seen that the models are in same position. In addition, with the current modeling process, it is necessary to ensure that the XYposition and angle of 2D drawings generated from the models match the BIM. 3.4 BIM Accuracy Before the detailed Building Element BIM phase, the model can be created using nominal dimensions for model components. For example, the doors and windows in the Architectural BIM may be modeled without the necessary installation gaps, which could be added in later phases of the project. Nevertheless, it is essential that the modeling principles used are carried out consistently. In the detailed Building Element BIM all components will be modeled with real dimensions.
9 Page 9 / 22 All models from Site Models to As-Built Models are made with highest reasonable level of accuracy. For example, in Inventory Models, absolute accuracy (e.g. small slant of walls, inclinations and changes of thickness) might make the models difficult to use, and therefore tolerances that are acceptable for the construction are also allowed in the models. The accuracy of the models follows the principle of expediency. In Spatial Models the dimensional accuracy can be the same as in traditional drafting. Since the actual form and size of the building may still be unclear, a mm grid may be an appropriate level of accuracy. The selected measurement system must be used consistently. It is also worth noting that the more accurate the original model, the easier it is to continue to work with it throughout the project. The dimension accuracy of building elements may also be associated with the model s intended use. For example, if the Architectural BIM is used for thermal analyses, the walls must connect to each other at the corners, since even a small gap can significantly interfere with the simulation. Accuracy requirements should be mutually agreed and all disciplines must comply with the agreed practice. 3.5 Modeling Tools All model elements should be modeled using the intended components and tools, i.e. walls are modeled with wall tools, slabs with slab tool etc. If the specific tool is not available or it is otherwise not suitable, the component will be modeled using a suitable work-around method which is documented in the Models Description Document. More detailed instructions are presented in the Discipline-specific BIM requirements. An example of a curve shaped ramp that has been modeled by applying the suitable tools of the BIM software. Micromedicum / Senate Properties, Arkkitehtuuritoimisto Heikkinen-Komonen Oy. 3.6 The Buildings, Floor Levels and Divisions A basic rule is that all disciplines will use a modeling method wherein the model is split by floor level and all model elements belong to correct floor, even though modeling programs could support a different approach. There are many reasons for this: model based analyses are often done by floor, construction sites deal mainly with floors, and facility and property management also use floor divisions. This does not mean that the BIM should be divided into separate models or files by floor,
10 Page 10 / 22 only the components in the model are split and aligned to appropriate floors. From project to project it is possible to make exceptions to this requirement if needed. Each separate building will be handed over as an independent model. If necessary, the building can be divided into multiple parts which will be agreed between the project team. Each building is normally handed over as a single model in the IFC and native formats. Building services systems are sometimes delivered as separate models for each floor and system. In very large buildings, architectural or even structural models sometimes have to be divided into separate models by floor. The concept of a floor is slightly different between the different disciplines. This might be a bit confusing especially between the architectural and structural disciplines, since they deal with same elements. The following guidelines should be followed in modeling: In the Structural BIM, each floor contains the horizontal structures above and the vertical structures that support them. The basement floor slab together with the foundations belongs with is a separate floor, and the top floor of the model also includes roof structures. The structural BIM contains also those bulky surface structures that are essential for the load-bearing capacity of the structure such as fire insulations. In the Architectural BIM, each floor contains the floor slab and its surface structures as well as the suspended ceilings and bulky acoustical structures in the ceilings. The architect does not need to model the foundation, but the base structure should be modeled at least above the ground level. Roof and roof structures are modeled as a separate floor. The roof equipment and accessories are normally not modeled unless otherwise agreed on. The differences in the modeling of the floor is illustrates by the two images above; Architectural BIM on the left and Structural BIM on the right. 3.7 Naming and Archiving of the BIM The CAD instructions provided by the Client must be adhered to as applicable when naming the models. All published versions of the BIM are archived in the project as agreed. 3.8 BIM Specification Each discipline has to maintain a Model Description Document. The document is a description of the contents of the model and it explains the purpose for which the model has been published and what the degree of precision is. The description document contains information about the modeling software used, the different versions created from the original model, and exceptions to these requirements. In addition, all naming conventions used, the maturity of the content and any restrictions on its use are documented in the description. The description document is published in parallel with the BIM, and it has to be updated whenever any changes that affect the content of the description occur in the model. All changes must be documented in the Model Description Doctument so that different parties can find them. At official publishing points, the publisher is responsible for the consequences caused by incomplete or incorrect documentation. The responsibilities are recorded in contracts and under general terms and conditions. In the case of Working Models, the use of the description is more explanatory, and therefore the requirements are considerably lower.
11 Page 11 / 22 The naming of the Model Description must be such that it can be associated to the equivalent BIM. 3.9 Role of the BIM Coordinator A BIM Coordinator must be appointed to each project. The Coordinator can be either the Head Designer, or someone chosen by the Head Designer or project management. The BIM Coordinator s tasks are overlapping both with the Head Designer and Construction Manager, and in many cases the Coordinator supports both parties in their core activities. Moreover, the Coordinator s tasks are often related to technical issues and therefore require a profound knowledge of BIM software and processes. The Coordinator s role is described further in Series 11, Management of a BIM Project. The BIM Coordinator takes care of the combination the design models and reports faults to the Head Designer and to rest of the design team. The Head Designer is responsible for the coordination of the design work of different disciplines as described in the official project task lists Publishing of Models At the official release points of the project, such as building permit application and construction cost estimation, the BIM and the documents that are produced from it are important tools for decision making. In a pure BIM-based design process, the BIM and design cannot be separated and therefore they should be publishable at the same time. Documents should primarily be based on the BIM itself. The model will be published simultaneously with, or before the documents. During the design phase, documents are published much less frequently than BIMs. This allows the active use of BIM in the design development phase instead of as a passive deliverable. This should be considered in the project schedule. If only the document publication date is scheduled (as in traditional process) there is a risk that model checking and analysis will not have the optimal effect, and many of the benefits of the BIM are wasted. When releasing a BIM, it is essential that it is conducted in a controlled way and includes the following steps: Model will be published for a particular purpose, and the publication is usually triggered by the project planning schedule. The decision to release the BIM is followed by the preparation of the model, BIM specification and sometimes also the building specification and other material that is related to the model. Before the release of the model, Quality Assurance is carried out as described in Series 6. It is important that the various documents and models are consistent. Finally, the release package will be published, for example, by uploading it to the project server. It has to be taken into account that all related analyzes and other material must be able to connect/link later clearly to the package. The schedule for publications in all stages should be agreed at the beginning of the project and there should be sufficient time and resources reserved for the quality assurance process at each release point Working Models The official BIM publishing and quality assurance steps take place only during certain stages of the design process. It is required to share BIM-based information between the project team during the whole design process. Most of the time, this information does not have to go through the extensive quality assurance process previously described, as long as the limitations in the BIM are informed to all parties. Working models are supposed to be a flexible and rapid method to exchange design information and to represent the intended design solutions, space reservations, specific details, etc. Working models may also be sent to other parties when needed, but in well-organized BIM projects, the models are regularly saved into a shared data store instead. The update cycle is determined by the phase and needs of the project, and typically ranges from one to four weeks. These models do not have to be fully audited, and are thus suitable only for limited purposes. The
12 Page 12 / 22 publisher of a working BIM must make the status of the model clear. The BIM specification document is an essential part of working models. It contains information about the maturity of the model and describes its content and purpose Quality Assurance of BIMs Each discipline is responsible for the quality assurance of the Working Models and is supervised by the BIM Coordinator. Working models are always more or less unfinished, and so the errors in BIM are acceptable. Nevertheless, each designer has to ensure the technical quality of its own BIMs and ensure that they do not contain any other than the normal errors and incompleteness of that design phase. In official quality assurance points set by the Client, the BIMs are checked according to the requirements described in Series 6 Quality Assurance. The quality requirements in these checkpoints are much higher compared to that of working models, and each discipline is responsible for checking its own BIMs prior to publishing the model. The official quality assurance of the BIMs is carried out by BIM Coordinator or other entity specified by the Client. 4 Generation and Utilization of Models at Different Project Stages This chapter presents the use of models at different stages of the construction process. The division into stages and different tasks are only presented from the perspective of BIM. The actual requirements for the content of BIMs are described in the requirements for different disciplines (Series 3 to 5). 4.1 Needs and Objectives During this stage, the needs and objectives of the owner and end users of the property are assessed. On the basis of surveys, alternatives are assessed and decisions concerning the operating model are made in order to attain the objectives of the project - for example new construction or renovation. The needs and objectives assessment stage does not necessarily involve a geometric model. However, projects should aim towards a Requirement Model in which at least the principal space requirements are recorded in electronic form. This would allow for an automated system for checking the designed areas and possibly also the generation of space objects in the design software. The incorporation of principal space requirements into an electronic design program would also significantly facilitate their management during the design process Area and volume, main activities, site requirements Many of the most important project decisions are done in its early stages. This stage generates the initial data for the design process: the project s budget and schedule objectives as well as overall objective for scope; gross area, volume and the total areas of different activities. The requirements relating to the site, from which the site or the building to be renovated is selected, are also considered at this stage. Since actual designs are often not yet available, the essential data for the decision-making is generated through the spatial and functional requirements. In building information modeling this is known as the Requirement BIM Space program, total budget, selected site On the basis of the needs and objectives assessments, the project requirements are processed into the format required for initiating the design process. The defined space requirements must be recorded in an electronic form as comprehensively as possible so that they can be conveniently maintained and used when the design solution is compared against the requirements. Projects normally involve a number of objectives, the direct linking of which into BIM-based work is currently neither possible nor practical. Budget and schedule objectives, for example, are matters for which the use of separate documents is in most cases the only option. The incorporation of document references into the requirements file or database might facilitate their management. However, only a few suitable tools currently exist to serve this purpose and solutions are in practice tailored to each organization and operator.
