PRIORITIZATION MODEL RESULTS AIRPORT Prioritization Project Prioritization Rank Name Score 1 Terminal Auto Parking Lot Expansion 55.

Similar documents
Chagrin River Watershed Partners, Inc. Cost Analysis of Low Impact Development Best Management Practices

Strategic Business Plan

Cuyahoga County Airport - A Guide to Funding Capital Improvements

Existing Facilities. Current and Forecast Demand

Green Streets, Places, and Spaces

Pavement Maintenance Management Katie Zimmerman, P.E. Applied Pavement Technology, Inc. (APTech)

STANDARD AND SPECIFICATIONS FOR STORM DRAIN INLET PROTECTION

Integrating Asset Management Principals to Watershed Management: A Risk-Based Approach to Managing Stormwater Assets

Implementing Green Infrastructure in Atlanta

The City of Rockwall Request for Proposals for Fixed Base Operator Services at Ralph M. Hall / Rockwall Municipal Airport

MICHIGAN AIRPORT DEVELOPMENT PROGRAM PACKAGE MDOT Office of Aeronautics. Airport Capital Improvement Plan

SECTION INLETS INLET LOCATIONS

CASFM Stormwater Quality Field Trip June 23rd, 2011

CONSTRUCTION MANAGER S WEEKLY PROGRESS REPORT

AREA: 2.37 acres NUMBER OF LOTS: 1 FT. NEW STREET: 0 LF. Single-family, Non-conforming machine shop

City of Minot CDBG Disaster Recovery Action Plan Amendment #3

Fairlington Community Center

MAIN STREET IMPROVEMENTS Water, Sewer, Stormwater and Streetscape Improvements

City of Atlanta. Department of Watershed Management. Post-Development Stormwater Management Ordinance Summary of Revisions

DRAINAGE SERVICE CHARGES

APPENDIX C INLETS. The application and types of storm drainage inlets are presented in detail in this Appendix.

VILLAS OF TRADITIONS AT GREY OAKS

Chapter 5.0. Stormwater Credits for Innovative Site Planning

Asset Management Approaches to Maximize Effectiveness of Your Stormwater Program

How To Fund An Airport Project

DEVELOPMENT STANDARDS FOR FACILITIES & IMPROVEMENTS. The Virginia Tech/Montgomery Regional Airport Authority November 19, 2002

Interlocking Concrete Pavement Institute (ICPI) Model Stormwater Ordinance for Permeable Interlocking Concrete Pavements August 2010

1800 Washington Boulevard, Baltimore, MD TTY Users Larry Hogan, Governor Boyd

Travel Time. Computation of travel time and time of concentration. Factors affecting time of concentration. Surface roughness

Guidelines for Control of Water Runoff on Small Lots. Revised 6/09

Operations at Coulter Airfield

APPENDIX F. RESIDENTIAL WATER QUALITY PLAN: ALLOWABLE BMP OPTIONS

Merrill Field Airport Anchorage: Performance. Value. Results.

Locust Valley High School Flood Remediation

Appendix 6. Permeable Alley Preliminary Evaluation

CCTV PIPE INSPECTION AND EVALUATION RUNWAY 17L-35R

Land Disturbance, Erosion Control and Stormwater Management Checklist. Walworth County Land Conservation Department

DRAINAGE :: DRAINAGE CONCERN FREQUENTLY ASKED QUESTIONS

SUSTAINABILITY INITIATIVE: PERMEABLE PAVEMENT: ADAPTING TO STORMWATER MANAGEMENT CHALLENGES

STORM WATER PROJECT COST ESTIMATES & LOCATION MAPS. Appendix F

Permeable Interlocking Concrete Pavements

Figure 3 Pipe Cracking

City of Friendswood FY 2010 Capital Improvements Program - Water & Sewer Projects 5-Year CIP

Home Drainage & Causes of Basement Flooding. Water

Module 6 : Quantity Estimation of Storm Water. Lecture 6 : Quantity Estimation of Storm Water

Green Alley. Handbook. The Chicago. Richard M. Daley, Mayor City of Chicago. An Action Guide to Create a Greener, Environmentally Sustainable Chicago

Comprehensive Plan Drainage Subelement

SECTION 5 DRAFTING STANDARDS

COPPER BEECH TOWNHOME DEVELOPMENT

TOWN OF SURFSIDE UTILITY UPGRADE PROJECT Project Completion

STORM DRAINS CHAPTER 7

Introduction to sustainable drainage.

