1 ISE 421 QUANTATIVE PRODUCTION PLANNING LECTURE III MRP, MRPII, ERP, APS Dr. Arslan ÖRNEK Fall Term

2 PRODUCTION PLANNING & SCHEDULING (PP&S) PP&S is one of the most critical activities in a manufacturing firm. PP&S involves determining the volume and timing of the production while considering both customer requirements and capacity limitations. 2

3 PP&S SYSTEMS HISTORY MRP-70 s MRP-II-80 s ERP-90 s APS ERP MRP-II MRP APS

4 MRP MRP attempts to provide the right part at the right time for the customer MRP aims to plan the end item requirements of the master production schedule (MPS) by using Bill of Material (BOM) and inventory records 4

5 MRP ADVANTAGES Rapid adaptability to dynamic changes in customer needs Ability to know what is required several periods in advance 5

6 MRP DISADVANTAGES Inability to perform comprehensive capacity planning Lack of a fluent shop floor extension Constant and inflated lead times All data known with certainty 6

7 MRP-II = MRP + Capacity Planning and Scheduling 7

8 MRP-II COMPONENTS Independent Demand over the Planning Horizon 8

9 MRP-II COMPONENTS Bill of Materials (BOM) to Compute Dependent Demand 9

10 MRP-II COMPONENTS Procurement and Production Lead-Times Time between the relase and the completion time of a procurement or production order. Lead time includes preparation, administration, waiting, production, quality control and tests, and delivery. Lead times are measured as an integer number of time periods. 10

11 MRP-II COMPONENTS Routing of Components 11

12 MRP-II COMPONENTS Capacity of Resources 12

13 MRP-II COMPONENTS Inventory Records on-hand inventory: physical inventory in the warehouses; allocated or reserved inventory: which is the part of the on-hand inventory that is reserved for production orders that have already been released, back-orders: late component orders,and will be satisfied at the next reception; and on-order inventory :quantity of components already ordered (purchase or production) but not yet received, and for each such released order the scheduled receipt time period is known. 13

14 MRP-II COMPONENTS Planning Rules safety stocks: for variations in demand safety times : for variations in lead time lot-sizing rules : transforms the net requirement to an economical production or procurement order component data : the procurement or production cost, the inventory holding cost, and so on to determine optimal lot size. 14

15 MRP-II PLANNING PROCESS Planning Process for an MTS policy 15

16 MRP-II PLANNING PROCESS Planning Process for an MTO policy 16

17 MRP-II PLANNING PROCESS 1. Master Production Scheduling (MPS) 2. Rough Cut Capacity Planning (RCCP) 3. Final Assembly Scheduling (FAS)* 4. Material Requirements Planning (MRP) 5. Capacity Requirements Planning (CRP) *: processed for only MTO production policy 17

18 MRP-II PLANNING PROCESS 18

19 MRP-II PLANNING PROCESS 1. Master Production Scheduling (MPS) Production plan for finished products 19

20 The gross requirements are defined, by convention, as the maximum of firm orders and forecasts in each time period, and correspond to updated forecasts. The required ending inventory plays the same role as an additional demand forecast for period 6. The net requirements are the minimal additional production quantities needed to satisfy the gross requirements, or equivalently the minimal quantities needed for the projected inventory to reach the safety stock level. The MPS is chosen to correspond to the net requirements and, therefore, the projected inventory corresponds to the safety stock after the consumption of the initial stock (and where the projected inventory in each period is equal to initial inventory plus scheduled receipt plus finished MPS orders minus gross requirements). The planned MPS orders have to start one period (the lead-time) before their completion. The available to promise (ATP) row gives the basic information needed to accept new customer orders; it indicates how many units of FP become available to satisfy new customer orders in each period. 20

21 MRP-II PLANNING PROCESS 2. Rough Cut Capacity Planning (RCCP) RCCP checks the feasibility of the MPS with respect to capacity utilization. If the load exceeds the capacity, the planner has to adapt the MPS or increase the capacity manually. In more sophisticated systems, modification of the MPS or the increase of capacity are suggested by the system. RCCP is rough (approximate) because it does not take into account production stages other than the final one 21

22 MRP-II PLANNING PROCESS 3. Final Assembly Scheduling (FAS)* In the case of MTO production policy, MPS and RCCP are established for semi-finished products. To calculate customer demands for MPS of semi-finished products, customer demand forecasts are computed. Then, assuming that these semi-finished products are available in stock, the FAS determines when to realize the operations required to transform them to finished products, in order to meet customer orders on time. 22

23 MRP-II PLANNING PROCESS 4. Material Requirements Planning (MRP) 23

24 MRP-II PLANNING PROCESS 4. Material Requirements Planning (MRP) MRP Process: Step 1. Computation of the gross requirements. These are time-phased requirements equal to the sum of dependent and independent demand. MRP Process: Step 2. Netting or computation of net requirements. Minimal additional (i.e., in addition to available stock and scheduled receipts) production quantities needed to satisfy the gross requirements. MRP Process: Step 3. Planning or uncapacitated lot-sizing. This last step consists in solving the single-item planning subproblem to determine the production plan meeting the net requirements. A production batch of an item in a period is called a suggested order. 24

25 MRP-II PLANNING PROCESS 4. Material Requirements Planning (MRP) MRP Process: Step 3. Planning or uncapacitated lotsizing. Cost of production ignored Cost of production included Lot for Lot Static demand with setup and inventory costs Dynamic demand with setup, inventory and production costs EOQ POQ PPB LUC LPC MIP DP 25