13 Page 13 / 22 Regardless of the documentation method, updating the project requirements to reflect the advancement of objectives and design is an important part of the process. All versions of the requirements that are important for decision-making must be retained so that their revision history can be viewed if required Requirement BIM The minimum requirement for the Requirement BIM is a room program in a table format that can be used for comparing the program and the design solutions. The space program must contain the roomspecific areas and special requirements. The room program may be complemented by the user and/or the client requirements. The Requirement BIM should be able to present the requirement to the whole building or its division, such as the total energy consumption, cooling, etc. Both the room program and requirements shall be maintained in electronic form so that they can be compared to the design. The requirements for individual spaces may also be referenced to spatial group or space type properties. The room program should contain following requirements: The net area requirements for each room and, if necessary, size and shape requirements The function and users of the room, the essential connections to other rooms The requirements for indoor air conditions, sound insulation, lighting, loads, durability, safety and quality. The requirements for HVAC systems, electrical systems, fixtures, fittings, equipment, spacesharing components, the interior surface structures. It is common for the original requirements to change during the design. The changes need to be recorded so that the project files have all the up to date requirements continuously available. A person appointed by the Client will take of the recording. Different versions of BIM requirements are archived the similar way as other design documents Identification of Spaces A space (or room) is the basic unit of planning and many building elements are in one way or another linked to the space. The Space Id is the most essential property of the room together with the function. Floor area can be calculated from the geometry and other data can be transferred to a database as long as it is taken care of consistent use of the Space Id. The most important information linked to the space is: Space Id: This can also be called as the room number, even if letters and special characters can be used as a part of the number. It is a requirement, that all rooms are identified by a Space Id. Space Function: This attribute describes the function of the room, for example according the Talo 2000 nomenclature. Name of the Space: A descriptive name for the space. In addition, the space properties may include: Space Type: A reference to a technical template that described, for example, ventilation and electrical outlets per person, square meter or workstation. Location of the Space: Room number or similar that represents the location of the room. Consistent and careful use is of spatial information is essential in order to gain benefits from BIMbased processes. Spatial data is utilized for a number of purposes such as area-based cost calculations, comparison of the design and the room program, energy analysis, and facility management applications. These concepts are explained in detail in the Series 3 Architectural Design." Laws, Regulations and Instructions Having the relevant laws, regulations and other instructions provided by authorities available in electronic form and linking them into BIM would substantially benefit the review of the design solutions. This unfortunately is not yet possible in Finland but requires extensive development work in cooperation with different authorities. This area has nevertheless been included in the process charts in view of possible future developments.
14 Page 14 / 22 Currently, procedures remain the same as those applied in a conventional document-based process Tasks for the BIM Coordinator In the early phases of the project, the BIM coordinator is responsible for specifying the projects BIM objectives and to coordinate availability of initial data for the BIM work. If there is no chosen coordinator, these tasks can also be taken care by the Project Manager or Head Designer: Review of the targets for BIM and to ensure that the BIM tasks and processes are taken into account in the schedule. In addition, the special requirements of the project are specified. Check that all designers have access to the necessary initial data (for example, possible Inventory BIM). 4.2 Design of Alternatives At this stage the most suitable basic solution is investigated using rough spatial models for alternative designs. The design models from each discipline should always be available each other, which is ensured by agreeing on a sufficiently frequent uploads to the project server. A suitable schedule at this stage could be, for example, linked to the regular design meetings. A visualization based on the Architect's BIM for communication purposes between the architect and the client. Alberga Business Park / NCC Property Development Oy, Arkkitehtitoimisto Brunow & Maunula Oy, image: Tietoa Visualisointi Interface between modeling and the decision-making process At this stage, the Client s tasks include overseeing the design, comparing the alternatives, and selecting the best design solution for the next stage in cooperation with the future end user of the building. Three-dimensional modeling and visualization facilitate the comparison between different alternatives and bring the design solutions to a concrete level. In addition to investment costs, lifecycle costs and environmental impact should also be included in the assessment. Comparison of proposed design solutions using simulations is one of the principal benefits of integrated models. Comprehensive comparisons performed at an early stage are important because even radical changes can still be easily made when discussing the general outlines of the project. The later the potential problems emerge in the process, the more difficult it is to resolve them without a major impact on cost or quality BIM of the Site and Existing Buildings For new constructions, the construction site, and for renovation projects, also the modeling of existing building (Inventory BIM) are included in the BIM requirements because the modeling of the existing situation is a basic precondition for the design process and all further modeling. Depending on the construction site, the model of the site may be obtained from the basic municipal registers or commissioned from an external supplier. In renovation projects, the modeling of existing buildings can be performed on the basis of old documents or electronic measurements, depending on the required level of accuracy. The model for both the site and the existing buildings can be commissioned as a separate assignment from a measurement service company or an architectural design office.
