How To Create Evaluation And Add A Detached Garage To SIMSOL

Similar documents
RELEASE NOTES EG USA 3.0.0

Microsoft Access 2007 Advanced Queries

CMS/ Custom Maintenance Software. Operating Manual

Commercial Building Valuation Report

Mike Bowman, Inc. Preparing a Comparative Market Analysis

Managing Contacts in Outlook

Avery Wizard: Using the wizard with Microsoft Word. This is a simple step-by-step guide showing how to use the Avery wizard in word

Mac Outlook Calendar/Scheduler and Tasks

NATIONAL FLOOD INSURANCE PROGRAM (NFIP) SUBSTANTIAL DAMAGE/ SUBSTANTIAL IMPROVEMENT (50% RULE)

Special Use Commercial Properties

Estimated Cost of Repair

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE NOTICE TO PROPERTY OWNER

3/23/2015 FEMA NFIP. Session Overview

Chapter 4. Reserving Resources on StatusBoard 2.0. Objectives

Mail Merge (Microsoft Office 2010)

In this example, Mrs. Smith is looking to create graphs that represent the ethnic diversity of the 24 students in her 4 th grade class.

Commercial Building Valuation Report

How-To Change your Account Settings in Office Outlook 2010:

How to use Backitup Modify Existing Schedule jobs

Physical Address/Intersection: Name of Project: Within a NFIP 100/500yr Floodzone:

MAS 90 Demo Guide: Accounts Payable

LX85 Series LCD TV Hudson Firmware Installation Instructions. Table of Contents

Special Inspection/Re Inspection, all Divisions $ per hour, one hour minimum

Creating an Access Database. To start an Access Database, you should first go into Access and then select file, new.

Appointments Module. User s Manual

Curve Fitting in Microsoft Excel By William Lee

To launch the Microsoft Excel program, locate the Microsoft Excel icon, and double click.

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

Presentations and PowerPoint

Microsoft Word 2011: Create a Table of Contents

Database Program Instructions

SUBSTANTIAL IMPROVEMENT OR SUBSTANTIAL DAMAGE APPLICATION REVIEW

Important Information for Owners of Buildings in Flood Zones

Kronos 6 Work Force Time Keeping System. Manager Procedure Manual

MAJOR 2015 MN RESIDENTIAL CODE CHANGES Effective Date: January 24 th, 2015

Lab: Data Backup and Recovery in Windows XP

To successfully initialize Microsoft Outlook (Outlook) the first time, settings need to be verified.

Visual Tutorial Basic Edition 1. Visual. Basic Edition Tutorial.

House Design Tutorial

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

HADS 2.1.0e Installation and migration

SUBSTANTIAL IMPROVEMENT/DAMAGE NOTICE TO PROPERTY OWNERS

Installing a printer in Windows 95.

Tutorial: Creating a form that s the results to you.

The Purchasing Wizard

Constant Contact User Manual

Lab - Data Backup and Recovery in Windows XP

Vmed QUICKSTART PC-DISPLAY INSTALLATION & PC-Display and Bluetooth Instructions

Steps to Create a Database

Leica 3D Disto Application Veranda / Conservatory

CHEG 3128 Heat, Mass, & Kinetics Laboratory Diffusion in Laminar Flow Regimes Modeling and COMSOL Tutorial Tutorial by Andrea Kadilak

Microsoft Outlook 2003 Module 1

CREATING EXCEL PIVOT TABLES AND PIVOT CHARTS FOR LIBRARY QUESTIONNAIRE RESULTS

Drupal Training Part One

Taco Hydronic System Solutions Quick Start Guide

Saint Cloud Business Center

2. Complete the appropriate sections of the Auto/Home Quote form. 4. Return all materials to Paul Goebel Group. or your local Citizens Agent.