26 MRP-II PLANNING PROCESS 4. Material Requirements Planning (MRP) There is no independent demand for item C. The planning rule used is the fixed-order size rule (EOQ), and an order of size 130. The suggested MRP orders have to start two periods (the leadtime duration) before their completion. 26

27 MRP-II PLANNING PROCESS 4. Material Requirements Planning (MRP), Execution The role of the planer (i.e., the user of the MRP system) in the fourth phase is first to check the availability of the components and of the resources to perform the orders suggested in the coming or next few periods, and then to release the corresponding orders to the shop floor or to the supplier. In some cases, the MRP system makes infeasible or inadequate suggestions, mainly because it does not take capacity into account during the MRP process, and the planner has to adapt or improve the suggested plan manually. 27

28 MRP-II PLANNING PROCESS 5. Capacity Requirements Planning (CRP) CRP check the capacity feasibility of MRP orders. Each workcenter is loaded according to the detailed description of the sequence of operations in the routing data of component items. If the load exceeds the capacity in a workcenter, the planner has to adapt the sugested orders by starting earlier or later to smooth the load- and to create firm suggested orders, or has to increase the capacity, manually. In more sophisticated systems, the modifications are automatically suggested by the system. In all cases, this approach remains suboptimal. Generate uncapacitated production plans first, then make local movements. 28

29 LIMITATIONS OF MRP II Single level decomposition => suboptimal productivity (More inventory and production costs) Single item decomposition => infinite capacity planning Infinite capacity planning => Constant and inflated lead times => Increased Inventory Unnecessary backlogging. 29

30 LIMITATIONS OF MRP II Single level decomposition => suboptimal productivity (More inventory and production costs) Demand for the finished product (i=1) is (10,15,20). Ordering cost for (i=1) and (i=2) is (100,200). Inventory holding cost is 5 for all items and periods. No capacity restrictions. 30

31 LIMITATIONS OF MRP II Constant and inflated lead times => Increased Inventory Unfortunately, in an infinite capacity planning approach, the load of the resources cannot be estimated or anticipated. Actual production lead-time for each operation is the sum of the technical or minimum production lead-time and the waiting time for the availability of the resources. This waiting or queue time clearly depends on the resource load, and consequently varies over time for each resource. Because these waiting times cannot be anticipated, a worst-case approach has to be taken, and the constant lead-time used in MRP is inflated by a large enough safety time to guarantee that the lead-time can be met in all cases. This inflated lead times increrases WIP inventory. 31

32 ERP =MRP-II + Non-Production Operations (sales planning, warehouse management, transport planning...) 32

33 IT SYSTEMS BEHIND Transactional IT Systems MRP MRP-II ERP Analytical IT Systems APS Transactional IT systems (existence and storage of transactional data, as well as faster and cheaper data communication) do not automatically lead to improved decisions. Analytical IT systems include effective decision-support systems to improve supply chain operations 33

34 ADVANCED PLANNING SYSTEMS (APS) APS uses the transactional data gathered from an ERP system. Main characteristics of an APS are: Integral or global planning : planning of the entire supply chain Optimization focus : definition of alternatives, objectives and constraints for all the planning tasks Hierarchical approach : the decomposition into planning modules, and their vertical and horizontal coordination by information flows 34

35 THE SUPPLY CHAIN PLANNING MATRIX 35

36 ARCHITECTURE of ADVANCED PLANNING SYSTEMS 36

37 The MRP process presented adequately represents the planning problem faced by many companies, but a global solution and optimization approach is needed in order to reach the desired goal of improving the productivity and flexibility simultaneously. This global optimization approach depends on the expertise needed to build correct and adequate mathematical models. In this course, we focus on understanding and modeling various types of PP&S problems by mixed integer programming. 37

CHAPTER 6 AGGREGATE PLANNING AND INVENTORY MANAGEMENT 명지대학교 산업시스템공학부

CHAPTER 6 AGGREGATE PLANNING AND INVENTORY MANAGEMENT 명지대학교 산업시스템공학부 CHAPTER 6 AGGREGATE PLANNING AND INVENTORY MANAGEMENT 명지대학교 산업시스템공학부 Learning Objectives You should be able to: Describe the hierarchical operations planning process in terms of materials planning & capacity

More information

Material Requirements Planning (MRP)

Material Requirements Planning (MRP) Material Requirements Planning (MRP) Unlike many other approaches and techniques, material requirements planning works which is its best recommendation. Joseph Orlicky, 1974 1 History Begun around 1960

More information

Production Planning Solution Techniques Part 1 MRP, MRP-II

Production Planning Solution Techniques Part 1 MRP, MRP-II Production Planning Solution Techniques Part 1 MRP, MRP-II Mads Kehlet Jepsen Production Planning Solution Techniques Part 1 MRP, MRP-II p.1/31 Overview Production Planning Solution Techniques Part 1 MRP,

More information

Chapter 7. Production, Capacity and Material Planning

Chapter 7. Production, Capacity and Material Planning Chapter 7 Production, Capacity and Material Planning Production, Capacity and Material Planning Production plan quantities of final product, subassemblies, parts needed at distinct points in time To generate

More information

MASTER PRODUCTION SCHEDULE

MASTER PRODUCTION SCHEDULE 6 MASTER PRODUCTION SCHEDULE MGT2405, University of Toronto, Denny Hong-Mo Yeh So far, in discussing material requirement planning (MRP), we have assumed that master production schedule (MPS) is ready

More information

1 Material Requirements Planning (MRP)

1 Material Requirements Planning (MRP) IEOR 4000: Production Management page 1 Professor Guillermo Gallego 1 Material Requirements Planning (MRP) Material Requirements Planning (MRP) is a computer-based production planning and inventory control

