VEHICLE DETECTION CHAPTER 16



Similar documents
Table of Contents. Inductive Loop Vehicle Detector Applications

The Basics of Loop Vehicle Detection

Modem. Backplane For Lanes 1 To 4 *

SECTION 611 ACCEPTANCE PROCEDURES FOR TRAFFIC CONTROL SIGNALS AND DEVICES

INSTALLATION OF A BAY WINDOW

SECTION SIGNAL WIRE AND CABLE

3. Contractor shall ensure that all permits are obtained prior to any construction. Contractor shall be responsible for all utility fees.

TS 813 GROUNDING AND BONDING TTD TRAFFIC SIGNAL INSTALLATION AND CONTROLLER CABINET GROUNDING SYSTEM TTD CONTROLLER CABINET GROUNDING

DESCRIPTION OF WORK:

Industrial Strength Rocket Launcher

INSTALLATION INSTRUCTIONS

September 1, 2003 CONCRETE MANUAL CONCRETE PAVEMENT REHABILITATION

Requirements for the Attachment of Communication Cable Facilities on PPL Poles

INSTALLATION & OPERATION MANUAL LED

EH-20 20m antenna. By VE3RGW

REQUIREMENTS AND SPECIFICATIONS FOR HIGH VOLTAGE CUSTOMER BUILT FACILITIES PEPCO ENGINEERING

RAUFOSS EXPLOSIVE COMPRESSION FITTINGS

State of Illinois Department Of Transportation CONSTRUCTION INSPECTOR S CHECKLIST FOR STORM SEWERS

Appendix A - Cost Estimate Spreadsheet

Line Loss WSDOT Winter 2008 BZA

Conduit Fittings & Accessories Directional Drilling Conduit Utility Duct Telephone Duct Residential Boxes

CONCRETE REPAIR GUIDELINES. Concrete repairs can be broken down into four basic types, plus special repairs and planing.

LS 2540 SEWER LATERALS AND INSPECTION TEES

Installation Instructions

Guidelines for Earthquake Bracing of Residential Water Heaters

Utility Marking Trace Wire Guide

5800 Temperature Sensor Cable Assembly

Installation of Rear View Camera in a 1995 Roadtrek 190 Popular

SECTION UNDERGROUND ELECTRIC SERVICE

SECTION GUARDRAILS

FORM DESIGN. easy to work with, and generally available.

SKT-SP Tangent Terminal


How To Launch A Rocket From A Formica

Installation Guidelines: Resistance Thermometers and Temptran Thermometers for Building Automation Systems

ITS specification Jointing chambers and pull pits (ITS-02-02)

Andersen Electric Window Opener for Andersen Awning and Roof Windows

METHOD STATEMENT INSTALLATION OF INSULATING FLANGE KITS

RayClic Connection System Installation Instructions

Guide for Modified Assembly: Lightning McQueen. By: Collin Patterson, University of Delaware. Materials and Tools:

It's large enough to handle most welding job shop projects, yet small enough to make it a worth while home-workshop tool

Slide the new steering column shaft through the steering column from the driver compartment.

Rebuild Instructions for and Transmission

Specifications for Lightning Protection. ASAE Engineering Practice

STREETLIGHT SYSTEM GROUNDING AND BONDING

FACTORY AUTOMATION. Manual Laying loops for Loop detector LC10-1 and LC10-2

BILLET HEADLAMP WITH SHORT/TALL MOUNTS

INSTALLATION & OPERATING INSTRUCTIONS

2014 NEC Guide Lines for Home Owner Doing Electrical Work on their Property

STANDARD SPECIFICATIONS FOR SIGNAGE, STRIPING, AND LIGHTING TOWNSHIP OF STANFORD

How To Wire Wireline Cable To A Cell Phone (New Zealand)

Permanent Stainless Steel Anchorage Point for Concrete, Solid Masonry and Steel Constructions

PROCEDURES PREVENTION OF ACCIDENTAL IGNITION

Electrical for Detached Garages: Updated Feb 19, 2016 for 2015 CE Code in force Jan. 1, Underground branch circuit feeding a detached garage:

CAST IRON THE BASICS. Heatline - Cast Iron Radiators SMOOTH FLAT FILE TO REMOVE ANY SWARF. ONE TIME. ASSEMBLY. JOINTS SHOULD BE TIGHTENED.

Char-Lynn Spool Valve Hydraulic Motors. Repair Information. W Series Geroler Motors

Section SEWER PIPE INSTALLATION AND TESTING

LOW-VOLTAGE TRANSFORMER QUICK START GUIDE PLANNING GUIDE INSTALLATION GUIDE

Part Name/Description Part Number Quantity. Power Cable

BLUE RIBBON CORP. BC001 Birdcage Installation Manual

Electric Engineering Division FIBER CONDUIT RULES AND REGULATIONS

FRONT BUMPER INSTALLATION INSTRUCTIONS DODGE / MERCEDES SPRINTER

1. Lay out 2 pieces of 7/8" tubing and mark for bending as shown. Remember that the bend is in the shaded area as shown below in Figure 1.