15 Page 15 / 22 The requirements concerning the BIM of the construction site and existing building are presented in Series 2 of the BIM requirements, Modeling of the Starting Situation Alternative Spatial Group Models and Spatial Models In the design alternatives stage, a number of alternative solutions are assessed. The architect models the building with space objects with an accuracy that is sufficient for the decision-making concerning spatial arrangements, massing and the outer shell. The architect s spatial model must be prepared such that space types and areas as well as the total volume of the building can be automatically obtained from it. The requirements concerning spatial group models and spatial models are described in more detail in Series 3 of the BIM requirements, Architectural Design.. Use of the Integrated BIM provides new opportunities for various types of study. When examination of the alternatives are connected to the interconnected whole, it is important to coordinate the explore options between different disciplines. For example, different façade solutions can be explored through investment costs, through the impact of the building energy consumption and through visual appearance using the BIM in various analyses and simulations Structural Design Based on the architect s design proposal, the structural engineer creates a preliminary Building Element BIM for the entire building and detailed Building Element BIM for the type structures. Requirements of the models are described in more detail in the series 5 of the BIM requirements Structural Design HVAC Design Building services designers develop the design proposal for the initial system models, which contains main systems paths, space-consuming channels and cable routes. Other HVAC models in this stage include service area models, model rooms in 3D, 2D sections and spatial reservations of technical rooms. Requirements of the models are described in more detail in Series 4 of the BIM requirements MEP Design Cost Estimatation based on Areas and Volumes Cost estimation based on space areas and volumes will be prepared from the architect s alternative BIMs on the basis of room categories (office, auditorium, toilet, etc.), which are to serve as a basis of comparison of the investment costs pertaining to design alternatives. Cost estimation based on space areas and volumes is included in the mandatory tasks of the BIM-based process. It is discussed in more detail in Series 7 of the BIM requirements, Quantity Take-off. The calculation of quantities and costs can be performed internally by the Client, included in the tasks of a project consultant, or commissioned as separate consulting. This will be agreed upon on a projectspecific basis Energy Consumption Simulation and Calculation of Lifecycle Costs On the basis of areas and room categories, preliminary energy simulations and life-cycle cost estimates can be prepared from the architect s alternative BIMs, which are to serve as a basis of comparison between alternatives. Energy simulation and life-cycle cost calculations are included in the mandatory tasks of a BIM-based process. They can be included in the tasks of an HVAC designer or commissioned as separate consulting assignment. Energy simulation and life-cycle cost calculation are discussed in more detail in Series 9 and 10 of the BIM requirements, Use of Models in MEP Analyses and Energy Analysis Visualizations Models are convenient for visualization purposes because they help to establish a shared understanding of the alternative design solutions between the shareholders. The required number and quality of visualizations will be defined in the call for tender and design agreements on a project-specific basis. However, it should be noted that even though the BIMs contain most of the source information needed
16 Page 16 / 22 for visualization, they do not always enable the desired level of detail or rendering without additional effort. Therefore, the information content of the BIM required for visualization cannot be defined in advance but needs to be decided, at least partially, during the progress of the project so that the visualization is capable of providing the information required for decision-making. In the design of alternatives stage, the use of rough mass models is sufficient for conventional projects. Visualization is discussed in more detail in Series 8 of the BIM requirements, Use of Models for Visualization Purposes Comparison and Decisions The information about alternatives provided by BIMs is used in the decision-making process alongside traditional procedures at the discretion of Senate Properties. The design solutions often affect the original requirements. Changes to the requirements must be recorded in the requirement documentation so that project requirements remain up-to-date in accordance with the decisions made and so that the most current information is available for the next stage BIM Coordinator At the beginning of the BIM work, the BIM coordinator should arrange a technical model compatibility test to ensure that the BIMs from different design disciplines are at the same coordinates and elevation. In practice, the architect creates some model components (e.g., basement floor, slab, wall, window, furniture), in the correct location of the out coming building, and sends the IFC model to other discipline. Each designer creates similarly a couple of components using the own design software tools so that when the IFC-models are combined, it can be fully verified, that everyone is using the same coordinate system and elevations. Other tasks for the BIM coordinator at this stage are: To find out what kind of models are needed for different purposes and who is responsible in creating them. To update the schedule for BIM according to the design schedule and BIM objectives according to the overall situation. Ensure that the required BIMs have been made. Check the compatibility of the BIMs and the absence of conflicts between them according to the design situation. 4.3 Early Design In the early design stage, the basic design solution that was selected in the design of alternatives stage and exists in the form of an architect s BIM is developed further. The client s requirements have been updated in the previous stage to conform to the decisions made. At the early design stage, the client s tasks include overseeing the design and approving the design solution for the subsequent detailed design phase. The BIMs enable fast, illustrative and interactive visualization and analyses (for example, energy and conditions simulations, cost information), which support communication and decision-making. The design models from each discipline should always be available to others, which is ensured by agreeing on a sufficiently frequent uploads to the project server. A suitable sequence at this stage could be for example linked to the design group meetings (i.e. one to four weeks). The work of different disciplines should make progress concurrently. At this design stage, this also includes the fact that significant changes might be made to the design Architectural Models The architect develops the selected design alternative into a Preliminary Building Element BIM. At the end of the early design stage, the BIM must contain, in addition to spaces, at least the following: Load-bearing structures: pillars, columns, slabs and walls Walls categorized according to main type (external walls, light partition wall, etc.) Windows and doors, although at this stage without type information
17 Page 17 / 22 The accuracy of the model must be sufficient for generating the drawing required for applying a building permit. The required content is defined in more detail in Series 3 of the BIM requirements, Architectural Design Structural Models At this stage, the structural designer must confirm the dimensions, requirements and impact on the work of other designers of the structural system. The structural model of the early design stage must fulfill the requirements defined in Series 5 of the BIM requirements, Structural Design. It must be possible to use the model in the integration of the design solutions HVAC Models At this stage, the HVAC designer must confirm the spatial requirements of the systems and their impact on the work of other designers. The model must contain the spatial requirements of main ducts and machine rooms to the extent that the required spatial reservations and their effects on other designer s work can be assessed. The requirements concerning the spatial reservation model are defined in more detail in Series 4 of the BIM requirements, MEP Design. It must be possible to use the model in the integration of the design solutions Electrical Models The electrical designer must define space requirements for those parts and components of electrical, telephone and data communications systems that have impact on space allocation. The requirements concerning the spatial reservation model are defined in more detail in Series 4 of the BIM requirements, HVAC Design. It must be possible to use the model in the integration of the design solutions Visualizations The opportunities for visualization and the accuracy of the models will naturally increase during the course of the process. However, the requirements applicable to the visualizations in the early design stage are mainly the same as those presented in section If needed, more detailed visualizations may also be required for items regarded significant for decision-making. Further information is also available in Series 8 of the BIM requirements, Use of Models for Visualization Model Merging and Checking The joint assessment of the models of different designers should be started in the early design phase if models are also generated by other designers apart from the architect. The BIM coordinator or Head Designer usually assumes the responsibility for model merging, but it can be allocated to another party as agreed upon on a project-specific basis. Visual clash detections are performed at this point on the merged model concerning the spatial reservations of at least structures and systems. This makes it possible to verify that the systems and structures are in principle compatible and that the spatial reservations required for structures and systems have been taken into account in the architectural design. Other checking may also be performed on merged models depending on the nature and degree of complexity of the project. Checking to ensure that the models are error-free is essential for the approval of the design solutions and for the further activities of the project. The purpose of the checking is to ensure that the content and structure of the models correspond with the BIM requirements. At the same time, the quality of the design solutions and the reliability of quantities data are also ensured Early Design Cost Estimation Cost estimation based on space areas and volumes supplemented by preliminary building elements, must be prepared using the early design stage models. The cost estimation based on space areas and volumes prepared of the architect s model on the basis of room categories (office room, lobby room, sanitary facilities ) supplemented by the quantities data obtained from the architect s building element schedules and possibly also from those of other designers. Model-based quantity take-off is discussed in more detail in Series 7 of the BIM requirements, Quantity Take-off.
