Application of Fuzzy Lead Time to a Material Requirement Planning System



Similar documents
1 Material Requirements Planning (MRP)

A FUZZY LOGIC APPROACH FOR SALES FORECASTING

An Evaluation Model for Determining Insurance Policy Using AHP and Fuzzy Logic: Case Studies of Life and Annuity Insurances

Material Requirements Planning (MRP)

How To Plan A Pressure Container Factory

ISE 421 QUANTATIVE PRODUCTION PLANNING

Resource grouping selection to minimize the maximum over capacity planning

Issues in Information Systems Volume 14, Issue 2, pp , 2013

Identification of Demand through Statistical Distribution Modeling for Improved Demand Forecasting

The use of an ERP system for new product development: a logistic perspective

Scheduling Policies, Batch Sizes, and Manufacturing Lead Times

STRATEGIC CAPACITY PLANNING USING STOCK CONTROL MODEL

Determining Inventory Levels in a CONWIP Controlled Job Shop

NTC Project: S01-PH10 (formerly I01-P10) 1 Forecasting Women s Apparel Sales Using Mathematical Modeling

DEVELOPMENT OF FUZZY LOGIC MODEL FOR LEADERSHIP COMPETENCIES ASSESSMENT CASE STUDY: KHOUZESTAN STEEL COMPANY

Analysis of Various Forecasting Approaches for Linear Supply Chains based on Different Demand Data Transformations

LIMITATIONS AND PERFORMANCE OF MRPII/ERP SYSTEMS SIGNIFICANT CONTRIBUTION OF AI TECHNIQUES

Manufacturing Planning and Control for Supp Chain Management

Marginal Costing and Absorption Costing

The Multi-Item Capacitated Lot-Sizing Problem With Safety Stocks In Closed-Loop Supply Chain

High-Mix Low-Volume Flow Shop Manufacturing System Scheduling

A Genetic Algorithm Approach for Solving a Flexible Job Shop Scheduling Problem

Keywords: Single-vendor Inventory Control System, Potential Demand, Machine Failure, Participation in the Chain, Heuristic Algorithm

Analysis of a Production/Inventory System with Multiple Retailers

A joint control framework for supply chain planning

Using Queueing Network Models to Set Lot-sizing Policies. for Printed Circuit Board Assembly Operations. Maged M. Dessouky

An ant colony optimization for single-machine weighted tardiness scheduling with sequence-dependent setups

MULTIPLE LINEAR REGRESSION ANALYSIS USING MICROSOFT EXCEL. by Michael L. Orlov Chemistry Department, Oregon State University (1996)

Chapter 7. Production, Capacity and Material Planning

A Fuzzy Logic Based Approach for Selecting the Software Development Methodologies Based on Factors Affecting the Development Strategies

A Robustness Simulation Method of Project Schedule based on the Monte Carlo Method

Schedule Risk Analysis Simulator using Beta Distribution

Chapter 11 Monte Carlo Simulation

SPARE PARTS INVENTORY SYSTEMS UNDER AN INCREASING FAILURE RATE DEMAND INTERVAL DISTRIBUTION

Organizational Learning and Knowledge Spillover in Innovation Networks: Agent-Based Approach (Extending SKIN Framework)

ARQUIMEDES: A TOOL FOR TEACHING PPC IN AN OPERATIONS MANAGEMENT COURSE

Marketing Mix Modelling and Big Data P. M Cain

Overview. Essential Questions. Precalculus, Quarter 4, Unit 4.5 Build Arithmetic and Geometric Sequences and Series

A Comparison of System Dynamics (SD) and Discrete Event Simulation (DES) Al Sweetser Overview.

FLBVFT: A Fuzzy Load Balancing Technique for Virtualization and Fault Tolerance in Cloud

UNCERTAINTIES OF MATHEMATICAL MODELING

DEVELOPMENTS OF MRP THEORY

Testing for Granger causality between stock prices and economic growth

Project Cash Flow Forecasting Using Value at Risk

INFORMATION TECHNOLOGIES AND MATERIAL REQUIREMENT PLANNING (MRP) IN SUPPLY CHAIN MANAGEMENT (SCM) AS A BASIS FOR A NEW MODEL

Analysing and Improving Manufacturing Operations using Production and Inventory Control SIMulator (PICSIM)

IEEE TRANSACTIONS ON NEURAL NETWORKS, VOL. 16, NO. 5, SEPTEMBER Fuzzy-Based Adaptive Bandwidth Control for Loss Guarantees