OFFICE SPACE FOR LEASE

Professional Fire Software Control Center. Fire Training Module Training Manual

From Page 1 of form:

Introduction to Microsoft Access 2007

Flip Video Digital Camcorder Startup Guide and Making Movies Tutorial Trevor Oakley, Teen Services Librarian, Saratoga Springs Public Library

Measuring Single Family Dwellings Town homes Condominium Units. P) ~ F)

Personalizing your Access Database with a Switchboard

Click on various options: Publications by Wizard Publications by Design Blank Publication

Creating a Poster in PowerPoint A. Set Up Your Poster

Microsoft Excel Basics

A. I do not have my own personal certificate I am a new client or want to download a new certificate

How to turn off Pop-up Blockers

52 Ways To Save. 3. Ask for feedback. Ask about the pros and cons of different elements of your design and how each will affect your budget.

CHARLOTTE COUNTY Community Development Department

IES <Virtual Environment> Tutorial. Apache Sim (Version 6.0)

Residential Adjustments. Overview 4.1

TABLE OF CONTENTS. INTRODUCTION... 5 Advance Concrete... 5 Where to find information?... 6 INSTALLATION... 7 STARTING ADVANCE CONCRETE...

Facilities and Safety How-To Guide: Accessing and Using Your UCF Webmail Account

Creating tables of contents and figures in Word 2013

The primary format type that we use is the one highlighted on top (Microsoft Word 97/200/XP (.doc))

Creating a PowerPoint Poster using Windows

Envision Credit Card Processing With EMV

Navigation Tree Plug-Ins for management Preview Area. Your Website Appears HERE

BUILDING SAFETY UNIT

How To Archive s On Groupwise On A Pc Or Mac Or Mac (For Mac) On A Mac Or Ipad (For Pc Or Ipa) On An Ipa Or Mac) (For Ipa).Com (For Pb

RESIDENTIAL BUILDING PERMIT REQUIREMENTS

cüéä wxçà tä VâáàÉÅ [ÉÅxá

Using WINK to create custom animated tutorials

Time Tracking for Employees

The WinStack Tenant Management System (TMVu) Overview

Microsoft Office Access 2007 Basics

SMS for Outlook. Installation, Configuration and Usage Guide

Lesson 8: LMS Inventory Wizard

Employee Appointment Books. User s Manual

How to create PDF maps, pdf layer maps and pdf maps with attributes using ArcGIS. Lynne W Fielding, GISP Town of Westwood

Sales Person Commission

TURN-KEY LAB SPACE AVAILABLE

Welcome! Want to find out more? Follow this tutorial, then launch Part 1 to get started.

VIVA 4G LTE Mini Router. Quick Start Guide

Personal Portfolios on Blackboard

Task Card #2 SMART Board: Notebook

CREATING A 3D VISUALISATION OF YOUR PLANS IN PLANSXPRESS AND CORTONA VRML CLIENT

Substantial Improvement/ Damage Review

Transcription:

This document will guide you through on How to Create and Add a Detached Garage to SIMSOL s Evaluation Program. Currently the NFIP Flood Program requires the detached garage be addressed in the Final Report. Please note, you do not want to include your detached garage in your 80% Insured to Value determination in your building estimate. This will penalize the insured from possibly qualifying them for full replacement cost. If at any time help is needed, please call us at Simsol Technical Support at 800-447-4676 and selected option 1 Technical Support. Please follow the directions below on properly create an evaluation and detached garage in Simsol: Steps for Preparing a Building Evaluation with Detached Garage: This tutorial will teach you how to properly create a building evaluation with a detached garage and apply it to the SIMSOL Estimate. Step One: Creating Your Evaluation In this tutorial, you will add a square foot valuation to a pre-existing claim. To begin this exercise make sure you are in an existing claim. 1) Create a new square foot valuation using the speed button at the top labeled New Valuation. 2) Once you create the new valuation, the valuation wizard will automatically start with the first screen titled Valuation information. Title the valuation Main Risk and use today s date as the valuation date. Continue to the next screen using the Next button. 3) On the Building Type screen, select the following building type: BUILDING TYPE: Single Family Residence Wood Frame 6 Corners When done select Next to advance to the next screen.