18 Page 18 / Energy Consumption Simulation and Calculation of Lifecycle Costs On the basis of room categories (office room, lobby room, sanitary facilities ) and areas, preliminary energy simulations can be prepared from the architect s model, which will be supplemented by the building outer shell data. These include, for example, the characteristics of external walls and the areas and type information of windows to the extent they are known at this stage. Energy simulation and life-cycle cost calculations are included in the mandatory tasks of a BIM-based process. The commissioning of these tasks will be decided on a project-specific basis, and they can be included in the tasks of an HVAC engineer or commissioned as separate consulting assignment. Energy simulation and life-cycle cost calculation are discussed in more detail in Series 9 and 10 of the BIM requirements, Use of Models in MEP Analyses and Energy Analysis BIM Coordinator As the design progresses, it is possible to obtain useful information form BIMs such as volumes and surface areas. The visual properties of the three-dimensional model are increasing, and design errors are easier to recognize, thereby enabling the Head Designer to ensure the non-contradiction of designs. The model can be used to compare the elevations of the ground and the building and to study the accessibility of the design solutions. The BIM coordinators responsibilities are roughly the same as those in the design of alternatives stage: To update the schedule for BIM according to the design schedule and BIM objectives according to the overall situation. Ensure that the required BIMs have been made. Check the compatibility of the BIMs and the absence of conflicts between them according to the design situation. 4.4 Detailed Design The procedure for the detailed design stage is similar to that of the early design stage with the exception that the level of accuracy for the generated information is significantly raised. Design solutions will be finalized to a level of accuracy that is required for calls for tenders, and all models prepared for the project will be further specified using detailed type information. However, a substantial part of the detailed design stage information still needs to be generated in the form of traditional design documents. The information content and accuracy level of the models are defined in Series 3 5 of the domainspecific BIM instructions Impact of the BIM on Process and Decision-making At the detailed design stage, the Client s tasks include overseeing the design and approving the design solutions. The visualizations and analyses enabled by the BIMs provide support for communication and decision-making. At the end of this stage, the detailed design solutions will be approved to the extent that they can be used for advancing to the tendering stage. In line with traditional design practice, the design will be supplemented during the construction stage. All BIMs must then be updated to reflect the changes made to the design solutions Architectural Models Upon completion of the detailed design stage, the architect s model must be a so called Building Element BIM that contains the building elements in the form they are intended to be implemented. The actual model need not be dimensioned, but it must be dimensionally accurate in accordance with the BIM instructions (section 0). The required content is defined in more detail in Series 3 of the BIM requirements, Architectural Design. It must be possible to use the model for quantity take-off and in the integration of the design solutions Structural Models The structural designer s documents must correspond with the architectural model and it must fulfill the requirements defined in Series 5 of the BIM requirements, Structural Design. It must be possible to use the model for quantity take-off and in the integration of the design solutions.
19 Page 19 / HVAC Models The HVAC designer s documents must correspond with the architectural model. The modeling in this stage will focus on the creation of a system model. It must fulfill the requirements defined in Series 4 of the BIM requirements, MEP Design. It must be possible to use the model in the quantity take-off and in the integration of the design solutions Electrical Models The electrical designer s documents must correspond with the architectural model. The modeling in this stage will focus on the creation of a system model. It must fulfill the requirements defined in Series 4 of the BIM requirements, MEP Design. It must be possible to use the model in the quantity take-off and in the integration of the design solutions Visualizations The BIM must be used for visualizing the design solutions. The required number and quality of visualizations will be defined in the call for tender and design agreements on a project-specific basis. However, it should be noted that even though the BIMs contain most of the source information needed for visualization, they do not always enable reaching the desired end result without additional effort. Therefore, the information content of the BIM required for visualization cannot be defined in advance but needs to decided, at least partially, during the progress of the project so that the visualization is capable of providing the information needed for decision-making. In the detailed design stage, the opportunities for visualization are substantially better than in the previous stages, because the information contained in the model is often sufficient for a visualization of a notably high quality. Visualization is discussed in more detail in Series 8 of the BIM requirements, Use of Models for Visualization Model Merging and Checking Merged models are created from the models of individual designers during the project, and it can be used for visualizing the designs and assessing their compatibility. The assessments performed at this stage include, e.g., the clash detections of the HVAC systems, clash detections of systems and structures, verification of the sufficiency of the spaces reserved for systems, and penetration and reservation design. These merged models are discussed in Series 4 MEP design, 5 Structural design and 6 Quality assurance and merging of models of the BIM requirements. At the official decision points, all generated models will be checked as specified in Series 6 of the BIM requirements, Quality assurance and merging of models Cost Estimation and Bills of Quantities Bills of quantities and cost estimates based on them will be prepared on the basis of the checked BIMs. The bills of quantities will also be used in the contract tendering stage. The bills of quantities and cost estimates generated from the BIMs can be included in the mandatory tasks of a BIM-based process. They can be performed by the Client, included in the tasks of a project consultant, or commissioned as separate consulting. This will be agreed upon on a project-specific basis. In addition to BIM-based bills of quantities, it will be necessary to also survey quantities by traditional methods, because modeling is not, at least currently, not capable of covering all of the required information. Further details are provided in Series 7 of the BIM requirements, Quantity take-off Energy Consumption Simulation and Calculation of Lifecycle Costs On the basis of the detailed design information, the models prepared in the detailed design stage can be used for generating the final energy simulations and life-cycle cost calculations, which can then be compared with the actual costs during the occupancy of the building. Energy simulation and life-cycle cost calculation are discussed in more detail in Series 9 Use of models in MEP analyses and Series 10 Energy Analysis. They are included in the mandatory tasks of a BIM-based process and they can be included in the tasks of an HVAC engineer or commissioned as separate consulting assignment.
20 Page 20 / BIM Coordinator In BIM based design, many Clients stress specifically an error free construction. The Head Designer is responsible for ensuring that the designs don t have conflicts and that construction work can be done according to them. The BIM coordinator will support the Head Designer and other disciplines to achieve this goal. In other respects, the BIM coordinator duties follow the pattern from the previous design stages: To update the schedule for BIM according to the design schedule and BIM objectives according to the overall situation. Ensure that the required BIMs have been made. Check the compatibility of the BIMs and the absence of conflicts between them according to the design situation. 4.5 Contract Tendering Stage At the contract tendering stage, the BIMs and the bills of quantities, visualizations and other documents generated from them will be handed over to the contractors for the purpose of facilitating the preparation of tenders and preliminary planning of the construction work Analysis and Planning With the help of three-dimensional BIMs, visualizations and other information obtained from the models, the contractors are better able to familiarize themselves with the design plans and the construction site. The tenders must be based on the quantities presented in the original call for tender. There are 4D software applications available for work planning and scheduling with which different schedule and implementation options can be tested. The use of models is at the discretion of the contractor. It must, however, be considered that the use of BIM on-site may require special ways of modeling, an therefore needs to be agreed as early in the project as possible. If BIMs are used in scheduling and work planning, it is essential that the building parts and products in the model, as well as their grouping should be consistent with the actual situation on site. If the models are to be used, for example, in scheduling, the method should be known by the designers as early as possible, so that the model can be drawn up accordingly. 4.6 Construction Using BIM in Construction Most uses of BIMs by the contractors, is related to organizing the production processes. This section is a brief description of the main uses of the models. More detailed description can be found in the Series 13 Use of Models in Construction. The 3D visual nature of BIMs is a significant benefit of models in many different situations. Models are a good way to study the designs and structures and to plan installation procedures and coordination of the work. The BIM based quantity take-offs speed up the calculation process and gives a more accurate result, assuming that the modeling is done properly and without error. Model-based quantity take-off and report templates reduce a significant amount of duplicated work, which improves the productivity of construction. It is already certain that BIMs and different types of reports that are generated from BIMs will be used as tender documentation for subcontracts. Subcontracts may also include additional BIM based design. The BIM based schedule is intended to complement the construction schedule which is given to the Client and to give, for example, a visual control over the installation order of systems. Critical structures, for example, the foundations, the load bearing core, and demolition work, may be presented with the help of the model. The ongoing construction work can be stored in the model daily or weekly in order to illustrate and document the progress of the construction and installation work.