A New Approach for Finite Capacity Planning in MRP Environment

Supply planning for two-level assembly systems with stochastic component delivery times: trade-off between holding cost and service level

DESIGN AND STRUCTURE OF FUZZY LOGIC USING ADAPTIVE ONLINE LEARNING SYSTEMS

Simulation-based Optimization Approach to Clinical Trial Supply Chain Management

Consumption-Driven Finite Capacity Inventory Planning and Production Control. A thesis presented to. the faculty of

TEACHING SIMULATION WITH SPREADSHEETS

International Journal of Advances in Science and Technology (IJAST)

A Comparative Study of the Pickup Method and its Variations Using a Simulated Hotel Reservation Data

Motivated by a problem faced by a large manufacturer of a consumer product, we

MATERIAL REQUIREMENTS PLANNING

A Brief Study of the Nurse Scheduling Problem (NSP)

QUEUING THEORY. 1. Introduction

INVENTORY MANAGEMENT. 1. Raw Materials (including component parts) 2. Work-In-Process 3. Maintenance/Repair/Operating Supply (MRO) 4.

Planning Optimization in AX2012

Applying Fuzzy Control Chart in Earned Value Analysis: A New Application

TAGUCHI APPROACH TO DESIGN OPTIMIZATION FOR QUALITY AND COST: AN OVERVIEW. Resit Unal. Edwin B. Dean

A Hybrid Tabu Search Method for Assembly Line Balancing

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras

SUPPLY CHAIN MISSION STATEMENT

Short-term Planning. How to start the right operation at the right shop at the right time? Just in Time (JIT) How to avoid waste?

A SIMULATION MODEL FOR RESOURCE CONSTRAINED SCHEDULING OF MULTIPLE PROJECTS

Recall this chart that showed how most of our course would be organized:

Optimization of Fuzzy Inventory Models under Fuzzy Demand and Fuzzy Lead Time

Fuzzy Logic Based Revised Defect Rating for Software Lifecycle Performance. Prediction Using GMR

Manufacturing. Manufacturing challenges of today and how. Navision Axapta solves them- In the current explosive economy, many

Analysis Of Shoe Manufacturing Factory By Simulation Of Production Processes

A LOT-SIZING PROBLEM WITH TIME VARIATION IMPACT IN CLOSED-LOOP SUPPLY CHAINS

CHAPTER 6 AGGREGATE PLANNING AND INVENTORY MANAGEMENT 명지대학교 산업시스템공학부

EMPLOYEE PERFORMANCE APPRAISAL SYSTEM USING FUZZY LOGIC

UNDERSTANDING THE TWO-WAY ANOVA

A Programme Implementation of Several Inventory Control Algorithms

Course Supply Chain Management: Inventory Management. Inventories cost money: Reasons for inventory. Types of inventory

Single item inventory control under periodic review and a minimum order quantity

Material Requirements Planning. Lecturer: Stanley B. Gershwin

International Journal of Industrial Engineering Computations

The relationship of cash flow prediction and accruals on the return of book value to market value in food industry listed in Tehran Stock Exchange

The Master s Degree with Thesis Course Descriptions in Industrial Engineering

SAS Software to Fit the Generalized Linear Model

SINGLE-STAGE MULTI-PRODUCT PRODUCTION AND INVENTORY SYSTEMS: AN ITERATIVE ALGORITHM BASED ON DYNAMIC SCHEDULING AND FIXED PITCH PRODUCTION

Abstract Title: Planned Preemption for Flexible Resource Constrained Project Scheduling

1.5 Oneway Analysis of Variance

Production Planning Solution Techniques Part 1 MRP, MRP-II

Optimization: Continuous Portfolio Allocation

An Application of Master Schedule Smoothing and Planned Lead Time Control

SYSTEMS OF EQUATIONS AND MATRICES WITH THE TI-89. by Joseph Collison

SUPPLY CHAIN MODELING USING SIMULATION

A MILP Scheduling Model for Multi-stage Batch Plants

Priori ty

AN ANALYSIS OF WORKING CAPITAL MANAGEMENT EFFICIENCY IN TELECOMMUNICATION EQUIPMENT INDUSTRY

On Simulation Method of Small Life Insurance Portfolios By Shamita Dutta Gupta Department of Mathematics Pace University New York, NY 10038