FIRST RESPONSE: STORM DAMAGE MITIGATION OF A BMP FAILURE

CHAPTER 8 - FINANCIAL PLAN

Review of Footing Drain Disconnection Projects

PARKVILLE HIGH SCHOOL LIMITED RENOVATION

STANDARD SPECIFICATIONS

San Francisco s Urban Watershed Framework: A Decision Making Process to Support Multi-Benefit Wastewater and Stormwater Projects September 26, 2011

4.3 Cisterns and Rain Barrels

Permeable Pavement Operation & Maintanence Guide

Post-Construction Stormwater Management Checklist* (5,000 SF or Greater)

Executive Director s Budget Message

PROPERTY EVALUATION AND RESERVE FUND STUDY

PUBLIC WORKS COMMISSION: PAVING WORK GROUP

Columbus State Community College MASTER PLANNING

Visual Integration of Compound Events. A presentation to the Climate Compact of Southeast Florida

Project Rankings. Fiscal Year Capital Improvement Plan

Computing Stormwater Runoff Rates and Volumes

Table of Contents ALPHABETIZED LIST OF CIP PROJECTS... 1 CIP 5 YEAR SUMMARY BY CATEGORY SMART CITY CIP 5 YEAR SUMMARY BY VISION...

Summary of Potential Storm Drain Projects and Programs

Massachusetts Department of Environmental Protection Bureau of Resource Protection - Wetlands Program Checklist for Stormwater Report

SOLD. Lot 1. 1 Mile: Population: 10,200 Median HH Income: $33, Mile: Population: 80,200 Median HH Income: $34,900

MARYLAND AVENUE BACKUPS DURING AUGUST 31, 2014 STORM EVENT COMMUNITY OUTREACH

Accela Automation User Manual for Gwinnett County Automated Inspection Request System (IVR)

Components of a Basement Flooding Protection Plan: Sewer System Improvements. November 2000

PROJECT PROPOSAL FOR THE SUPPLY AND OF A MULTI-PURPOSE AIRCRAFT HANGAR, A PARALLEL TAXI-WAY, NEW TERMINAL BUILDING AND

CHAPTER 8 CIVIL DESIGN

Triple Bottom Line (TBL) Analysis Favors Green Infrastructure Over Offline Storages to Mitigate the Upper Olentangy CSOs

Description Quantity Cost Total Cost

Operations and Maintenance

DRAFT MAINTAINING HOUSTON S STREETS REPAIR, REHABILITATION, RECONSTRUCTION. Using the Full Range of Tools for a Challenging Job

CHAPTER 7. AIRSPACE 7.1 AFFECTED ENVIRONMENT

Thin Whitetopping Application at Williamsburg Regional Airport and Other Thin Whitetopping Airport Applications.

Table 4.9 Storm Drain Inlet Protetion Applicable for

AIRFIELD DRIVING TEST

PROJECT COST ESTIMATE ASSUMPTIONS AND EXCLUSIONS

2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES

DISTRICT OF COLUMBIA WATER AND SEWER AUTHORITY. a guide to PREVENTING SEWER BACKUPS AND FLOODING

Alternatives RIAC 5.1 INTRODUCTION 5.2 WORKING ASSUMPTIONS

VILLAGE OF LOMBARD CONTRACT DOCUMENT NUMBER ST BID PROPOSAL

CITY OF VISTA STANDARD DRAWINGS (PRELIMINARY, FOR REVIEW)

Private storm drain inlet retrofitting requirements - Purpose. Sec Private storm drain inlet retrofitting requirements - Definitions.

CONSTRUCTION STORMWATER POLLUTION PREVENTION PLAN TEMPLATE

STAFF REPORT TO COMMITTEE OF THE WHOLE

AGENCY COORDINATION AND PUBLIC INVOLVEMENT

SUMP PUMP. City of Ann Arbor & C O L L E C T I O N S Y S T E M G L O S S A R Y

ORDINANCE NO. 511 ORDINANCE ESTABLISHING A COST REIMBURSEMENT PROGRAM FOR THE INSTALLATION OF OVERHEAD SEWERS OR BACKFLOW PREVENTION DEVICES

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Operation & Maintenance Document Templates

Transcription:

PRIORITIZATION MODEL RESULTS AIRPORT itization Project itization Rank Name Score 1 Terminal Auto Parking Lot Expansion 55.65 2 Runway Safety Extension 51.97 3 Terminal Expansion 48.01 4 Runway Rehabilitation and Pavement Markings 43.80 5 Looping Water Main 40.31 6 Rehabilitate and Expand Terminal Apron with Lighting 36.95 7 Reconstruct Southeast and Northeast Taxiways 33.77 8 Access Road Reconstruction ( Blvd) 30.53 9 Stormwater Detention Pond and System 29.84 10 Taxilane for Box Hangers 28.07 11 Six Box Hangers 17.75 12 New Corporate Hanger 13.95