More information

Universidad del Turabo MANA 705 DL Workshop Eight W8_8_3 Aggregate Planning, Material Requirement Planning, and Capacity Planning

Universidad del Turabo MANA 705 DL Workshop Eight W8_8_3 Aggregate Planning, Material Requirement Planning, and Capacity Planning Aggregate, Material Requirement, and Capacity Topic: Aggregate, Material Requirement, and Capacity Slide 1 Welcome to Workshop Eight presentation: Aggregate planning, material requirement planning, and

More information

OR topics in MRP-II. Mads Jepsens. OR topics in MRP-II p.1/25

OR topics in MRP-II. Mads Jepsens. OR topics in MRP-II p.1/25 OR topics in MRP-II Mads Jepsens OR topics in MRP-II p.1/25 Overview Why bother? OR topics in MRP-II p.2/25 Why bother? Push and Pull systems Overview OR topics in MRP-II p.2/25 Overview Why bother? Push

More information

TU-E2020. Capacity Planning and Management, and Production Activity Control

TU-E2020. Capacity Planning and Management, and Production Activity Control TU-E2020 Capacity Planning and Management, and Production Activity Control Copyright Jari Laine 11/23/2015 Copyright Jari Laine 11/23/2015 Different capacity planning options 1 4 7 10 13 16 19 22 25 28

More information

IM 322 Inventory Management

IM 322 Inventory Management IM 322 Inventory Management Chapter 9: Material Requirement Planning -1- Textbook: Donald Waters, Inventory Control and Management, 2 nd ed Chapter Outline Master Scheduling The use of MRP (Material Requirement

More information

Functional Area Systems Production / Operation Systems

Functional Area Systems Production / Operation Systems ACS-1803 Introduction to Information Systems Instructor: Kerry Augustine Functional Area Systems Production / Operation Systems Lecture Outline 5, Part 2 ACS-1803 Introduction to Information Systems Examples:

More information

26/10/2015. Functional Area Systems Production / Operation Systems. Examples: Functional Area Info Systems. Functional Area Information Systems

26/10/2015. Functional Area Systems Production / Operation Systems. Examples: Functional Area Info Systems. Functional Area Information Systems ACS-1803 Introduction to Information Systems Instructor: Kerry Augustine Functional Area Systems Production / Operation Systems Lecture Outline 5, Part 2 ACS-1803 Introduction to Information Systems Examples:

More information

Material Requirements Planning. Lecturer: Stanley B. Gershwin

Material Requirements Planning. Lecturer: Stanley B. Gershwin Material Requirements Planning Lecturer: Stanley B. Gershwin MRP Overview Primary source: Factory Physics by Hopp and Spearman. Basic idea: Once the final due date for a product is known, and the time

More information

Manufacturing Planning and Control for Supp Chain Management

Manufacturing Planning and Control for Supp Chain Management Manufacturing Planning and Control for Supp Chain Management Sixth Edition F. Robert Jacobs Indiana University William L. Berry The Ohio State University (Emeritus) D. Clay Whybark University of North

More information

Dependent vs Independent Demand. The Evolution of MRP II. MRP II:Manufacturing Resource Planning Systems. The Modules In MRP II System

Dependent vs Independent Demand. The Evolution of MRP II. MRP II:Manufacturing Resource Planning Systems. The Modules In MRP II System MRP II:Manufacturing Resource Planning Systems IE 505: Production Planning Control Lecture Notes* Rakesh Nagi University at Buffalo * Adapted in part from Lecture Notes of Dr. George Harhalakis, University

More information

INDEPENDENT STUDY PAILIN UDOMSANTI

INDEPENDENT STUDY PAILIN UDOMSANTI 1 INDEPENDENT STUDY ERP Comparison : Production Planning and Control Module PAILIN UDOMSANTI An Independent Study submitted in Partial Fulfillment of the requirements For the Degree of Master of Engineering

More information

Manufacturing Planning and Control for Supply Chain Management

Manufacturing Planning and Control for Supply Chain Management Manufacturing Planning and Control for Supply Chain Management APICS/CPIM Certification Edition F. Robert Jacobs Indiana University William L. Berry The Ohio State University (Emeritus) D.ClayWhybark University

More information

1.3 ERP System Evolution

1.3 ERP System Evolution 1.3 ERP System Evolution Learning Objectives State the purpose of enterprise resource planning (ERP) systems List the challenges facing the industry List the development stages of the manufacturing planning

More information

ERP(Enterprise Resource Planning) & MRP

ERP(Enterprise Resource Planning) & MRP ERP(Enterprise Resource Planning) & MRP Mr.Vijayakumar S 1 Session Objectives At the end of this session the delegate would have understood ERP ERP example SAP MRP and structure MRP1 & MRPII difference

More information

Manufacturing Flow Management

Manufacturing Flow Management Manufacturing Flow Management Distribution D Distribution Authorized to Department of Defense and U.S. DoD Contractors Only Aim High Fly - Fight - Win Supply Chain Management Processes Information Flow

More information

Manufacturing. Manufacturing challenges of today and how. Navision Axapta solves them- In the current explosive economy, many

Manufacturing. Manufacturing challenges of today and how. Navision Axapta solves them- In the current explosive economy, many Manufacturing challenges of today and how Navision Axapta solves them- the solution for change; controlled by you. Manufacturing In the current explosive economy, many manufacturers are struggling to keep

More information

MATERIAL REQUIREMENTS PLANNING

MATERIAL REQUIREMENTS PLANNING MATERIAL REQUIREMENTS PLANNING A basic tool for performing the detailed material planning function in the manufacture of component parts and their assembly into finished items. MRP s Managerial objective

