Natural G Natur as Ser as S vice Line and Meter Installation R Inst equirements equir Installation Guide

Similar documents
Gas Meter Clearances and Service Installation Requirements

G SPECIFICATION: GAS METER AND REGULATOR INSTALLATION REQUIREMENTS. 3 and Gas Yellow Book. REVISIONS: (See ) 1/15/14 5 Years

Gas Meter Clearances and Service Installation Requirements

2010 Residential Water Heater Replacement Check List

Upper Southampton Township Department of Licenses and Inspections 939 Street Rd. Southampton, Pa Phone: Fax:

Development Services City of Lawrence, KS

ASX7-4-IOM-7 J

SWIMMING POOL, SPA, & HOT TUB GUIDELINES

DRYER VENTING SPECIFICATIONS DRYER SAFETY

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

PART 6: VENTING, COMBUSTION AIR & CONDENSATE REMOVAL

NFPA31FuelOilPiping 1 Revised

RESIDENTIAL/COMMERCIAL

TYPICAL FIRE SAFETY INSPECTION VIOLATIONS

The City of Basehor, Kansas

INSTALLATION GUIDELINES for SOLAR PHOTOVOLTAIC SYSTEMS 1

Mobile Home Pre-Inspection Checklist

HV AC CODE CHECKLISTS

October 5, 2015 Dear Client,

MOBILE HOME LAW. Revised November 2001

ELECTRICAL SERVICE REQUIREMENTS FOR MOBILE HOME DEVELOPMENTS

This handout is a guide only and does not contain all of the requirements of the Minnesota State Building Code or city ordinances.

Final inspections are completed by site visit only. Access to fenced yards shall be planned.

Gas Appliances and Gas Piping

BUILDING DEPARTMENT 8748 W. 82 nd Place - Justice, IL Phone: (708) Fax: (708)

City of Riverside Building & Safety Division Residential Electric Vehicle (EV) Charger Guidelines

Report for. Dick and Jane Homeowner Lovers Lane, Houston, Texas 77000

Bureau Veritas Contact Information

Frequently Asked Questions Generators

DESCRIPTION OF WORK:

Sample Drawing Package for One and Two Family Dwelling Applications

Current as of 11/10/08 1 of 1

Dennis Fire Department Fire Prevention Mark Dellner Fire Chief

BUILDING PERMIT SPECIFICATIONS

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

2. What building projects are exempted? (permit not required)

COMMERCIAL COOKING HOODS, VENTILATION & FIRE SUPPRESSION SYSTEM GUIDELINES AND PROCEDURES

OREGON FIRE CODE Interpretations and Technical Advisories

Pressure Vessels (Air Compressors) and LPG Tanks

ETL listed for installations within 5 ft. (1.5M) of outer edge of water Rev E Page 1 of 10

Fiberstars Mini Lighted Laminar Flow Fountains

KITCHEN AND BATH REMODELING BUILDING PERMIT REQUIREMENTS

SECTION 105 PERMITS. 2. Fences not over 6 feet (1829 mm) high. 3. Oil derricks.

Section 2 Gas Service

PERMITS REQUIRED & PERMIT EXEMPTIONS

Fiberstars Lighted Laminar Flow Fountain Installation Manual

Orlando Home Inspection Services

SINGLE FAMILY DWELLING ELECTRICAL SERVICES RATED 225 TO 600 AMPS

Electric Service Conversion Overhead-to-Underground. Minnesota

All substantial design decisions and budget confirmation shall be resolved for the College to approve the Design Development Submittal.

TECHNICAL GUIDE 95.5% SINGLE STAGE GAS-FIRED RESIDENTIAL MULTI-POSITION GAS FURNACES MODELS: TG9S DESCRIPTION FEATURES

How To Make A House Safe

Building Code Inspections and Fees

CHAPTER 9 VENTS. copper drainage tube Type DWV, Schedule 40 plastic piping, or borosilicate glass.

ARTICLE II (2) ARTICLE II - REQUIRED USE OF PUBLIC SEWERS. PARAGRAPH Purpose and Application.

Residential Foundations and Basements

Arapahoe County Residential Water Heater Installation and Inspection Guide

CITY OF FAIRFAX CODE ADMINISTRATION / FAX

Town of Bellingham Fire Department

SOLD. Lot 1. 1 Mile: Population: 10,200 Median HH Income: $33, Mile: Population: 80,200 Median HH Income: $34,900

CITY OF VAUGHAN SCHEDULE O LOT GRADING DESIGN FOR RESIDENTIAL DEVELOPMENT

BUILDING SAFETY UNIT

Uniform Construction Code (UCC) Building Permit Application Package

Contents General Requirements Location Size Inlet and Outlet Piping Protection Security Electrical Automatic Meter Reading (AMR)