FIGURE 1 Benefit Score by Criteria Weight Composition Be enefit Score 60 50 40 30 20 Energy O & M (Operations & Maintenance) System Influence/Capacity Partnerships Economic Development/Retention Innovation User Experience (Level of Service) Coordination with Other Projects Funding Master Plan Objectives Sustainability Framework Goals Safety/Compliance/Emergency Preparedness 10 0 Project

PROJECT NAME: Access Road Reconstruction ( Blvd) Project ID: TR AP 03 01 itization Model Rank: 8 Project Type: Capital Maintenance itization Model Score: 30.53 Rehabilitation of existing Blvd. Include pedestrain sidepath along one side of Blvd (approximately 2000 LF); include boulevard entrance at Ellsworth; install curb and gutter and conveyance storwater pipes thereby reducing flow to County drain system Condition Analysis Design Start: October December 2015 Design End: January March 2016 $32,000.00 Construction: April June 2016 To: October December 2016 $407,000.00 enue Source Name 2748 $0 $22 $0 $0 $0 $0 $0 $0 $22 2260 MI: Other State Grants (, MDNR) $0 $417 $0 $0 $0 $0 $0 $0 $417 $0 $439 $0 $0 $0 $0 $0 $0 $439

PROJECT NAME: Looping Water Main Project ID: TR AP 10 02 itization Model Rank: 5 Project Type: New Construction itization Model Score: 40.31 City Completion of water main loop identified during plan review of new box hangars Twp involvement with connecting to Twp main in Ellsworth. Backflow prevention. Capacity Analysis Master Plan 1: Master Plan 2: Design Start: October December 2017 Design End: January March 2019 $30,000.00 Construction: April June 2019 To: July September 2019 $300,000.00 enue Source Name 2748 $0 $0 $0 $330 $0 $0 $0 $0 $330 $0 $0 $0 $330 $0 $0 $0 $0 $330

PROJECT NAME: Storm Water Detention Pond and System Project ID: TR AP 03 03 itization Model Rank: 9 Project Type: New Construction & Replacement itization Model Score: 29.84 Modification of the airport's stormwater drainage and detention system for the airport's existing and future facilities north of the Wood Drain Creekshed, including the removal of an small, existing pond at the Bijan Air facility. Market driven (need for additional hangars) Allowance for future hanger develo Design Start: October December 2023 Design End: January March 2024 $15,000.00 Construction: April June 2024 To: July September 2024 $113,000.00 enue Source Name 2748 $0 $0 $0 $0 $0 $0 $0 $6 $6 2260 MI: Other State Grants (, MDNR) $0 $0 $0 $0 $0 $0 $0 $122 $122 $0 $0 $0 $0 $0 $0 $0 $128 $128

PROJECT NAME: New Corporate Hangar Project ID: TR AP 08 02 itization Model Rank: 12 Project Type: New Construction itization Model Score: 13.95 New corporate hangar near terminal Economy driven for need Tenants Capacity Analysis Master Plan 1: Master Plan 2: Design Start: October December 2017 Design End: January March 2018 $70,000.00 Construction: April June 2018 To: October December 2018 $930,000.00 enue Source Name 2748 $0 $0 $0 $1,000 $0 $0 $0 $0 $1,000 $0 $0 $0 $1,000 $0 $0 $0 $0 $1,000

PROJECT NAME: Reconstruct Southeast and Northeast Taxiways Project ID: TR AP 14 01 itization Model Rank: 7 Project Type: Replacement itization Model Score: 33.77 Southeast and Northeast Taxiways Reconstruction of aged pavements Examine possible use of permeable pavement; coordination with tenants Condition Analysis Planning Start: 0 Planning End: 0 $0.00 Design Start: July September 2021 Design End: October December 2021 $75,000.00 Construction: April June 2022 To: July September 2022 $1,063,000.00 enue Source Name 2260 MI: Other State Grants (, MDNR) $0 $0 $0 $0 $0 $0 $0 $1,138 $1,138 $0 $0 $0 $0 $0 $0 $0 $1,138 $1,138

PROJECT NAME: Rehabilitate and Expand Terminal Apron with Lighting Project ID: TR AP 03 07 itization Model Rank: 6 Project Type: New Construction & Replacement itization Model Score: 36.95 Rehabilitate existing and expand terminal apron. Replace existing terminal apron lighting and install lighting for the new general aviation aircraft parking apron. Examine use of LED's. Condition Analysis Customer Level of Service Capacity Analysis Design Start: October December 2021 Design End: January March 2022 $100,000.00 Construction: April June 2022 To: July September 2022 $1,457,000.00 enue Source Name 2748 $0 $0 $0 $0 $0 $0 $0 $78 $78 2260 MI: Other State Grants (, MDNR) $0 $0 $0 $0 $0 $0 $0 $1,479 $1,479 $0 $0 $0 $0 $0 $0 $0 $1,557 $1,557