More information

Going Lean the ERP Way

Going Lean the ERP Way Going Lean the ERP Way Somnath Majumdar Abstract: Lean concepts and techniques are widely used all over the world today to eliminate waste in all processes. These are applicable for all organizations,

More information

Material Requirements Planning (MRP)

Material Requirements Planning (MRP) The Priority Enterprise Management System Material Requirements Planning (MRP) Contents MRP - Introduction...2 Calculating Demand for Top-Level Parts...2 Calculating Demand for Sub-assemblies and Raw Materials...3

More information

BSCM Sample TEST. CPIM(Certified In Production & Inventory Management) - 1 -

BSCM Sample TEST. CPIM(Certified In Production & Inventory Management) - 1 - BSCM Sample TEST. 1. Which of the following demand fulfillment approaches typically provides the longest delivery time? A) Engineer-to-order. B) Make-to-order. C) Assemble-to-order. D) Make-to-stock. 2.

More information

12 MRP and ERP. Dr. Ron Lembke

12 MRP and ERP. Dr. Ron Lembke 12 MRP and ERP Dr. Ron Lembke Historical Perspective MRP II Manufacturing Resource Planning ERP- Enterprise Resource Planning mrp material requirements planning MRP Crusade (1975) Material Requirements

More information

INTRODUCTION. What is Enterprise Resource Planning?

INTRODUCTION. What is Enterprise Resource Planning? 1 INTRODUCTION MGT2405, University of Toronto, Denny Hong-Mo Yeh What is Enterprise Resource Planning? According to the definition given in the APICS Dictionary (American Production and Inventory Control

More information

Short-term Planning. How to start the right operation at the right shop at the right time? Just in Time (JIT) How to avoid waste?

Short-term Planning. How to start the right operation at the right shop at the right time? Just in Time (JIT) How to avoid waste? Short-term Planning Material Requirements Planning (MRP) How to get the right material in the right quantity at the right time? Manufacturing Resource Planning (MRP2) How to start the right operation at

More information

Basics of Supply Chain Management (BSCM) Curriculum

Basics of Supply Chain Management (BSCM) Curriculum Basics of Supply Chain Management (BSCM) Curriculum Version 4.0 Session 1 to Supply Chain Management to Manufacturing Role of Manufacturing Global Citizenship Manufacturing Business Model Business Environment

More information

PARADIGMS THAT DRIVE COSTS IN MANUFACTURING. The whole purpose of a business enterprise is pretty simple to make a profit by selling

PARADIGMS THAT DRIVE COSTS IN MANUFACTURING. The whole purpose of a business enterprise is pretty simple to make a profit by selling PARADIGMS THAT DRIVE COSTS IN MANUFACTURING The whole purpose of a business enterprise is pretty simple to make a profit by selling products or services to persons who desire those particular goods or

More information

INVENTORY MANAGEMENT

INVENTORY MANAGEMENT 7 INVENTORY MANAGEMENT MGT2405, University of Toronto, Denny Hong-Mo Yeh Inventory management is the branch of business management that covers the planning and control of the inventory. In the previous

More information

MTTN20 Supply Chain Information Systems

MTTN20 Supply Chain Information Systems MTTN20 Supply Chain Information Systems Lecture 1b: Evolution of and control systems ERP system implementation /Jan Olhager Agenda A historical perspective Olhager, IJPR 2013, Evolution of and control

More information

1 2 3 4 5 Demand 150 170 180 160 160

1 2 3 4 5 Demand 150 170 180 160 160 MGT 3110: Exam 2 Study Guide 1. What is aggregate planning? What is its purpose? 2. What are demand options for aggregate planning? Give examples and discuss the effects of each. 3. Why is there a need

More information

Release: 1. MEM30019A Use resource planning software systems in manufacturing

Release: 1. MEM30019A Use resource planning software systems in manufacturing Release: 1 MEM30019A Use resource planning software systems in manufacturing MEM30019A Use resource planning software systems in manufacturing Modification History Not Applicable Unit Descriptor Unit descriptor

More information

ERP Course: Production and Materials Management Reading: Chapter 6 from Mary Sumner

ERP Course: Production and Materials Management Reading: Chapter 6 from Mary Sumner ERP Course: Production and Materials Management Reading: Chapter 6 from Mary Sumner Peter Dolog dolog [at] cs [dot] aau [dot] dk 5.2.03 Information Systems September 16, 2008 2 Sales Finished and packaged

More information

Expert s Guide to Successful MRP Projects. September 2012

Expert s Guide to Successful MRP Projects. September 2012 September 2012 Ziff Davis Research All Rights Reserved 2012 White Paper Executive Summary For most manufacturers, the planning department performs business critical functions. It is responsible for balancing

More information

Supply Chain Management with SAP APO

Supply Chain Management with SAP APO Jörg Thomas Dickersbach Supply Chain Management with SAP APO Structures, Modelling Approaches and Implementation of SAP SCM 2008 3rd edition Springer Contents PART I - OVERVIEW 1 SCM Projects with SAP

More information

Operations Management

Operations Management 13-1 MRP and ERP Operations Management William J. Stevenson 8 th edition 13-2 MRP and ERP CHAPTER 13 MRP and ERP McGraw-Hill/Irwin Operations Management, Eighth Edition, by William J. Stevenson Copyright

More information

Planning and scheduling in the 21st century

Planning and scheduling in the 21st century Infor ERP Planning and scheduling in the 21st century How Infor Advanced Planning and Scheduling systems deliver a lean and agile environment for today s manufacturers. Table of contents Executive summary...

