Marienplatz Underground Station, Munich Tunnelling method by using soil freezing

Similar documents
BUTE Department of Construction Management and Technology

Appendix D.1. Testing Requirements for Infiltration, Bioretention and Sand Filter Subsoils

CONSTANT HEAD AND FALLING HEAD PERMEABILITY TEST

9.00 THE USE OF HUNTER LAND DRAINAGE PERFORATED PIPES. Hunter Underground Systems

STRUCTURES Excavation and backfill for structures should conform to the topic EXCAVATION AND BACKFILL.

Construction sites are dewatered for the following purposes:

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

PRESENT ISSUES FOR CENTRE DE LA MANCHE DISPOSAL FACILITY

Unit Price Averages Reports

[4] SA1.2 The student demonstrates an understanding of the processes of science by observing,

SECTION 55 PIPE FOR STORM DRAINS AND CULVERTS (FAA D-701)

Geotechnical Building Works (GBW) Submission Requirements

Soils, Foundations & Moisture Control

TBM CROSSING OF STATIONS

Storm Drain Inlet Protection - IP

Milan M5 metro extension the construction of Lotto station

APPLICATION FOR DEMOLITION & RIGHT-OF OF-WAY PERMIT

The Manitoba Water Services Board SECTION Standard Construction Specifications PIPE EXCAVATION, BEDDING AND BACKFILL Page 1 of 11

INSITU TESTS! Shear Vanes! Shear Vanes! Shear Vane Test! Sensitive Soils! Insitu testing is used for two reasons:!

EXPERIMENT 10 CONSTANT HEAD METHOD

BMP-7. A sediment filter or an excavated impounding area around a storm drain drop inlet or curb inlet.

SHAFT CONSTRUCTION IN TORONTO USING SLURRY WALLS

Watershed Works Manual

PERMEABILITY TEST. To determine the coefficient of permeability of a soil using constant head method.

International Greenhouse Company

CW 3110 SUB-GRADE, SUB-BASE AND BASE COURSE CONSTRUCTION TABLE OF CONTENTS

Types of Mining - Expert Table

Amendment to OPSS 415 (Nov 2008) Construction Specification for Pipeline and Utility Installation by Tunnelling

Section 2100-Trenching and Tunneling

VOLUME AND SURFACE AREAS OF SOLIDS

DUPLEX ROLLERS AND TRENCH COMPACTORS. LP range

Member Nation Report 2010 from Denmark.

Hydraulic Excavators

A perforated conduit such as pipe, tubing or tile installed beneath the ground to intercept and convey ground water. or structures.

COSMOS 2012: Earthquakes in Action COSMOS 2012

Designed and Engineered to Perform

Tunnelling & Underground. Specialists

CHAPTER 2 QUANTITY TAKE-OFF

Design, Testing and Automated Monitoring of ACIP Piles in Residual Soils

Appendix A Sub surface displacements around excavations Data presented in Xdisp sample file

HIGHWAYS DEPARTMENT GUIDANCE NOTES ON SOIL TEST FOR PAVEMENT DESIGN

Cardok Sàrl CP37 CH-1295 Tannay Switzerland Phone:

Guide to working on Public Sewers

SPECIFICATION FOR PIPE SUBSOIL DRAIN CONSTRUCTION

How To Prepare A Geotechnical Study For A Trunk Sewer Project In Lincoln, Nebraska

GUIDELINE FOR HAND HELD SHEAR VANE TEST

Stormwater/Wetland Pond Construction Inspection Checklist

PILE FOUNDATIONS FM 5-134

(25) CONCEPT STUDY OSLO HUB A MEGA PROJECT Nina Tveiten Norwegian National Rail Administration

Specification Guidelines: Allan Block Modular Retaining Wall Systems

EXCAVATION AND PILING NEAR SEWERS, STORMWATER DRAINS AND WATER MAINS

High Strain Dynamic Load Testing of Drilled Shafts

Treatment Practice for Controlling Water Damage in the Annular Space of Shaft Freezing Hole

Chapter 3 Pre-Installation, Foundations and Piers

How To Retaining Wall Guide

Indiana State Department of Health Construction Guidelines for Gravity and Flood-Dose Trench Onsite Systems

CHAPTER 11 STORM DRAINAGE

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Construction Dewatering and Ground Freezing

ARCHITECTURAL TECHNOLGY 4 ADVANCED CONSTRUCTION TECHNOLOGY BASEMENT CONSTRUCTION YEAR 3 SEMESTER 1 AIDAN WALSH R Lecturer: Jim Cahill

SUPPLEMENTAL TECHNICAL SPECIFICATIONS BI-DIRECTIONAL STATIC LOAD TESTING OF DRILLED SHAFTS

Module 7 (Lecture 24 to 28) RETAINING WALLS

LANDSCAPING AQUA SPORT. Rainwater treatment using filter substrate channel. DIBt approval applied for