PROJECT NAME: Runway Rehabilitation and Pavement Markings Project ID: TR AP 16 01 itization Model Rank: 4 Project Type: Capital Maintenance itization Model Score: 43.8 Rehabilitate aging runways Refresh pavement markings for runways and taxiways; miscellaneous concrete repairs to runways and taxiways Condition Analysis Customer Level of Service Master Plan 1: Master Plan 2: Planning Start: 0 Planning End: 0 $0.00 Design Start: July September 2017 Design End: October December 2017 $16,000.00 Construction: April June 2018 To: July September 2018 $154,000.00 enue Source Name 2748 $0 $0 $0 $170 $0 $0 $0 $0 $170 $0 $0 $0 $170 $0 $0 $0 $0 $170

PROJECT NAME: Runway Safety Extension Project ID: TR AP 10 04 itization Model Rank: 2 Project Type: New Construction itization Model Score: 51.97 (Runway 6 24) Addressing local safety concerns clearance at State Road (15 foot minimum) and Part 77 Transitional Surface (steep approach angle); line of sight problem from tower; runway overruns. B2 aircraft critical aircraft under state (4300 foot runway recommended), existing runway 3500 feet; Consider State Rd Corridor Study recommendations; shifting runway to southwest to address safety concerns; LED's; include approach study; rehabilitate WC Master Plan 3: State Road Corridor Study (Pittsfield) Master Plan 4: Design Start: January March 2015 Design End: April June 2015 $233,000.00 Construction: July September 2015 To: October December 2015 $2,656,000.00 enue Source Name 2748 $0 $144 $0 $0 $0 $0 $0 $0 $144 2260 MI: Other State Grants (, MDNR) $0 $2,745 $0 $0 $0 $0 $0 $0 $2,745 $0 $2,889 $0 $0 $0 $0 $0 $0 $2,889

PROJECT NAME: Six Box Hangers Project ID: TR AP 10 01 itization Model Rank: 11 Project Type: New Construction itization Model Score: 17.75 Additional tenant space Timing based on market demand. Tenants Capacity Analysis Design Start: October December 2017 Design End: January March 2018 $100,000.00 Construction: April June 2018 To: October December 2018 $900,000.00 enue Source Name 2748 $0 $0 $0 $1,000 $0 $0 $0 $0 $1,000 $0 $0 $0 $1,000 $0 $0 $0 $0 $1,000

PROJECT NAME: Taxilane For Box Hangers Project ID: TR AP 10 06 itization Model Rank: 10 Project Type: New Construction itization Model Score: 28.07 Connect new box hangers to taxiway Timing based on market demand for new box hangers Tenants Capacity Analysis Planning Start: July September Planning End: July September $0.00 Design Start: October December 2022 Design End: January March 2023 $12,000.00 Construction: April June 2023 To: October December 2023 $181,000.00 enue Source Name 2748 $0 $0 $0 $0 $0 $0 $0 $10 $10 2260 MI: Other State Grants (, MDNR) $0 $0 $0 $0 $0 $0 $0 $183 $183 $0 $0 $0 $0 $0 $0 $0 $193 $193

PROJECT NAME: Terminal Auto Parking Lot Expansion Project ID: TR AP 03 10 itization Model Rank: 1 Project Type: New Construction itization Model Score: 55.65 Expand existing terminal area automobile parking lot. Examine parking lot standards for Pittsfield Township with goal to achieve them; consider porous pavement and rain gardens (stormwater BMP's), LED lighting. Capacity Analysis Design Start: July September 2016 Design End: October December 2016 $33,000.00 Construction: April June 2017 To: October December 2017 $323,000.00 enue Source Name 2748 $0 $0 $18 $0 $0 $0 $0 $0 $18 2260 MI: Other State Grants (, MDNR) $0 $0 $338 $0 $0 $0 $0 $0 $338 $0 $0 $356 $0 $0 $0 $0 $0 $356

PROJECT NAME: Terminal Expansion Project ID: TR AP 99 11 itization Model Rank: 3 Project Type: New Construction & Capital Maintenance itization Model Score: 48.01 Expand terminal to include full access (day and night), accessible restrooms and meeting room(s) and pilot's lounge. Energy improvements; examine use of green roof Capacity Analysis Condition Analysis Customer Level of Service Design Start: October December 2018 Design End: January March 2019 $57,000.00 Construction: April June 2019 To: July September 2019 $704,000.00 enue Source Name 2748 $0 $0 $0 $0 $38 $0 $0 $0 $38 2260 MI: Other State Grants (, MDNR) $0 $0 $0 $0 $723 $0 $0 $0 $723 $0 $0 $0 $0 $761 $0 $0 $0 $761