Project Management GCC Interconnection Project



Similar documents
GCCIA Phase 1. Making interconnection in the Gulf a reality GRID

GCC Power Grid: Transforming the GCC Power Sector into a Major Energy Trading Market

Submarine Power Cables. State-of-the-art production facility, more than 100 years of experience and reference installations around the world.

Alstom in UAE. Over 30 years of commitment in UAE. Alstom s Presence

TABLE OF CONTENTS. I. Introduction 3. II. Contractor Pre-Qualification Criteria 4. III. Procedure for Application of Contractor Pre-Qualification 6

Introduction to The Trans Bay Cable Project

Middle East. Bahrain Kuwait Oman Qatar Saudi Arabia United Arab Emirates

Wire & Cable Focus Report Middle East and North Africa Markets

Regional Electricity Supply Issues: Coping with Capacity Needs

RULES FOR ACCESS AND USE GCCIA DATA ROOM

TitleRe of presentation

Experience and Qualifications of PROCESS PLANTS CORPORATION

CHUGACH ELECTRIC ASSOCIATION, INC. Anchorage, Alaska. February 10, 2014

Water Security and Desalination in the GCC Countries. Dr. Muhammad F. Al Rashed Executive Director Water Research Center

The MEED view of the GCC construction market Ed James, Head of MEED Insight

Gulf Cable and Electrical Industries Company KSC (CABLE) - Financial and Strategic SWOT Analysis Review

Konti Skan Replacement of Cable 1

SUPPLIER PREQUALIFICATION QUESTIONNAIRE FORM

PB POWER ISLAND OF IRELAND CAVAN-TYRONE AND MEATH-CAVAN 400KV PROJECTS PRELIMINARY BRIEFING NOTE OVERHEAD AND UNDERGROUND ENERGY TRANSMISSION OPTIONS

SUBJECT: Marcy-South Series Compensation Project Capital Expenditure Authorization Request and Contract Award

Eyefortransport Middle East Summit - Dubai

HABTOOR LEIGHTON SPECON COMPANY PROFILE. hlspecon.com

Current: Our organization is currently losing one of our elite team members and we need to replace him.

North American Development Bank. Model Prequalification Document: Prequalification of Contractors

WATER / WASTEWATER & POWER PROJECTS LAST 5 YEARS. No of Staff Provided by BCE. Overall Project Value (SR)

HEAVY LOAD FREIGHT SERVICES & 247 CARGO SERVICES

Data Services Portfolio

Muskrat Falls Project Oversight Committee. Committee Report August 2015

PROJECT MANAGEMENT BASICS

Eng.Mostafa. Ibrahim Khamis. Dr. Shaher Anis Mahmoud. Eng.Ehab. Ehab Ismaeel Amin. Acc. Hazem Ahmed Abdelhalim

Survey Aims & Methodology

AL ABDULKARIM HOLDING

Optimization of the coupled grid connection of offshore wind farms

NATIONAL REMITTANCE PLAN 2015 INDONESIA

Renewable Energy Strategy for 2020 and Regulatory Framework. Eng. Hatem Amer Egyptian Electric Regulatory and Consumer Protection Agency

Manaar Energy Consulting & Project Management

Recent Siemens HVDC Activities Yuriy Kazachkov Siemens PTI

By Manitoba Hydro, March 4 th 2013

Summary of Electric Transmission Assessment Report

Viking Link Interconnector

COMPLIANCE REVIEW OF 2006/07 ASSET MANAGEMENT PLAN. Top Energy Limited

National Fund for Environmental Protection and Water Management. activities in climate protection

Curriculum Vitae Fredrik Rüter 1 December 2014

Engineering g Procurement. 02-Feb-2015

HANDOVER OF DISTRIBUTION NETWORK ASSETS (ELECTRICITY & WATER)

Technical Specifications For The Drilling Program

Market Potential. Abu Dhabi is One of the richest cities in the world, possesses 10% of the world s oil and 5% of gas reserves.

Grid connection of near shore wind farms

भ रत ह व इल क ट र कल स ललल ट ड

Towards Achieving ABET s Substantial Equivalency Recognition in Department of Chemical Engineering at a non-us institution

Feasibility studies - for successful tendering. Felix Eichhorn CEO Solarpraxis Engineering GmbH

Seminar s Title: EPC (Engineering-Procurement-Construction) Project Management

Egypt Renewable energy Projects. Eng. Lamya Youssef Head Of FIT Unit Central Unit Egyptian Electricity Transmission Company EETC

SAMPLE TERMS OF REFERENCE FOR ELECTRICITY SECTOR PRIVATIZATION TRANSACTION ADVISORY SERVICES

ResultsPresentation 9M Juan Lladó CEO

The Irish Short-stay Visa Waiver Programme

Q: PLEASE STATE YOUR NAME AND BUSINESS ADDRESS. A: Gerry Sheerin. Sheerin Technical, 25 Eastville Avenue, Toronto, Ontario Canada

MINISTRY OF ECONOMY. TURKISH ENGINEERING CONSULTANCY SECTOR An overview

Joint Con Edison LIPA Offshore Wind Power Integration Project Feasibility Assessment

Provision of Accounts Payable Service

Impacts of Recent Submarine Cable Cuts on Middle East Internet MENOG 10 Dubai, UAE 1 May 2012

The Impact of Dollar Devaluation on World Oil Industry: Do Exchange Rates Matter?