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

Electrical Service Guidelines

HVAC Code Requirements

Packaged Terminal Air Conditioner Wall Sleeve Installation

ELECTRICAL GUIDELINES FOR SINGLE-FAMILY HOME OWNERS:

Index. protection. excavated drop inlet protection (Temporary) Block and gravel inlet Protection (Temporary)

BUILDERS AND CONTRACTORS GUIDE FOR ELECTRIC SERVICE

SECTION 19 RESIDENTIAL CONSTRUCTION IN FLOODZONES

Underground Service Requirements and Instructions

HIGHWAY DEPARTMENT ACCESS AND RIGHT OF WAY WIDTH GUIDELINES

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

GROWTH MANAGEMENT DEPARTMENT 201 SE 3 rd ST, (Second Floor), Ocala, FL (352) ; FAX: (352)

POOL AND SPA REQUIREMENTS

SWIMMING POOL / SPA PLAN REVIEW CHECKLIST

ADA POST INSPECTION CHECKLIST. Job No. Route County Location

2.0 DESIGN CRITERIA FOR WATER DISTRIBUTION SYSTEMS

SECTION 5 DRAFTING STANDARDS

Name Of Occupancy Date. Yes No Describe

Botetourt County, Virginia. Frequently Asked Questions

CHAPTER 4 VENTILATION

INTERNATIONAL RESIDENTIAL PLUMBING CODE

Installation of Underground LP-Gas Systems

GENERAL WIRING RULES FOR HOUSES

2014 British Columbia Building Code Changes

Does Part of My Basement Floor Have to Be Removed to Install. Where Does the Water from the Sump Pump Go?...Page 5

When is a Permit Required? What Types of Permits are Required? The most common types of projects that require permits are:

Does Wall Township require an inspection by the building department on resale of a home?

Florida Building Code 2004 SECTION 1009 STAIRWAYS AND HANDRAILS

MA BUILDING CODES ON SWIMMING POOLS SECTION 780 CMR 120.M

City of Elk River BASEMENT Office Use Only

Propery Inspection Report

3 IN 1 BATHROOM HEATER

City of St. Charles Basement Finish or Remodel

The replacement or modification of existing windows shall comply with the following requirements:

Fabricated Drainage Products

Town of Beaumont. Lot Grading Guidelines

Transcription:

Natural Gas Service Line and Meter Installation Requirements Installation Guide

Residential Service Line and Meter Guidelines Meter Guidelines Here are some important points to remember for construction projects requiring new residential gas service. Getting a Natural Gas Service Line and Meter Please follow these three easy steps to get a natural gas service line and meter for your project. STEP 1: Contact our New Business Team at least 30 days prior to needing natural gas service at 800-440-6111. n The natural gas service line and meter will be installed at the same time if the site is ready. STEP 2: Identify the location of the natural gas meter and stub out the fuel line. n Clearly mark the proposed location of the natural gas meter on the building s foundation. n Stub out the fuel line in accordance with appropriate fuel gas code. STEP 3: Mark all private underground utilities and ensure the site is ready. Locate and mark all private underground utilities owned by you or your firm which are not marked by VA811 such as water lines, sewer laterals, drain fields, sprinkler systems and invisible dog fences. n Make sure the site is within 6 of final grade. n Make sure the proposed path of the natural gas service line is clear of debris and obstructions. If Your Construction Project Requires an Inspection If your construction project is located within an area requiring a city inspection prior to the gas service being established in the building, a city building inspection sticker or report needs to be available at your site prior to requesting a gas meter being set. Important: Fuel line(s) and appliance(s) must have been installed in accordance with the National Fuel Gas Code ; and manufactured home installations shall be in accordance with Title 24, Code of Federal Regulations, Part 3280, Subpart H. When the fuel line(s) and equipment, if applicable, have been installed, inspected, and tested, the party responsible for the payment of the gas bill should call our New Business Team at 800-440-6111 to schedule the meter installation. The required Columbia Gas inspection and testing will be done at the time the meter is installed. 1

Meter Guidelines The section of fuel line piping which extends through the outside wall to connect to the meter setting must extend: n 4-6 inches outside the building wall, with a threaded end for piping smaller than 2 inches n 6-8 inches outside the building wall for piping 2 inches and larger if the connection to the meter setting will be threaded, and n10 inches outside the building wall for piping 2 inches and larger if the connection to the meter setting will be welded. Fuel lines that will be tied into large volume meter settings should terminate 18 inches above finished grade. The meter setting size will be determined by our New Business Team during the application process. All fuel line piping must be sealed, to be rain and insect resistant. Meter protection will be required, if near vehicular traffic. Customer will be responsible for installing meter protection prior to meter installation for commercial properties. On multiple meter installations, each fuel line stub must be plainly and properly identified with a weatherproof tag or other approved means of designating the apartment, unit or the part of the building it supplies. Customer Charges The first inspection and/or test is done at no charge. If a Columbia Gas Field Technician determines that a return trip is necessary due to the failure to comply with the requirements detailed above, a tag will be left at the premise stating the reason and the appropriate fee will be charged for each subsequent return trip. The provisions in this document are subject to change and are not intended to be all-inclusive. Local codes, ordinances, and governmental regulations will govern when they are more stringent than the requirements contained herein. When in doubt as to the proper procedure, consult with Columbia Gas before proceeding with the work. 2