21 Page 21 / 22 Contractors and designers can use BIM to study the installation of prefab and in-situ cast structures, installation order of different building services systems, temporary supports etc. If all temporary supports and structures are also modeled, the model can help to study the security and logistical issues for them as well. The site can utilize the BIMs also in meetings for HVAC installations, in which the work sections and installation order are studied with contractors in order to ensure the schedule compatibility among the various contractors. 4.7 Commissioning From the point of view of modeling, the most important documents generated at this stage are the Asbuilt Models and the maintenance manual. The maintenance manuals, however, are not generally required in a BIM-based format Using BIMs in Maintenance BIM-based maintenance manuals are currently in a developmental stage and are thus only required in exceptional cases. However, regardless of the working methods, all parties must fulfill normal documentation requirements of the Client concerning maintenance manuals. Further details are provided in Series 12 of the BIM requirements, Use of Models in Facility Management As-built Models All BIMs required for the project must be supplemented in the construction stage to reflect the modifications made so that they correspond with the end result as-built. The requirements concerning information content are similar to those in the detailed design stage and applicable to all parties; see Series 3 Architectural Design, Series 4, MEP Design, and Series 5, Structural Design of the BIM requirements. However, in the calls for tenders concerning construction and design it is possible to declare that asbuilt models are also required from contractors. The primary intended use of As-built Models relates to the use, maintenance and repair of the building. As-built Models are agreed upon on a case-specific basis.
22 Page 22 / 22 Appendix 1: General Purposes of BIM in Different Phases of the Project ARCHITECTURAL DESIGN Requirements BIM Space program in a spreadsheet format, requirements of the client and the enduser Site BIM Site borders, elevations, required joining to the surroundings and to the Inventory BIM Spaces and building elements of the existing building(s) STRUCTURAL DESIGN Requirements BIM Space-specific loads and other structural requirements, if any Inventory BIM Load-bearing structures, typically included in the architectural BIM MEP DESIGN Requirements BIM MEP requirements for the spaces (indoor climate, lighting, system requirements, etc.) Inventory BIM MEP systems to the extent regarded applicable - Documentation of space requirements and possible other requirements in a structured form - Site use planning - Location of the building(s) on the site - Documentation of the starting situation for renovation construction Spatial Group BIM Special case of Spatial BIM. Building masses and principal spatial groups are presented as space objects. Spatial BIM Spaces as space objects, building envelope Building Element and System BIMs Spatial Reservation BIM Suggestion for structural system, suggestion for basic structure Spatial Reservation BIM MEP system service areas, main ducts and flues, as well as pipework, cable racks and other technical systems and spaces presenting significant space requirements Building Element and System models are an integral part of project planning and management of information. In BIMbased process the content of the models equals designs. Also the aimed use of the BIMs reflects to the contents of the models. Preliminary Building Element BIM Preliminary Building Element BIM Preliminary System BIM Spaces, preliminary building elements Frame structures (measures, locations and dimensions of the vertical and horizontal frame), agreed BIM details, foundations Building Element BIM Penetration and Reservation BIM Quantity take-off phase Quantity take-off phase Tilat, rakennusosat tyyppitietoineen Frame structures (measures, locations and dimensions of the vertical and horizontal frame, example elements, type structures and joints, foundations), joinings to foundations, penetrations and reservations Building Element BIM Construction phase BIM with a level of precision similar to that of the previous stage, updated to correspond with the implementation As-built model BIM with a level of precision similar to that of the previous stage, updated to correspond with the final implementation Building Element BIM Construction phase Frame structures and joints, input information to prefabricated element design, placements and reinforcements of cast-in-situ structures, foundations, joinings to foundations, details, penetrations and reservations As-built model BIM with a level of precision similar to that of the previous stage, updated to correspond with the final implementation Service areas of MEP systems, main ducts, pipework and central units Penetration and Reservation BIM Quantity take-off phase Service areas of MEP systems, central units, ducts, pipework, terminal devices, switchboards, cable routes (lead and cablethroughs and grates), lighting fixtures, penetrations and reservations System BIM Construction phase Service areas of MEP systems, central units, ducts, pipework, terminal devices, switchboards, cable routes (lead and cablethroughs and grates), lighting fixtures, penetrations and reservations As-built model BIM with a level of precision similar to that of the previous stage, updated to correspond with the final implementation - Investigation and visualization of the building s massing as well as comparison between alternatives - Investment calculation based on scope and massing - Rough energy simulation if applicable - Design and visualization of alternative spatial design solutions - Scope management - Investment calculation - Energy simulation and, if required, simulation of ambient conditions (determining the dimensioning bases for systems) - Examining MEP system alternatives and determining service areas - Examining structural system alternatives - Agreements concerning spatial requirements for structures and systems - Definition of building elements, comparison of building element and structural alternatives - Management of quantity information Investment calculation - Energy simulation and, if required, simulation of ambient conditions (further specification of the dimensioning bases for systems) - Preliminary dimensioning of structures - Building permit - Dimensioning of structures to the precision required in the calls for tenders - Definition of MEP systems - Quantity take-off - Investment calculation - Energy simulation - Use of models as appendices to tenders - Use of models to support penetration and reservation design - Detailed design - Information for prefabricated element design and production planning - Information to maintenance and repairs, space and occupancy management and to the planning of later use and renovation of the building
COBIM. Series 3. Architectural design. Common BIM Requirements 2012. v 1.0
COBIM v 1.0 Common BIM Requirements 2012 Series 3 Architectural design Series 3 Author Gravicon Oy Tomi Henttinen Foreword The publication series Common BIM Requirements 2012 is the result of a broad-based
COBIM. Series 8. Use of models for visualization. Common BIM Requirements 2012. v 1.0
COBIM v 1.0 Common BIM Requirements 2012 Series 8 Use of models for visualization Foreword The publication series Common BIM Requirements 2012 is the result of a broadbased development project entitled
Foreword. Version 1.0 27.03.2012 Parties to the COBIM project
Series 12 author Insinööritoimisto Olof Granlund Oy: Markku Jokela, Tuomas Laine, Reijo Hänninen Foreword The publication series Common BIM 2012 is the result of a broadbased development project entitled
BIM in Finland today. TOMI HENTTINEN M.Sc. (Archit.) SAFA Gravicon Oy, CEO buildingsmart Finland, Chair FINLAND
BIM in Finland today TOMI HENTTINEN M.Sc. (Archit.) SAFA Gravicon Oy, CEO buildingsmart Finland, Chair GRAVICON BIM SERVICES BIM Manager Specifications and Supervision for BIM projects BIMwise WEB-Based
Volume 4 compiled by Olof Granlund Oy Tero Järvinen, Tuomas Laine, Kari Kaleva, Kimmo Heljomaa
Volume 4 compiled by Olof Granlund Oy Tero Järvinen, Tuomas Laine, Kari Kaleva, Kimmo Heljomaa Volume 4 compiled by Olof Granlund Oy Tero Järvinen, Tuomas Laine, Kari Kaleva, Kimmo Heljomaa Foreword The
2012 BIM Guidelines and Standards (Rev. 00) University at Albany
A. Building Information Modeling (BIM) Guidelines: The Office of AECM will require the submission of BIM modeling files as part of an electronic file submission to the AECM project manager as requested
New Business Models in Construction
New Business Models in Construction Results of the Finnish BIM Survey 2013 CIB BIM & IDDS Seminar, Tokyo 1.11.2013 Dipl. Ing. Helena Soimakallio, M. Sc. (CE), B. Sc. (BA), M. aff. ASCE Managing Director
T170 Interior Design Technology MTCU Code 61833 Program Learning Outcomes
T170 Interior Design Technology MTCU Code 61833 Program Learning Outcomes Synopsis of the Vocational Learning Outcomes The graduate has reliably demonstrated the ability to 1. analyze a client's needs
Schematic Design: Quality Management Phase Checklist Project Phase Checklist Series
Best Practices : Project Phase Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA members without endorsement
Olilo's AEC Design Services. SrinSoft Inc, Partners of
Olilo's AEC Design Services SrinSoft Inc, Partners of Olilo provides design services that include design and analysis, cost estimation, 3D modeling, 2D drafting, conversion from 2D to 2D, quantity take-off,
Common InfraBIM requirements YIV2015
Common InfraBIM requirements YIV2015 Vol 1.0 MANAGING MODEL BASED PROJECT Quality control Interaction and collaboration Supervision and coordination Infra modeling Coordination of disciplines Gathering
How To Design A Bim Project
BIM Virtual Construction & Integrated Project Delivery Randy LaNear BIM Manager Barnhart - Heery Synonyms & Related Terms Integrated Practice Integrated Project Delivery Virtual Building (Environment)
Tekla Structures More than a detailing tool. Precast concrete
Tekla Structures More than a detailing tool Precast concrete Much more Than a detailing tool a Tekla Structures is much more than design and detailing software: it is the most accurate and comprehensive
Certified Instructors & Curriculum
Our Promise. TPM is dedicated to provide the most extensive and high-quality training programs to help you maximize your investment. Although the investment in time and money may seem substantial, it will
Energy Efficiency Agreement between the Ministry of Trade and Industry and the Municipality of (2008 2016)
Dnro 7202/804/2008 Unofficial translation Energy Efficiency Agreement between the Ministry of Trade and Industry and the Municipality of (2008 2016) 1 The starting points and grounds for the agreement
for Revit MEP The professional s choice for Building Services
for Revit MEP The professional s choice for Building Services The professional s choice for Building Services With MagiCAD, all modelling is highly automated, fast and accurate. Checking the model and
CPIx on Line. Post Contract-Award Building Information Modelling (BIM) Execution Plan (BEP) Supporting the HMG Construction Strategy.