Sample Project with SlurryTBM according to Anagnostou and Kovári

Attachment G-1: Pit Latrine Diagram. Fig E.1a: Pit Latrine. Fig E.1b: Plan View of Twin Pits

Membrane for tunnels and underground construction

TECHNICAL NOTE Lining of Casings with SaniTite HP Pipe

SECTION GUARDRAILS

Report on. Wind Resistance of Signs supported by. Glass Fiber Reinforced Concrete (GFRC) Pillars

KWANG SING ENGINEERING PTE LTD

Rain Gardens: Designing your Landscape to Protect Aquatic Resources. Curtis Hinman WSU Extension Faculty Watershed Ecologist

Preventing Basement Flooding

Comprehensive Design Example 2: Foundations for Bulk Storage Facility

SOUTHWEST FLORIDA WATER MANAGEMENT DISTRICT RESOURCE REGULATION TRAINING MEMORANDUM

FRANKIPILE. High Pile Loads Optimum Adaptation to Foundation Soil Low-noise Manufacturing Process

GOWANUS EXPRESSWAY TUNNEL PRIMER

TABLE OF CONTENTS. Manhole, Frame, and Cover Installation (includes Drop Manhole) Additional Manhole Depth

Eurocode 7 - Geotechnical design - Part 2 Ground investigation and testing

The Follo Line Project

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

SOME EXPERIENCE FROM THE SOFT GROUND TUNNELLING IN URBAN AREA

GEOTECHNICAL ENGINEERING FORMULAS. A handy reference for use in geotechnical analysis and design

Culvert Rehabilitation A presentation by ms consultants, inc. engineers, architects, planners

EXPLAINING GROUNDWATER AND WATER WELLS

The CLIPPER Solutions

SECTION 1 GENERAL REQUIREMENTS

LEGACY REPORT ER ICC Evaluation Service, Inc. Reissued November 1, Legacy report on the 1997 Uniform Building Code

Protecting Your Pools Crack Treatments

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

Underground Injection Control Storm Water Information

APPLICATION PROCEDURES FOR PLACEMENT OF UNDERGROUND WATER AND SEWER PIPELINES IN THE VICINITY OF TRANSPORTATION FACILITIES UNDER THE

Sewer network renovation using glass-fiber reinforced (GRP) pipe liners

SOIL MECHANICS Assignment #4: Soil Permeability.

4 SENSORS. Example. A force of 1 N is exerted on a PZT5A disc of diameter 10 mm and thickness 1 mm. The resulting mechanical stress is:

Safe & Sound Bridge Terminology

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

Specification for tunnelling third edition. The British Tunnelling Society and The Institution of Civil Engineers

FY08 SEWER POINT REPAIRS BID TABULATION

Transcription:

Marienplatz Underground Station, Munich Tunnelling method by using soil freezing

Underground station Marienplatz visualisation Marienplatz The underground station Marienplatz is by far the most frequented traffic intersection of the Munich regional train and underground transport system. The possibility to change from underground lines U3/U6 to the regional train lines as well as its location in the heart of Munich provoke huge numbers of passengers. After the decision in 2001 to build a new football stadium in Fröttmaning just outside Munich linked to the town centre by underground line U6, it was certain: In time for the Football World Cup 2006 in Germany, the station Marienplatz, since long time at its capacity limit, had to be significantly enlarged. The aim was to efficiently ease the passenger flow. The examination of different concepts resulted in a solution that envisaged two tunnels running parallel to the platforms and connected to them by eleven gallery-like cross-cuts, thus, nearly doubling the platforms surface. The construction comprised interference into the ground only ten metres underneath the Munich City Hall. The very sensitive historic building was not be harmed under no circumstances by settlement intolerances. That is why a tunnel drilling method was chosen that used partial soil freezing expected to cause the least possible interference in the ground and to offer huge advantages in terms of risk consideration. SSF Ingenieure was responsible for the whole final design of this variant proposal and was awarded in 2005 the engineering price of the Bavarian Chamber of Civil Engineers for enlargement of the platforms of underground station Marienplatz. Picture credits: Lang Hugger Rampp GmbH Architekten Ground On top, the ground consists of sandy fine and coarse gravel. A huge closed groundwater horizon is missing; only singular quaternary water due to infiltrating rainwater had to be expected. In the underlying clays and silt are very thick (7.5 to 12 meters) layers of fine and medium dense sands that stow the ground water. They carry groundwater that is in parts highly pressurized (confined groundwater). It was difficult to handle the relicts of the first underground construction of the years 1966 to 1970. Several filter wells and groundwater levels were not rebuilt according to the current state-of-the-art and could not be clearly located.