INSTALLATION INSTRUCTION - INSTRUCCIONES DE INSTALACION FOR DOUBLE-HUNG VENT REPLACEMENT WINDOW

CHAPTER 1 TRAFFIC SIGNAL DESIGN STANDARDS AND GUIDELINES

Merrimac Municipal Light Department. Residential Developments Policy

SECTION SECTIONAL OVERHEAD DOORS 521 SERIES ALUMINUM SECTIONAL OVERHEAD DOORS

CTI TECHNICAL BULLETIN Number 9: A publication of the Cable Tray Institute

Guidelines for Earthquake Bracing Residential Water Heaters

INSTALLATION INSTRUCTIONS

Electrical Wiring Technical Bulletin

GUIDELINES FOR UTILITY INSTALLATIONS Part 1 - Wire Lines and Communications Cables

Arecont Vision H.264 Color or Day/Night SurroundVideo Series Installation Manual

Reasons for reissue of this instruction sheet are provided in Section 5, REVISION SUMMARY.

Table of Contents. What to Expect with. Preparation. Tools Needed. Wiring. Hanging the Fan. Blades. Motor Housing.

The "DAVID" Steam Engine By Alan Marconett Hobbit Engineering

Section 500 Rigid Pavement

COMMERCIAL CONDUIT RULES AND REGULATION

CONTENTS. Yale University Design Standards. Underground Electrical Duct Bank. A. Summary. B. System Design and Performance Requirements

758 Heavy-duty Ratchet Guy Wire Cutter

WINDOW INSTALLATION GUIDE FOR NEW CONSTRUCTION - WOOD FRAMING

BUILT-IN DISHWASHER INSTALLATION INSTRUCTIONS

PART E SPECIFICATIONS

DYI INNOVA LIGHT BAR

Cooktop Low-Profile Ventilation Hoods

GENERAL ELECTRICAL REQUIREMENTS

Owner s Manual Read and keep this manual. Patents World Wide

Special Specification 6033 Computerized Transportation Management System

Guidelines for Fiber Optic Cable Permits

OPERATING INSTRUCTION MANUAL FOR S-240 HYDRAULIC CUTTERS WITH PARTS LIST

Carlon Bore-Gard and Boreable Multi-Gard Raceway


March 14, Installation of Bay, Bow and Garden Windows

Joint Rehabilitation. Driving Forces for Concrete Pavement Joint Repairs

SECTION CEMENT-MORTAR LINED AND COATED STEEL PIPE

1. SAFETY RULES. 8. Avoid placing objects in the path of the blades.

Chapter 9. Bonding and Grounding

SECTION SANITARY SEWER AND STORM DRAIN SYSTEMS

Section 402. STORM SEWERS

Operating Instructions

Transcription:

Vehicle detectors act as the eyes of the traffic signal controller thereby allowing it to become traffic responsive. The loss of even one vehicle detector could greatly disrupt the timing of the signal and result in traffic backup. Because this is a vital part of the traffic control signal system, great care must be exerted when installing vehicle detectors. The location of vehicle detectors range from: at or near the stop line to up to 750 feet (230 meters) back from the stop line. It is necessary to locate lane markings and crosswalks to correctly locate vehicle detectors that are in the pavement. Mark vehicle detectors after pavement markings have been determined or placed. Other types of detector units (Video, Microwave, Sonic) will need to be located per the Contract Documents, Manufacturer s instructions, and/or as directed by the Engineer. Note: Vehicle Loop detector materials, installation requirements, approved loop detector conductors, test reports, requirements for inductance, and number of turns will be identified within the Contract Documents MnDOT approved loop sealants and MnDOT approved loop detector splice encapsulation kits are listed on MnDOT s Approved/Qualified Products List (APL). 16-1

There are four different types of vehicle detection used by MnDOT on traffic control signal system projects: Preformed Rigid PVC Conduit Loop Detectors Saw Cut Loop Detectors Video Detectors Microwave and Sonic Detectors The Contractor must refer to the Contract Documents for the type of vehicle detection system that is required for the specific traffic control signal project. 16-2

Preformed Rigid PVC Conduit Loop Detectors Standard Plate 8132 Preformed rigid PVC conduit loop detectors are the most common type of vehicle detector that MnDOT currently uses on a typical traffic control signal system project. Standard Plate No. 8132 will have all the requirements for a complete installation of this type of detector. These types of detectors are either placed in the class 5 roadway base before pavement installation or they may be required to be milled into the existing pavement. 16-3