Employee Likelihood of Purchasing Health Insurance using Fuzzy Inference System

Basic Queuing Relationships

Fuzzy decision support system for traffic control centers

Transcription:

Proceedings of the 8th WSEAS International Conference on Fuzzy Systems, Vancouver, British Columbia, Canada, June 19-21, 2007 208 Application of Fuzzy Lead Time to a Material Requirement Planning System R. TAVAKOLI-MOGHADDAM Department of Industrial Engineering, Faculty of Engineering University of Tehran P.O. Box 11365/4563, Tehran IRAN tavakoli@ut.ac.ir M. BAGHERPOUR Industrial Engineering Department Islamic Azad University, Shiraz, 71968-45615 IRAN mortezabagherpour@gmail.com A.A NOORA Department of Mathematics, Science and Research Branch, Islamic Azad University, Tehran IRAN dr.noora@hamoon.usb.ac.ir F. SASSANI Department of Mechanical Engineering The University of British Columbia 6250 Applied Science Lane, Vancouver, B.C., V6T 1Z4 CANADA sassani@mech.ubc.ca Abstract: - Material requirement planning (MRP) is used as an important technique in production planning topics. Several researches have been carried out in MRP systems, however in the case of fuzzy lead time (FLT), there are few researches available in the literature. In this paper, fuzzy lead time is discussed to cover an uncertainty condition in MRP systems. Hereby, the history of a vendor delivery and the volume of an order are considered as inputs and lead time is considered as an output of the proposed fuzzy system. Finally, lead time is estimated based on generating fuzzy rule bases and some linguistic rules, which are logical relationships between inputs and output. To establish the validation of the proposed approach, results of lead time obtained by the Monte Carlo simulation are compared with fuzzy lead times, both in 20 independent observations, each in 1000 simulation runs, using two-way analysis of variance (ANOVA). This statistical analysis also confirms the superiority of the proposed approach significantly. Key-words: - Material requirement planning, Fuzzy rule based, Lead time, ANOVA 1 Introduction Material requirement planning (MRP) is used in planning and control systems for batch manufacturing systems. The robustness of the MRP logic comes from its ability to deal with complexity, variability, and uncertainty. Key characteristics include the

Proceedings of the 8th WSEAS International Conference on Fuzzy Systems, Vancouver, British Columbia, Canada, June 19-21, 2007 209 coordination of assembly and purchased component requirements through time-phased order releases and the reduction of setups through the aggregation of common part requirements. To obtain a basic understanding of MRP systems, you may refer to Vollmann et al. [1] and Sipper and Bulfin [2]. Lot sizing issues have been studied extensively; however, it is not clear how relevant the results are to MRP environments. MRP lot sizing research should be based on stochastic, multi-item, capacity-constrained assumptions with setup times. Time-phased order releases are also relevant since they affect downstream inter-arrival time variability and therefore influence queuing behavior. Finally, assembly requirements further complicate analysis since part coordination becomes an issue. Karmarkar [3] provided some excellent insights on lot sizing under capacity constraints. Molinder [4] provided an example, in which safety stock and safety lead times were examined. Actual lead-time distributions within the production environment are treated as being independent of any forecasting or master scheduling inputs. Finished product can be assumed to be completed exactly on the due date dictated by the master production schedule (MPS). In a study of forecasting effectiveness, Fieldes and ingsman [5] applied an MPS generated on the basis of forecasts, safety stock, and lot-sizing policies. Enns [6] focused on the effects of lot size and planned lead-time settings in a shop producing assembled products. Their results show that the required inventory levels can be minimized by selecting the proper lot sizes and by using planned lead times to control delivery performance. Biggs [7] showed that the effect of lot sizing and sequencing rules and the interaction between these are significant at the significance level of 0.01. He argued that it is possible that particular sequencing rule may work in "opposite direction" to a particular lot sizing rule and vice versa. He also studied the interaction of priority rules with the capacity levels and reported that these are significant. He found that the critical ratio rule (CRR) preformed consistently well over different levels of capacity. Later, Goodwin and Weeks [8] reported that the CRR for scheduling gives consistently better results over a variety of criteria and with a variety of lot sizing rules. Collier [9] and Billington, et al. [10] pointed out that certain lot sizing rules may hurt the capacity utilization. Grasso and Taylor [11] studied main effects and interaction effects among four factors as follows; lead time, buffering alterative, lot size rule, and cost value on the total cost. They reported that main effects of each factor and the interaction between lead time distribution and lot size rule and the interaction between buffering alternative and cost value on the total cost are significant. Now, we briefly review the work where the initial decision in this area is modified and presented later. South and Stewart [12] reported their experience at Hix Corporation wherein the fifty percent increase in lot sizes and planned manufacturing lead time resulted in low system tardiness without increasing in WIP inventory costs. An intuitive explanation could be that the increase in lot sizes reduces the number of setups while releasing the shop capacity and hence leads to the reduction in a queue length before the processing centers, which leads to low tardiness. In the case of Hix Corporation, the effects balanced in such a manner that it did not increase the work in process inventory. Billington, et al formulated a capacity /lot size/ leadtime problem as a mixed-integer linear programming problem and they suggested a product structure compression to reduce the problem size. Models with lot sizing and sequencing together become large and are intractable to the conventional integer programming techniques. Single stage optimization procedure such as Wagner-Whithin [13] is used due to its simplicity and it is likely to yield sub-optimal solutions when stage wise interactions are ignored. 2 Fuzzy Rule Base In any diagnostic or prognostic study in meteorology for the application of fuzzy reasoning, there are three interdependent steps. A successful execution of these steps leads to the solution of the problem in a fuzzy environment; i.e. the solution procedure digests any type of uncertainty in the basic evolution of the event concerned. 2.1 Fuzzification Review All meteorological events are considered as having ambiguous characteristics and therefore their domain of change are divided into many fuzzy subsets that are complete, normal, and consistent with each other. Hence, the domain of change is fuzzified. This stem is applied to each meteorology factor considered in the solution of the problem.

