48. AQUARIUM. Aquarium. Classification: Cluster: Location: Close to junction of Inselrhue and Loiter Way, Belle Isle. Total Area: No.

Project : CONSTRUCTION OF BUILDING(including electrical and plumbing works) FOR NATIONAL CENTRE FOR SUSTAINABLE COASTAL MANAGEMENT,CHENNAI

SPECIFICATIONS FOR VASWANI BRENTWOOD PROJECT. RCC Framed Structure confirming with zone II seismic detailing. Reinforced Cement Concrete

Building Condition Assessment Report

RESPONSIBILITY FOR REPAIRS AND MAINTENANCE FAIR FUNDING: April 2002

SCHEDULE OF FINISHES AMBLE RIDGE RETIREMENT VILLAGE

BILL OF QUANTITIES Part No.: Part Description

Issue of the Guidelines on Prevention of Water Seepage in New Buildings

LONDON BOROUGH OF HACKNEY BUILDING SERVICES ENGINEER REPORT GAS HOUSE, SPRINGFIELD PARK, HACKNEY

Building Condition Assessment Report

CONTRACT PRICE ADJUSTMENT PROVISIONS (CPAP)

DESIGNERS GUIDE TO DOMESTIC CONSERVATORIES

OPTIMUS WORK CLASSIFICATION LIST ENTER ALL THAT APPLY

L_All_Vocatinal_Ed_Construction. Sector: Construction. Sr. No Specialisation Page No 1 Construction and Building Technology 02.

Sports Buildings: budget costs for the Flood Relief Fund

Park View Place. Compass. House. Royal Wharf Gardens Endeavour. House. Thameside. Sienna. House. House. Apartments Townhouses.

SAMPLE SCHEDULE OF VALUES APPLICATION & CERTIFICATE FOR PAYMENT

PROJECT TITLE : 2-STOREY RESIDENCE LOCATION : ALONG DAANG HARI,MOLINO.BACOOR,CAVITE OWNER : CUEVASVILLE REALTY

BOQ for Plumbing, Sanitary Works

If stepping is required, step at 180mm as seen in this picture.

ICRC WORK SPECIFICATIONS IRAQ WATER AND HABITAT

LITITZ MUTUAL INSURANCE COMPANY 2 North Broad Street Lititz, Pennsylvania - MAIN OFFICE -

CHAPTER 2 QUANTITY TAKE-OFF

Requirements for Building Application Submission

STEP-BY-STEP. construction guide. Delivering better priced Conservatories, Sun Lounges and Garden Rooms via the Internet.

SECTION TABLE OF CONTENTS. H Proposed Material, Product or Equipment Substitution Request

Facility Summary. Facility Condition Summary. Seattle School District David T. Denny International Infrastructure. Facility Components

Table of Contents. Division 2 Site Work Site Preparation Site Demolition Tree Protection Excavation, Trenching, and Backfilling for Utilities

CONTENTS. Page KERBS ETHEKWINI PRODUCTS ETHEKWINI PRODUCTS WATER CHANNELS WATER CHANNELS / GRILL BLOCKS / CHANNEL DRAIN COVERS

Capital Expenditure. The common definition of capital expenditure is

How to build a Pizza Oven in 4 days

Introduction. Contents. General. Materials and workmanship. Diagrams. Other regulations. References

Residential Inspection Guidelines

How to report a repair

How To Account For Ict Expenditure In A School

Renovation instructions

Improving the flood resistance of your home. Advice sheet 6: Flood-resilient floors

PLUMBING MAINTENANCE WORK FOR TOILETS IN HEAD OFFICE, SUPPLYCO ESTIMATE

EFFECTIVE FEBRUARY note: drainage permit required to call for a dampproof inspection

Turnkey Projects, Conversions, Restorations & Property Management. Marsalforn - Gozo APARTMENT FINISHING EXCLUSIVE PACKAGE

SECTION REMOVAL OR ABANDONMENT OF EXISTING UTILITIES AND UNDERGROUND STRUCTURES. 1. Trench excavation, backfill, and compaction; Section

- From the Makers of India s Finest Designer Homes

Tender schedule. Rate in

CONSOLIDATED EDISON CO. OF NEW YORK, INC. 4 IRVING PLACE NEW YORK, NY DISTRIBUTION ENGINEERING DEPARTMENT SUBSTATION & EQUIPMENT SECTION

STATE BANK OF INDIA.

