RAMAPO COLLEGE OF NEW JERSEY PHASE I HOUSING REHABILITATION C 2012



Similar documents
GigaCrete Specification PlasterMax

SECTION PREFORMED METAL STANDING SEAM ROOFING PART 1 - GENERAL 1.1 DESCRIPTION OF WORK

09/07/07 GLASSFIBER REINFORCED CEMENT (GRC) C. S. I. Spec Master Spec Page 1

Photo courtesy of Delta Stone, Heber City, UT. Installation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick

SECTION PREFORMED METAL STANDING SEAM ROOFING

Manufactured Stone Veneer Installation Instructions

Composite Stone Veneer

Installation Solutions for: Manufactured Stone, Natural Thin Veneer, and Thin Brick ARCHITECTURAL SPECIFICATIONS / CAD MODELS TVISTM WARRANTIES

PART 1 GENERAL 1.1 SECTION INCLUDES

K2 STONE NATURAL VENEER

SECTION STANDING SEAM METAL ROOFING

GUIDELINE SPECIFICATIONS

Section EXTERIOR STONE VENEER Full Mortar

Preformed Metal Roofing and Siding

SECTION GUARDA SECURITY WINDOW SCREENS

RACQUETBALL, HANDBALL OR SQUASH COURTS AND GYMNASIUM WALL SURFACES

NCMA TEK CONCRETE MASONRY FOUNDATION WALL DETAILS. TEK 5-3A Details (2003)

Ver. 2. Guide to. Inspecting Residential Brick Veneer

Code of Standard Practice for Timber Frame Structures

OLD BRICK ORIGINALS KILN-FIRED THIN BRICK VENEER Installation Guide. GeneralShale.com

City of San Diego, CWP Guidelines

LATICRETE 290 Premium Floor and Wall Thin-set Adhesive PRODUCT DESCRIPTION

SECTION METAL WALL PANELS

GYPSUM BOARD, GYPSUM PANEL PRODUCTS AND PLASTER

FIRESTOPPING & SMOKE SEALS

SECTION COILING COUNTER DOORS. Display hidden notes to specifier. (Don't know how? Click Here)

INSTRUCTIONS FOR COORDINATION SECTION SOLID SURFACE FABRICATIONS

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

Sun Windows General Information Sun New Construction Window Installation Instructions

2. Division 05 Structural Steel Framing for steel framework requirements

The better way to build TM. Installation Manual. FOUNDATION SIPs & FROST WALLS SIPs

GreenGuard Housewrap Installation Guide

GYPSUM AREA SEPARATION FIREWALLS GA

Division 9. SignaFlor Pad and Pour Flooring System

2.18 INTERIOR & EXTERIOR FINISHES VAPOR & AIR BARRIERS

COMMERCIAL BUILDING APPLICATIONS

Moisture Control. System Solutions to Prevent Mold

Introduction...COMB-2 Design Considerations and Examples...COMB-3

VA25014B0516 VA CINCINNATI PROJECT NO INPATIENT BED TOWER ADDITION (4 TH AND 5 TH FLOORS) SECTION GYPSUM BOARD

Assessing Curtain Walls

Specifications. Preformed Metal Wall and Roof Panels. Alcoa Cladding Systems Manufacturing Plant 100 Industrial Boulevard Eastman, Georgia 31023

SECTION XXXXXX TECHNICAL SPECIFICATIONS FOR INSTALLATION OF PROTECTIVE COATINGS FOR MANHOLES, WETWELLS, AND OTHER SANITARY SEWER STRUCTURES

March 14, Installation of Bay, Bow and Garden Windows

THIRD PARTY INSPECTION GUIDELINES FOR OWNERS AND GENERAL CONTRACTORS/CONSTRUCTION MANAGERS DS150

Built to Last. Built for Beauty. Good. Solid. Logix. TM

LAYING BLOCK AND BRICK

The Difference Between Cast Stone and Adhered Manufactured Stone Masonry Veneer

Natural Thin Stone Veneer

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE

EcoTouch Insulation with PureFiber Technology

CLEAR-DIVISIONS CENTERFOLD

THERMOTEK SELF ADHESIVE MEMBRANE +G2 OVER WOOD SYSTEM DESCRIPTION SELF ADHESIVE OVER WOOD (8YR) BS-SA/CS

Avoiding Air Barrier Pitfalls

JANUARY, 2016 TR-7100 Windows (Fixed) 1 EC ALUMINUM WINDOWS Guide Specs

Asphalt Shingle Application Requirements

SECTION SERIES 1500 VINYL PATIO DOORS

INSTALLATION RECOMMENDATIONS. Outdoor Rubber Tiles

Comment Form on Proposed Gut Rehabilitation Alternatives

Uncovered Decks & Porches

SECTION ACOUSTICAL WALL TREATMENT. A. PART A and DIVISION 1 of PART B are hereby made a part of this SECTION.

