Appendix II - Attachment A of SI Manual Letter of Footing and Foundation SER assuming responsibility of PEMB SER



Similar documents
CITY & COUNTY OF DENVER COMMUNITY PLANNING & DEVELOPMENT BUILDING PERMIT POLICY Special Inspector Qualification Michael Roach, P.E., Building Official

FAIRFAX COUNTY, VIRGINIA. SPECIAL INSPECTIONS PROGRAM 2012 Edition (2012-SIP) Effective: July 14, 2014

Professional Engineers Providing Structural Engineering Services In Buildings

Contractor s Statement of Responsibility for Seismic-Force-Resisting Systems This form is to be filled out by the contractor.

SPECIAL INSPECTION AND TESTING AGREEMENT INTERNATIONAL BUILDING CODE

1 RCNY CHAPTER 100

LOCAL AGENCY CONTRACT ADMINISTRATION CHECKLIST

City Of Portsmouth, New Hampshire REQUEST FOR QUALIFICATIONS # For. Construction Management Services for the

Section 1. The title of Section of Subchapter A of Chapter 100 of Title 1 of the Rules of the City of New York is amended to read as follows:

Foundation Repair Permit - Residential and Commercial

HATFIELD TOWNSHIP DEMOLITION PERMIT APPLICATION PROCEDURES

ACG Commissioning Guideline

CQR-1 CONTRACTOR QUALITY REQUIREMENTS for CONSTRUCTION SERVICES

SUBSTITUTION PROCEDURES

Code of Standard Practice for Timber Frame Structures

CCU Engineering Specifications. Section PRECAST CONCRETE PRODUCTS

Building Code of New York State

2. Division 05 Structural Steel Framing for steel framework requirements

VDOT GOVERNANCE DOCUMENT

Designer Quality Control Plan Guidelines

1 RCNY CHAPTER 100. (a) Definitions. For the purposes of this chapter, the following terms will have the following meanings:

EXAM GUIDE. Construction Documents & Services

CITY OF YORBA LINDA P.O. BOX CALIFORNIA

Subcontractor Prequalification Statement

Village of Airmont APPLICATION FOR BUILDING PERMIT INSTRUCTIONS

HATFIELD TOWNSHIP DRY CLEANING PLANT PERMIT APPLICATION PROCEDURES

APPLICATION FOR HISTORIC MIRAMAR COMMERCIAL REHABILITATION PROGRAM (TARGET AREA)

Acceptance Codes APPENDIX - A. Acceptance Criteria

SECTION WINDOW WASHING SYSTEMS

INDIANA DEPARTMENT OF TRANSPORTATION QUALIFIED LABORATORY AND TECHNICIAN PROGRAM

HATFIELD TOWNSHIP. FLAMMABLE and COMBUSTIBLE LIQUIDS PERMIT APPLICATION PROCEDURES

ACCREDITATION CRITERIA FOR SPECIAL INSPECTION AGENCIES AC291. June 2013 (Effective July 1, 2013) (Editorially revised June 4, 2015)

NON-RESIDENTIAL BUILDING PERMIT PROCEDURES

TOWN OF OHIO BUILDING PERMIT APPLICATION

ElmTree System Engineering Laboratory Management System

CERTIFICATE OF APPROVAL OF LOCATION (CAL) APPLICATION Page 2

SECTION ALUMINUM FRAMED ENTRANCES and STOREFRONTS. System 402 Flush-Glazed Screw Spline Storefront

Shed Application Package

Section 10.8 AUGER CAST PILES

C O N S U L T A N T S RESUME

POSITION STATEMENT THE ENGINEER AND THE ENGINEERING TECHNICIAN DESIGNING FIRE PROTECTION SYSTEMS. July 28, 2008

Chapter 4: Contractor Quality Control

CLARK COUNTY DEPARTMENT OF BUILDING & FIRE PREVENTION 4701 W. Russell Road Las Vegas, NV (702) Fax (702)

STANDARD OPERATING PROCEDURE BUILDING & SITE DEVELOPMENT

Request For Proposal. Furnish Schneider Business Park Signs Design Build Services. For the Cibolo Economic Development Corporation Cibolo, Texas

COMPANY ESTIMATOR BID DAY PHONE NO.