More information

Issues in Information Systems Volume 14, Issue 2, pp.353-358, 2013

Issues in Information Systems Volume 14, Issue 2, pp.353-358, 2013 A MODEL FOR SIMULTANEOUS DECISIONS ON MASTER PRODUCTION SCHEDULING, LOT SIZING, AND CAPACITY REQUIREMENTS PLANNING Harish C. Bahl, California State University-Chico, hbahl@csuchico.edu Neelam Bahl, California

More information

Module 5 The R+ Available Stock Calculation

Module 5 The R+ Available Stock Calculation Welcome to Demand Driven Technologies, the home of Replenishment plus and module 5 of our education tutorials Understanding the R+ Available Stock Calculation This module is intended to provide a basic

More information

Chapter 7 Production Planning

Chapter 7 Production Planning Production Planning and Control Chapter 7 Production Planning Professor JIANG Zhibin Dr GRANG Na Department of Industrial Engineering & Management Shanghai Jiao Tong University Contents Introduction Master

More information

SUPPLY CHAIN MODELING USING SIMULATION

SUPPLY CHAIN MODELING USING SIMULATION SUPPLY CHAIN MODELING USING SIMULATION 1 YOON CHANG AND 2 HARRIS MAKATSORIS 1 Institute for Manufacturing, University of Cambridge, Cambridge, CB2 1RX, UK 1 To whom correspondence should be addressed.

More information

Table of Contents. Planning the ERP System...1

Table of Contents. Planning the ERP System...1 Table of Contents Planning the ERP System...1 Core Group Basic Training...1 Define Current Business Processes...1 Define Future Business Processes...2 Documenting the ERP Blueprint...2 ERP System Budget

More information

Chapter 11. MRP and JIT

Chapter 11. MRP and JIT Chapter 11 MRP and JIT (Material Resources Planning and Just In Time) 11.1. MRP Even if MRP can be applied among several production environments, it has been chosen here as a preferential tool for the

More information

SPREADSHEET SIMULATOR FOR INVENTORY MANAGEMENT IN A SUPPLY CHAIN

SPREADSHEET SIMULATOR FOR INVENTORY MANAGEMENT IN A SUPPLY CHAIN SPREADSHEET SIMULATOR FOR INVENTORY MANAGEMENT IN A SUPPLY CHAIN ABSTRACT Sakir Esnaf Istanbul University, Faculty of Business Administration Department of Production Management Avcilar,Istanbul 34850

More information

TU-E2020 ADVANCED OPERATIONS MANAGEMENT. Demand management Sales & Operations Planning Master Production Scheduling

TU-E2020 ADVANCED OPERATIONS MANAGEMENT. Demand management Sales & Operations Planning Master Production Scheduling TU-E2020 ADVANCED OPERATIONS MANAGEMENT Demand management Sales & Operations Planning Master Production Scheduling 1982 1983 1984 1985 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999

More information

Agenda. Real System, Transactional IT, Analytic IT. What s the Supply Chain. Levels of Decision Making. Supply Chain Optimization

Agenda. Real System, Transactional IT, Analytic IT. What s the Supply Chain. Levels of Decision Making. Supply Chain Optimization Agenda Supply Chain Optimization KUBO Mikio Definition of the Supply Chain (SC) and Logistics Decision Levels of the SC Classification of Basic Models in the SC Logistics Network Design Production Planning

More information

Glossary of Inventory Management Terms

Glossary of Inventory Management Terms Glossary of Inventory Management Terms ABC analysis also called Pareto analysis or the rule of 80/20, is a way of categorizing inventory items into different types depending on value and use Aggregate

More information

SAP APO SNP (Supply Network Planning) Sample training content and overview

SAP APO SNP (Supply Network Planning) Sample training content and overview SAP APO SNP (Supply Network Planning) Sample training content and overview Course Objectives At the completion of this course, you will be able to: Understand the concepts of SNP and supply chain network

More information

How To Learn How To Manage A Business

How To Learn How To Manage A Business Course Objectives Upon course completion, the participants will be able to: 1) To gain an understanding and appreciation of the principles and applications relevant to the planning, design, and operations

More information

GESTION DE LA PRODUCTION ET DES OPERATIONS PICASSO EXERCICE INTEGRE

GESTION DE LA PRODUCTION ET DES OPERATIONS PICASSO EXERCICE INTEGRE ECAP 21 / PROD2100 GESTION DE LA PRODUCTION ET DES OPERATIONS PICASSO EXERCICE INTEGRE 2004-2005 Prof : Pierre Semal : semal@poms.ucl.ac.be Assistants : Eléonore de le Court : delecourt@poms.ucl.ac.be

More information

BILL OF RESOURCES AND PRIORITY-CAPACITY BALANCING

BILL OF RESOURCES AND PRIORITY-CAPACITY BALANCING Bill of Resources and PriorityCapacity Balancing 5 BILL OF RESOURCES AND PRIORITYCAPACITY BALANCING MGT2405, University of Toronto, Denny HongMo Yeh Load and capacity are terms that are often used interchangeably.