B-1 Buildings & Service Maintenance

Holz Choices & Specifications

Repair Responsibilities A Guide for Sadeh Lok Residents

Melbourne balcony Assessments

Plumbing. Helpful Hints Residential Construction. Lincoln County. Bert Polk Plumbing Inspector

C, D Only if fitted by Sadeh Lok. A, B, C Category dependent upon impact on residents enjoyment of their home

50AI01oe 02/15. Labko GRP cesspools. Instructions for installation, operation and maintenance

first look at GigaCrete s revolutionary new New Construction GigaHouse GigaHouse Utilizing GigaPanel

PLEASE REFER TO YOUR INDIVIDUAL QUOTE

City of Treasure Island FEMA Cost Breakdown Worksheet For Substantial Improvement / Damage

Greater Dublin Strategic Drainage Study Regional Drainage Policies - Volume 2 New Development

LAYING BLOCK AND BRICK

October 5, 2015 Dear Client,

Cost of Building a Typical Home The impact of using PVC and alternative construction materials in house construction

Repair and Renew Grant. Croydon RRG Scheme

Excerpts from the Canadian National Building Code (NBC)

WASHROOM UPGRADE SIR CHARLES TUPPER BUILDING 2250 RIVERSIDE DRIVE, OTTAWA, ON SIR CHARLES TUPPER BUILDING A0.0 COVER SHEET / DRAWING LIST

SEPTIC SYSTEM CONSTRUCTION REQUIREMENTS ST. MARY S COUNTY HEALTH DEPARTMENT

CONSTRUCTION SUMMARY OF THE PEREIRA HOUSE AT MADOL, VERNA GOA.

D Sample Notices to Property Owners, Sample Affidavits, and Other Material

C-2 Construction, Inc. - NAICS Codes

Reticulation sewers in basements Technical guidelines

Revised Specifications & Scale of Amenities for General Pool Residential Accommodation (Type I to VI) Revised Amenities.doc

FOR RENT PRODUCTION AND COMMERCIAL FACILITIES ALONG WITH A SOCIAL AND OFFICE SURFACE MARR BUSINESS PARK 10 NAD DRWINĄ STREET IN KRAKÓW

Estimating Database Checklist

What Causes Foundation Leaking?

STRUCTURAL CONCEPT FOR LIGHT GAUGE STEEL FRAME SYSTEM

Section 5.0. Basements. Wall insulated externally. Wall insulated internally. Ba02. Product: Polyfoam ECO Floorboard Ba01.

Scope of Work Class I Contractor s Licenses. Putnam County Ordinance Section 17. Types of Authorized Contractor Licenses.

Nominal Life Expectancy for Building Components

SUGGESTED CONSTRUCTION SEQUENCE - Owner Builders

Hamilton-Wentworth Catholic District School Board Event Listing By Ascending Event Year

Think Of Us First! When It s Time to Distribute Your Plans

Toilet Plumbing. Here is a selection of different types of W.Cs and urinals. Can you match the pictures to the names below?

Application for Repair and Renew Grant

plumbing products guide

Energy Company Obligation (ECO): Technical Monitoring Questions

QS 004 DEPARTMENT OF PUBLIC WORKS REPUBLIC OF SOUTH AFRICA BUILDING COST DATABASE

Exhibit A. Rules and Regulations for House Connections and Sewer Extensions

ISSUING AGENCY: New Mexico Public Regulation Commission, Insurance Division. [7-1-97; NMAC Rn & A, 13 NMAC 17.6.