Proceedings of the 8th WSEAS International Conference on Fuzzy Systems, Vancouver, British Columbia, Canada, June 19-21, 2007 210 2.2 Fuzzy Inference System (FIS) In fact, this step relates systematically pair wise all the factors taking place in the solution, which depends on the purpose of the problem. This part includes many fuzzy conditional statements to describe a certain situation. For instance, if two events X and Y are interactive, then they are dependent on each other. Conditional statements express the dependence as verbally without any equation, which is used in the classical approaches: IF X is A(1) THEN Y is B(1) ALSO IF X is A(2) THEN Y is B(2) ALSO IF X is A(3) THEN Y is B(2) ALSO IF X is A(n) THEN Y is B(n) where A(1), A(2),: : :, A(n) and B(1), B(2),: : :, B(n) are the linguistic description of X and Y respectively. They are fuzzy subsets of X and Y that cover whole domain of change of X and Y. The fuzzy conditional statements in Eq. (1) can be formalized in a form of the fuzzy relation R(X,Y) as R(X,Y)=ALSO (R1; R2; R3; : : :; RN) Where, ALSO represents a sentence connective which combines Ri's into the fuzzy relation R(X,Y), and Ri denotes the fuzzy relation between X and Y determined by the i-th fuzzy conditional statement. After having established the fuzzy relationship R (X,Y), then the compositional rule inference is applied to infer the fuzzy subset B for a given fuzzy subset A for X as B=AOR(X,Y) where "o" is a compositional operator. 2.3 Defuzzification The final result from the previous step is in a form of the fuzzy statement in order to calculate the deterministic value of a linguistic variable Y. The defuzzification method must be applied as follows [10]: L y i i y j = = 1 (1) L M ( x ) i= 1µ A i ij p j ( x) = (2) L M x y = f j = 1 i= 1 µ A ij ( ) i L ( x) = p j ( x) y j (3) j = 1 TABLE 1. Obtained lead time based on the fuzzy system Volume of order History of Vendor Small Medium Big delivery Bad 4.4 5.0 5.6 Medium 1.2 5.0 5.0 Good 4.0 4.1 4.0 where, p(x) is a fuzzy basis function and y is a particular value of the linguistic variable. y j is the support value, in which the membership function reaches its maximum grade of membership. L and M are a number of rules and inputs respectively. In this paper, the center-average method is selected and applied to defuzzify the proposed problem. 3 The Proposed Approach When manufacturer wants to begin production, it is important to estimate lead time accurately. Also, estimated planned lead time will affect on the MRP and MPS respectively. After a proper estimation of lead time, the manufacturer is able to improve delivery performance into the customer. In this paper, a fuzzy rule base is applied in order to estimate lead time accurately. In the proposed fuzzy system, the history of vendor delivery and volume of order are considered as inputs. Lead time is defined as an output of the fuzzy system. Selecting the inputs is significant because they have high impact on output. Then according to real conditions, some linguistic rules are used to model this system. After fuzzification and fuzzy inference steps, finally based on defuzzification results, expected lead time will be estimated based on real conditions (i.e., linguistic rules),in which it is impossible to model them except using a fuzzy approach. 4 A Typical Example In this section, a typical test problem is given to demonstrate applicability of the approach. 4.1 Fuzzy rule base implementation According to the steps mentioned in Section 2, the test problem is implemented in MATLAB 7.0 as follows: 4.1.1 Fuzzification step: In this step, it is required to fuzzify inputs and output as depicted in Figures 1 to 3 respectively.