CPIx on Line Post Contract-Award Building Information Modelling (BIM) Execution Plan (BEP) Project Name: Project Address: Project Number: Date: Document No: Date: March 2013 Revision: R1 Status: Published
CAD Standards Guideline For Facility Documentation and Construction Projects
CAD Standards Guideline For Facility Documentation and Construction Projects Page 1 of 12 Table of Contents A. Software B. CAD Methods 1. Layer Standards 2. Font 3. Lineweights 4. External References 5.
Revit MEP. Autodesk Navisworks
What is BIM? Autodesk BIM is an intelligent model-based process that helps owners and service providers achieve business results by enabling more accurate, accessible, and actionable insight throughout
Autodesk Revit LEARNING PATH BUILDING DESIGN SUITE
Autodesk Revit LEARNING PATH FUNDAMENTALS Duration: 3 days Cost: R5 500 (excl VAT) Revit MEP Duration: 3 days Cost: R5 500 (excl VAT) Revit Structure Duration: 3 days Cost: R5 500 (excl VAT) REVIT ADVANCED
Innovative capture and modeling of existing building conditions using 3D laser scanning. Entry B Submission
Innovative capture and modeling of existing building conditions using 3D laser scanning Entry B Submission Executive Summary As a large owner organization, understanding and developing new technologies
BIM: FOR PROJECT MANAGERS. 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am
BIM: FOR PROJECT MANAGERS ANA BAKER BRANDON GARRETT 2011 CSI Southwest Region Conference Program 1B 8:45am 11:00am 1 2 3 4 BIM Overview BIM Level of Development Evolution of the Drawing Process BIM Workflow
Building Information Modelling (BIM); How it Improves Building Performance. R.P. Kumanayake Lecturer, Department of Civil Engineering
Building Information Modelling (BIM); How it Improves Building Performance R.P. Kumanayake Lecturer, Department of Civil Engineering R.M.P.S. Bandara Lecturer, Department of Mechanical Engineering Faculty
Multi-user Collaboration with Autodesk Revit Worksharing
AUTODESK REVIT WHITE PAPER Multi-user Collaboration with Autodesk Revit Worksharing Contents Contents... 1 Autodesk Revit Worksharing... 2 Starting Your First Multi-user Project... 2 Autodesk Revit Worksets...
CHAPTER 1. Introduction to CAD/CAM/CAE Systems
CHAPTER 1 1.1 OVERVIEW Introduction to CAD/CAM/CAE Systems Today s industries cannot survive worldwide competition unless they introduce new products with better quality (quality, Q), at lower cost (cost,
CAD Standards Guideline For Facility Documentation and Construction Projects
CAD Standards Guideline For Facility Documentation and Construction Projects Implemented March 2010 Page 1 of 9 Table of Contents A. Software B. CAD Methods 1. Layer Standards 2. Font 3. Lineweights 4.
BIM Test At ASHRAE HQ
This article was published in ASHRAE Journal, April 2011. Copyright 2011 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Posted at www.ashrae.org. This article may not be
THE NATIONAL LIBRARY of Finland Bulletin 2014
THE NATIONAL LIBRARY of Finland Bulletin 2014 The renovation of the National Library of Finland respects Engel's architecture Dorrit Gustafsson Completed in 1845, the main building of the National Library
NEW YORK CITY DEPARTMENT OF DESIGN + CONSTRUCTION
NEW YORK CITY DEPARTMENT OF DESIGN + CONSTRUCTION July 2012 BIM Guidelines Michael R. Bloomberg, Mayor David J. Burney, FAIA, Commissioner David Resnick, AIA, Deputy Commissioner TABLE OF Contents Message
BETTER BY 3D DESIGN AND COORDINATION IN BUILDING SERVICES INDUSTRY
BETTER BY 3D DESIGN AND COORDINATION IN BUILDING SERVICES INDUSTRY MR. ALVIN WONG-KAM MAN Building Services Engineering Graduate Gammon Skanska Limited E-mail: [email protected] Do a 2-Dimensional
Design Development Quality Management Phase Checklist Project Phase Checklist Series
Best Practices Design Checklist Project Phase Checklist Series Contributed by Micheal J. Lough, AIA, Principal, Integral Consulting The AIA collects and disseminates Best Practices as a service to AIA
A WORKFLOW ANALYSIS FOR BIM SOFTWARE: ARCHITECTURAL AND MECHANICAL ENGINEERING DEPARTMENT OF ARUP TURKEY
ISTANBUL TECHNICAL UNIVERSITY FACULTY OF ARCHITECTURE DEPARTMENT OF DESIGN COMPUTING BIM 2037 / BUILDING INFORMATION MODELS INSTRUCTOR: Salih OFLUOĞLU A WORKFLOW ANALYSIS FOR BIM SOFTWARE: ARCHITECTURAL
ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY
ESSENTIAL CURRICULUM ARCHITECTURAL DESIGN ACADEMY HOWARD COUNTY MARYLAND ARCHITECTURAL DESIGN ACADEMY Architectural Design 1 Introduction / Overview of Course This course will introduce the basic principles
THIRD REGIONAL TRAINING WORKSHOP ON TAXATION. Brasilia, Brazil, December 3 5, 2002. Topic 4
THIRD REGIONAL TRAINING WORKSHOP ON TAXATION Brasilia, Brazil, December 3 5, 2002 Topic 4 INFORMATION TECHNOLOGY IN SUPPORT OF THE TAX ADMINISTRATION FUNCTIONS AND TAXPAYER ASSISTANCE Nelson Gutierrez
3D Drawing. Single Point Perspective with Diminishing Spaces
3D Drawing Single Point Perspective with Diminishing Spaces The following document helps describe the basic process for generating a 3D representation of a simple 2D plan. For this exercise we will be
Tekes: Construction and Wood Technology Cluster
New Business Models for the Building Industry: Pockets of Innovation, Program Manager [email protected] Tekes: Construction and Wood Technology Cluster 2 Environment Information and Communication Technology
Civil Engineering and Architecture (CEA) Detailed Outline
Civil Engineering and Architecture (CEA) Detailed Outline Unit 1: Overview of Civil Engineering and Architecture (23 days) Lesson 1.1: History of Civil Engineering and Architecture 1. Many features of
Collaborating Across Disciplines with Revit Architecture, MEP, and Structure
Collaborating Across Disciplines with Revit Architecture, MEP, and Structure David Cohn AB104-3 Are you ready to take the next step and use building information modeling to share data across the entire
Go to contents 18 3D Visualization of Building Services in Virtual Environment
3D Visualization of Building Services in Virtual Environment GRÖHN, Matti Gröhn; MANTERE, Markku; SAVIOJA, Lauri; TAKALA, Tapio Telecommunications Software and Multimedia Laboratory Department of Computer
Proceedings of Meetings on Acoustics
Proceedings of Meetings on Acoustics Volume 19, 2013 http://acousticalsociety.org/ ICA 2013 Montreal Montreal, Canada 2-7 June 2013 Architectural Acoustics Session 5aAAa: Room Acoustics Computer Simulation
Dimensioning and Estimating Brick Masonry
TECHNICAL NOTES on Brick Construction 1850 Centennial Park Drive, Reston, Virginia 20191 www.gobrick.com 703-620-0010 10 February 2009 Dimensioning and Estimating Brick Masonry Abstract: This Technical
Excerpts from the Canadian National Building Code (NBC)
Excerpts from the Canadian National Building Code (NBC) Reproduced here with Permission of the Copyright Owner, the National Research Council of Canada, Institute for Research in Construction. For more
Copyright 2011 Casa Software Ltd. www.casaxps.com. Centre of Mass
Centre of Mass A central theme in mathematical modelling is that of reducing complex problems to simpler, and hopefully, equivalent problems for which mathematical analysis is possible. The concept of
MAJOR LEARNING OUTCOMES ARCHITECTURE AND URBAN PLANNING 1ST CYCLE PROGRAMS GENERAL ACADEMIC PROFILE
MAJOR LEARNING OUTCOMES Faculty: Major: Course level: ARCHITECTURE ARCHITECTURE AND URBAN PLANNING 1ST CYCLE PROGRAMS GENERAL ACADEMIC PROFILE Positioning of major in the study area The major in Architecture
WHITE PAPERS. Food Processing Plant Design