- 5 - Table1. Maximum Compartment Volumes

OPEN ITEMS LIST - CONSTRUCTION Project Name: East Central Middle School - Jackson County CLA#: 11003

Which generic risk assessments are provided? Construction Risk. Assessments Plus. ervices

BMIC S APPETITE GUIDE EFFECTIVE JUNE 2013

BILL OF QUANTITY FOR THE WORK OF "REPAIRING OF CIVIL & PLUMBING WORKS INSIDE AND OUTSIDE OF THE WORKSHOP"

Site Survey Questionnaire

Construction Industry Scheme

Cost Guide MARKET SUMMARY OVERVIEW REPAIRS AND MAINTENANCE ELECTRICAL ROOFING & ROOF DRAINAGE (UP TO TWO STOREYS; FIXED TO EXISTING ROOF FRAME)

In Partnership with. TDIndustries Diplomat Drive Dallas, Texas Phone: Fax: Website: TDIndustries.

VOLUME V GUIDELINES FOR DESIGN CONSULTANT TABLE OF CONTENTS APPENDIX B: MASTER CONSTRUCTION SPECIFICATIONS AND PREPARATION GUIDE, DIVISIONS 0-10

After reading this lesson you will be able to: 12.3 IMPORTANCE OF ROOF 12.4 TYPES OF ROOF IN A HOUSE

NATIONAL DIPLOMA IN ARCHITECTURAL TECHNOLOGY

NAHB PRODUCT DEFINITION

BSI Kitemark. Delivering quality, reassurance, trust

Transcription:

Annex I - STATEMENT OF WORKS (SoW) CONSTRUCTION OF A NEW DISTRICT COURT/PIRACY COURT IN MOKA, MAURITIUS. A. Executive Summary. 1. In order to repress piracy in the Horn of Africa and in the absence of effective justice and law enforcement systems in the land areas from which the pirates operate, the capacity of those systems in the region, which do have the potential to repress piracy and have shown interest to do so, must be developed. Hence, the UNODC program strategy is centered on the provision of UNODC expertise, advisory and capacity building services to Kenya, Tanzania, Mauritius and the Seychelles for the strengthening and establishment of regional cooperation mechanisms and specific support to strengthen the capacity of their law enforcement and criminal justice systems to efficiently deter, investigate, prosecute and detain pirates. 2. To this end the United Nations Office on Drugs and Crime (UNODC), intends to carry out infrastructural and capacity improvement within the Judiciary in Mauritius by constructing a new District court/ Piracy court in Moka. The works include: a. Construction of a single story courthouse building. b. General External works B. Site location. The new District court/ Piracy court in located in the district Moka, in the central part of Mauritius. The exact location the site is as attached in ANNEX A. C. Construction of one (1) No. New District/Piracy courthouse. 1. The construction of the courthouse will include; a. Erection of a construction sign board. b. Excavation works for a new foundation. c. Backfilling. d. Structural works, (column bases, ground beams, ring beams, beams, lintels, staircases and columns. e. Construction of 200mm thick walls reinforced with hoop iron in every alternate course finished with 12 mm thick cement sand screed plaster and paint.

f. Installation of an approved joint sealer for the expansion joint. g. 31 No. New hardwood timber doors varnished and complete with all accessories as specified in the B.o.Q (locks, hinges and handles). h. 36 No. steel grilled windows painted with gloss paint and complete with all accessories as specified in the B.o.Q. i. 11 No. steel grilled doors and 1 steel plated door painted with gloss paint and complete with all accessories as specified in the B.o.Q (locks, hinges and handles). j. 47 No. aluminium windows fitted with glazing and of which 28 No. are fitted with steel grills as protective shield. k. 3 staircases finished with granite and with mild steel balustrades. l. IT4 roofing sheets and timber trusses to cover selected areas. m. Supply and fixing of 60x60 cm precast concrete paving slabs all round the building. n. Cement sand floor screed finished with epoxy industrial paint and ceramic tiling to selected areas as per the drawings. o. An insulated waterproofed roof slab with parapet walls, coping and rain water disposal. p. A judge s area, a witness box an accused caging as pr the drawings. q. Electrical installations & fittings (cabling, conduits, switches, lighting points, luminaires, sockets, earthing system, 1 No generator set, distribution board sockets, consumer unit, a fire alarm, detection and suppression system and a CCTV system. r. Mechanical, plumbing and sanitary installations & fittings (wash hand basins, PPR pipe work, floor traps, 3 No. water tanks, booster pumps, 4 urinals, 14 water closets, sewerage pipes, rain water downpipes, inspection chambers, man holes, HVAC,(air conditioning split units extractor units and complete with accessories as specified in the drawings and the B.O.Q). D. General external works. 1. The external works include; a.construction of Three (3) No. Gatehouse and gates. b.construction of a new Boundary wall. c.construction of a new One (1) No. Septic tank and One (1) No. soak way unit. d.construction of a new Drive way and parking e.construction of a generator house and Installation of One 1 No. Generator set.