1. Adhered KEE membrane roofing system. 2. Mechanically fastened KEE membrane roofing system.

Product Guide Specification

WELCOME. Recommended Window Installation. 1.5 credits Minnesota Department of Labor and Industry

2015 DuROCK Alfacing International Limited

Sapa: SECTION ARCHITECTURAL ALUMINUM HANDRAILS AND RAILINGS

The Prefab Package. Modular EIFS construction offers benefits to today s busy jobsites. Building Envelope. Roland Serino, P.E., of Dryvit Systems Inc.

THERMOTEK MODIFIED BITUMEN TORCH MEMBRANE OVER

Guide Specification STAYFLEX CORROSION CONTROL AND THERMAL INSULATION SYSTEM

ST. MONICA FOOD PANTRY HOUSTON, TEXAS

SECTION 623 CONCRETE BONDING COMPOUND, EPOXY MORTAR AND EPOXY POLYMER CONCRETE OVERLAY SECTION CONCRETE BONDING COMPOUND.

SECTION FLUID APPLIED ROOFING (LIGHT TRAFFIC DECKS OVER CONCRETE)

A. This Section includes rubberized asphalt sheet membrane waterproofing systems.

SECTION WINDOW WASHING SYSTEMS

INSTALLATION INSPECTION GUIDE FOR 3RD PARTY INSPECTORS FOR PAREX USA EXTERIOR INSULATION AND FINISH SYSTEMS

INSTALLATION OF A BAY WINDOW

Schluter -KERDI-BOARD Substrate, building panel, bonded waterproofing

Discipline: Structural Issued

Tundra Series Windows January 2016

Cost Comparisons for Common Commercial Wall Systems

A D D E N D U M # 3 QUESTIONS FROM BIDDERS: DATE: November 5, All Bidders. Jenne dos Santos, CBI Consulting Inc. City of Chelsea, MA

STANDARD REQUIREMENTS FOR BONDING OR MECHANICAL ATTACHMENT OF INSULATION PANELS AND MECHANICAL ATTACHMENT OF ANCHOR AND/OR BASE SHEETS TO SUBSTRATES

INSTALLATION INSTRUCTIONS IMPERVIA (Vent and Fixed) AWNING, CASEMENT, and LARGE AWNING WINDOW WITH FINS

Fiberglas, Exterior Wall Thermal Insulation

AAMA Standard Practice for Installation of Windows with a Mounting Flange in Open Stud Frame Construction for Low Wind/Water Exposure

GYPSUM BOARD AND PLASTER

Read and understand all installation instructions and precautions before installing. GENERAL APPLICATION INSTRUCTIONS

NEW ELECTRICAL SUBSTATION Building 300 SECTION ETHYLENE-PROPYLENE-DIENE-MONOMER ROOFING WORK

SECTION SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

POST AND FRAME STRUCTURES (Pole Barns)

SECTION STANDING SEAM METAL ROOF

ROOFING APPLICATION STANDARD (RAS) No. 150 PRESCRIPTIVE BUR REQUIREMENTS

Frequently Asked Questions LP SmartSide Siding, Trim, and Soffit

Window Installation Instructions

AUTHORIZATION TO MARK

Certification: Building Plans Examiner. Exam ID: B3

DUROCK Brand Cement Board. installation guide. Substrate and ceramic tile installation for walls, floors, countertops and wall shields.

LEGACY REPORT. (800) (562) A Subsidiary of the International Code Council RETAINED ON U.S.

Storage Store the siding in a dry and ventilated area. Do not place it directly on the ground. Always cover the siding after a day s work.