WHITE PAPERS Food Processing Plant Design Preface The design of your food processing plant can be a lengthy and tedious process, but is where the most critical decisions will be made. Your architects and
NATIONAL INSTITUTE FOR CERTIFICATION IN ENGINEERING TECHNOLOGIES. Level III Content Outline
Fire Alarm Systems Level III Content Outline The skills and knowledge listed under each task are suggestive of those involved in that task, but are not intended to constitute an exhaustive listing. 3.1
Vertex BD. Leading Software Solution for Cold Formed Steel Construction
Vertex BD Leading Software Solution for Cold Formed Steel Construction Architectural Design Framing Engineering Detailing Production One Tool Does It All Leading Software for CFS Construction Vertex BD
3D Drawing. Single Point Perspective with Diminishing Spaces
3D Drawing Single Point Perspective with Diminishing Spaces The following document helps describe the basic process for generating a 3D representation of a simple 2D plan. For this exercise we will be
At the completion of this guide you should be comfortable with the following:
This guide provides instructions and best practices for deployment of the Yealink W52P IP DECT phones and repeaters RT10, which is intended for qualified technicians (or administrator) who will deploy
Coordinating and Sharing Information with Revit Architecture and Revit Structure Best Practices!
Revit Architecture and Revit Structure Best Practices! Erleen Hatfield Thornton-Tomasetti Uk Jung SE304-1 This class identifies best practices using Revit Architecture and Revit Structure for sharing and
drawings_how_to?? Arch 172: Building Construction 1 Fall 2013
drawings_how_to?? Arch 172: Building Construction 1 Fall 2013 Danger!!! The following images are being used as examples of DRAWING METHOD ONLY. Do NOT copy the details. They have been drawn from everywhere
d e n v e r a r t m u s e u m
d e n v e r a r t m u s e u m The Denver Art Museum Expansion will be a dramatic addition to the downtown Denver skyline and will help place Denver among the top art centers in the nation. The new addition
The Integrated Design Process
The Integrated Design Process The Integrated Design Process (IDP) has been developed on the basis of experience gained from a small Canadian demonstration program for high-performance buildings, the C2000
BIM IN FACILITY MANAGEMENT AND MAINTENANCE: THE CASE OF KAISA LIBRARY OF HELSINKI UNIVERSITY
BIM IN FACILITY MANAGEMENT AND MAINTENANCE: THE CASE OF KAISA LIBRARY OF HELSINKI UNIVERSITY Jenni Korpela and Reijo Miettinen Institute of Behavioural Sciences, CRADLE, University of Helsinki, Finland
STATE OF MINNESOTA. BIM GUIDELINE State of Minnesota s Facilities Administration Data Capture Plan
STATE OF MINNESOTA BIM GUIDELINE State of Minnesota s Facilities Administration Data Capture Plan January 2014 TABLE OF CONTENTS GENERAL INFORMATION BUILDING INFORMATION MODELING (BIM)... 1 PURPOSE OF
BIM and Lean Construction Can BIM remove waste from construction processes?
Tekla European BIM Forum 2014 BIM and Lean Construction Can BIM remove waste from construction processes? Assoc. Professor Rafael Sacks What is Lean Construction? Waste in construction? Lean and BIM Synergies
Role of BIM Standards in Quality Assurance
Role of BIM Standards in Quality Assurance Heikki Kulusjärvi Managing Director Solibri, Inc. [email protected] www.solibri.com buildingsmart Finland Construction Process Leaks 30% 100% 70%
Construction Technologies Career Field Pathways and Course Structure
Courses in Structural Systems (DD) Construction Technologies Career Field Pathways and Course Structure PATHWAY COURSES SUBJECT CODE Construction Technology-Core and Sustainable Construction 1 178000 Carpentry
Execution Plan Template Design Modeling
Execution Plan Template Design Modeling NEW CONSTRUCTION By signature below, this Execution Plan is herewith adopted and incorporated into the Agreement, dated, for Professional Design Services between
SECTION 3: ANNEX J UNC CHARLOTTE ILM IMPLEMENTATION PLAN (New Section)
University of North Carolina at Charlotte Design and Construction Manual Section 3, Annex J UNC Charlotte ILM Implementation Plan SECTION 3: ANNEX J UNC CHARLOTTE ILM IMPLEMENTATION PLAN (New Section)
BIM Extension into Later Stages of Project Life Cycle
BIM Extension into Later Stages of Project Life Cycle Pavan Meadati, Ph.D. Southern Polytechnic State University Marietta, Georgia This paper discusses the process for extending the implementation of the
BIM for Interior Designers BIM IN PRACTICE
8 BIM for Interior Designers BIM IN PRACTICE 8 BIM for Interior Designers Contributors: Julia Allen, Geyer Dominik Holzer, AEC Connect Edited by Belinda Hodkinson, SKM BIM utreach 1 Educating Clients -
Tall Building Form Generation by Parametric Design Process
ctbuh.org/papers Title: Authors: Subject: Keywords: Tall Building Form Generation by Parametric Design Process Mahjoub Elnimeiri, Professor, Illinois Institute of Technology Sang Min Park, PhD Candidate,
FACTORS AFFECTING ENERGY CONSUMPTION OF BUILDINGS
FACTORS AFFECTING ENERGY CONSUMPTION OF BUILDINGS 1 Ralf Lindberg, Professor Minna Korpi, M.Sc. Juha Vinha, Dr.Tech. June 11, 2008 Department of Civil Engineering, Tampere University of Technology 2 BACKGROUND
3D Laser Scanning for Manufacturing Facilities Developing the Business Case. By Bill Campbell Founder, Digital Dimensions 360, LLC
3D Laser Scanning for Manufacturing Facilities Developing the Business Case By Bill Campbell Founder, Digital Dimensions 360, LLC Table of Contents Introduction The Importance of Accuracy Workflow and
The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into
The following is intended to outline our general product direction. It is intended for information purposes only, and may not be incorporated into any contract. It is not a commitment to deliver any material,
for AutoCAD The professional s choice for Building Services
for AutoCAD The professional s choice for Building Services With MagiCAD, all modelling is highly automated, fast and accurate. Checking the model and simulating the operation of different systems is easy
ELECTRICAL CONTRACTORS THE UNIVERSITY OF TENNESSEE KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1
KNOXVILLE, TENNESSEE SECTION 16050 PAGE 1 PART 1 - GENERAL 1.01 RELATED DOCUMENTS: SECTION 16050 A. Drawings and general provisions of Contract, including General and Supplementary Conditions and Division-1
Effective Collaboration using Revit Structure and AutoCAD MEP
REVIT STRUCTURE Effective Collaboration using Revit Structure and AutoCAD MEP This white paper explains how structural engineers using Revit Structure software and mechanical/electrical/plumbing (MEP)
Effective Collaboration
AUTODESK BUILDING SOLUTIONS Effective Collaboration Exporting Revit Architecture Models as ACIS Solids for Use in AutoCAD MEP The intent of this paper is to explain a process by which architects using
C r e a t i n g S u s t a i n a b l e D e s i g n s
Architecture Engineering Interiors Project Management C r e a t i n g S u s t a i n a b l e D e s i g n s About Us: Kompass Architects & Engineering Consultants Pvt Ltd is a provider of total professional
Space Planning. Gretchen Addi, Associate AIA, and Jacqueline Lytle, IIDA, Associate AIA. Summary CLIENT NEEDS
Excerpt from The Architect s Handbook of Professional Practice, 13th edition, 2000 Space Planning Gretchen Addi, Associate AIA, and Jacqueline Lytle, IIDA, Associate AIA Space planning is an integral part
The use of BIM in plumbing projects creates deeper project knowledge, delivers a more robust product, and can reduce total project costs.