Construction process Behind the City Hall two oval starting pits were built. For each shaft two superimposed bored piles with 1.2 m diameter up to 30 metres deep were erected and equipped with additional reinforced concrete rings at the height of the tunnel starting point to protect it from earth pressure. Next, two pilot shafts for soil freezing were excavated. The approximately 100 metre long pilot shafts had an inner diameter of two metres and were constructed by using reinforced concrete rings that were pushed into the ground one after the other from the starting pit. The working chamber for the mining machine at the working head was put under overpressure in order to keep the groundwater away which occurred in the sand layers with a thickness of 2 to 5 meters. Soil freezing Initially the extension of the underground station was envisaged by utilizing conventional tunnel mining technique with lowering of the groundwater level. There, the construction ground would have been drained by numerous horizontal wells. The then occurring settlements of the ground would have been equalised by compensation grouting. The tunnelling method by using soil freezing elaborated by SSF Ingenieure in cooperation with the construction company and presented as alternative to the method in the tender was awarded the contract because it comprised economic and technical improvements. By freezing the soil, the horizontal wells could be relinquished. At the same time the ground s stability was amplified, thus simplifying the later on 1 2 3 4 Cross-section platform lines U3/U6, direction south 1 Existing platform 2 New platform in the relief tunnel The following is necessary for mining construction of the relief tunnel: 3 Working for well installation and freezing 4 Freezing tubes 5 Frozen ground as protection cup for tunnel drilling 6 Small well for drainage of construction ground 7 Supporting arches 8 External shotcrete shell 0.30 m 9 Floor drainage 10 Bottom edge of the calotte 4 3 1 Drilling of pilot shafts 2+3 Tunnel boring 4 Breakthrough to the existing structure 5 Cross-section platform lines 7 5 5 10 1 2 8 9 6 Picture credits: ediundsepp Picture credits: 1-4 Max Bögl GmbH & Co. KG, 5 SSF Ingenieure GmbH

1 2 3 drilling of the galleries and increasing security for the historic City Hall building. Departing from the pilot shaft, 654 freezing drillings with a diameter of 88.9 millimetres and a total length of 4,000 metres were executed in fan-like order. The ground was frozen at minus 38 degrees Celsius, intermittently adapted to the actual state of the drilling. This measure was permanently controlled by 180 temperature probes which enabled temperature control so as to avoid large lifting through frost as water expands up to nine percent when frozen. The new tunnels Underneath the ice caps, both new tunnel galleries were constructed by mining technique with shotcrete. The drilling speed was at about two metres in 24 hours with a uniform breakthrough cross-section of 50 square metres. A particularity was the tangent position to the existing platforms. In order to connect old and new structures, the old remaining steel sheeting elements were removed. Then, 15 centimetres of the outer concrete shell were demolished. Special dowels ensured the connection of the new reinforcement to the existing construction. Eleven openings link the new tunnels to the platforms. At the southern head front, two openings were built cutting through the 2.5 metres thick reinforced concrete shells of the existing tunnels with a diamond wire saw. Under static considerations these cut-throughs were done in several steps. The sawn-out concrete blocks weighted about 40 tonnes. They were pulled into the new tunnel by special hydraulic devices, cut up and disposed of via the starting shaft. Water tight connections and inner shell As the platforms lie within groundwater, the connection between the new and the existing structures were made watertight. The outer shotcrete shell was complemented by a 50 centimetres thick water-tight inner shell made of reinforced concrete. All construction measures were accomplished whilst underground operation was maintained. There was nearly no inconvenience caused to the passengers throughout the whole construction period of the new tunnels. Only during breaking-through the openings to the platforms, passengers had to put up with narrowing of the platforms and of the connecting gaits. Weinstrasse N Landschaftstrasse Facts Marienplatz Client City of Munich, department for underground construction Tunnel lenght 103 m / 95 m breakthrough cross-section 50 m 2 Construction period 2003 2006 Construction Mined tunnel with cross-cuts to the existing structure, construction with pilot shafts, soil freezing and groundwater decompression SSF Ingenieure variant proposal, final design Whilst the ground plan remained unaltered, the following modifications arose in the course of the European-wide invitation to tender, as a result of a variant proposal put forward by SSF Ingenieure: 4 back-fill gravel sand, dry sand water saturated clay (impermeable to water to a large extend) frozen ground 1 Construction of both launching shafts 2 Drilling of pilot shafts 3 Ground freezing, decompression of groundwater 4 Tunnel boring Picture credits: ediundsepp for SSF Ingenieure GmbH / Max Bögl GmbH & Co. KG Picture credits: ediundsepp Marienplatz new City Hall Dienerstrasse - oval starting shafts - additional pilot tunnels for targeted freezing of the subsoil above each of the tunnel roofs - subsoil freezing, and extraction of the second pocket of ground water planned relief tunnel existing platforms and ways to the regional trains and the surface track lines U3/U6 launching shaft with working pits for tunnel boring connection to the regional train system

Title: Carsten Kykal - Fotolia.com