Foundation Experts, LLC Specializes in Foundation Repair and Waterproofing

Vinyl Composition Tile Installation System

Transcription:

SECTION 04235 - BRICK PANEL SYSTEMS PART 1 - PRODUCT & DESCRIPTION Structural Support Panel System for Thin Brick shale be Tabs II, manufactured by Tabs Wall System, LLC, Grandville, MI 49468, (616) 261-5656.or Architect approved equal. Structural steel panel must include integrated tab & locking system, be G90 hot dipped galvanized and manufactured with.018 (26GA) structural grade steel with thermo set coating. PART 2 - GENERAL 2.1 RELATED DOCUMENTS A. Drawing and general provisions of the Contract, including General and Supplementary Conditions and division 1 general requirements apply to this section. 2.2 SUMMARY A. This specification document is designed to provide Contractors with information concerning brick panel systems. B. This section contains details the may be required during the bid process. Information can also be useful as a continuing reference to owners. 2.3 SCOPE OF WORK A. Include all labor, materials and appliances, and perform all operations in connection with the installation of the panel system and all the related work, in strict accordance with drawings, and as specified herein. B. Products to be considered equal to those specified must be approved by the architect ten days prior to project bid date. 2.4 SUBMITTALS A. Samples shall be provided in small-scale form for initial selection purposes to show range of colors, textures, and patterns, for the project for each type of thin veneer. Shop drawings are to be submitted, for clarification if needed, detailing dimensioned plans and elevations that show installation details of connections, joint conditions, and flashings of the project. Refer to Division I, Section 01330, Submittals. 2.5 QUALITY ASSURANCE A. Appoint at least one supervisory journeyman who shall be present at all times during execution of work, who shall be thoroughly familiar with design requirements, type of materials being installed, reference standards and other requirements, and who shall direct all work performed at jobsite. B. Applicator Contractor shall be Thin Brick systems certified and/or have at least three years experience in the installation of panel systems. C. Comply with all applicable codes, regulations, and standards. Where provisions of applicable codes, regulations and standards conflict with requirements of this section, then the higher specification shall govern. D. Panel component parts shall be made using prime materials and meet National Building codes. BRICK PANEL SYSTEMS 04235-Page 1 of 5

E. Panel manufacture will provide all component and prime material certifications. 1. Metal panel material shall be corrosion resistant to a commercial grade. 2. Metal panel material shall be of a commercial grade or higher in strength. 3. System manufacture will provide material certifications that adhesive to be used meets ASTM C-557 Requirements. 2.6 PERFORMANCE CHARACTERISTICS A. Assembled wall systems shall meet or exceed the following performance standards when tested in accordance with the following methods: 1. ASTM E-72-80 WINDLOAD STRUCTURAL TESTING i. From the exterior side with a foam sheathing board on the studs: ii. Allowable load based on deflection limit of L/240: iii. Panels shall attach the veneer to the panel with an active tie system. 2.7 DELIVERY, STORAGE AND HANDLING A. Delivered materials to project sites in their original factory wrappings and containers, clearly labeled with identification of manufacturer, brand name, fire hazard classification, and lot number. Store materials in original undamaged packages and containers, inside a well ventilated area protected from weather, moisture, soiling, extreme temperatures and humidity, laid flat and blocked off-ground to prevent sagging and warping. B. Comply with the instructions and recommendations of the manufacture for special delivery, storage and handling requirements. 2.8 SEQUENCING AND SCHEDULING A. Sequence thin brick system installation in proper order to minimize the possibility of damage during the construction period. PART 3 - PRODUCTS 3.0 MANUFACTURED PRODUCTS A. Support panel shall be corrosive resistant 1. Various sizes shall be available to facilitate installation. 2. Panel shall have support ledges to support and space veneer. B. Veneer shall meet appropriate code requirements ( Thin Brick ASTM C-1088 ) 1. Veneer size and bond pattern shall be as specified. 2. Color shall meet project specified code level. C. Adhesive of veneer shall meet minimum requirement for adhered material per code of 50 p.s.i. of surface area. D. Mortar material shall comply with code requirements of an S-Grade mortar. E. Fasteners shall be non-corrosive screws, nails with a flat back. F. Flashings and trims will be corrosive resistant to the elements and non-reactive to mortar. G. Water infiltration barrier- shall be 15 lb felt paper or have equal or better performance criteria. BRICK PANEL SYSTEMS 04235-Page 2 of 5