BIM for plumbing design The use of BIM in plumbing projects creates deeper project knowledge, delivers a more robust product, and can reduce total project costs. BY JUNCHENG (JAMES) YANG, PE, CPD, LEED
Office Space Standards and Guidelines
Office Space Standards and Guidelines Revised: February, 2003 Contents Introduction...3 Principles...3 Definitions...4 Space Allocation Standards...6 Purpose...6 Space Envelope...6 Special Purpose Space...6
BIM and Digital Fabrication
REVIT BUILDING INFORMATION MODELING BIM and Digital Fabrication This whitepaper examines how structural building information models are being used for the digital fabrication of structural steel and the
Project Report. Structural Investigations Hotel del Sol Yuma, Arizona
Project Report Structural Investigations Yuma, Arizona Prepared by: 2619 Spruce Street Boulder, CO 80302 303-444-3620 Prepared for: Principle Engineering Group, Inc. 833 East Plaza Circle, Suite 100 Yuma,
CHAPTER 2 QUANTITY TAKE-OFF
CHAPTER 2 QUANTITY TAKEOFF The quantity takeoff is an important part of the cost estimate. It must be as accurate as possible and should be based on all available engineering and design data. Use of appropriate
Decree of the Ministry of the Environment on fire safety of ventilation systems
THE NATIONAL BUILDING CODE OF FINLAND MINISTRY OF THE ENVIRONMENT Housing and Building Department Decree of the Ministry of the Environment on fire safety of ventilation systems Adopted in Helsinki, 18
Responsibilities of Engineering Surveyors under ISO 9000 in Hong Kong Construction Industry
Responsibilities of Engineering Surveyors under ISO 9000 in Hong Kong Construction Industry Steve Y. W. Lam and Conrad H. W. Tang Department of Land Surveying & Geo-Informatics Hong Kong Polytechnic University,
Using BIM In HVAC Design
This article was published in ASHRAE Journal, June 2010. Copyright 2010 American Society of Heating, Refrigerating and Air-Conditioning Engineers, Inc. Posted at www.ashrae.org. This article may not be
3rd Annual Design Drafting Contest
3rd Annual Design Drafting Contest YTI Career Institute 3 rd Annual Design Drafting Contest The purpose of this contest is to encourage excellence in effort and discipline, and to give recognition to outstanding
MASTER CLASS INTEGRATED PROJECT MANAGEMENT SOFTWARE REPORT 2009. Timo Hartmann [email protected]
Technical Paper #5 MASTER CLASS INTEGRATED PROJECT MANAGEMENT SOFTWARE REPORT 2009 Timo Hartmann [email protected] COPYRIGHT 2009 VISICO Center, University of Twente [email protected] Integrated
SOUND INSULATION FOR AIR CONDITIONERS AND OTHER EXTERNAL MECHANICAL PLANT. Installing and Maintaining Air Conditioning Units
SOUND INSULATION FOR AIR CONDITIONERS AND OTHER EXTERNAL MECHANICAL PLANT Excessive noise from the operation of machines and external mechanical plant can disturb neighbours, disrupt sleep, interfere with
Problem of the Month: Cutting a Cube
Problem of the Month: The Problems of the Month (POM) are used in a variety of ways to promote problem solving and to foster the first standard of mathematical practice from the Common Core State Standards:
BIM Best Practice to Cut Capital and Operational Expenditure: Maximizing Business Value. Professor Mustafa Alshawi
BIM Best Practice to Cut Capital and Operational Expenditure: Maximizing Business Value Professor Mustafa Alshawi Improving Project Performance Current Project Portfolio 1.83 B UAED ($500M) Award Winning
Renovation instructions
1(13) Renovation instructions The purpose of these instructions is to inform you of the things to consider when renovating an apartment. You can avoid many possible problems and additional costs following
Norwegian Tax Authority - Oslo Norway
1. INTRODUCTION Norwegian Tax Authority - Oslo Norway PROJECT SUMMARY Year of construction - 1980 No previous energy renovations SPECIAL FEATURES Main topics in the renovation are: High insulated pre fabricated
CONTE NT DESIGN PROCESS. Appendix. 01 First Issue. 02 Revision A. 03 Revision B. 04 Co-ordination. 05 Panel Thicknesses. 06 Panel Surface Quality
CONTE NT DESIGN PROCESS First Issue 02 Revision A 03 Revision B 04 Co-ordination 05 Panel Thicknesses 06 Panel Surface Quality 07 CNC Timber Processing 08 Panel Standard Sizes 09 Glulam Standard Sizes
Conceptual Design and Analysis in Autodesk Revit Architecture 2011
AUTODESK REVIT ARCHITECTURE 2011 Conceptual Design and Analysis in Autodesk Revit Architecture 2011 In this white paper, CASE Design, a design technology consultancy based in New York City, describes how
BIM and DWF REVIT BUILDING INFORMATION MODELING. About DWF. BIM and DWF
REVIT BUILDING INFORMATION MODELING BIM and DWF This white paper explores how DWF technology extends the building information modeling (BIM) design process and facilitates the sharing of the consistent,
The Shorten AutoCAD the road solution for mechanical, electrical, to done. and plumbing engineering. AutoCAD AutoCAD.
The Shorten AutoCAD the road solution for mechanical, electrical, to done. and plumbing engineering. AutoCAD AutoCAD Civil 3D MEP 2009 More Productivity, Same Skills Michigan-based Peter Basso Associates
CAD Standards. Design Guidelines and Standards. June 2004. Office of the University Architect
Design Guidelines and Standards CAD Standards June 2004 Office of the University Architect Construction Management P.O. Box 210181 Cincinnati, Ohio 45221-0181 Table of Contents Contents CAD STANDARDS Introduction...
t e c h n o l o g y BIM Services 1
BIM Services 1 What is BIM? Building Information Modeling (BIM) is our digital modeling toolset that allows us to create and manipulate virtual model environment with information of services properties
5.2 Drawing Information. 0400 Consultants Procedure Manual. 5.2 Drawing Information: 5.2.2 Large Format Document Standards: Page 1 of 5
Page 1 of 5 5.2 : 5.2.1 General Information:.1 Final drawings for all projects shall be one of the following sizes: 11" x 17", 24" x 36" or 30" x 42". The dimensions refer to the outside edge or cut line.
ARCHITECTURAL TECHNICIAN PROGRAM (T132)
ARCHITECTURAL TECHNICIAN PROGRAM (T132) PROGRAM NAME COURSE CODE SCHOOL CENTRE LOCATION DURATION Architectural Technician T132 Construction Engineering Technology Casa Loma Campus 2 years (4 semesters)