More information

A New Approach for Finite Capacity Planning in MRP Environment

A New Approach for Finite Capacity Planning in MRP Environment A New Approach for Finite Capacity Planning in MRP Environment Hong-bum Na 1, Hyoung-Gon Lee 1, and Jinwoo Park 1 1 Dept. of Industrial Engeering / Automation & Systems Research Inst. Seoul National University

More information

IT-375 using the 6 th Edition PRODUCTION AND INVENTORY CONTROL CHAPTER 1: INTRODUCTION TO MATERIALS MANAGEMENT

IT-375 using the 6 th Edition PRODUCTION AND INVENTORY CONTROL CHAPTER 1: INTRODUCTION TO MATERIALS MANAGEMENT IT-375 using the 6 th Edition PRODUCTION AND INVENTORY CONTROL CHAPTER 1: INTRODUCTION TO MATERIALS MANAGEMENT What is wealth? GDP = production = profits What is the source of wealth? The conversion process

More information

Visual Planning and Scheduling Systems. A White Paper. Gregory Quinn President Quinn & Associates Inc September 2006 Updated October 2006

Visual Planning and Scheduling Systems. A White Paper. Gregory Quinn President Quinn & Associates Inc September 2006 Updated October 2006 Visual Planning and Scheduling Systems A White Paper By Gregory Quinn President Quinn & Associates Inc September 2006 Updated October 2006 Visual Planning and Visual Scheduling Systems Introduction The

More information

Consumption-Driven Finite Capacity Inventory Planning and Production Control. A thesis presented to. the faculty of

Consumption-Driven Finite Capacity Inventory Planning and Production Control. A thesis presented to. the faculty of Consumption-Driven Finite Capacity Inventory Planning and Production Control A thesis presented to the faculty of the Russ College of Engineering and Technology of Ohio University In partial fulfillment

More information

2.4 Capacity Planning

2.4 Capacity Planning 2.4 Capacity Planning Learning Objectives Explain functions & importance of capacity planning State four techniques for capacity planning Explain capacity planning factor and bill of capacity techniques

More information

ORACLE CONFIGURE TO ORDER SOLUTION

ORACLE CONFIGURE TO ORDER SOLUTION ORACLE CONFIGURE TO ORDER SOLUTION KEY FEATURES ORACLE CONFIGURE TO ORDER SOLUTION PROVIDES SUITE LEVEL SUPPORT FOR YOUR CONFIGURED BUISNESS. KEY FEATURES INCLUDE: Create and maintain assemble to order

More information

Business Challenges. Customer retention and new customer acquisition (customer relationship management)

Business Challenges. Customer retention and new customer acquisition (customer relationship management) Align and Optimize Workflows with Lean Dan Marino Marino Associates, LLC Strategic and tactical planning Information systems integration Customer retention and new customer acquisition (customer relationship

More information

CISCM STUDY GUIDE. International Purchasing and Supply Chain Management Institute, 2006 1

CISCM STUDY GUIDE. International Purchasing and Supply Chain Management Institute, 2006 1 CISCM STUDY GUIDE International Purchasing and Supply Chain Management Institute, 2006 1 TABLE OF CONTENTS PART PAGE PART I Materials, Production, Inventory, Logistics, and Supply Chain Management 3 PART

More information

Business Proposal: Recommendation for Implementation of the SAGE Enterprise Suite. Debbie Miksiewicz. Elaine Kithcart BSA 375. Mr.

Business Proposal: Recommendation for Implementation of the SAGE Enterprise Suite. Debbie Miksiewicz. Elaine Kithcart BSA 375. Mr. Business Proposal: Recommendation for Implementation of the SAGE Enterprise Suite Debbie Miksiewicz Elaine Kithcart BSA 375 Mr. Andrew Mahaney April 17, 2011 Business Proposal 2 Table of Contents Introduction

More information

APICS acknowledges the Basics of Supply Chain Management Committee for its contributions in the development of this resource.

APICS acknowledges the Basics of Supply Chain Management Committee for its contributions in the development of this resource. APICS acknowledges the Basics of Supply Chain Management Committee for its contributions in the development of this resource. Jim Caruso, CPIM, CSCP (chair) Carol Bulfer, CPIM James F. Cox, Ph.D., CFPIM,

More information

Infor Planning Tools. From Demand to Execution. Hans Smet Senior Account Executive hans.smet@infor.com

Infor Planning Tools. From Demand to Execution. Hans Smet Senior Account Executive hans.smet@infor.com Infor Planning Tools From Demand to Execution Per Osmar Solution Consultant per.osmar@infor.com Hans Smet Senior Account Executive hans.smet@infor.com 1 Overview M3 Planning Tools Demand Planner Accurate

More information

Operations Management

Operations Management Operations Management Short-Term Scheduling Chapter 15 15-1 Outline GLOAL COMPANY PROFILE: DELTA AIRLINES THE STRATEGIC IMPORTANCE OF SHORT- TERM SCHEDULING SCHEDULING ISSUES Forward and ackward Scheduling

More information

Logistics Management Inventory Cycle Inventory. Özgür Kabak, Ph.D.

Logistics Management Inventory Cycle Inventory. Özgür Kabak, Ph.D. Logistics Management Inventory Cycle Inventory Özgür Kabak, Ph.D. Role of Inventory in the Supply Chain Improve Matching of Supply and Demand Improved Forecasting Reduce Material Flow Time Reduce Waiting

More information

Key Benefits: Minimize lead times and maximize on-time deliveries to customers. Respond quickly to changes in demand for materials and capacity

Key Benefits: Minimize lead times and maximize on-time deliveries to customers. Respond quickly to changes in demand for materials and capacity Microsoft Business Solutions Axapta Master Planning streamlines your manufacturing processes and supply chain to help you reduce costs and satisfy customer demands. Key Benefits: Minimize lead times and

More information

Functional Area Systems Lecture 5

Functional Area Systems Lecture 5 ACS-1803 Introduction to Information Systems Instructor: David Tenjo Functional Area Systems Lecture 5 1 1. ACCOUNTING TRANSACTION SYSTEMS 2 1 Business Transaction Cycles 3 Business Transaction Cycles

More information

An investigation into production scheduling systems

An investigation into production scheduling systems Computer Science Kjell Olofsson An investigation into production scheduling systems D-dissertation (10 p) 2004:06 This report is submitted in partial fulfillment of the requirements for the Master s degree

More information

School of Management and Languages Capacity Planning

School of Management and Languages Capacity Planning School of Management and Languages Capacity Planning Dr Neil Towers 1 Learning Objectives a. To understand Capacity Planning and Control b. To manage the supply chain capabilities effectively Dr Neil Towers

More information

INVENTORY MANAGEMENT. 1. Raw Materials (including component parts) 2. Work-In-Process 3. Maintenance/Repair/Operating Supply (MRO) 4.