Proceedings of the 8th WSEAS International Conference on Fuzzy Systems, Vancouver, British Columbia, Canada, June 19-21, 2007 211 Fig. 1. Membership function for the vendor history 4.1.2 Deffuzification step After defuzzifing the proposed fuzzy system, estimated lead time will be achieved. The form of a fuzzy rule base is illustrated through a matrix. The number of fuzzy regions in the input defines the size of the matrix of the combined fuzzy rule base. For a two input one output case, a combined rule base can be formed with a two-dimension matrix as shown in Figure 4. Data given in Table 1 illustrate the lead time value for various conditions. Fig. 2. Membership function for the order volume 4.2 Discussion In the above well-indicated example, instead of considering deterministic lead time, it is estimated due to real conditions on the vendor delivery and order volume. The results show that each pair of two selected inputs has an impact on lead time, only exception is occurred when the history is medium and volume of order is small simultaneously. Also, it is possible to run a sensitivity analysis on affected parameters on lead time to make a good decision about lot sizing policies. It is clear that the obtained lead time will be used in the MRP system by applying available methods in the literature. Fig.3. Membership function for the lead time 4.1.2 Fuzzy inference system In this section, linguistic rules are used to attain the objective as follows: Rule 1: If history of vendor delivery is good and volume of order is small then lead-time is small. Rule 2: If the history of vendor delivery is good and volume of order is medium, then lead time is medium. Rule 3: If the history of vendor delivery is good or volume of order is small, then lead time is small. Rule 4: If the history of vendor delivery is bad and volume of order is medium, then lead time is medium. Rule 5: If the history of vendor delivery is bad and volume of order is big, then lead time is big. 5 Experimental Results While common methods available in the literature considered lead time as a deterministic and prespecified value, the proposed fuzzy approach emphasis on applying fuzzy rule based and estimating lead time resulting from the real conditions that may occur in the manufacturing environment. Also, the obtained lead time is considered as an input as well as MPS- in the MRP system. 5.1 Monte Carlo Simulation In this section, the validation of the proposed approach is evaluated. For this reason, simulated lead times are compared with lead times obtained from the fuzzy rule based approach. The model was tested in the cases of 1, 2, 3, and 4 orders in an MRP system to demonstrate the superiority of the proposed approach. Each observation has obtained through 1000 simulation runs, based on obtained data given in Table 1. Also, simulated lead times are obtained after 1000 simulation runs due to the uniform probability distribution function. Finally, the summation of lead times is