E. Construction of three (3) No. new gatehouses and four (4) No gates. 1. To control access in and out of the Moka District Magistrates court, there will be construction of 3 gates and 3 gate houses to compound. The scope of works for this includes: a. Excavation and backfilling works. b. Foundations for the columns and the walls. c. Reinforced concrete columns and beams. d. 20cm thick Concrete block walling. e. Supply and installation of Three (3) No. steel gates complete with iron monger as per the B.O.Q. f. 1 No. suspended reinforced solid slab waterproofed flat roof with 200mm thick parapet roof with coping as per the details. g. Supply and fixing of 2 No. timber doors and frames varnished and fitted with specified iron mongery as per the door schedules per gate house. h. Supply and fixing of 3 No. aluminium windows fitted with specified iron mongery as per the window schedules per gate house. i. Plaster and paint to internal wall surfaces and wall tiles to the wet areas. j. Plaster and paint with textured paint to external wall surfaces. k. Supply and installation of Electrical works (conduits, fluorescent light tubes, switches, sockets, together with trunking and all associated fixtures). l. Supply and installation of 3 No. double leaf, steel framed gates. F. Construction of a new boundary wall. 1. To ensure security of the Moka District Magistrates court, there will be construction of a boundary wall. The scope of works for this includes; a. Excavation and backfilling works. b. Foundations for the columns and the walls. c. Reinforced concrete columns and beams. d. Precast concrete copping. e. 20cm thick Concrete block walling. f. Supply and installation of steel grills.

G. Construction of a new driveway & parking. 1. To provide a proper vehicular parking and circulation within the Moka District Magistrates court there will be construction of a new driveway and parking. The scope of works for this includes; a.excavation and backfilling works b.laying of precast concrete interlocking blocks and precast concrete kerbs c.road marking with reflective paint. H. Construction of a new foul water drainage system. 1. There will be construction of a foul water drainage system to channel away water from the buildings in to the septic tanks. The scope of works involved will be; a.excavation works. b.supply and installation of UPVC pipes for the sewerage system. c.construction of inspection chambers. d.construction of gully traps. e.supply and installation of medium duty cast iron covers. f. Supply and installation of UPVC solid drain pipes iron pipes. I. Construction of a new one (1) no. septic tank & one (1) no soak away. 1. There will be construction of 1 No. septic tank and 1 No. soak away to soak the waste water into the ground. The scope of works will involve; a.excavation works. b.reinforced concrete works for bottom and cover slab. c.20 cm thick concrete walling. d.step iron fixed to concrete works. e.heavy duty cast iron man hole covers. J. Construction of a new generator & transformer house and installation of one 1 no. generator set. 1. There will be construction of 1 No. generator house to house the generator. The scope of works will involve; a.excavation works. b.reinforced concrete works for bottom and cover slab. c.20 cm thick concrete blocks walling finished with plaster and paint. d.1 No. mild steel door.

e.vent blocks. f. Electrical fittings and connections. g.supply of One (1) no. 44 KVA generator with associated electrical cabling as per the B.O.Q. K. 3-d views of the proposed Moka District/ piracy court Fig 1. A3-D front view of the new single storey districtcourt/piracy court Fig 2. A 3-D front view of the new single storey districtcourt/piracy court

ANNEX A Fig 3. The Location plan of the new single storey districtcourt/piracy court