INVENTORY MANAGEMENT. 1. Raw Materials (including component parts) 2. Work-In-Process 3. Maintenance/Repair/Operating Supply (MRO) 4. INVENTORY MANAGEMENT Inventory is a stock of materials and products used to facilitate production or to satisfy customer demand. Types of inventory include: 1. Raw Materials (including component parts)

More information

A Diagnostic Approach to Scheduling

A Diagnostic Approach to Scheduling Harish C Bahl * Neelam Bahl California State University, Chico, CA, U.S.A. Several algorithms and methodologies have been proposed for a variety of environments. In this paper, we suggest a diagnostic

More information

Plan forecast optimise

Plan forecast optimise Plan forecast optimise Don t Forecast the future, CONTROL IT Reflex Business Forecasting breaks new ground. This is sales forecasting software with unique features that allow you to create real value for

More information

QUALITY THROUGH INTEGRATION OF PRODUCTION AND SHOP FLOOR MANAGEMENT BY DISCRETE EVENT SIMULATION

QUALITY THROUGH INTEGRATION OF PRODUCTION AND SHOP FLOOR MANAGEMENT BY DISCRETE EVENT SIMULATION QUALITY THROUGH INTEGRATION OF PRODUCTION AND SHOP FLOOR MANAGEMENT BY DISCRETE EVENT SIMULATION mr Zoran Mirović, Center for Quality, Kragujevac Abstract: With the intention to integrate strategic and

More information

Customer Order Management

Customer Order Management MPA_C08.qxd 07/01/2009 03:51PM Page 140 CHAPTER 08 L Customer Order Management ogistics in manufacturing companies is primarily concerned with controlling the flow of materials and the consumption of resources

More information

Cadena de suministro. Mtro. William H. Delano Frier

Cadena de suministro. Mtro. William H. Delano Frier Cadena de suministro Mtro. William H. Delano Frier Module 2 Operations and Productivity What is Operations Management? Production Is the creation of goods and services. Operations Management Is the series

More information

Utilizing KolibriMFG Software System to Schedule and Control Shop Floor

Utilizing KolibriMFG Software System to Schedule and Control Shop Floor Utilizing KolibriMFG Software System to Schedule and Control Shop Floor Lajos Kiss Patternium AC., www.patternium.hu, lk812@vnet.hu Abstract: Manufacturing software modules are essential part of any large

More information

Item Master and Bill of Material

Item Master and Bill of Material 4 Item Master and Bill of Material MGT2405, University of Toronto, Denny Hong Mo Yeh The enterprise resource planning (ERP) system plans and controls all resources in an enterprise. Material requirement

More information

SAP ERP Versus SAP APO: Which Production Planning Functionality Do I Use, and How Can I Be Successful?

SAP ERP Versus SAP APO: Which Production Planning Functionality Do I Use, and How Can I Be Successful? SAP ERP Versus SAP APO: Which Production Planning Functionality Do I Use, and How Can I Be Successful? Matthew Campbell SCMO2 Copyright 2013 Wellesley Information Services, Inc. All rights reserved. What

More information

QAD Enterprise Applications Standard & Enterprise Edition. Training Guide MRP/CRP

QAD Enterprise Applications Standard & Enterprise Edition. Training Guide MRP/CRP QAD Enterprise Applications Standard & Enterprise Edition Training Guide MRP/CRP 70-3220A QAD 2011.1 Standard & Enterprise Edition Lab: Enterprise Edition 2011.1 r01 - Training Workspace: 10USA > 10USACO

More information

BEST PRACTICES IN DEMAND AND INVENTORY PLANNING

BEST PRACTICES IN DEMAND AND INVENTORY PLANNING WHITEPAPER BEST PRACTICES IN DEMAND AND INVENTORY PLANNING for Food & Beverage Companies WHITEPAPER BEST PRACTICES IN DEMAND AND INVENTORY PLANNING 2 ABOUT In support of its present and future customers,

More information

Manufacturing Management

Manufacturing Management Manufacturing Management Make sure Shopfloor Manufacturing Manufacturing Planning Manufacturing Scheduler Laboratory Quality Management Manufacturing Management Shopfloor Manufacturing Manufacturing Planning

More information

APS1028 Operations and Production Management - Fall 2014 (Monday Noon-2 PM starting 8 th September 2014: BA B025 (the basement classroom)

APS1028 Operations and Production Management - Fall 2014 (Monday Noon-2 PM starting 8 th September 2014: BA B025 (the basement classroom) - Fall 2014 (Monday Noon-2 PM starting 8 th September 2014: BA B025 (the basement classroom) Course Outline Operations Management is the systematic approach and control of the processes that transform

More information

Job Manager for Metal Fabrication

Job Manager for Metal Fabrication Job Manager for Metal Fabrication What makes Metal Fabrication unique? First, most metal shops are building to unique specifications. The Jobs are service type jobs, not production type jobs. Mass Production