4) On the Building Information Screen use the following data to complete the screen: BUILDING INFORMATION: Total Area: Stories: 2175 SF 2-Story: 1 st. Floor 1275 SF 2 nd. Floor 900 SF Story Height: 8 Quality: Year Built: Class 4 Good Std. 2000 - Economic Age (Same Age) 50+Miles From Metro Area:Yes Bldg. On Slab: 1275 SF When done select Next to advance to the next screen. 5) On the Building Components screen, edit the roofing component as follows: BUILDING COMPONENTS: Roofing: Override to Class 2 (Multi-level,slate, tile or flat surface, decorative details.) Hint: Double Left Click on the desired Component. When done select Next to advance to the next screen.

Click OK to Accept and Continue

6) On the Additions to the Building, complete the following additions: Please follow steps for adding Detached Garage for Flood Claim in SIMSOL ADDITIONS TO BUILDING: Garage, Single Family Dwellings: Area: Detached - Finished 450 square foot 1. From the Construction Additions to the Building Screen, click Garages Single Family Dwelling. Double Left Click Detached Finished 2. Insert 450 SF and click the OK button.

3. Detached Garage amount is displayed, please see below screen shot. 4. In order to apply the proper evaluation for detached garage for the house which is being evaluated, you first must determine the price per square foot of the garage. Take the total square foot of the garage and divided it by the total amount generated by the evaluation as shown above. (19,073.25 / 450 = 42.38 per sqft.) 5. Please retain these figures: 450 sqft. @ 42.38=19,073.25. These figures will then be transferred into the APS Evaluation Section in the SIMSOL CLAIM once the building evaluation is completed. 6. Right click on the Garages Single Family Dwelling and select the delete option. You do not want to include this amount in the original building evaluation. Please note, you originally added this item in the evaluation in order to determine proper amount for the type of detached garage being evaluated. 7. Proceed with your evaluation of the building by clicking next. 7) On the Building Built-in screen complete the following additions: BUILDING BUILT-IN ITEMS: Heating & Cooling Eq. Single Family Res. HVAC: Area: Central Ducted Air Systems, Forced Air Heating and Cooling, Overhead Outlets. 2175 square foot

Double Left Click on Central Ducted Air Systems, Forced air heating and cooling, Overhead Outlets. Validate the livable square footage under air (2,175) and click OK to accept. When done select Next building evaluation. to advance to the next screen which displays the total Steps for Applying the Building Evaluation with Detached Garage to the SIMSOL Claim: Once the building evaluation is complete along with the price per square foot of the detached garage, it must be applied to the BUILDING and APS Estimates of the claim, please see the steps below: Applying the Building Evaluation the Estimate Select the Building Estimate Information Screen from the Claims Enclosure Tree Hint: (Gold Padlock)

1. Click Bldg. Info Icon located top center of the screen. This displays the Building Description and Valuation Information Screen shown below: 2. Locate the Description Field Box and select the down arrow. The Valuation name will be displayed. Click the Valuation name from the drop down box and the evaluation amounts be inserted and now will be included on all Flood Forms. Applying the Detached Garage Evaluation to the APS Estimate Select the Building Estimate Information Screen from the Claims Enclosure Tree Hint: (Gold Padlock) 1. Click Bldg. Info Icon located top center of the screen. This displays the Building Description and Valuation Information Screen shown below:

2. Locate the Description Field Box and type Detached Garage followed by the square footage of the Detached Garage of (450sqft example) in the SQFT field box. Apply the Cost per SF of 42.38 (obtained by the Building Valuation for Detached Garage). RCV Amount will then be displayed just add depreciation and the amounts will then be applied to all relative flood forms. As stated above if you need further assistance please call 1-800 447-4676 option 1 for Technical Support. (Sample of Claim Summary NFIP Final Report)