PART 4 - EXECUTION 4.1 INSPECTION A. Installer must examine conditions under which the Thin Brick System is to be installed and notify Contractor in writing of any unsatisfactory conditions. Do not proceed with installation of the Thin Brick System until the unsatisfactory conditions have been corrected in a manner acceptable to the installer and general contractor. B. Installer shall consult the other trades and contractors involved prior to start of the Thin Brick System installation. This is to determine any areas of potential interference. Do not start the installation until interferences have been resolved to the satisfaction of the installer or general contractor. C. Coordinate layout with other work to determine that work schedule is satisfactory with other contractors. 4.2 PREPARATION A. Wherever possible, take field measurements prior to the preparation of shop drawings and fabrication to insure proper fitting and installation of product. B. Verify that materials are those specified before installing. C. Insure walls are plumb and corners are braced to specifications. Maximum wall frame spacing for stud walls = 60mm (24 ) O.C. Girts = 75mm (30 ) O.C. D. Walls must be structurally sound and the substrate system designed with a wall deflection not greater than L/240. Substrate shall have no planer irregularities greater than 7mm in 3.05 m (¼ in 10 ). E. Water infiltration barrier (if required), must be installed prior to placement of panel. F. Trim or flash in place per manufacturer s details and/or BIA Technical Note 7A on flashing of Brick Walls. 4.3 INSTALLATION PANELS A. Exterior walls shall be constructed of structurally sound masonry, wood, or steel studs, with an approved building sheathing and a water infiltration barrier placed over it if needed. This should be done prior to the installation of the panel system. B. Panels shall be mechanically secured to a structural wall with a manufacturer s approved fastener in accordance with the manufacture s recommendation. Panels shall be attached with a minimum of one fastener per square foot. All fastening devices shall be of a corrosion resistant type with wafer head design. C. Panels applied to an oblique wall shall be installed with the support tabs aligned and level to each other. D. Panel joints shall be staggered over sheathing joints. E. Control joints in the panel system (including pre-fabricated panels) are required to coincide with the building control joints where substrates change, within 600 mm- 1200 mm (2-4 ft.) of corners, per Technical Note 18A Revised as recommended by the BIA or where significant BRICK PANEL SYSTEMS 04235-Page 3 of 5

structural, substrate or frame movement occurs. F. Panels shall be clean, free of dirt, oil or any other foreign contaminant. THIN VENEERS A. Thin veneers shall be either field applied, factory installed, or panelized into components or curtain walls. (select as required) B. Thin veneers shall be initially adhered to panel using specially formulated adhesive in Quarter sized dabs or vertical stripes 10mm ( 3/8 ) wide. C. Thin veneers shall be applied within 5 to 10 minutes after adhesive has been applied. D. Thin veneers shall be placed in the bond pattern called for. MORTAR A. When all applied veneers are secured in place, fill joints and seams with an approved latex modified mortar L Types. B. Mortar vertical joints immediately following each fourth horizontal joint. C. Mortar only an area that can be tooled before mortar becomes to stiff. Mortar should have a dull finish and be moist, but not wet. WEATHER REQUIREMENTS A. In cold weather do not use frozen materials in mortar mix. Do not apply mortar to frozen surfaces containing frost. Do not apply mortar when ambient is less than 2 Degrees Celsius (35 degrees Fahrenheit) without sufficient protection and supplemental heat. B. In hot weather, protect mortar from uneven and excessive evaporation. Where conditions are hot, dry and/or windy and evaporation is great, veneer shall be fogged with water to allow the mortar enough time to set. Moist curing is not recommended for latex modified mortar. CAULKING A. All areas where thin veneer meets non-veneer surfaces must be caulked with the proper approved sealant for conditions. B. Thoroughly and neatly caulk joints between thin veneer and abutting material. CLEANING A. Thin veneer shall be cleaned per the appropriate method established by the Brick Institute of America for brick (see Technical Bulletin #20 Revised ), or the Association of Tile, Terrazzo and Marble Contractors and Affiliates bulletin entitled Grouting and Cleaning Ceramic Floors with Latex Grout. 4.4 - MAINTENANCE A. When applied according to manufacture s specifications, Thin brick panel systems installations should last indefinitely and be maintenance free. However, if for any reason the thin brick panel system should become unattached from it surface, or damaged by severe impact, the affected areas should be cleaned of old mortar and adhesive and a new panel system applied with its approved adhesive and mortar. BRICK PANEL SYSTEMS 04235-Page 4 of 5

4.5 - WARRANTY A. Upon project completion, Owner/Owner's representative acceptance, Contractor shall deliver to Owner a Manufacturer's Twenty year Warranty for the brick panel system. THIN BRICK SCHEDULE See Architectural Building Elevations for Thin Brick Locations. 1. Exterior Face Brick: a. Running Bond: Two colors selected for project equal to Glen Gery Brick Company, ½ X 2 1/4 X 7 5/8 in size. 1. Color type W-12 2. Color type FW-88 b. All thin brick to conform with A.S.T.M. spec C-1088, Grade SW, Type TBX c. Provide outside and inside corner units Contact for thin brick units: Tri State Brick & Building Materials 151 West 25 th St. NY, NY 10001 Gary Duda Tel: 212-366-0339 END OF SECTION BRICK PANEL SYSTEMS 04235-Page 5 of 5