Gas Meter Location Standards Meter Standards How to Determine the Best Location for Our Gas Meter Please keep these requirements in mind when determining the best location for our natural gas meter: n Create a perpendicular, continuous straight line of sight from the meter to our gas main line facility which is typically located in or near the street right-of-way or alley. n Locate the meter a minimum of 3 feet from any building opening, vent, electric equipment, electric panel or meter and any other possible source of ignition. 2ND FLOOR LINE gu ve a a a f fe t a a fro ny r, wi ow, gravity g g, o a g tr t. owever, c ta th eve t te ta th ny f fe e ove T egu ve t a a fe a a fro swi owever, f t t a ti to ta fo t ati fo a a e e FOUNDATION VENT ELECTRIC METER ELECTRIC OUTLET 3FT RADIUS 1FT RADIUS NOTE: Regulator vent terminal shall not be installed beneath any 1st floor air opening into a building nor under any rotating electrical equipment. DRYER EXHAUST AIR CONDITIONING UNIT 3

Meter Placement Guide Meter Standards When planning for the location of your natural gas meter, please note: Meter Meters and meter settings must maintain a clearance of: < Setting n 6 above finished grade to bottom of meter n 6 on sides and top of meter n 36 in front of meter METER Meters and meter settings must be: n Installed in a ventilated, readily accessible location Meter Setting > Regulator n Protected from corrosion and damage Vent > Meters, meter settings & regulators must be a minimum of 10 feet away from: n Generators Regulator vents must be a minimum of: n 12 above grade (in areas where flooding may occur, vent height may be in excess of 12 above grade) n 3 feet radially and NOT directly below any rotating electrical equipment (e.g., an air conditioner) n 3 feet radial separation from: an electric meter, electric panel, electric outlet, electric pedestal, electrical equipment disconnect, or pad mounted transformer. n 3 feet radially from, and NOT below any first floor opening into a building, such as: a door, window or other gravity air openings (including clothes dryer exhaust terminals and appliance air intakes) n 10 feet radially from, and NOT below any forced air inlet or power intake. fa e e e ay exc fe. wi yo ga t ta fo ta Central A/C compressor > (source of ignition) < Intake to direct vent appliance Window air conditioner (source < of ignition) > <3 FT MIN> Crawl space opening, windows, or exhaust fan < GAS METER 4

Meter Protection Design Meter Protection Meter Protection Design Requirements Meter protection is required for gas meters with less than 5 feet of clearance between the meter and the edge of pavement or curb. Meter protection is also required if there is less than 8 feet of clearance from the edge of any perpendicular parking surface. n Meters requiring protection should have a minimum of two bollards installed. Bollards must be: n Minimum 4 in diameter n Grade B, schedule 40 steel pipe n Minimum 60 in length n Filled with concrete and domed at the top n Bollards must extend above grade to a distance that is sufficient to offer adequate protection to the meter. n Bollards must be placed in concrete-filled holes at least 24 deep and 12 in diameter. n The concrete must be sloped away from the bollard at grade level. n Bollards cannot be installed closer than 1 foot from the front of the meter set assembly and must allow adequate room for operation and maintenance activities. Protect Our Meter and Service Line Please help us protect our natural gas meter and service line by following these requirements to keep your service in compliance: n Locate the meter where it will not be damaged by outside forces such as vehicular traffic, ice, snow, construction equipment and falling objects. Avoid installing the meter under a fire escape. n Vehicular protection is required if there is less than 5 feet of clearance between the meter and the edge of pavement or curb. n Vehicular protection is required if there is less than 8 feet of clearance from the edge of any perpendicular parking surface. n Do not build structures such as decks, garages or patios over our meter or service line. The meter and service line are the property of Columbia Gas of Virginia and must remain accessible by our service technicians or other emergency responders. <8 FEET 5 th f a fro ge f ny g e fa te t e e o PARKING AREA STREET B

Meter Protection n Protect the meter from vehicular traffic with meter protection bollards. n Ensure the natural gas meter is accessible by our service technicians or other emergency responders. Do not install the natural gas meter indoors or in confined spaces such as a crawl space, closet, vault or shaft. twe ge ge ave o f e a DRIVEWAY < EDGE OF PAVEMENT/CURB STREET B STREET A <5 FEET < EDGE OF PAVEMENT/CURB 6

Natural Gas Service Line and Meter Installation Requirements 1809 Coyote Dr. Chester, VA 23836 Telephone: 1-800-440-6111 Website: ColumbiaGasVA.com 10/2014