Multiples Insights on MENA region

STATE OF MAINE DEPARTMENT OF EDUCATION RFP # PAYROLL SERVICES FOR TEMPORARY RESOURCES

CITY OF GLENDALE CALIFORNIA REPORT TO CITY COUNCIL

Knowledge Management Strategic Alignment in the Banking Sector at the Gulf Cooperation Council (GCC) Countries

Project Cost & Schedule Monitoring Process Using MS Excel & MS Project

Engineering and Construction Contract Management Certificate Program (ECCM Workshops 1, 2, 3, 4, 5, 6) Certified Program

SSE Greater Gabbard Offshore Wind Farm Supply Chain Engagement

Q. Please provide resumes for Gary L. Murray, Sean LaCour, Glenn Samms, Trina L. Troke, Trina Cormier.

Examples of cooperation to promote business activities between Japan and Arab countries

Welcome to Markbygden, Sweden. Winterwind , Piteå Eva Sjögren, Sales, ENERCON Sweden

EuroAsia Interconnector Project Submarine power cable

DESIGN WEEK.

Power products and systems. Intelligent solutions for power distribution Zone concept

Qatar Railway Company

Financing Drivers and Funding Rapid Growth

Introduction Building project management

EXPRESSION OF INTEREST

Data Centre Middle East Report

Consultation Paper. Communications and Information Technology Commission

Randstad MENA Salary Survey 2016

Ladies and Gentlemen,

Respecting the environment

HV Submarine Cable Systems Design, Testing and Installation

ESB Networks Response. ERGEG Consultation. Voltage Quality Regulation in Europe

Prequalification of Roading Contractors

Personal Information: Academic Qualification: Work Experience: Training Courses:

How to travel from Qatar to UAE and Oman by road

Time for take-off The MEED Insight Renewable Energy Webinar 29 April 2013

HVDC Light Cables. Submarine and land power cables

REQUEST FOR PROPOSAL (RFP) for Provide Document Imaging & Archiving Solution And Develop Application Process Workflow on MS SharePoint

A closer look at the major green building rating tools in use around the world: BREEAM

Investigating DSM solutions applicability in

Decision. Matter of: Al-Tahouna Al-Ahliah General Trading & Contracting Company W.L.L. File: B Date: August 11, 2015

HVDC Light & SVC Light Reference list

My Medical Home. Presenter Ayub Kalaff, M.S. Director of Business Development Psychologist, Johns Hopkins Hospital

Ministry of Information and Communication Technology EXPRESSION OF INTEREST

Section 3 - Evaluation and Qualification Criteria

GCC FM BRIEFING 2013

Transcription:

GCC Interconnection Authority Project Management GCC Interconnection Project Saleh H. Al-Awaji, Awaji, PhD March 2007 1

Project Background Gulf Cooperation Council (GCC) between Kuwait, Saudi Arabia, Bahrain, Qatar, United Arab Emirates and Oman formed in 1981 Recognized benefits of interconnection of electricity grids of the t countries Initial study in mid-eighties Preliminary project definition study in 1990 confirmed technical, economic and financial feasibility, recommended formation of GCC Interconnection Authority GCCIA established in 2001 Project technical, economic and financial feasibility updated in 2003/04 Countries decided to self-finance finance project in 2004 Project tendered and awarded in 2005 2

Conceptual Diagram of the Interconnection System KUWAIT AL ZOUR 400 kv SAUDI ARABIA SEC ERB HDVC BACK-TO-BACK 1200 MV 1200 MV 310 km 112 km 290 km AL FADHILI 400 kv 90 km 600 MV 100 km BAHRAIN JASRA 400 kv GHUNAN 400 kv SALWA 400 kv UAE SILAA 400 kv 120 km 900 MV EMIRATE NATIONAL GRID AL OUHAH 220 kv 600 MV 400 MV 52 km QATAR DOHA SOUTH SUPER 400 kv OMAN OMAN NORTHERN GRID AL WASEET 220 kv 3

Approximate Route and Layout of the GCC Interconnection محطات تحويل محطة تحويل الذبذبة مرآز التحكم الري يسي 4

Phase I Development Plans Kuwait Saudi Arabia-ERB Bahrain Qatar Year of Interconnection 2008 Phase II Development Plans UAE Formation of Emirates National Grid Oman Formation of Oman Northern Grid Phase III Development Plans UAE Oman Year of Interconnection 2010 5

Pre-Qualification Process Announcement to all interested bidders to participate in pre-qualification exercise in 2004 All bidders were requested to fill out and submit pre-qualification form with their company credentials A total of 91 bidders requested pre-qualification forms 63 companies submitted forms and credentials 45 companies were pre-qualified 6