More information

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras

Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras Operations and Supply Chain Management Prof. G. Srinivasan Department of Management Studies Indian Institute of Technology, Madras Lecture - 36 Location Problems In this lecture, we continue the discussion

More information

EnterpriseOne Requirements Planning 8.9 PeopleBook

EnterpriseOne Requirements Planning 8.9 PeopleBook EnterpriseOne Requirements Planning 8.9 PeopleBook September 2003 EnterpriseOne Requirements Planning 8.9 PeopleBook SKU REL9EMP0309 Copyright 2003 PeopleSoft, Inc. All rights reserved. All material contained

More information

Master Scheduling Course

Master Scheduling Course The Oliver Wight Public Course Portfolio Master Scheduling Course Detailed Description Schedule your products to satisfy customers and support changes in demand while maximizing plant and supplier resources.

More information

Electronics Components Manufacturing: The Path to Excellence

Electronics Components Manufacturing: The Path to Excellence Electronics Components Manufacturing: case study The Path to Excellence Successful electronics manufacturers design their supply chains around their key stakeholders specifically, customers, suppliers

More information

Supply Chain Leaders Understanding and Improving Supply Chain Performance Where It Counts

Supply Chain Leaders Understanding and Improving Supply Chain Performance Where It Counts Leaders Understanding and Improving Performance Where It Counts What is the Leaders Programme? Leaders is an action-oriented, practical programme which identifies the most vital supply chain improvements

More information

Teaching Manual-Operation Management. Gunadarma University. Week : 9 Subject : INVENTORY MANAGEMENT Content :

Teaching Manual-Operation Management. Gunadarma University. Week : 9 Subject : INVENTORY MANAGEMENT Content : Week : 9 Subject : INVENTORY MANAGEMENT Content : WHY INVENTORY a. One of the most expensive assets of many companies representing as much as 50% of total invested capital b. Operations managers must balance

More information

abf Avercast Business Forecasting The Trusted Name in Demand Management. Software Features: Enterprise Level Software Solutions for: The Cloud

abf Avercast Business Forecasting The Trusted Name in Demand Management. Software Features: Enterprise Level Software Solutions for: The Cloud Avercast Business Forecasting Avercast Business Forecasting (ABF) is powered by an industry leading 187 forecasting algorithms. ABF systematically measures each algorithm against up to five years of historical

More information

LOGISTIQUE ET PRODUCTION SUPPLY CHAIN & OPERATIONS MANAGEMENT

LOGISTIQUE ET PRODUCTION SUPPLY CHAIN & OPERATIONS MANAGEMENT LOGISTIQUE ET PRODUCTION SUPPLY CHAIN & OPERATIONS MANAGEMENT CURSUS CONTENTS 1) Introduction 2) Human resources functions 3) A new factory 4) Products 5) Services management 6) The processes 7) Planning

More information

Operations Management Part 12 Purchasing and supplier management PROF. NAKO STEFANOV, DR. HABIL.

Operations Management Part 12 Purchasing and supplier management PROF. NAKO STEFANOV, DR. HABIL. Operations Management Part 12 Purchasing and supplier management PROF. NAKO STEFANOV, DR. HABIL. Introduction basic terms Supply management describes the methods and processes of modern corporate or institutional

More information

Modeling agile demand-supply network of industrial investment goods delivery process

Modeling agile demand-supply network of industrial investment goods delivery process Modeling agile demand-supply network of industrial investment goods delivery process 123 126 125 124 127 128 Petri Helo & Bulcsu Szekely University of Vaasa, Logistics Research Group, PO Box 700, FIN-65101

More information

supply chain optimization packages

supply chain optimization packages supply chain optimization packages SAP Add-on Tools bigbyte software systems STRATegic & TACTicAL Determining the correct replenishment policy for the right situation is often an overwhelming task faced

More information

Job Manager for Tool and Die Shops

Job Manager for Tool and Die Shops Job Manager for Tool and Die Shops What makes Tool and Die Shops unique? First, most orders are for a unique Tool or Die. No two Jobs are alike. The Job is a one of a kind job, not a mass production type

More information

Contents. The Planning Hierarchy. Capacity / Load. TPPE37 Manufacturing Control

Contents. The Planning Hierarchy. Capacity / Load. TPPE37 Manufacturing Control TPPE37 Manufacturing Control Contents Lecture 6 Capacity Planning Capacity theory RoughCut Capacity Planning Three different techniques Comparison of of the the techniques Capacity Requeriments Planning

More information

Operations Management Study Guide

Operations Management Study Guide Operations Management Study Guide Inventory Management Amazon.com example Wanted to be a virtual retailer (no inventory, no warehouse, no overhead) Now, they are one of the largest retailers Obtain knowledge

More information

Master Scheduling and Rough-cut Capacity Planning

Master Scheduling and Rough-cut Capacity Planning Master Scheduling and Rough-cut Capacity Planning SUPPLEMENT D Before studying this supplement you should know or, if necessary, review 1. Capacity management concepts, Chapter 9, pp. 316 322. 2. Work

More information

ORACLE MANUFACTURING MATERIAL PLANNING FOR PROCESS MANUFACTURING

ORACLE MANUFACTURING MATERIAL PLANNING FOR PROCESS MANUFACTURING ORACLE MANUFACTURING MATERIAL PLANNING FOR PROCESS MANUFACTURING KEY FEATURES MATERIAL PLANNING FOR PROCESS INCLUDES: Material and rough cut capacity planning Multi-level graphical pegging Advanced sourcing

More information