DENVER MODEL 30 X 30 SPECIFICATIONS

Suffolk County Department of Health Services. Division of Environmental Quality

REQUEST FOR QUALIFICATIONS FOR CONSTRUCTION MANAGER-AT-RISK (CMAR)

Independent Third-Party Review Guidelines

TROUP COUNTY COMPREHENSIVE HIGH SCHOOL

SECTION PRECAST CONCRETE UTILITY STRUCTURES

Georgia Department of Transportation. Office of Materials and Research. Standard Operating Procedure (SOP) 19

Foundations 65 5 FOUNDATIONS. by Richard Chylinski, FAIA and Timothy P. McCormick, P.E. Seismic Retrofit Training

Basic Requirements for Residential Plan Review _

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES

Career Path Project Engineer to Project Manager 1

Proposal for Structural Engineering Design Services (Structural design mark-up services)

VILLAGE OF SHOREHAM. Instructions for obtaining a building permit for a new home for all one-family dwellings (with required forms)

Construction Laborer Dies after Falling off Collapsed Precast Concrete Floor Slab

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

APPLICATION FOR NON-SUBSTANTIAL DAMAGE / IMPROVEMENT REVIEW

Fence Application Package

SUBJECT: INFORMATION BULLETIN 172 Residential and Commercial Foundation Repair Permits. DATE: March 10, 2010/Revised May 13, 2014/August 1, 2014

MISSISSIPPI STATE UNIVERSITY DEPARTMENT OF RECREATIONAL SPORTS FACILITY USAGE AGREEMENT. Name and address of entity requesting use:

REQUEST FOR QUALIFICATIONS FOR VARIOUS AS-NEEDED ENGINEERING AND PROFESSIONAL SERVICES FOR FISCAL YEARS 2017 THRU 2019

Summary of Modifications/Changes in this Update

APPLICATION FOR EAST MIRAMAR COMMERCIAL REHABILITATION PROGRAM

Exhibit C: Scope of Work and Schedule of Deliverables

GORDON COUNTY BOARD OF COMMISSIONERS REQUEST FOR QUALIFICATIONS FOR AN ARCHITECT FAMILIAR WITH COMMUNITY DEVELOPMENT BLOCK GRANT APPLICATIONS

AGREEMENT FOR PROFESSIONAL DESIGN SERVICES

N.I.C.E. COMMUNITY SCHOOL DISTRICT PRELIMINARY ARCHITECTURAL SERVICES REQUEST FOR PROPOSALS ("RFP")

Guide to Professional Practice

Section 600 Incidental Construction

City of West Chicago Community Development Department 475 Main Street, West Chicago, IL Phone: (630) x 131 / Fax: (630)

Construction Management Services Delmar School District RFP No. DSD16001-CONSTR_MAN

5. Whether the timely completion of the project is critical to the university s ability to repay debt service or to meet grant obligations.

FLORIDA PRODUCT APPROVAL

SUFFOLK COUNTY DEPARTMENT OF HEALTH SERVICES TOXIC/HAZARDOUS MATERIAL TRANSFER FACILITY DESIGN GUIDELINES

PRIME CONSULTANT SERVICES

Purchasing a Business in Utah - RFP Approval Bid Process

Practice Note for Authorized Persons, Buildings Department Registered Structural Engineers and APP-13 Registered Geotechnical Engineers

PRIVATE PROVIDER REQUIREMENTS General Information and Checklist Rev

WORK SCOPE. Domains in which we work:

REQUEST FOR PROPOSAL CONSTRUCTION MANAGEMENT SERVICES PINE TRAIL ELEMENTARY HVAC, CEILING & LIGHTING PROJECT NO

Certification: Building Plans Examiner. Exam ID: B3

REQUEST FOR PROPOSALS FOR CONSTRUCTION MANAGEMENT AT-RISK FOR LOGANVILLE ELEMENTARY SCHOOL (REPLACEMENT) FOR THE WALTON COUNTY SCHOOL DISTRICT

Invitation to Bid and Instructions to Bidders (This is Phase I of the project please note on any Bid that it Applies to Phase I only) May 1, 2015

UNIVERSITY AND COLLEGE SIGN GENERAL INFORMATION AND APPLICATION

Commercial Construction Permit Application

CIVIL ENGINEERING ASSOCIATE, 7246

SECTION PUBLIC STORM UTILITY DRAINAGE PIPING

COMMONLY USED RESIDENTIAL BUILDING CODES

REQUEST FOR PROPOSAL TO PROVIDE CONSTRUCTION MANAGEMENT AND GENERAL CONTRACTOR SERVICES SPRINGVILLE CITY NEW AQUATICS AND ACTIVITIES CENTER

Wastewater Capital Projects Management Standard Construction Specification

W.E. O NEIL CONSTRUCTION CO. OF COLORADO INSURANCE REQUIREMENTS. Project Name Project Address City, State Zip

Section 100 Contractor Quality Control Program

SECTION STORM DRAINAGE STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

ENGINEERED FOUNDATIONS. Department of Public Works Jeff Hill, PE

APPLICATION FOR SINGLE PROJECT PROFESSIONAL LIABILITY INSURANCE. Name of Firm or Joint Venture: Address of Head Office:

Transcription:

Appendix II - Attachment A of SI Manual Letter of Footing and Foundation SER assuming responsibility of PEMB SER Subject: Letter assuming the responsibility as Structural Engineer of Record (SER) for Pre-engineered Metal Building (PEMB) I, Mr./Ms., P.E. am the SER for the Footing and Foundation of the above-referenced project. By this letter, I am assuming the role of the SER for the entire building. I will make site visits during the construction of the structure and review and approve the Final Report of Special Inspections upon completion of the special inspections elements specified in the Statement and Schedule of Special Inspections. Dated Sealed and Signed by SER cc: The Owner