Tendering & Adjudication Process Invitations to Tender based on FIDIC conditions for Plant and Design Build were sent to the 45 pre-qualified bidders 5 Tenders received for GIS substations 3 Tenders received for back-to to-back HVDC station 19 Tenders received for overhead transmission lines 3 Tenders received for submarine and land cable 4 Tenders received for control, protection & SCADA and telecommunication system 7

Evaluation Process Tenders evaluated for Technical conformance and then Commercial evaluation was performed Technically qualified lowest evaluated tender awarded contract Six (6) GIS substations awarded to ABB Back-to to-back HVDC station awarded to AREVA - Cogelex Two overhead transmission lines awarded to NCC Two overhead transmission lines awarded to HEC MEEDCO Submarine & Land cable awarded to Prysmian/Nexans Control Centre, Protection & Telecommunications awarded to AREVA - Cogelex 8

Phase I Implementation Strategy For implementation purposes the project was broken down into 13 discrete EPC contract packages. Six contract packages for the GIS substations One contract for the back-back HVDC station Four contracts for the transmission lines One contract for the land & submarine cable One contract for the control center (including telecommunications, control & protection) The contractors will work concurrently but independently from one another. The strategy enabled wide participation by international contractors in the shared implementation of the project. 9

Implementation Strategy Functional Relationship GCCIA Owner s Engineer Contract Administration Contract Supervision & Coordination Contract Package 1 Contract Package 2 Contract Package..n Functional Relationships 10

Project Management Complexity 13 different EPC contract packages with facilities in four countries : Kuwait, Saudi Arabia, Bahrain and Qatar Client, GCCIA, in Dammam, Saudi Arabia Engineer, SNC Lavalin, based in Montreal with resident team in Dammam EPC Contractors design teams located in several countries plus different site offices and sourcing of equipment from around the world Information flow and design approvals is a major issue between different design and site offices 11

Fundamentals of Project Management Based on Goal Setting the project is a strategy that will meet this goal. Project is defined in terms of constraints: Time, Budget and Performance. To successfully meet these constraints a project must be well managed. Project Management requires: Set a clear project goal Determine project objectives Establish checkpoints (milestones, activities, and time estimates) s) Draw a picture of the project (MS Project) Keep everyone connected with the project informed and reinforce commitment and excitement. 12

Fundamentals of Project Management PM is a complex task as it involves the following critical duties: Ensure the contract limits and interfaces are well specified Ensure that the documentation of the contractors are consistent and cross referenced Supervise the individual contract schedules to assure meeting the overall project schedule Facilitate the coordination between the individual contractors and the GCC member utilities Establish the overall control philosophy for the joint operation of the interconnected network Supervise the testing and commissioning of the individual substations as well as the interconnected systems Prepare weekly, monthly and quarterly progress reports 13

Project Management MIS To ensure proper information flow three easy and effective management information systems have been implemented to share, control and store information for GCCIA, the Contractors and other entities: Exchange Public Folder Microsoft Outlook A Project E-mail E address has been assigned to ensure a single and effective channel of communication and to share this information with multiple users (Engineer s s employees) in Dammam and Montreal Electronic Document Management System Microsoft SharePoint Is an internet based tool used to store in a specific website and share with multiple users all kinds and large amount of documents, tasks, contacts, events and announcements without sending hardcopies via mail or courier. 14

Project Management MIS Project Management (PM+) Document Control Module PM+ is a SNC Lavalin developed program tailored to track a project at all levels and to better plan and control scope, budget, schedule, documents and quality. For this Project the document control module is used by the Engineer. The module generates date stamps to mark-up the status of document revisions and generates transmittal sheets to expedite documents internally and externally. 15

Progress of Implementation Design review of the GIS substations is well advanced and issues such as interfacing with existing substations and fitting into available space were addressed Work is progressing on the detailed design studies for the HVDC converters Design review is well advanced for the Transmission lines. Because of the environmental pollution it was decided to coat the insulators with silicone. The concrete mix for the foundations had to take into account the high salt content in the soil. A detailed survey of the submarine and land cable routes has been completed. Design review is underway for the Control Centre and the protection and telecommunication system 16

Project Schedule Update Technical and Economic Feasibility 2003 / 2004 Approval of Project Financing Issue of Tender Documents Tenders Received Tenders Evaluated and Recommendation for Award Contracts Awarded Project Operation May 2004 February 2005 June 2005 September 2005 November 2005 Early 2009 17

Conclusions Project under-study since mid-eighties Agreement and participation required by six GCC countries Principal Issues that had to be resolved Demonstration of feasibility Agreement between countries Creation of the GCC Interconnection Authority Agreement on cost sharing and financing Project is now under implementation Implementation strategy adopted was to divide the Project into Contract Packages and to go out for International Competitive Bidding Management of the Project is a complex task and it was decided to t use an Electronic Data Management System to share, control and store large amounts of information in a secure manner Overall Project progress is around 20 % and it is targeted to be completed on schedule 18