Saw Cut Loop Detectors Standard Plate 8130 When saw cut loop detectors are required, the requirements are on Standard Plate No. 8130. Mark loop detectors and loop conduit locations on the pavement. If necessary, adjust the location of the loops to avoid cracks and joints in the pavement. If cracks or pavement joints are encountered, refer to Standard Plate No. 8130 for complete details of installation requirements. Install loop detectors in the roadway before bituminous wearing course is placed. It is essential to maintain required depth of trench or saw cut thru out, including the corners of the loop, to insure the loops will survive future roadway milling operations. 16-4

After sawing and drilling is complete, clean all foreign materials from loop detector saw cuts. Dry sawing does not require water flushing Before installation of loop detector conductors, a bead of MnDOT approved loop detector sealant must be placed in the saw cut. Ensure the dowels are installed in the corners of the saw cut prior to winding the loop detector conductor. Install clean, dry, continuous loop detector conductor wound in a clockwise direction allowing 6 extra feet of conductor within the handhole. Lay the loop detector wire in the saw cut and push them to the bottom of the saw cut with a blunt instrument to avoid damaging the tubing or conductors. Install 1/2 inch (15 millimeters) diameter by 1 inch (25 millimeters) backer rods at 24 inch (600 millimeters) intervals to ensure that the conductors remain at the bottom of the saw cut. 16-5

To run the loop wire to the handhole it is necessary to install a conduit from the road surface to the handhole. Drill a hole a minimum of 18 inches (450 millimeters) from the curb apron or edge of pavement or joint between the road and the shoulder at an approximate 45 degree angle at the intersection of the loop saw cuts. The hole must be large enough to install 1-1/4 inch (35 millimeters) PVC conduit or rigid steel conduit (RSC). A ¾ inch (21 millimeters) PVC or RSC is acceptable when installing a single loop. Ream the end of the conduit so that the insulation on the wires is not damaged during installation. The conduit must be inserted far enough into the hole so that the bottom is 1 inch (25 millimeters) below the bottom of the saw cut. When installing Rigid PVC loops, the conduit must be continuous from the loop to the handhole. Install a conduit end bell bushing on the handhole end of the conduit. It is necessary to place a 1 inch (25 millimeters) metallic washer over the roadway end of the lead-in conduit so that the lead-in conduit can be found if the loop goes dead. After all sawing and drilling is complete, clean and flush all foreign materials from loop detector saw cuts and general area of loop detector using a high-pressure air and water mix. Dry all loop detector saw cuts and general loop area prior to installation of sealant and conductors. Loop wire must be clean when it is installed. If necessary place loop wire in a plastic bag to ensure it remains clean. 16-6

Twist the loop conductor pairs for the entire length of the loop detector lead-in conduit at a minimum rate of 3 turns per foot (300 millimeters). To Handhole Seal the loop detector conduit at the roadway end with duct seal to prevent loop sealant from entering the conduit. Test the loop before the sealant is placed in the saw cut. Seal saw cut loop conductors with an approved loop detector sealant (see MnDOT s Approved/Qualified Products List) as per manufacturer s recommended procedures. Do not over fill the saw cut with sealant. 16-7

PVC and Saw Cut Loop Detector Splicing Properly prepare and clean the loop detector conductors. The ends of the roadway loop detector conductors are to be soldered to the loop detector lead-in cable. After being soldered, install an appropriate sized wire nut and scuff the conductor insulation with the provided emery cloth before splice kit installation. Splice the loop detector conductors according to the approved method and approved splice kit. (See Contract Documents for approved splice kit and splicing method). Loop Detector splice kits must be installed in a manner to ensure that they are suspended and secured near the top of the handhole so that they are accessible if water freezes in the handhole. 16-8

PVC and Saw Cut Loop Detector Testing 2565.3G.3 Test each loop detector in accordance with the Contract Documents. Testing at the handhole or junction box must be done before installing sealant or hot mix (if installing a Rigid PVC loop). The loops must be tested for resistance, inductance and a Meg Ω reading to ground at the signal cabinet. The test results must be recorded on a form similar to the one found in the APPENDIX of this field guide. Three copies of the report must be given to the Project Engineer for distribution. (Signal cabinet, ESU, and the District Traffic Office) If the readings are not within the design parameters, there is a problem with the installation, or materials, and the loop will have to be reinstalled. These procedures will ensure a good functioning loop detector. Refer to Contract Documents for complete details on loop materials, installation, and testing. 16-9

VIDEO DETECTION SYSTEMS Some MnDOT projects will require video detection systems. All material and installation requirements for video detection systems are contained in the Contract Documents. Microwave and Sonic Detectors Microwave and sonic detector units are mostly used on span wire type traffic control signal systems. The Contractor must refer to the Contract Documents for location and installation requirements for these vehicle detector types. 16-10