Appendix II - Attachment B of SI Manual Letter of SIER accepting the County approved geotechnical report Subject: Geotechnical Report Review I, Mr/Ms., P.E., of, am the SIER for the above referenced project. I have reviewed the Geotechnical report dated,, prepared by Mr./ Ms., P.E. of, the GER of the project. I take responsibility for implementing the findings and recommendations in the geotechnical report 1. Respectfully, Dated Seal and Signed by SIER 1 If the SIER takes exceptions to any part of the geotechnical report, he/she needs to identify those items which will be evaluated for any design implications.

Appendix II - Attachment C of SI Manual AR/SER list of shop drawings and other structural submittals Project Name Project Address Subject: List of Shop Drawings As the SER for the referenced project, I require the following shop drawings and submittals for my review and approval: Rebar shop drawings for footings, slabs and foundation walls Structural Steel Masonry Product Data Concrete Mix Design Grout and Mortar Mix Design for Load Bearing Masonry Manufacturer s specifications for SFRM Manufacturer s specifications for EIFS Others: Dated Sealed and Signed by SER cc: The General Contractor

Appendix II - Attachment D of SI Manual Request for waiver of preconstruction meeting Subject: Request for Waiver of Preconstruction Meeting This is to request for waiver of preconstruction meeting for the above-referenced permit based on the fact that a meeting for a similar project, Permit # BLD, involving the same parties, was held on (mm/dd/yyyy) which is within the last six (6) months. The parties involved are: 1. The Contractor representative: Address: Telephone: 2. The Special Inspections Engineer of Record: Address: Telephone: 3. The Structural Engineer of Record: Address: Telephone: 4. The Architect of Record: Address: Telephone: Fax: Fax: Fax: Fax: Sincerely, cc. AR, SIER, SER & Contractor

Appendix II - Attachment E of SI Manual Letter of Engagement of SIER to perform Third Party Inspections Subject: Letter of Engagement to Perform Third Party Inspections This is to confirm that [Name of Company], have been hired by the Owner,,on the above referenced project to perform inspections and testing. I, Mr/Ms/ Dr. [Name of County approved Third Party Inspections Engineer], P.E., will be the Special Inspections Engineer of Record (SIER) for the project and will be certifying the project upon completion. The detailed scope of work, resumes and certifications of technicians and the laboratory accreditation certificate of the testing agency are attached herewith. Respectfully, Dated Seal and Signature of SIER Attachments: cc: The Owner

Appendix II - Attachment F of SI Manual AR/SER Letter of Authorization Subject: Letter of Authorization This is to authorize Mr/ Ms/Dr. undersigned for the above referenced project at:, P.E. to represent the Preconstruction meeting Site visits Review shop drawings However, I, Mr/ Ms/ Dr, P.E., the SER for the project, will review and approve the Final Report of Special Inspections submitted by the Special Inspections Engineer of Record upon completion of the special inspections elements specified in the Statement and Schedule of Special Inspections. Dated Sealed and Signed by SER

Appendix II - Attachment G of SI Manual The Owner s Letter for Change of Special Inspections Engineer of Record Subject: Letter of Change of Special Inspections Engineer of Record I, Mr./Ms./Dr., the Owner of the above-mentioned project have replaced Mr., P.E., by Mr., P.E., as the new Special Inspections Engineer of Record as of mm/dd/yyyy. The new SIER is on the List of Approved Third Party Engineers. Dated and Signed

Appendix II - Attachment H of SI Manual Letter Assuming the Role as the New Special Inspections Engineer of Record Subject: Letter Assuming the Role as the New Special Inspections Engineer of Record I, Mr./Ms./Dr., P.E., have been hired by the Owner of the above-mentioned project as the new Special Inspections Engineer of Record as of mm/dd/yyyy. I have been involved and I am familiar with the work that has been carried out to-date on this project. Upon completion of the Special Inspections items, I will sign off on the Final Report of Special Inspections without taking any exceptions. Dated Sealed and Signed by SIER cc: The Owner The General Contractor

Appendix II - Attachment I of SI Manual Format of SER/AR Shop Drawing Review / Approval Stamp APPROVAL FOR DESIGN CONCEPT [ ] APPROVED Final Approval. Fabrication may proceed on work as shown. [ ] APPROVED AS NOTED Fabrication may proceed based on corrections indicated. [ ] DISAPPROVED Fabrication may not proceed. Revisions shall be made and submitted for further check. Approval is only for general conformance with the design concept of the project and compliance with information given in the contract documents. The contractor is responsible for dimensions to be confirmed and correlated at the job sites, for information that pertains solely to the fabrication processes or to techniques of construction, and the coordination of his work of all trades. BY (Initials) DATE (Company)