Proceedings of the 8th WSEAS International Conference on Fuzzy Systems, Vancouver, British Columbia, Canada, June 19-21, 2007 212 considered to compare both methods. Also, to have a significant insight within comparative analysis, a twoway analysis of variance has been conducted. The results show that the fuzzy lead times are smaller than simulated lead times in all cases. As a result, when the number of orders in the MRP system increases, it seems that the existing difference between simulated and fuzzy lead time becomes bigger. However, as it was expected in both cases by considering large numbers of order, the summation of lead times becomes greater. Table 2 indicates a comparative analysis between fuzzy and simulated data. As indicated, fuzzy lead times in all observations are less than corresponding simulated lead times. TABLE 2. Comparative analysis between fuzzy and simulated lead times Number of Fuzzy Simulated Observation order lead time lead time 1 4.2 4.9 2 4.3 5.1 3 1 4.2 5 4 4.3 4.9 5 4.2 4.8 6 8.5 9.9 7 8.6 9.8 8 2 8.4 10.2 9 8.6 9.9 10 8.5 9.8 11 12.7 15.2 12 12.8 14.9 13 3 12.8 14.9 14 12.7 14.8 15 12.8 15.1 16 17.12 19.9 17 17 20.2 18 4 17 19.8 19 16.9 20.1 20 17.1 19.8 Average 10.636 12.45 Source TABLE 3. Two-way analysis of variance Mean square Degree of freedom F- statistic P-value Column 32.9 1 8.84 0.0058 Row 964.11 4 64.74 0 Interaction 6.22 4 0.42 0.79 Error 111.69 30 5.2 Two-way analysis of variance (ANOVA) A two-way analysis of variance tests the equality of population's means when classification of treatments is by two variables or factors, which in this research the number of orders and the available methods are considered as two important factors affecting on lead time in the MRP system. The results of analysis of variance, as shown in Table 3, indicates the fuzzy approach is significantly different from the results obtained by simulation. The p-value for the approach effect is 0.0058. This is a strong indication that the lead time varies from one approach to another. Also, the p- value for the number of orders is near to zero, which is also highly significant. Thus, the proposed approach can be used appropriately. 6 Conclusion In this paper, a fuzzy lead time application to a material requirement planning (MRP) environment has been addressed. The proposed approach has used a fuzzy rule base to cover linguistic rules, which it would be happen in a manufacturing environment. In the proposed fuzzy system, the history of vendor delivery and volume of order were considered as inputs to estimate lead time as out put in the proposed system. The results showed that after the defuzzification process, lead time could be estimated easily on the basis of various input conditions and obtained results would be used in the MRP system by applying available methods in the literature. The approach was more reliable when the manufacturer wanted to estimate lead time and consequently MRP and master production schedule (MPS) more accurate. To evaluate the validation of the fuzzy approach, the results obtained by the proposed approach were compared with simulated lead times, both in 1000 simulation runs and 20 independent observations. A two-way analysis of variance confirmed our hypothesis significantly. Therefore, the

Proceedings of the 8th WSEAS International Conference on Fuzzy Systems, Vancouver, British Columbia, Canada, June 19-21, 2007 213 proposed fuzzy approach can be used in MRP systems safely. Further research will be focused on applying stochastic processes to obtain lead time due to a probabilistic nature of MRP situations. References: [1] T.E. Vollmann, W.L. Berry and D.C. Whybark, Manufacturing Planning and Control, 4th edition, Irwin, 1997. [2] D. Sipper and R.L. Bulfin, Production Planning Control and Integration, McGraw-Hill Co., 1997. [3] U.S. Karmarkar, Lot Sizes, Lead Times and in Process Inventories, Management Science, Vol. 33, 1987, pp. 409-418. [4] A. Molinder, Joint Optimization Of Lot Sizes, Safety Stocks and Safety Lead Times in an MRP System, International Journal of Production Research, Vol. 35, 1997, pp. 983-994. [5] R. Fieldes and B. Ingsman, Demand Uncertainty and Lot Sizing in Manufacturing Systems, the Value of Forecasting, Working Paper MS 01/97, Lancaster University, 1997. [6] S.T. Enns, MRP Performance Effects Due to Lot Size and Planned Lead Time Settings, International Journal of Production Research, Vol. 39, 2001, pp. 461-480. [7] J.R. Biggs, Priority Rules for Shop Floor Control in a Material Requirement Planning under Various Levels of Capacity, International journal of production research, Vol. 23, No.1, 1985, pp. 33-36. [8] J.S. Goodwin and J.K. Weeks, Evaluating Scheduling Policies in a Multilevel Assembly System, International Journal of Production Research, Vol. 24, 1986, pp.247-257. [9] D.A. Collier, A Comparison of MRP Lot Sizing Methods Considering Capacity Change Cost, Journal of Operations Management, Vol. 1, 1980, pp. 23-29. [10] P. Billington and L.J.T. McClain, The Interaction of Lead Time Determination, Lot Sizing Decisions and Capacity Planning in MRP Systems, Proceeding, American Institute of Decision Sciences, Eleventh Annual Meeting, 1979. [11] E.T. Grasso and B.W. Taylor, A Simulation Based Experimental Investigation of Supply Timing Uncertainty in MRP Systems, International Journal of Production Research, Vol. 22, No. 3, 1984, pp. 485-497. [12] J.B. South and R.J. Stewart, A 50% Increase in Lot Size and Planned Manufacturing Lead Time with no Increase in Work-in-Process Inventory, Production and Inventory Management, Vol. 35, 1997, pp. 19-25. [13] H.M. Wagner and T.M. Whitin, Dynamic Version of Economic Lot Size Model, Management Science, Vol. 5, No. 1, 1958, pp. 89-96.